HomeMy WebLinkAboutAgenda - 11-01-94 - VIII-E-attch 1
RESOLUTION
OF THE
ORANGE COUNTY BOARD OF COUNTY COMNIISSIONERS
Date November 1, 1994
Name of Subdivision Deer Ridge
Owner/Applicant Spence M. Dickinson
The Board of County Commissioners hereby approves Deer Ridge Subdivision, preliminary
plat, dated September 16, 1994 and containing 8 lots in Orange County, subject to the
fulfillment of requirements specified herein.
Blackwood Mountain Road Extension shall be irrevocably dedicated to the general public and
be constructed to standards of the North Carolina Department of Transportation. The
approval of this resolution authorizes and directs the Orange County Manager to accept for
Orange County and on behalf of the public generally, the offer of dedication of Blackwood
Mountain Road Extension. This acceptance by Orange County of the dedication to the
general public of Blackwood Mountain Road Extension shall be without maintenance
responsibility. This road shall be maintained by the owner/applicant until such time as it is
accepted for maintenance by the North Carolina Department of Transportation or some other
governmental body. Before the Final Plat of Deer Ridge can be recorded:
A. Sewage Disposal
1. Each residential lot shall contain an adequate area for septic disposal, and
repair area, approved by the Orange County Division of Environmental
Health.
2. The septic system location may restrict the size and location of improvements.
This disclosure shall be included in a document describing development
restrictions to be recorded concurrently with the Final Plat. The document
shall also disclose that information regarding the tentative location of septic
systems is available from the Orange County Health Department, Division of
Environmental Health.
3. A septic easement shall be provided for lot 4 on the common land as indicated
on the Preliminary Plat. The easement and the conditions shall be contained in
the development restrictive covenants or other documents. A reference to the
restrictive covenants shall be included in a document describing development
restrictions to be recorded concurrently with the Final Plat.
2
B. Roads and Access
1. Blackwood Mountain Road Extension shall be constructed to standards of the
North Carolina Department of Transportation, within a 50-foot right-of-way,
and the construction shall be inspected and approved by NCDOT.
OR
A letter of credit, escrow agreement, or bond shall be submitted to secure
construction of Blackwood Mountain Road Extension to the standards of the
North Carolina Department of Transportation. An estimate of the construction
cost must be prepared by a certified/licensed engineer or grading contractor
and submitted to the Planning and Inspections Department. The financial
guarantee must reflect 110% of that estimate and be issued by an accredited
financial institution licensed to do business in North Carolina.
The document describing development restrictions to be recorded with the
Final Plat shall state that the financial guarantee will not be released until the
road construction has been inspected and approved by NCDOT.
2. Pathway Court shall be constructed to Class B private road standards within a
50 foot right-of-way.
Pathway Court shall be inspected, and the construction certified in writing to
the Orange County Planning Department by a North Carolina Professional
Engineer, or a North Carolina Registered Land Surveyor. The location of the
travelway within the platted private road right-of-way shall also be certified.
OR
A letter of credit, escrow agreement, or bond shall be submitted to secure
construction and inspection of Pathway Court to Class B private road
standards. An estimate of the construction and certification costs must be
prepared by a certified/licensed engineer or grading contractor and submitted
to the Planning and Inspections Department. The financial guarantee must
reflect 110% of that estimate and be issued by an accredited financial
institution licensed to do business in North Carolina.
The document describing development restrictions to be recorded with the
Final Plat shall state that the financial guarantee will not be released until the
road construction has been certified by a North Carolina Professional Engineer
or a North Carolina Registered Land Surveyor.
3. Submit an erosion control plan for construction of the road.
4. The connection of Blackwood Mountain Road Extension with Blackwood
Mountain Road must meet NCDOT standards.
3
C. Land Use Buffers and Landscaping
1. Landscaping shall be installed or preserved as indicated on the approved
landscape plan, and must be inspected and approved by the Planning and
Inspections Department.
OR
Guaranteed financially through a letter of credit, escrow agreement, or bond
submitted to secure required landscape installation and preservation. An
estimate of the cost for required preservation, plantings and their installation
must be provided. The financial guarantee shall reflect 110 percent of the
estimate and be issued by an accredited financial institution licensed to do
business in North Carolina.
2. Provisions for protection of existing trees as shown on the approved landscape
plan shall be included in a document describing development restrictions and
requirements to be prepared by Planning Staff and recorded concurrently with
the Final Plat.
D. Parkland
1. Cash in the amount of $1,120.00 [($4,900/acre x 8/35 acre)] shall be paid to
Orange County as payment in lieu of parkland dedication.
E. Miscellaneous
1. The Final Plat shall contain a title block and vicinity map in accordance with
Section V-D-2 and V-D-3 of the Orange County Subdivision Regulations.
2. Protection shall be provided for the existing pump building and tank from the
proposed road.
G. Certifications
1. A Certificate of Survey and Accuracy signed by a registered Land Surveyor
shall be notarized on the face of the Final Plat.
2. A Certificate of Declaration and Maintenance in the form provided in Section
V-D-6-b of the Orange County Subdivision Regulations signed by the
landowner and developer shall be on the face of the plat and included in a
document describing development restrictions to be recorded concurrently with
the Final Plat.
3. The Division of Environmental Health shall certify that all residential lots
contain sufficient area for septic tank disposal and repair.
4
4. The North Carolina Department of Transportation shall certify that Blackwood
Mountain Road Extension has been constructed to State standards or that
E' construction plans have been approved.
5. A Certificate of Approval signed by the Orange County Planning and
Inspections Department.
7) 72i 7/ Apr
Signature o Applicant Clerk/ the Board .
I, Sec 31/i.efIc e (1," s , accept the above listed conditions of subdivision approval,
and dcknowledge that each must be met prior to recordation of the final plat.
41,119' A � f`
Applicant Date