HomeMy WebLinkAboutAgenda - 10-04-2016-13-5 - Information Item - State Transportation Improvement Program Regional Impact Funding Tier Project Prioritization INFORMATION ITEM 1
PLANNING & INSPECTIONS DEPARTMENT
Craig N. Benedict, AICP, Director
Administration 131 W. Margaret Lane
(919) 245-2575 Suite 201
(919) 644-3002 (FAX) 0 RA"Si III ,' I II II U w„ VU a P. O. Box 8181
www.orangecountync.gov RI,:)1 M Hillsborough, NC 27278
lair k1 y a AUIIIV
`1 , 'yl �.�, �° f✓ �v' r /� ////1; + G
„ (11\1� 1 "�„ I IPI' w ”
M
gyp 111 sir i 1111 "�1 IINi uNr 1104 h
,rr
MEMORANDUM
TO: Board of County Commissioners
FROM: Max Bushell, Orange County Transportation Planner
DATE: September 6, 2016
SUBJECT: INFORMATION ITEM — State Transportation Improvement
Program Regional Impact Funding Tier Project Prioritization
ATTACHMENT 1: DCHC MPO Projects Flow Chart
The Strategic Planning Office of Transportation (SPOT) recently released the funding
decisions for transportation projects in the Regional Impact funding tier as part of the SPOT
Prioritization 4.0 (P4.0) process.
Orange County Regional Impact Tier Projects
Both the Durham Chapel Hill Carrboro Metropolitan Planning Organization (DCHC MPO)
and the Triangle Area Rural Planning Organization (TARPO) project priority lists included
projects eligible for funding in the Regional Impact funding tier of the SPOT prioritization
process P4.0. No projects eligible for funding in the Regional Impact funding tier are
included in Orange County's portion of the Burlington-Graham MPO (BG MPO) jurisdiction.
Of these projects, only the I-40/NC 86 Interchange Improvements project just north of
Chapel Hill was selected for inclusion in the 2018-2027 State Transportation Improvement
Program (STIP).
Cascading Projects
As per the policy of the DCHC MPO, no projects are allowed to cascade to lower funding
tiers. The TARPO policy, however, does allow projects to cascade between funding tiers.
For the Orange County projects within the TARPO planning area, both the NC 54
Operational Improvements project and the NC 54 and Orange Grove Road Intersection
Improvements project cascaded to the Division Needs funding tier from the Regional
Impact funding tier. It is anticipated that both of these projects will receive Local Input
Points from TARPO.
Next Steps
Neither BG MPO nor TARPO has formally approved the assignment of Local Input Points
to projects in the Division Needs tier, though Local Input Points were assigned for all
projects before submitting projects for consideration at the Regional Impact level. Both
TARPO and BG MPO will assign Local Input Points during the month of October at the
2
Division Needs tier, while DCHC MPO has already assigned Local Input Points to projects.
Final Local Input Point assignments are due back to the North Carolina Department of
Transportation by the end of October. Attachment 1 indicates the updated Local Point
Assignment for Division Needs projects in DCHC MPO, the proposed Local Input Point
assignment for Division Needs projects in TARPO, and funding decisions at the Regional
Impact funding tier.
The Draft STIP is expected for release in Winter 2016 and is scheduled to be finalized in
Summer 2017.
2
Created By:Max Bushell,Orange
Att 1: SPOT P4.0 Transportation Project Prioritization Process (STIP 2018 — 2027) — DCHC MPO County Transpirtation Planner
i1nitisl project Ust Statewide Regional Impact Division Needs*
100 N.Dd— ] NtaDdw,,15%MPO/RPO Input,M Division Input 50%Data Drtr ]5%MPO/RPO Input,35%—mn Input
August/September ® 1
South Churton Street(Old NC 86 from I- South Churton Street(O1cf--NC86)from I-
40 to Eno River Improvements 0 to Eno River Improvements
140 Widening from 1-40/1-85 interchange 1-40 Widening from 1-40/1-85 RECEIVED LOCAL INPUT POINTS(100)
to NC 86 13 interchange to NC 86
J I-40 Widening from NC 86 to U.S.15-501 414 1-40 Widening from NC 86 to U.S.15-501
FUNDEDI
4� I-40 and NC 86 Interchange I-40/NC 86 Interchange Improvements
Improvements '—'
I-85/Old NC 86 SR-1009-South Churton FUNDED! I-85/Old n INC S re t) Interchange
-South
Street)Interchange Improvements lr ✓ Churton Street) Interchange
Improvements
V I-85/NC 86 Interchange Improvements 2
RECEIVED LOCAL INPUT POINTS(100)
NC 86 Improvements North o �. NC 86 Improvements Nort o
�7 Hillsborough Hillsborough RECEIVED LOCAL INPUT POINTS(25)
Eno Mountain Road/Mayo,Mayo Street at y iy Eno Mountain Road/Mayo Street at
gj Orange Grove Road 11 Orange Grove Road
J U.S.70 East/1-85/1-40 Connector 8 U.S.70 East/I-85/I-40 Connector
ea Road Bike Lanes an Homestea Road Bike Lanes an
410 Homest Sidewalks 12 Sidewalks
* Eubanks Road Bike Lanes ; Not Carried Forward 9 Exten Orange Grove Road from Orange
RECEIVED LOCAL INPUT POINTS(35) rnvodn I IS 7nA
12 Mt.Carme Church Road Bike/Pedestrian Not Carried Forward Neville Road I RECEIVED LOCAL INPUT POINTS(100)
Improvements provemen
413 Orange High School Roa Haro Latta Not Carried Forward I-85 rom Mt.Herman Church to
Road Sidewalk Improvements Durham County Line Widening
y 41 Orange Grove Road/1-40 Pedestrian Not Carried Forward 1-85 from 1-85/1-40 Split to east of the NC
Bridge 6 86 Interchange Widening
515 Dairyland Road Paved Shoulders Not Carried Forward Dimmoc s Mill Road Rail Crossing
Im rovement and Bellvue Street Closure tThis project crosses DCHC MPO and TARPO
Trai Connection from English Hi Lane to NC 54 Operational Improvements(Orange boundaries and is rated as top priority in the TARPO
5 Buttonwood Drive r.., Not Carried Forward t to Old Fayetteville Road) region.It will receive local input points from both
Tral Connection from Patriot s Pointe to RECEIVED LOCAL INPUT POINTS(65) organizations.
4 Timbers Drive , Not Carried Forward
*Projects in the Division Needs category are scored as low priorities as they are not eligible for funding at the Regional Impact funding level.
Once the Regional Impact scores are returned from NCDOT in August/September,the projects will be reprioritized.
Created By:Max Bushell,Orange
Att 1: SPOT P4.0 Transportation Project Prioritization Process (STIP 2018 — 2027) — TARPO County Transwrtation Planner
MOW Project List Statewide ItWonal Impact Divisi®n Na®ds�'
IDp N.Dd.. ]D%NtaDdw,,M MPO/RPO Input,M DI,1,1,n Input 50%—Drtr 25%MPO/RPO Input,35%DN6bnlnput
June 20 'V
• August/September December \..
%
NC 54 Operational Improvements PROPOSED LOCAL INPUT POINTS—REGIONAL IMPACT(35)and DIVISION NEEDS(100) NC 54 Operational Improvements
`� (Orange Grove Road-originally 1 (Orange Grove Road-originally
U Dodsons Crossroads-to Old Dodsons Crossroads-to Old
Fayetteville Road) Fayetteville Road)
y�� NC 54 Widening(Orange Grove Road NC 54 Widening(Orange Grove Road Removed from Local Input Scoringt
to Old Fayetteville Road) to Old Fayetteville Road)
Buckhorn Road(SR 1114)Widening: Included as part of the B-G MPO Project List
Q4 Old Greensboro Road Paved Old Greensboro Road Paved
Shoulders
Shoulders
5 Efland-Cedar Grove Road r' /} Efland-Cedar Grove Road
Improvements: 4! Improvements:
Orange Grove Road/Buckhorn Road r Orange Grove Road/Buckhorn Road
6 Paved Shoulders PF 5 Paved Shoulders
NC 54 Widening(NC 119 in
Orange Grove Road Paved Shoulders <� From NC 54 to ArthurMinnisRoad �. Not Carried Forward Removed from Local Input Scoria t
( ) Road)t
,�
C�54 Orange Gro ve Road
Not Carried FprWard on Improvements
PROPOSED LOCAL INPUT POINTS(100)
�p� Orange Grove Road/Dodsons *Projects in the Division Needs category are scored as low priorities as they are not eligible for funding at the Regional Impact funding level.
iJ Crossroads Not Carried Forward tThe NC 54 widening projects have been removed from scoring in favor of the operational improvements projects,which scored higher and will
solve the problems along the corridor in the interim.Also,a corridor study on NC 54 is programmed,which will provide better data to
determine the best approach to solving(future)congestion issues on the roadway.
Created By:Max Bushell,Orange
Att 1: SPOT P4.0 Transportation Project Prioritization Process (STIP 2018 — 2027) — B-G MPO County Transp rtation Planner
1W%Oata Onven M DIta Onven,]5%MPO/RPO Input,1%Olvlsl11 Input 50%Data Driren,ZS%MPO/RPO Input,35%—mn Input
1 / - December AprIVMay% I June 215
Mattress Mattress
51 Factory Road Factory Road
Interchange Interchange
Mattress Mattress
Factory Road Factory Road
2 Extension to Extension to
U.S. 70 U.S. 70
Buckhorn Road Buckhorn Road
3 SR 1114 1 SR 1114
Widenin ' Widening
� *Initially not carried forward,but added back to proposed TIP projects as a result of additional
revenue from House Bill 97.The B-G MPO Transportation Advisory Committee amended the
Metropolitan Transportation Improvement Program to include this project(and others outside of
Orange County)on January 19,2016.