The Orange County Board of Commissioners met in a work session on Tuesday, April 12,
2016 at 7:00 p.m. at the Whitted Building, Hillsborough, N.C.
COUNTY COMMISSIONERS PRESENT: Chair McKee and Commissioners Mia Burroughs,
Mark Dorosin, Barry Jacobs, Bernadette Pelissier, Renee Price and Penny Rich
COUNTY COMMISSIONERS ABSENT:
COUNTY ATTORNEYS PRESENT: James Bryan
COUNTY STAFF PRESENT: County Manager Bonnie Hammersley, Deputy Manager Travis
Myren and Clerk to the Board Donna Baker (All other staff members will be identified
appropriately below), Jeff Thompson and Paul Laughton
ORANGE COUNTY SCHOOLS: Chair Donna Coffey, Vice Chair Brenda Stephens, Pam Jones
and Superintendent Todd Wirt
CHAPEL HILL CARRBORO CITY SCHOOLS: Chair James Barrett, Vice Chair Annetta
Streater, Todd LoFrese, and Superintendent Tom Forcella
Chair McKee called the meeting to order at 7:04 p.m.
Chair McKee said at their places are the Orange County Schools (OCS) responses to
Board questions and revised hand out and the Chapel Hill — Carrboro City Schools (CHCCS)
responses to Board questions.
Chair McKee said the Governor issued an executive order today in reference to HB2
and it is unknown what effect this will have on the legislation moving forward.
Bonnie Hammersley referred to the slide from April 7th work session on the School CIP
which was in regard to the schools' capital projects. She said this is consistent with previous
years and does not include bond funding.
Paul Laughton, Finance and Administrative Services, reviewed each line item: total-
$7,716,500.
Paul Laughton said the largest item is the Pay as You Go (PAYG) funds at $3,799,346.
He said the CHCCS PAYG portion is $2.3 million for electrical, safety, water quality, and
technology. He said the OCS portion is $1.48 million, and includes categories such as
athletics, fire safety, food services, roofing projects, and security, etc.
Paul Laughton said Lottery Proceeds are additional PAYG funding, totaling $1.3 million.
He said the CHCCS portion is $828,000 for ADA, maintenance, etc., and the OCS portion is
$528,000 for classroom building improvements, etc. He said the Article 46 Sales Tax totals
$1.4, with the CHCSS portion being $842,000 for mechanical systems and technology, and the
OCS portion being $558,000 for technology, which is consistent with past spending.
Paul Laughton said there is $1 million in the Capital Investment Plan (CIP), for the next
five years, for Older School Improvements. He said by ADM, the total for CHCCS is $610,700
for the Chapel Hill High School renovation, and $389,000 for OCS for classroom building
improvements and food services.
2
Paul Laughton said all of the aforementioned funds are outside of any potential bond
funds.
1) Review Chapel Hill Carrboro City Schools (CHCCS) and Orange County Schools
(OCS) Priorities for the Potential Bond Referendum Funds
Bonnie Hammersley said this evening is an opportunity for the schools to report on the
prioritization of their capital projects.
Pam Jones reviewed the updated OCS hand out at the Commissioners' places:
OCS Facility Recommendations
• 2013 Facilities Assessment reflected needed repairs/replacements/additions in excess
of$160M as of the date of the assessment.
• OCS receives approximately $2.6M for capital funding annually.
• Of the $160 million overall needs, OC Board of Education prioritized projects in the
following categories assuming approximately $50 Million would be made available
through bond proceeds or other cost sharing arrangements:
o Safety;
o Critical infrastructure projects whose cost would exceed CIP funding capabilities,
including roof replacement and replacement of antiquated and failing mechanical
systems in some schools;
o Cedar Ridge High School (CRHS) classroom wing addition;
o Replacement of Transportation facilities.
• Phase 1 projects per the attached sheet represent those for which 2016 bond funding
would be utilized.
• To the extent they are available, School Construction Impact Fees are requested for
project planning to ensure "shovel-ready" status.
• Unfunded projects would be addressed as future allocations allowed.
• Based on approved CAP Certificates to date, OCS has adequate elementary and
middle school capacity for the current 10-year CIP period. However, two major
developments in the Town of Hillsborough are likely to significantly diminish the
capacity within a relatively short time period. For that purpose, Elementary #8 has been
included as a Phase III project. The Cedar Ridge classroom addition will address the
needed high school capacity, which is projected to reach SAPFO capacity by 2022. A
planning/constructing/opening period of approximately three years is anticipated.
District leadership remains concerned that the 110% high school capacity upon which
SAPFO is built is no longer a viable and safe level of occupancy and would request the
County's review over the next year.
• Replacement and consolidation of Transportation facilities is included in the OCS
Phase 1 request, but is envisioned as a joint project with CHCCS. OCS is the
recognized LEA for Transportation for both OCS and CHCCS (State only recognizes
one per County). The 1950's vintage Transportation facilities for both CHCCS and OCS
are woefully inadequate. Some buses will not fit and still close the bay doors, for
example.
• Potential bond funds will allow OCS to divert future pay-as-you-go CIP funds to other
critical projects addressed in the Facilities Assessment, but not included in Phase 1
bond funding.
3
Commissioner Rich asked if the changes between the original OCS recommendations,
and the updated version being presented this evening, could be highlighted. She also asked if
the transportation component of the recommendations could be explained, including how
much each school district will be contributing.
Pam Jones said the OCS Board of Education (BOE) went through priorities based on
the completed study of its facilities. She said items were prioritized as a 1, 2, or 3. She said
the BOE decided to focus only on items prioritized as a 1 or 2, such as the HVAC systems.
She said there are some deficiencies in the facilities that need upgrading for safety purposes.
She said the bond proceeds that each district would receive were realigned, and it was
determined what could be funded separately from that. She said this change is reflected in the
revised document. She said Grady Brown Elementary is in need of roof repairs, but with those
repairs comes asbestos abatement, which simply cannot be funded by the regular CIP
allotment.
Pam Jones said both districts are still working to finalize the transportation figures. She
said part of the question remains based on the site that is chosen, as this will affect the cost.
She said CHCCS plans to allocate its portion of the $1 million to this project, but it is not yet
known if this will be sufficient, as the plans are not yet finalized.
Commissioner Rich said the $52.6 million is more than the schools will get from bond
funds, and she asked if priorities will have to again be reviewed.
Pam Jones said part of the costs will be offset by CHCCS. She said there is some
latitude in some of these projects, with HVAC for example.
Commissioner Price asked if the removal of the food service projects means these
projects will no longer be accomplished.
Pam Jones said these projects have been incorporated in various CIP funding sources.
Commissioner Pelissier said the high school capacity is no longer viable, according to
the hand out. She asked if this has been discussed with CHCCS.
Pam Jones said when SAPFO was created when the world was different, and she said
they are asking to look at 107 for middle schools and 110 capacity for the high schools to see
if these numbers can be lowered.
Commissioner Pelissier referred for the Cedar Ridge High School classroom wings, and
asked if there is a process to determine size.
Pam Jones said part of this is determined by the school construction standards, which
designates this as a 1,500 capacity high school. She said it was sized as such in the original
master plan which has been adhered to.
Commissioner Dorosin asked if there is a timeline for building a transportation facility
and if there is a plan for the existing facility.
Pam Jones said the older transportation facility may be used for storage of buses.
She said the delay of the transportation facility is the lack of land. She said Chatham County
has a good model, which was constructed in about 18 months. She said the first priority is the
HVAC at Orange High School, then Cedar Ridge, and then a transportation facility.
Chair McKee referred to the capacity for Cedar Ridge High School (CRHS) and asked if
the upcoming SAPFO calls for an expansion.
Paul Laughton said there is nothing in the SAPFO right now.
Donna Coffey said OCS has to contend with growth as well, and the SAPFO does not
include Mebane. She said the SAPFO projections are understated since so much
development is forthcoming.
Commissioner Burroughs said SAPFO is based on current student numbers as well as
the past five years. She said when new developments are built in the CHCCS district, the
SAPFO numbers do not reflect these until the students show up in the schools.
4
Donna Coffey said it is a bit different because there has always been growth in the
Chapel Hill area, which is not the case historically in Mebane or Hillsborough.
Commissioner Burroughs referred to the CRHS project, and asked if the SAPFO
numbers remain fairly flat, would OCS possibly delay this project.
Pam Jones said yes, but two major developments have been approved in the
Hillsborough area, and while elementary capacity can be maneuvered around, high school
capacity cannot. She said these developments will be both single family and multiple family
housing. She said it takes about three years for the developments to move from shovel ready
to occupation.
Chair McKee said to use the Collins Ridge development as an example, and asked how
quickly the SAPFO numbers would reflect the growth. He asked if the capacity demand does
not come to fruition, would OCS move some Phase 2 projects forward and the CRHS project
move back.
Donna Coffey said that is a discussion the OCS board would have to have.
Pam Jones said there is enough flexibility to complete the design for CRHS and then
manipulate the projects if need be.
Commissioner Jacobs referred to the Collins Ridge development, and asked if the
potential population impact would be felt more at the high school level than the elementary
level, due to available capacity at the elementary level.
Pam Jones said there is more flexibility because there is more capacity in the
elementary schools and middle schools, but not in the high schools.
Commissioner Jacobs asked if re-districting is anticipated.
Donna Coffey said this discussion has yet to occur.
Commissioner Jacobs asked if it is known when redistricting was last discussed.
Donna Coffey said at least six years ago.
Commissioner Jacobs asked if there is a felt need to put the new transportation facility
close to the present one.
Pam Jones said it should be near the center of Orange County, so that both school
districts can have access.
CHCCS
Tom Forcella said this discussion began over four years ago regarding new buildings,
and the conversation turned to the dire needs of the older facilities, then turned again to the
"what ifs" and what may be possible with the older buildings to improve safety, and also
increase capacity. He said it is clear that all needs cannot be met at one time, and CHCCS
supports a long-range approach and vision for its older schools.
Todd LoFrese reviewed the following PowerPoint presentation:
Older Facility Recommendations and the 2016-26 CIP Key Elements of Older Facility
Recommendations
(included in the 2016-26 CIP Recommendations)
• The recommendations are for a comprehensive program that focuses on the district's
10 oldest schools.
• Facility recommendations include:
o correction of building code violations;
o improved safety by consolidating operations and controlling entry;
o indoor air quality deficiencies and health concerns addressed;
o replacement of malfunctioning mechanical equipment;
5
o relief of traffic congestion problems and providing pedestrian access;
o deconstruction of some inefficient buildings;
o accessibility for all students and staff;
o extending the life of the schools an additional 50 years; and
o providing educational facilities that meet Orange County school construction
standards.
• Implementation of the recommendations eliminate mobile classrooms (also in need of
renovations) while providing additional student capacity.
o Elementary school capacity increase = 555.
o High school capacity increase = 155.
• Increased student capacity would result in deferment of new elementary school and
high school additions well beyond the 10-year CIP window.
o Delays nearly $57.6 million in projected capital
expenditures.
o Delays significant operational increases with opening a new school.
• Bond funds and future capital funds directed to the 10 oldest schools will make
available CIP (Paygo) revenue for needed maintenance at district's "newer" schools
that are 20-30 years of age.
Phase 1 Projects Rationale
Chapel Hill High School
• significant disrepair and deferred maintenance
• building has chronic flooding, moisture and mold issues
• inadequate educational spaces, including severely antiquated science labs
• academic building needs complete replacement
• the entire campus HVAC system needs replacement
• profound security concerns including: multiple access points, outdated security
system, and hard to monitor entrances
• major traffic and pedestrian conflicts that cause congestion, busing delays, and
safety issues
• pervasive ADA issues throughout the campus
• scale of project requires significant financial investment (bond appropriate)
Glenwood Elementary School
• provides a solution to continue safe operations for the next 10 years
• addresses safety and security concerns by providing a secure entrance
• addresses handicap accessibility and appropriate restrooms
• addresses flooding, moisture, and mold issues
• provides for repairs to existing infrastructure
• Glenwood Elementary's continuance after 10 years is uncertain
PreK Center/ Phoenix Academy/ Lincoln Center
• provides a comprehensive facility to support early childhood education
o improved access to educational resources
o improved services for students
o disadvantaged student supports
6
• returns existing space back to elementary schools and allows for phasing of other
projects
• provides the greatest increase in capacity
o 189 Elementary School seats
o 100 High School seats
• provides Phoenix Academy High students with appropriate and supportive facilities,
including a biomedical lab
• provides desperately needed additional space for students with mental health needs
and for students who need a smaller educational environment
• provides a community meeting space and a Black/education history museum
• provides renovations and A/C to the existing gymnasium
• addresses moisture and mold concerns
• addresses handicap accessibility issues
• frees up future capital funding to address other school capital needs
• provides appropriately-sized administrative space on the second floor, reducing total
expenditures to a small fraction of the total anticipated CHCCS bond funding allocation
Next Phase Projects
Phase II, to begin in 3-4 years: Improvements at Ephesus, Estes Hills and Seawell
Elementary Schools and Phillips Middle School. These improvements provide the second most
positive impact to capacity. These improvements will hopefully be funded by long range funds
Orange County has planned for the district's new schools.
Phase III, to begin in 4-7 years: Improvements at Carrboro and Frank Porter Graham
Elementary Schools and at Culbreth Middle School. These projects are currently unfunded. It
is hoped that future-funding sources will be identified to complete all the projects.
James Barrett thanked the Board for its willingness to discuss these topics. He
expressed his excitement for both the Chapel Hill High School (CHHS) and the Lincoln Center
(LC) projects.
James Barrett said Tom Forcella had talked with alumni from Lincoln High and the
opportunity to bring education back to this area provides great excitement to the alumni
community.
Todd LoFrese said it is important to remember that CHCCS has been operating at
capacity for the last two decades. He said SAPFO projections show a current lull, and thus
this is an opportunity to address the older schools and capacity issues. He said the proposed
plan would create the capacity of one whole elementary school and 200 high school seats by
renovating current buildings.
Todd LoFrese said Chapel Hill High is in need of major renovations.
Todd LoFrese said a packet was provided to the Board ahead of time with CHCCS
projects and priorities included. He said CHCCS also provided written responses to Board
questions which are at their places.
Commissioner Burroughs asked if there are reasons for renovating CHHS, as opposed
to building a new school.
Todd Lofrese said the cost is one issue, and the other is where would students go
during renovations.
Todd LoFrese said there are no additional school sites large enough for a high school.
He said CHHS has 1,500 students, and to phase these students in would be a challenge.
7
Todd LoFrese said the academic wing is the focus, as it is deemed beyond renovation
and must be a re-build. He said the gym was renovated a few years ago, so it and the
auditorium are salvageable to bring up to Orange County standards.
Commissioner Burroughs repeated her question and clarified that the largest portion of
CHHS will be built new, while the other sections are renovated.
Todd LoFrese said it is $50-70 per square foot to renovate versus $200 per square foot
for a new facility. He said a new high school would be too expensive, and if an entirely new
facility were built at CHHS, there would be no funds to do the projects at the other schools.
Commissioner Burroughs asked if Todd LoFrese would speak about the mobile units,
the costs to maintain them, and some of the challenges these units present.
Todd LoFrese said each mobile unit is a separate facility, with its own utilities and
HVAC, which are inefficient and require maintenance. He said it costs $6,000 to replace a
mobile unit HVAC, which is fiscally irresponsible. He said CHCCS does not want to use CIP
funds on renovating the mobiles.
Commissioner Rich said the school construction standards were approved in 2007, and
asked if these standards need to be updated.
Todd LoFrese said down the road these standards should probably be reviewed, and
he said that both the construction standards and Department of Public Instruction (DPI)
regulations are in line with what CHCCS is proposing.
Commissioner Rich said technology is ever changing and asked if this should be
acknowledged somehow in the standards.
Commissioner Rich asked if Todd LoFrese could clarify what some of the $6-9 million
of improvements will include.
Todd Lofrese said HVAC replacement, locker renovations, flooring, new technology
and seating in the auditorium, wall and window seals, and infrastructure upgrades.
Commissioner Rich asked if safety issues are being addressed.
Todd LoFrese said the older schools have lots of doors. He said at Chapel Hill High
School some buildings will be connected with secure vestibules. He said there are a lot of
conflicts with pedestrian, kiss and go, and bus lanes, all of which create safety and traffic
hazards. He said these need to be made into appropriate types of entrances and exits.
Todd LoFrese said there would be a similar approach with other older schools:
expanding capacity and creating secure vestibules.
Commissioner Rich referred to Glenwood Elementary, noting it may disappear in the
near future. She said there is $940,000 assigned to this school, and she asked if the life span
of the school could be identified.
Todd LoFrese said this renovation project is already underway through fund balance
dollars. He said the goals of this project are to create a secure a main entrance, address
issues of ADA compliance, and to extend the life of this building as long as possible by
addressing mechanical systems. He said the hope is to extend the life of the building for at
least 10-15 years. He said the majority of this work will be done this summer.
Commissioner Pelissier said all of the older schools will not be able to be addressed in
Phase 1. She asked if there are any other funds outside of the CIP and the bond to address
these many needs, especially mold.
Tom Forcella said by putting bond funds into CHHS, the CIP dollars typically funded to
CHHS will become available for other projects.
Todd LoFrese said CHCCS highlighted some projects in their current CIP that, if CHHS
and the Lincoln Center projects moved forward, could be funded. He said this would be about
$3.5 million over five years.
Commissioner Jacobs referred to page 15 of construction standards, where it
addresses school site acreage. He said the document does not reflect current standards, as
8
the acreage requirements were not followed when building Northside Elementary School. He
said the standards should be re-visited, if millions are going to be invested in renovations.
James Barrett agreed that the acreage standards could be reviewed, especially for
CHCCS.
Todd LoFrese said all of the older schools become denser when more students are
added to an existing site.
Commissioner Jacobs said now is the time to look at sites for future use. He suggested
the idea that larger school properties, such as Carrboro Elementary, may be able to
accommodate another facility.
Bonnie Hammersley said there is a Superintendents/Manager meeting coming up,
where these standards and ideas could be discussed and recommendations brought back to
the Board.
James Barrett said Todd LoFrese presented to the Chapel Hill Town Council last night,
and there were questions about student capacity. He said capacity consistently reaching
110% indicates that the CHCCS is accepting of mobile units. He said those standards could
have been made at a time when there was no funding for new schools. He said revisiting the
standards is a worthwhile endeavor.
Chair McKee said he does not like mobile units, but removing them means more new
schools must be built. He said this whole discussion brings back the question of available
resources versus necessary needs.
Commissioner Dorosin said the percentages over 100 are designed to allow time to
accommodate the growth as it happens. He said all of this feeds into the question of whether
or not bigger schools are needed. He said Chapel Hill has more schools for 12,000 students
than a lot of other places.
Commissioner Price said in considering mobile units, it is important to think about
safety and security standards as a priority. She said the children must come first.
Tom Forcella referred to CHHS and said the discussion is centering on how to make
best use of space, especially in a collaborative way by using one space for multiple purposes.
James Barrett said secure vestibules are not inexpensive.
Commissioner Jacobs said as far as SAPFO goes, it is a far more conservative
standard than the alternative, and it was a compromise. He said building cannot continue on
the current tax base. He said the Board of County Commissioners (BOCC) tries to be
sensitive to the schools' needs, but has to balance schools with other County needs. He said
when considering school size and standards, one must consider how much is reasonable.
Commissioner Jacobs asked if mobile units are as unsafe and insecure as classrooms
with doors with outside access.
Todd LoFrese said yes. He said all doors have locks, which should remain locked
during school hours; however, every door is another opportunity for access.
Commissioner Jacobs said he wished the schools would talk about safety first, and that
is what has bothered him about the CHCCS proposal. He said the primary motivation should
be safety for the children, and he does not hear that in the proposal, since mobile units are in
Phase 2.
James Barrett said no safety measures are 100%, and the worst incident in the CHCCS
occurred at East Chapel Hill High. He added that solving the issues at Estes Hills Elementary
School is no guarantee, and as there is no guarantee of safety, perhaps that is why the issue
is not at the forefront of the proposal.
Todd LoFrese said safety goes beyond these issues being discussed. He reviewed
several other safety issues identified by the facilities study that were addressed immediately
upon discovery.
9
Todd LoFrese said the situations with mold and water are significant and an on-going
issue. He said CHCCS would absolutely like all children out of mobile units and in buildings,
but there is a balance between safety and not causing hysteria in the community.
Commissioner Burroughs said the CHHS and LC projects both offer improved safety,
and this element of the plans should be highlighted. She said the bond committee can talk
about this going forward.
Commissioner Pelissier said the Lincoln Center will include some community space and
asked if this will be the case in the CHHS project as well. She said having multifunctioning
spaces can allow for greater stretch of the tax payer dollars.
Commissioner Pelissier asked if features, such as geothermal heating, would be
considered with the rebuilding at CHHS.
Todd LoFrese said the district has a high performing building policy that is followed,
within a particular budget.
Todd LoFrese said in regards to community spaces, the BOE has a community use
policy and a rental fee to offset costs.
Commissioner Pelissier said she got the impression that the community does not often
use the schools.
Todd LoFrese said to the contrary, and that some spaces are used on a consistent
basis.
Commissioner Pelissier requested more information be sent to the Board regarding
these matters.
James Barrett said the Lincoln Center needs a good size meeting room to
accommodate public overflow. He said the proposed museum allows for history to look down
on the BOE, as it meets and conducts business.
Commissioner Dorosin asked if there are fees for outside usage and if it is a source of
revenue.
Todd LoFrese said yes, and the rates differ for types of usage, as well as non-profit
versus for profits usage. He said it is a break-even operation and the fees collected go directly
back into school maintenance.
Commissioner Dorosin asked if the mobile units have bathrooms, and if it has been
determined what CHCCS will do with the 32 mobile units being discarded.
Todd LoFrese said that is open for discussion and exploration.
Commissioner Dorosin said perhaps the mobile units with bathrooms could be
converted into some type of affordable housing.
Commissioner Jacobs said he and Todd LoFrese had a conversation years ago
regarding the preservation of the Lincoln Center for historical reasons, and he gave the BOE
credit for recognizing the importance of this.
Commissioner Rich referred to the pre-K students, asking of the 200 to 250 pre-K
students, how many does the County fund and how many are state funded.
Todd LoFrese said exceptional students (EC) must be provided for.
Commissioner Rich asked if most of the students fall under the EC designation.
Todd LoFrese said no. He said there are EC pre—K classes, which are smaller in head
count, perhaps 4-7 students. He said there are also Head Start and NC pre-K students which
comprise the majority of the students. He said there are also tuition-paying students.
Commissioner Rich asked if there is a waiting list.
Tom Forcella said the District is required to offer services for EC students, but there
may be a waiting list for the tuition-paying students.
Todd LoFrese said he thought there were students that would attend if there were open
Head Start slots or available NC pre-k funds. He said EC students are paid for by State and
local funds.
10
Commissioner Dorosin asked if the pre-K project at the Lincoln Center proceeds, will
there be no more pre-K students at other elementary schools.
Todd LoFrese said 20 classrooms are being designated to keep a pre-K at Frank Porter
Graham Elementary School, since it is a dual language program, and perhaps at Carrboro
Elementary for the same reason.
Commissioner Jacobs said he asked Margaret Samuels to attend the meeting since
she had worked in pre-K for years.
Commissioner Jacobs said he read through all the materials and the rationale for
changing the pre-K model. He asked if it is known which portion of the program would be
funded locally. He remembered the conversation from years ago making the case that it is
easier to transfer a pre-K student into an existing elementary school. He asked if the proposed
LC project is better for the teaching staff or for the students.
Margaret Samuels said pre-K is funded in many different ways. She said CHCCS runs
the Head Start grant locally, but OCS runs its program slightly differently. She said as far what
provides a good pre-k experience for a child is a consistent, licensed and trained teacher first
and foremost. She said it would be optimal if there were enough money to put every child in a
pre-K class at their assigned neighborhood school, but this is currently happening with less
than 50% of the pre-K students.
Margaret Samuels said the opportunities that the consolidation offers is that there
would be health services at the Lincoln Center, ratio of teacher to children, programmatic
benefits, and the most important piece is the availability for all of the pre-K teachers to
collaborate, meet, train together, etc. at one site. She said this project is the best compromise
at this time.
Chair McKee referred to the next phase projects and said there is an expectation of
future bonds. He read a portion of the abstract pertaining to Orange County's funds planned
for future new schools. He asked if there could be clarification regarding this.
Todd LoFrese said Phase 1 projects are bond projects. He said CHCCS has requested
that for Phase 2 projects, the District be given access to what was in the CIP last year. He
said the 10-year CIP included funding for elementary school number 12 and a high school
addition at Carrboro High School. He said if these funds could be accessed to complete
Phase 2 projects, then a new elementary school and a high school addition will not be
necessary for quite some time. He said Phase 1 projects will significantly address capacity
issues as well.
Chair McKee asked if SAPFO numbers push out those two projects past the 10-year
mark, what justification would there be to release those funds in year two or three.
James Barrett said these funds were never intended for years two or three.
Chair McKee said if these projects are to be completed over 10 years, then funds would
need to be released in the third year.
Todd LoFrese said a small amount of Phase 2 projects begin in FY 2018-19, but the
majority of these projects are in FY 2020-21.
James Barrett said it is harder for act any sooner, because once the pre-K students are
co-located at the LC, there needs to be some flexibility at the schools in order to move
students around during construction.
Todd LoFrese said every year that passes gets the District a year closer to when a new
school may be needed. He said there is a lull right now, and great strides can be made.
Chair McKee said he is trying to understand the mechanics of these projects. He said
there will be 189 additional seats provided by the LC project, and asked if that will not satisfy
the capacity issues that Phase 2 seeks to address.
Todd LoFrese said it delays the capacity need but not the condition of the schools.
James Barrett said it is a buffer to complete the construction.
11
Chair McKee referred to Phase 3, and asked if there could be clarification regarding the
statement "future funding resources will be identified" in the abstract.
Todd LoFrese said the CHCCS tried to align the Phase 2 projects with the funding that
was planned for last year in the 10-year CIP. He said it is unknown where Phase 3 funds
would come from.
James Barrett said if the funds allotted to the CIP can be repurposed for Phase 2
projects, a great deal of progress can be made to make CHCCS safer and stronger.
Chair McKee said he does not understand the mechanics of the Lincoln Center project.
He is very supportive of pre-K education, and if the consolidation of the program is best, he
supports that as well. He said he is unclear how the InterFaith Council (IFC) and Piedmont
Health Services play into the project. He can see the benefit to having health services on the
campus, but he has heard parental concerns about increasing the access to the school.
Todd LoFrese said Lincoln Center is comprised of three main components of the
District: consolidated pre-school; Phoenix Academy High School with a larger building to
include the mental health component; and administrative offices on the second floor. He said
the gym will be preserved. He said earlier this year, an inquiry was received from the IFC and
Piedmont Health regarding co-location of services at these facilities. He said there is not
enough room on the campus to build another building, thus IFC likely will not fit at the LC. He
said discussions are still taking place with Piedmont Health, with the possibility of extending a
portion of the Phoenix High School building to house medical and dental services. He said if
this were to occur, Piedmont Services would provide the funding in exchange for a 30-year
use.
Todd LoFrese said this co-location idea is still being considered from an educational
viewpoint. He said the co-located services could provide access to early education and health
care, both of which are extremely important for child development. He said high school
students at Phoenix, and across the District, could benefit from hands on experience and
learning in various aspects of the medical field, when considering career choices.
Chair McKee said a concern he has with the Lincoln Center project is whether this
expenditure of$22 million should come before other issues with safety and security have been
addressed. He said he knows that the needs outpace the resources, but of all the projects
identified, the Lincoln Center gave him the most reason for pause.
James Barrett said completing the Lincoln Center first allows for a full transition plan for
the other schools over the next 10 years, as it will allow for flex space to move students around
during construction.
Commissioner Jacobs thanked Chair McKee for raising this issue. He said this is the
first time the Board is hearing details of the Lincoln Center project.
Tom Forcella said this project has been presented twice before.
Commissioner Jacobs said this is the first time that the Board of County Commissioners
has heard about the entire Lincoln Center project, which has been helpful.
Commissioner Jacobs asked if Piedmont will be able to provide nursing care, or would
the County still have to provide nursing services.
Todd LoFrese said that could be a possibility to discuss going forward.
Commissioner Dorosin thanked the two school districts for the conversation, and asked
both districts to adopt resolutions to repeal HB2. He said school districts are adversely
affected in unique ways and have a unique legal standing in the matter.
James Barrett said the CHCCS BOE passed a resolution last week, and has learned
from their lawyers that policies do not need to be changed. He said gender-neutral bathrooms
are being implemented in all middle and high schools.
Todd LoFrese provided the following information:
12
In advance of tonight's work session, the CHCCS district received questions from County
Commissioners related to the bond priorities. A brief response follows each question along
with two supporting documents.
1. What were the square foot costs for Carrboro High, the total cost, and some coefficient for
inflation in construction costs since the building was completed?
• Carrboro High was bid in 2005, pre-recession.
• It cost $190 per square foot for a total cost of$36 million.
• It was initially constructed without an auditorium/arts wing (added in 2011 @ $4 million)
and without a concession/bathroom building (added in 2012 at $900K)
Calculating construction cost inflation is difficult due to the recession and since 11 years
have passed since the bid opening. We have included a more recent cost analysis based
on DPI reports of new school project costs. Please find it attached.
2. For CHCCS, how many mobile classrooms will be retired by executing each project, and
what percentage of the total mobile classrooms does that represent?
• The need for 24 mobile classrooms will be eliminated with our Phase 1 projects. 3
mobiles are at Lincoln Center, 14 mobiles are at Chapel Hill High School, and 7 mobiles
are occupied by pre-K students at other schools across the district. Phase 2 projects
would eliminate the need for an additional 8 mobile classrooms. A total of 32 mobiles
would be eliminated through all 10 projects, of which 24 (or 75% of the total eliminated)
would occur in Phase 1.
• Furthermore, 12-14 additional classroom spaces would be vacated across all elementary
schools by the pre-K consolidation, assisting with Phase 2 swing space needs.
3. Do the existing school construction standards add significant costs to typical school
construction? If so, how much?
• We do not feel the school construction standards significantly increase the cost of typical
school construction. Local approval/permitting and significant regional demand (Wake
$800 million bond, recently passed state bond, recently passed Town of Chapel Hill
Bond) are much bigger factors.
4. Can we get a breakdown of costs for the Chapel Hill High project? What is the cost of
deconstructing building A and rebuilding it vs. the amount of money going to upgrading the
rest of the buildings?
• We have broken down the details for our initial estimate for Chapel Hill High School.
Please find it attached.
5. What components are included in the overall project costs? Can those be itemized to isolate
construction from architectural fees, equipment, etc. for each of the major projects?
• Yes, see the Chapel Hill High School estimate sheet for an example.
6. In the 20th Annual School Construction Report
http://www.haddonfield.k12.nj.us/Attachments/AnnualSchoolConstructionReport2015.pdf and
13
Schooldesigns.corn web site, Stuart Cramer High School in Gaston County was completed in
2013 at a cost of roughly 39 million. This facility is larger than the requested renovation size of
Chapel Hill High and accommodates 300 fewer students. Is the difference construction costs
vs. the overall cost of the project, or are there other important differences to explain the large
difference in costs? If a new school costs less, why not build a new school?
• The project in Gaston County was bid in 2011. We do not feel that cost is an accurate
representation of the current local market and a new Chapel Hill High School would
cost significantly more than $52 million. In addition it would be extremely difficult to
build given our limited remaining school sites (none of which are appropriate for a HS)
and that 1500+ students currently attend CHHS. Phasing would be very difficult and
expensive.
7. How firm are the costs for Chapel Hill High? Could the district representatives please
describe the process, where we are now and what are the next steps?
• The costs are not firm at this time as we have not yet begun design. The design process
will commence later this spring. At the different phases of architectural design (concept
plan, schematic design, and construction documents) professional cost estimates will
be obtained to ensure the project is within our budget estimate.
8. What is the County's role in funding pre-K?Are pre-K students counted in the ADM?Are
counties in the state legally obligated to provide facilities for pre-K or is this a policy choice that
varies by district?
• Orange County is not required to fund pre-K.
• Pre-K students are not included in our ADM numbers, however their presence in our
schools utilized capacity.
• Counties in NC are not required or obligated to provide PK facilities
• The district must provide pre-K for exceptional children students. Also consider that if we
didn't provide appropriate space for pre-K most of our students receiving Head Start
assistance or NC pre-K would not be served.
A motion was made by Commissioner Burroughs, seconded by Commissioner Rich to
adjourn the meeting at 9:25 p.m.