MEMORANDUM
TO: Board of County Commissioners
FROM: Max Bushell, Orange County Transportation Planner
DATE: November 1, 2016
SUBJECT: INFORMATION ITEM — Employment and Population Guide
Totals for Transportation Modeling
ATTACHMENT 1: Population and Employment Guide Totals
ATTACHMENT 2: Modeling Process Graphic
As part of the Durham Chapel Hill Carrboro Metropolitan Planning Organization (DCHC
MPO) and Capital Area Metropolitan Planning Organization (CAMPO) planning process to
create a joint Metropolitan Transportation Plan (MTP), local transportation and land use
planners provided detailed spatial information about current and future land use types and
the development status of parcels county-wide to populate a land use model. Local
transportation and land use planners also reviewed guide totals indicating future population
and employment projections (Attachment 1). These are fundamental components in a
process entitled Imagine 2045.
Overall Process
Imagine 2045 uses the CommunityViz modeling tool to create a scenario-based approach
for evaluating land use and transportation decisions. Using agreed-upon guide totals for
future population and employment, the model creates scenarios (i.e. maps) that take
different geographic representations of transportation networks and land use assumptions
into account. Transportation networks vary by scenario and include a no improvements
network (current status quo), an existing and committed transportation improvements
network, and a future desired transportation improvements network. In a similar vein, land
use assumptions for the type of use on a parcel and the development status of that parcel
include a current zoning assumption, a future land use plan assumption (from the Orange
County Comprehensive Plan Future Land Use Map), and an aspirational land use planning
assumption. The aspirational land use planning assumption includes additional growth
around key anchor institutions, such as universities, hospitals, and downtowns. Each
scenario is evaluated using a set of performance measures, which relate to the goals and
objectives of the respective MPOs.
The current process is managed by the Triangle "J" Council of Governments (TJCOG) with
participation from local governments and both the DCHC MPO and CAMPO. The ultimate
intent of the modeling process is to calibrate the travel demand model, known locally as the
Triangle Regional Model (TRM), with accurate and up-to-date socioeconomic data. The
TRM is used in the MTP process to help evaluate how the difference in land use patterns
2
and change in development intensities influence the current and proposed transportation
network. The modeling process, which is updated every four years as part of the MTP
process, is presented graphically in Attachment 2.
Role of Guide Totals
Guide totals, representing the future year (2045) employment and population projections,
play an important role in the modeling process. The guide totals, presented in Attachment
1, serve as the future demand in the entire county, essentially, the projected amount of
growth in population and employment slated to occur. In order for the model to function
correctly, all new growth must be accommodated in the county, i.e. each parcel will receive
either employment or population growth based on the type of land use and availability for
development and the suitability of the specific parcel for development. The parcels that are
suitable for new development represent the future supply; all of the future growth in
population and employment (demand) must be accommodated in the county for the model
to function correctly.
Population Forecasts
The population forecasts for Orange County use the North Carolina Office of State Budget
and Management (NC OSBM) methodology to forecast to 2045. Currently, the NC OSBM
forecasts only to 2035. In comparison with other forecasting methods, such as using a
linear growth rate, exponential growth rate, or logarithmic forecasting method, the OSBM
method forecasts the lowest population figure for 2045. The estimated population for
Orange County in 2045 is 194,867. Please see Attachment 1 for more information. Orange
County Transportation Planning staff evaluated each of these methods and is in agreement
with the decision to use the NC OSBM methodology to forecast 2045 population in the
County.
Employment Forecasts
With regard to employment forecasts, however, Orange County Transportation Planning
staff as well as planners from each Orange County community expressed concern that the
guide total for Orange County employment in the Imagine 2045 process is too high. The
current guide totals for employment are based on Woods & Poole employment growth rates
and are higher than expected for the county. It is, however, important to note that TJCOG
has undertaken discussions with major anchor institutions, such as UNC-Chapel Hill, with
regard to their projected growth in employment. UNC-Chapel Hill has indicated that
employment at the university is forecast to grow by 18,130 jobs in 2045. Even with this
amount of employment growth accommodated at the university, the Woods & Poole
forecasts for employment may still be too high.
Orange County Transportation Planning staff is hopeful that the work to update the land
use types and development status will ameliorate any concerns about the forecasts from
the Imagine 2040 model run. However, if issues do arise, staff will work in coordination with
Orange County municipalities, the University, and TJCOG to address any issues in the best
possible manner.
Key Points
• It is important to note that while the goal of this model is to accurately reflect the
realities of land development in Orange County, this is nonetheless a modeling effort
and is inherently flawed.
2
3
• The outputs of this model (parcel level data) will be aggregated to a larger
geography (Traffic Analysis Zone), summarized, and added into the TRM to assess
future transportation needs.
• Only the Orange Water and Sewer Authority (OWASA) has plans to use the
CommunityViz model outputs for purposes other than Transportation Planning.
• The CommunityViz model is updated every four years in a process that takes
approximately two years to complete.
• The discussions for the 2050 MTP Update will begin in 2018.
• The CommunityViz model is assessed after each MTP process and as the software
is updated. TJCOG is constantly refining the modeling process in the Triangle
Region.
MTP Milestones
The MTP is currently in the nascent stages of development. As the planning process
moves forward, a more definitive schedule will be developed. As part of the process, the
MPO Board for DCHC MPO will receive opportunities to review and comment on the plan.
3
Attachment 1 4
Draft 2045 MTP Guide Totals Edited:August 15,2016
These are the preliminary 2045 MTP guide totals,using the same analysis process as was used in Imagine 2040. The population projections are for the full counties in the MTP region.Using the 2013
estimates from the N.C.Office of State Budget and Management,and their projections out to 2035,projected growth was extrapolated out to 2045. The net households added to the region between
2013 and 2045 were calculated using the population numbers,the single-family/multi-family splits from Imagine 2040,and average household size for each from the 2010-2014 ACS. The net
households added are for the full counties as well. The employment projections are calculated for the TRM region only. Growth rates were calculated from Woods&Poole's employment projections,
as they are the only data source that projects out to 2045. However,given concerns that their employment numbers tend to be high,the base 2013 data comes from InfoUSA data that has been
cleaned and verified by local planners through Employment Analyst.The Woods&Poole growth rates were applied to the 2013 Employment Analyst base data to provide 2025 and 2045 employment
estimates.
Net Households Added
2025 2045
County 2013 2025 2045 County Total SF IMF Total SF IM IF
Chatham 67,587 81,136 105,958 Chatham 5,367 4,991 376 15,198 14,135 1,064
Durham 286,210 353,649 475,091 Durham 26,246 17,060 9,186 73,509 47,781 25,728
Franklin 62,715 69,923 83,313 Franklin 2,811 2,727 84 8,033 7,792 241
Granville 57,844 60,188 64,391 Granvillel 855 778 77 2,388 2,173 215
Harnettl 123,432 150,535 200,131 Harnett 9,577 8,715 862 27,102 24,663 2,439
Johnston 177,312 222,091 314,100 Johnston 15,515 14,584 931 47,394 44,550 2,844
Nash 94,633 92,429 88,239 Nash (860) (740) (120) (2,495) (2,146) (349)
Orange 139,289 158,244 194,867 Orange 7,831 5,090 2,741 22,961 14,925 8,036
Person 39,158 39,791 40,353 Person 243 234 10 459 441 18
Wake 964,934 1,206,046 1,647,536 Wake 90,135 63,095 27,041 255,178 178,625 76,553
Total 2,013,114 2,434,032 3,213,980 Total 157,720 116,533 41,187 449,728 332,938 116,790
From NC OSBM projections dated 08Oct2015,extrapolated to 2045 Steps used:
1 Used population numbers to determine net added population
2 Applied proportions of SF/MF housing units,from Imagine 2040 process
3 Applied average household size of SF/MF units,from 2010-2014 ACS 5-Year estimates
County 2013 2025 2045 4 Calculated net new occupied units(full calculations on"Households"tab
Chatham 9,374 12,163 17,784
Durham 227,924 289,559 405,219
Franklin 14,617 18,449 25,218
Granville 8,576 10,128 12,325
Harnettl 5,704 7,165 9,639
Johnston 43,960 55,009 72,331
Nash 335 386 444
Orange 66,405 83,666 111,473
Person 9,988 10,957 11,692
Wake 552,018 715,817 1,025,938
Total 1 938,901 1,203,298 1,692,063
Note,this is for the TRM area only
Steps used:
1 2013 employment from Employment Analyst
2 2025 and 2045 employment reached by applying Woods&Poole's rates of employment growth from their 2015 data book from 2013-2025 and 2013-2045
Calculations completed by TJCOG staff
Attachment 2 5
Overall Model Relationships Triiangle R!eg�iomal Model (T�iZ+MJ)P_ro,�,c`,e�ss
Imagine 2045 Data ..
Simplified Imagine 2 (Cowm t fiz') Pro, c,ges,�s, Deficiencies • Creates Alternatives
mw-
T09Weg 11J Co,u,Ln
Inputs `ofl Governments Preferred • Land Use and Transportation Network
Land Use and •
Development • •
Local Factors The TRIVI Provides Data to Select Projects for IVIPO and
•
ZT,ra,�n�s�portation Plan Hiera cahay
Development(LAND
Seven Scenario lloundati'ons
..
Possible
Scenarios
Constrained By Right
(Zoning)
Community
Moderate Plan(Future
Land Use Map)
J Preferred
Anchors and Scenario
Aspirational Mainstays
(Aspirational)
*The Imagine 2045 effort involves both the Durham Chapel
Hill Carrboro Metropolitan Planning Organization and the
Capital Area Metropolitan Planning Organization. Overall,40 cities,towns,and counties are present in the modeled area.