Loading...
HomeMy WebLinkAboutAgenda - 03-25-1986 ORANGE COUNTY BOARD OF COMMISSIONERS AND PLANNING BOARD AGENDA • SPECIAL PUBLIC HEARING MARCH 25 , 1986 , 7 : 30 P .M . ORANGE COUNTY COURTHOUSE SUPERIOR COURTROOM HILLSBOROUGH, NORTH CAROLINA A . PUBLIC HEARING ITEMS 1 . Water Supply a . Overview of the Problem Mr . John Wray , Deputy Director N .C . Division of Water Resources b . Short and Long Range Solutions Statement by Hillsborough Statement by Orange-Alamance Statement by OWASA c . Public Comment (Limited to Water Supply) d . Commissioner Questions and Comments e . Summary 2 . PD-5-85 Scotswood (Planned Development Continuation of Public Hearings held 11 -25-85 and 1 -6-86) B . ADJOURNMENT ORANGE WATER AND SEWER AUTHORITY STATEMENT ON ORANGE COUNTY WATER RESOURCES SUPPLY ISSUES BY Ems" BILLINGSLEY, .DIVE DIRECTOR, OWASA (Presented at Orange County's March 25, 1986 Public Hearing) I an Everett Billingsley, Executive Director of Orange Water and Sewer Authority (OWASA) . OWASA provides water and wastewater services to approximately 52,000 residents in the Chapel Hill - Carrboro community. OWASA recognizes the importance of comprehensive water resources planning and management and strongly supports cooperative efforts to assure efficient, equitable and environmentally compatible utilization and expansion of the water resources in the region. When OWASA began operations in 1977 it proceeded to aunt the supply of water available to the Chapel Hill - Carrboro community. The American Stone Quarry was acquired for use as an emergency reserve in 1979 and the temporary impoundment on Cane Creek was completed in July of 1985. These projects cost OWASA customers about $2.5 million and increased the local water supply capacity by 80%, from approximately 3.5 MQ) to 6.3 W. The 16-inch water line interconnection to Hillsborough was constructed in 1978 . at a cost of $1.1 million. This line permits the purchase of treated water from the Town of Hillsborough. Under formal agreement with Orange County, up to 2.0 W from Lake Orange would be released for treatment by Hillsborough and eventual delivery to OWASA through the 16-inch water line. These additions to supply by OWASA have allowed OWASA to continue to meet the demand for water until additional water supplies can be developed. Under normal rainfall conditions, University Lake, the Stone Quarry and the Temporary Impoundment on Cane Creek should be able to meet the projected water demand until about 1989, when the permanent Cane Creek Reservoir is complete. However, during periods of subnormal rainfall the water purchases from the Town of Hillsborough will still be required to meet demand. OWASA recognizes that all of Orange County faces a potential problem with respect to the adequacy of available public water supplies. Recent reports cite that the demand for water is nearing the capacity of available supplies. At the same time, other reports are recommending the release of water from Orange County water supplies to augment instream flows. OWASA supports the maintenance of a reasonable instream flow release for the purposes of maintaining the aquatic environment to the extent that such a release does not jeapordize the continued provision of adequate water supply to sustain the public health and welfare of citizens of the County. 1 ` T Considerable effort has been expended by the Department of Natural Resources and Community Development to model Orange County's water resources and to determine a desirable instream flow for the Eno River. The Office of Water Resources has stated that a minimum release of about 5.4 cubic feet per second, or 3.5 MGD, is required from Lake Ben Johnson to meet instream flow needs. This is much in excess of the statistical 7-day, 10-year low flow for the Eno River, which the has been variously reported to be between 0.169.cfs to 1.7 cfs. Apparently, the 7Q10 has not been established. For comparison, HISARS flow data for the Eno River near Hillsborough show that in 1941 there were 8 consecutive days when flow was 0.3 cfs or lower and 9 consecutive days in 1954 when flow was 0.10 cfs or less. Differences between the reported low flows must be resolved and the impact on water supply capacity determined before a decision concerning instream flow requirements is reached. The limitations and other demands on stored water must be carefully examined prior to establishing the instream flow comnittment. Given the limited capacity of present water supplies and the fact that the primary purpose of these supplies at the time of construction did not include an instream allowance, OWASA supports the assurance of a 0.39 ads.-1440 instream flow above the Hillsborough Water Plant. The discharge from the 2 MGD treatment plant will increase the stream flow to over 2,0 cfs. which is above the 1.7 cfs flow suggested by the State. As future supplies are planned and developed, requirements for maintaining instream flows can be incorporated into project design, construction and financing. The State has completed an extensive computer evaluation of the Eno River flow. This model was used as a basis for recommendations presented by the Office of Water Resources. A better understanding of the model, including all of the assumptions utilized in running the model is needed to adequately evaluate the recommendations of the State. It is also important to evaluate the need to maintain flow in the Eno River at the Hillsborough wastewater treatment plant site. The State has based the issuance of the Town of Hillsborough's wastewater discharge permit on the assumption that the 7Q10 flow, reported to be 1.7 cfs, will exist. The permit as written indicates the Town's wastewater plant has a capacity of 3.0 MGD; however, the actual capacity is only 2.0 MGD and present plant flows are only about 0.9 MGD. The need to maintain a flow of 1.7 cfs to maintain water quality downstream of the Hillsborough plant needs to be reevaluated in light of the actual plant capacity and flows. For comparison, the OWASA WWTP with similar standards but 8 MGD capacity is based on only 0.25 cfs in the receiving stream. It will be beneficial to evaluate the water quality impact of instream flow release through the use of water quality and stream flow simulation models prior to any final decision on the amount of such release. The State uses water quality computer models to determine the NPDES Permit limits which are needed to protect water quality at the 7Q10 flow. With further knowledge and evaluation of these models, local governments will be better able to understand the basis for decisions which significantly affect the provision and cost of water and wastewater services and the need for capital improvements such as reservoirs and treatment plants. Present plans for increasing the storage capacity of Lake Orange and Lake Ben Johnson, along with improvements at Corporation Lake, should be diligently pursued. Efforts to obtain additional supplies on a temporary basis from water purveyors in Alamance County should also be continued. A comprehensive action plan for providing an adequate water supply for Orange County must be expeditiously developed, complete with a funding program and a time schedule for completion of construction. This is the only real solution to the continuing problems of water deficiency that affect all of the utilities and consequently the general economy, environment and welfare of everyone in the county. Thank you very much for your consideration of these remarks. The Board of Directors and staff of OWASA pledge continuing cooperation in the evaluation of the water resources planning and management issues which affect Orange County. We will also appreciate the Department of Natural Resources and Community Development's efforts to assist and educate local water managers in the use of water quality and stream simulation modeling which the Department has developed. Everett Billingsley Executive Director • • • LEAGUE OF WOMEN VOTERS OF NORTH CAROLINA • PUBLIC HEAxZING ON :TATTER RESOURCES AND DEVELOPMENT -- l'iarch 25, 1985 Orange County Comm'ss ioners I am Margaret Holton, a citizen of Orange County and speaking for the League of Women Voters, . Orange County is at a crossroads of moving from predominantly rural to urbanized • con,.murities. Projections are now being stated that Northern Durham County and Hillsborough areas will be the second Triangle development when I-40 is 'comploted to 1-35 at Hillsborough, Planned growth is absolutely essential. This means that the elected officials must plan for infrastructure to serve the future population and businesses. I'm talking roads, open spaces, water supply and waste trait :.3nt systems (including sewers planned to standards that are environmentally sound and will not lower our present quality of life. . One big question is WATER SUPPLY,, Orange .County is at the headwaters •of the xxse River in Northern Orange and the Southern part of the county has waters flowing toward Jordan Lake and the Cape Fear River Basin. One does not have a river to capture water from. ;:here is the WATER SUPPLY for Hillsborough and surrounding areas--is it the creeks that lead to the itle River? The residents of Northern Orange do_not yet have their long-range plan put together and started. It has taken OVASA the past 10 years to get a plan on the ground and they only have a temporary impoundment. The permanent dam is scheduled to be completed in 1939. The persons responsible have to wisely • realize that it takes Lead Time for all the planning, permits and acquiring of land for a water supply. reservoir, If citizens want development and growth they need to elect officials who will plan and execute wisely so that the resources are protected. They should also note that the public needs to be continually informed of the process. The elected officials need to take bold positive steps toward a future protected water supply for Northern Orange County. The County Commissioners will be taking a wise course by approving development contingent on a prior vote to provide the nec- essary infrastructure, such as water sunnly, to provide for the population that is projected to come to Orange County in the next 20 :years. •'e wish to thank the Orange County Commissioners for providing tonights meeting on ::ester Resources for Orange County. Margaret Holton, water Resources Chair TOWN OF HILLSBOROUGH POSITION STATEMENT ON THE SCOTSW00D DEVELOPMENT . March 25, 1986 At the County Commissioners ' meeting on February 17 , 1986, the Board of Commissioners postponed a decision on the proposed Scotswood development in order to solicit additional public comments on water availability and other issues central to the decision on Scotswood. This statement represents the position of the Town of Hillsborough with respect to the issue of water availability, as well as other key issues raised by the proposed development. First, let me say that adequate water treatment capacity exists to accommodate Scotswood as well as other approved and planned developments in the Hillsborough area . As shown in Figure 1 , we are currently treating and consuming about 1.3 to 1.4 million gallons per day, which is less than one-half of the maximun design capacity of our existing water treatment . plant. With the addition of Scotswood as well as other presently approved and planned projects, we will be treating about 1 .8 to 1 .9 million gallons of water per day. This is based on a consumption estimate of 100 gallons per day per bedroom. Based on the higher estimate of 150 gpd per bedroom, we will be treating about 2.2 million gallons per day once Scotswood and •all other currently planned developments are built. When each of these projects is fully developed , according to our estimates, we will be using about two-thirds to three-fourths of our existing capacity, depending on which consumption estimate you use. 711M qp so ►n .S� ��t r�Q.i E !t� — c�; S a Of1 r 3a 00 !a . c •M A All .? ?A S 0 �' D -l' Ic le f :ir1 /�:f �% fOri . i.; �Tjp�l / /hl•�iirif j ?��.5D L7r� �r 1 There is no doubt that the pace of development 'will quicken in Hillsborough in the future and that our existing treatment capacity is being committed at a relatively fast rate. However, we feel confident that - adequate treatment capacity is presently available to handle water demands for the foreseeable future. Nevertheless , we are currently reviewing .our water fee structure to ensure that sufficient. funds are set aside to expand • our treatment facilities when needed. Even though we have ample treatment capacity remaining at present, the anticipated pace of future development in the Hillsborough area means that the day when additional water, and for that matter sewer, treatment capacity will be needed is not that far off. We are determined to be• prepared for that day when it arrives by having, plans z; ' money in place to expand our treatment capacity as needed. The issue raised by Scotswood is, therefore, not whether adequate water treatment capacity is available, but whether available water supplies- are sufficient to accommodate Scotswood and other anticipated growth in Hillsborough. Based on the recent County study of water supply in the upper Eno River watershed (summarized in the County Manager's memo of November 15, 1985) , there is cause for concern that the existing capacity of the Eno River and its three reservoirs may have been reached and that a water shortage will occur during a drought. The current safe yield of the Eno' three reservoirs is estimated to be approximated 2.2 mgd under current methods of reservoir operation. As I said, Hillsborough is' currently consuming about 1.3 to 1.4 mgd. The Orange-Alamance System is currently using about. .6 mgd, for a total of around 2.0 mgd total . And then , during the summer, the Orange Water and Sewer Authority (OWASA) has been drawing as much as 1.0 mgd or more from the Eno • through the purchase of treated water from Hillsborough (the -sale of water to OWASA for 1984 and 1985 is shown in Figure 1) . This brings the total consumption level from the upper Eno basin to over 3.0 mgd during periods of low rainfall , clearly exceeding the current safe yield of our combined reservoirs of about 2.6 mgd. The safe yield of Hillsborough's reservoir, Lake Ben Johnston, Js about .44 million gallons per day. At present rates, we are consuming' about three times the safe yield of our reservoir. The balance of the water to meet Hillsborough ' s needs comes from Lake Orange, which we share as a water source with other residents of the County. As mentioned above, during dry periods water drawn from Lake Orange is treated by Hillsborough and piped to the 0WASA system for use in southern Orange County. It should be noted that during the drought of 1983, Hillsborough supplied roughly 20% of the water consumed by Chapel Hill , Carrboro, and other areas served by OWASA. ' Consequently, we acknowledge that a water problem will arise during times of drought and that the problem is one that we must jointly address with the County and other water users in Orange County. Of course, we do not have a water shortage today and will not with adequate rainfall . In our opinion , however, the solution to our water concerns is not to disapprove Scotswood or other pending projects for lack of water supply unless similar constraints on growth are imposed on development in the NASA and Orange-Alamance service areas. In particular, so long as CWASA relies on water from northern Orange County, it would be extremely unfair to turn away development in Hillsborough while allowing development to proceed unabated in the southern end of the County. If Scotswood is denied for water reasons , we need to consider a policy whereby future water consumption would be limited according to a fair and equitable formula in all parts of the County which rely upon the Eno River for water. The water issues raised by Scotswood, however, must be addressed immediately in a coordinated fashion. To address the concerns regarding future water supply, we recommend the following steps be implemented immediately: ( 1) Rapid implementation of all available stop-gap measures to increase short-term water supplies . These steps include making the improvements. to Lake Ben Johnston, Corporation rake and Lake Orange recommended in the County study to increase the yield from these existing water sources. Hillsborough has already initiated action on raising the elevation of the spillway at. Lake Ben Johnston by two feet. Engineering work is underway and $60,000 has been committed to the project. We expect to have that and other improvements to Lake Ben Johnston completed by the end of 1986 at the latest. Raising the dam at Lake Ben Johnston is estimated to increase the reservoir' s safe yield by .2 mgd. Implementation of recommended improvements to the design and operation of all three reservoirs on the Eno is , according to County Consulting Engineer Don Cordell , estimated to increase their combined safe yields from the current 2.6 mgd to something more than 4.0 mgd. This would represent a 50 percent increase in our existing water supplies. (2) Implementation of a plan to reverse the flow of water in the 16 inch pipeline connecting Hillsborough's and OWASA' s systems. As a mid-term "L measure, Hillsborough could be supplied water from OWASA during periods of drought once the new Cane Creek Reservoir is fully on-line. (3) Construction of the Seven Mile Creek Reservoir. Plans for the • construction of a new reservoir should be expedited unless it is determined in the near future that Jordan .reservoir is a better long-term supply of water for northern Orange County. Hillsborough would, of course, be willing to consider setting aside monies to pay for its fair share of such a future reservoir. Because of long lead times for reservoir construction, action on a long-term supply should not be delayed. (4) Adoption by Hillsborough of a water conservation ordinance for use in the event of a severe drought. (5) If Scotswood or other developments in northern Orange County are turned down becaus of water, consideration of a consumption •growth ceiling on all jurisdictions relying upon the Eno River for water.. (6) Adoption of a water supply management plan that will maximize the availability of water during drought periods and ensure adequate instream flows in the Eno to minimize pollution and protect wildlife and the river's ecosystem. Let me next address the issue of traffic. In our opinion , traffic congestion is really a more serious concern than water. According to the traffic analysis prepared for Scotswood, when fully developed Scotswood would greatly increase the traffic volumes on Highway 70 and St. Mary' Road. For example, it is estimated by the developer' s traffic consultants that • Scotswood would generate an additional 3500 trips per day down St. Mary' s Road past Cameron Park Elementary School : St. Mary's Road in this area is a • - • two-lane, winding road requiring traffic to enter the school zone from the East just after the crest 'of a hill : This situation, coupled with the curved stretch just to the west of the school zone, creates a potential • hazard even with present traffic volumes . To increase existing traffic • levels in front of Cameron Park School by 3500 trips per day is clearly unacceptable, given the present configuration of St. Mary' s Road. • We recognize that the project will be developed in stages and that the traffic impacts will not all be experienced at once. However, we feel it is impera ive that the necessary road improvements. be made before the full. traffic impacts are felt. It is the Town' s position that the traffic problems posed by Scotswood must be addressed now rather than 10 years from now. In particular, we recommend that the following road improvements be completed prior to construction of the 200th dwelling unit as a condition for project approval : (1 ) The widening of Highway 70 to a minimum of four lanes from NC 86 on the North to Lawrence Road on the South ; (2) The construction of an eastern by-pass to direct traffic from the Scotswoccl •area to I--85 and 1-40; (3) Completion of other road and traffic- improvements as specified in the conditions recommended by the County Planning Department. Recognizing that improvements of this magnitude are beyond the ability of this or any other individual developer, we would ask for the assistance of the applicants in obtaining the necessary NC Department of Transportation commitments to carry out • these improvements , which will be needed. whether for Scotswood or the accumulation of other developments on the east and north sides of Hillsborough . We do not think we are asking for anything unreasonable when we ask, as we are in this case, that the road and other improvements necessary for a project like Scotswood be in place before any adverse impacts from the project are experienced. In conclusion, Mr. Chairman, we believe that sufficient water is available to serve the Scotswood development, provided short-term improvements are carried out to increase existing water supplies and definite plans are made for a longer-term, permanent source of supply. Scotswood should not be turned down because of water alone unless simi ilr growth limits are placed on all other parts of the County that rely ,'.;, the i Eno River for water. Also, we are concerned about the potential traffic impacts of Scotswood, especially in the vicinity of Cameron Park School and along Highway 70. We wish to be assured that any and all road improvements necessary to handle the traffic demands of Scotwood will take place before additional traffic hazards or traffic congestion occur. In recommending a limit of 200 dwelling units until certain improvements are completed , we have merely tried to propose one possible way to provide this assurance. We would , of course, welcome other approaches that address this concern. Thank you for the opportunity to present the Town Board' s position on this matter. ' PROPOSED POLICY POS±TIGPS . 1. Decldrati on of Purpose It is hereby declared that the general welfare. and . public. interest require that the Lake Crange stored water resource of Orange County be managed in such a manner to provide optimum public benefit, subject to reasonable regulation in order to conserve this resource and to provide and maintain conditions t:hiich are cor;du- cive to the development and use of the water. 2. Capacity Condition a. Based upon available information from the NRCD Division of Water Resources (as rendered in a November 15, 1985 written report of the County Manager: "Water Supply and Usage in the Upper Eno River Basin") the Board finds that usage of water - released from Lake Orange is at or near capacity during periods of extended low stream flow in the Eno River. b. By "at or near capacity" it is meant that the aggregate uses of the released water have developed or threaten. 3. Back-up Supply Sources a. Orange Alan:ance Water Corporation is called upon to ' enter into an agreement(s) ;pith other water pro- viders to purchase water supplies for its customers in the Cape Fear Basin when the stream flow in the Eno has to be maintained by Lake Orange !eater releases and the piater level at Lake Orange has dropped to the emergency stage. b. The Orange Water and Sewer Authority is called upon to limit this purchase of water from the Eno River to periods when natural stream flow exits in the I� river. Once water releases from Lake:E Orarrae are necessary to augment natural flew in the Eno, such purchases should cease. OWASA is further called upon to enter into an agreement(s) with other water providers to purchase water during these periods. c. The Town of Hillsborough is called upon to enter into an agreement(s) for the purchase of water from other water providers when the stream flow in the Eno has to be- maintained by Lake Orange water releases and the .rater _'e eel _.. Lake Crane,- has dropped to the emergency stage. 4. Cons erva ti r: and Regulation ' ,n G �I.C: ._0ll_.2 t•�C. a. Ordinance: are direct-ed to be developed to roster conservation and regulate water use to the safe yield aveiic ble first f r'oi Lake Orange and later ".. -.., ... -S. -- . . � � � yields '.ate • /� e i safe 1 e� ds a r .frbn, other reservoirs as the it effective. b. Since supply may be 'increased throughesvr . improvement measures .at .Lake Orange, Corporation Lake and Lake Ben Johnson each ordinance shall . reflect the combined safe . yield available at a given time. c. The Orange Alamance Water Corporation, the Town of - : Hillsborough and the OWASA are requested to identify by January 27, 1986 the improvement measures, timetable and source of financing they . are willing .to commit towards increasing the available supply. • ' d. Once the maximum withdrawal limits and instream- flow requirements are established, consistent with available surpp?.y_ard _safeguards.:-_agairlst_..water dep t?ohs KI i ch; 10d_..in jur-e-.the-pubs{ sa ety. - . heealt t Welfare, it will be the responsibility of local government and water purveyors to prohibit g "n aggregate additional uses which singly or �. would cause the water allocations established by ordi-. nance to be exceeded. e. Instream flow requirements shall be based upon the unadjusted 7 Q 10 flow rate below Lake Ben Johnson, , - . as measured at the USGS/Orange' County stream flow gage. This amount shall be , reduced to a lessor amount (to 0) as, each successive.stage of water level is reached at Lake Orange. - f. Development approvals up to the allocation levels shall be staged in accordance with the amount of demand and the timing required to provide major n2w, water supply. 5. Punning for Major New Water Supply . , a. Since improvement to existing reservoirs will be inadequate to meet growth demands Orange County will join the water utility providers in the engineering study of new supply sources and sites. . b. All utility providers are urged to begin now a review of water rate structures to determine the capacity of these rates to develop reserve to A y addit'cr_al supply. finance new construction for . . ORANGE COUNTY HILLSBOROUGH 1 �( NORTH CAROLINA _ PP P 1wue9cc d l.11``2 Estal�Li ud 1752 TO: Mr. James . Campbell, President, Orange-Alamance Water System, Inc. Mr.. Frank. Sheffield, Mayor, Town of Hillsborough Mr. Everett Billingsley, Executive Director, OWASA FROM: County Manager SUBJECT: Water System Data - • DATE: March 19, 1986 • Orange County is in the process of assembling background information on each water system in the County to aid in the compilation of an inventory of existing facilities and financing the construction of new water supply. Documents or data needed include: 1. Date and copy of documents by which the water system was established (i.e. public law reference, articles of incorporation, purchase agreement) . 2. List and size of water storage and treatment facilities 3 . How facilities were" financed 4 . Existing rate structure and tap fee amounts 5. Geographic distribution of customers by County and drainage basin 6. Geographic distribution of water consumption by County and drainage area 7. Map of system Please provide this information at the earliest time possible. Thank you for your cooperation. 0 Kenneth R. Thompson G County Manager KRT/srs cc: Board Members ORANGE COUNTY HILLSBOROUGH NORTH CAROLINA _ un[✓!4!-'1 °i . eliatp YC 1752 TO:- Jimmy Campbell, President, Orange-Alamance Water System, Inc. Eddie Mann, Chairman, Orange Water and Sewer Authority- Frank Sheffield, Mayor, Town of Hillsborough FROM: County Manager SUBJECT: March 25, 1986 Public Hearing Notice DATE: March 19, 1986 Enclosed is a second public hearing notice for the proposed Scottswood Development and the related subject of water supply. This hearing will be conducted on the evening of March 25, 1986, 7:30 p.m. in the Superior Courtroom, Hillsborough. The Board of Commissioners has requested that each of ' you be specifically invited to attend the hearing and provide comment regarding the measures your organization is willing to undertake to address the water shortage situation. In addition to stop gap measures to enhance existing supply, the Board will be interested in hearing what measures you would be willing to explore to help plan and finance the construction of a new water supply in the central portion of the County or from Jordan Lake. Questions which come to mind include: 1. What is the existing water consumption amount and pattern geographically? 2 . What areas should a new reservoir be expected to serve (i.e. only the Town of Hillsborough and Orange Alamance, OA customers in the Cape Fear Basin, OWASA service area customers as well, other)? 3. How much capacity will each jurisdiction wish to have reserved for its service area? 4. How much capacity will need to be released for instream flow requirements of the State? 5. What overall size will be necessary? 6. How quickly should the new capacity be operational? 7. To what extent will a phasing of development be necessary in the meantime? 8. At what site or sites should water volume be located? 9. How should it be financed? • • • • INTEROFFICE MEMORANDUM: 8603-502 . March 25, 1986 Public Hearing Notice March 19, 1986 Page z a. Surcharge on customer rates b. Water rates coupled with tap on fees c. Bonds 10. What is each jurisdiction's capacity to pay debt service on bonds, given the current and projected customer base? 11. How much bonded-debt already exists in relation to each jurisdiction's debt limit? 12. Have capital reserve funds already been established to pay for future construction? • 13. How shall we organize ourselves to study and decide these questions? 14. How much engineering assistance will be necessary? 15. What would be an equitable percentage for each to contribute for the payment of engineering services? Obviously we will not be able to answer all of these questions at the hearing but we can begin a discussion of whether we are willing to work on this together and what strategy ought to be employed. Under separate cover, I have asked for information that will begin the development of a data base. The Board of Commissioners solicits your ideas both at the hearing and over the ensuing months. It will be a challenging undertaking for all. 4„/ANtr-1--__ Kenneth R. Thompson County Manager KRT/srs cc: Board Members John Wray, N. C. Department of Natural Resources and Community Development Enclosure '► 'ORA�'GE C4�Y PLANNING DEPARTMENT - . I31LLSBOROuGH • NORTH CARCAROLINA. (2-644" 4 & &/Wed, 27278 . S•r•'y of O - l7`4 S,+ 5 • Pio ago' NOTICE OF CONTINUATION PUBLIC HEARING ON PROPOSED AMENDMENT TO THE ZONING ATLAS OF ORANGE COUNTY, N.C. - Pursuant to the requirements of the General Statutes of. North Carolin Chapter 153A, Section 323 and Section 343 , Article 20 .5 and Article 20.6 of t Orange County Zoning Ordinance, notice is hereby given that a public heari will be held in the Superior Courtroom of the Orange County Courthouse, 1 East Margaret Lane, Hillsborough, North Carolina on Tuesday, March 25 , 1986 7:30 p.m. for the purpose of giving all interested citizens an opportunity speak for or against the adoption of proposed amendment to the Orange Coun Zoning Atlas. The amendment under consideration is as follows : PD-5-85 aCDTh1YQOD • The property in question is located along Highway 70 Bypass and St . Mary' s Road (SR 1002) northeast of the Town of Hillsborough in Hillsborough Township. It is known as Block B Lots 3 and 4 on Orange County Tax Map #6 and Block A Lot 17 on Orange County Tax Map 22 for Hillsborough Township. The planned development request contains approximately 14 , 374 , 800 square feet ' 'or 330 acres . The present zoning of the property is Residential-1 (R-1) , The applicant is requesting that 290 . 03 acres be rezoned Planned Development Residential-2 (PD-H-R2 ) , 29. 50 acres be rezoned Planned Development Residential-5 (PD--H-R5) and 10 . 43 acres be rezoned Planned Development General Commercial--4 (PD-GC4) and the issuance if a Class A Special Use Permit for 410 single family Units , 216 multi-family units and 65, 460 square feet of commercial space. At the meeting evidence will be received regarding traffic and wa supply problems , particularly current and proposed water withdrawals , possi • improvements to the three reservoirs in northern Orange County (Lake Oran- Corporation Lake and Lake Ben Johnston) and the State' s recommendati • regarding in-stream flow requirements . _ All interested citizens are invited to attend this hearing and be hear , . Public comment on any item must be received during the public heari Those wishing to oppose a request must provide competent material substantial evidence as to the specific manner in which the proposed use di not satisfy the ordinance . For requests requiring the issuance of special permit only sworn testimony and evidence will be taken as required in a qua ' judicial proceeding. The testimony of experts on impacts on pub health/safety and property values may be necessary . Following the close of public hearing, only evidence presented at public hearing will be examined r the Planning Board and Board of County Commissioners for decision • on - t request . Changes may be made in the advertised proposals which reflect debat objections and discussions at the hearing. Questions regarding the proposals should be directed to the Orange Coun Planning Department . Copies of the proposed full amendments are available the Planning Department for public review. The Planning Department- is locat in the New Courthouse , 106 East Margaret Lane , Hillsborough . . Office hours a froth 8:00 a.m. to 5 :00 p.m. , Monday through Friday. acTLAAT) VIAOW41,- MARVIN COLLINS, PLANNING DIRECTOR PUBLISH: MARCH 19, 1986 ti DIY ORANGE COUNTY BOARD OF COMMISSIONERS • ACTION AGENDA ITEM ABSTRACT Meeting Date MARCH 25, 1886 Action Agenda Item IL 2 SUBJECT: PD-5-85 SCOTSWOOD DEPARTMENT: PLANNING PUBLIC HEARING ,_Yes No Attachment(s) Information Contact: EDDIE KIRK VICINITY MAP SEE 11 -25-85 , 1 -6-86 AND 2-18-86 AGENDA PACKETS DRAFT 2-18-86 BOCC MINUTES REVISED WATER USE PROJECTIONS - HILLSBOROUGH SERVICE AREA Telephone Numbers Hillsborough -- 732-8181 Durham - 688-7331 Mebane - 227 -2031 Chapel Hill - 968-4501 PURPOSE : To consider further public comment on a proposed planned development and rezoning request submitted by John W. Graham and A . H . Graham, Jr . This item was submitted to public hearing on November 25 , 1985 and January 6 , 1986 . The Planning Board recommendation was submitted to the Board of Commissioners on February 18 , 1986 . On February 18 , 1986 the public hearing on Scotswood was continued to March 25 , 1986 to receive further public comment on traffic and water supply issues , particularly current and proposed water withdrawals , possible improvements to the three reservoirs in northern Orange County and the State 's recommendation regarding in-stream flow requirements . NEED: John W. Graham & A . H . Graham , Jr. are requesting approval of a planned development and rezoning for 331 . 12 acres of land located along Highway 70 Bypass and St . Mary 's Road(SR 1002) northeast of Hillsborough . The property is referenced as Tax map 6 , Block B . , Lots 3 & 4 and Tax Map 22 Block A , lot 1.7 of Hillsborough Township . The property is located in an area designated as Ten Year Transition and Commercial Transition Activity Node in the Orange County Land Use Plan . The present zoning classification is ( Residential-1 ) R- 1 . The applicants are requesting 290 .03 acres to be rezoned PD-H-R2 , 29 .50 acres to be rezoned PD-H.-R5 and 10 . 43 acres to be rezoned PD-GC4 . PD-5-85 S.COTSWOOD March 25 , 1986 PAGE 2 IMPACT : Approval of the request would allow development of 410 residential lots with a minimum 20 ,000 sq . ft . per dwelling unit 216 attached multi-family dwelling units and a 65 ,460 square feet of commercial space on 10 .43 acres . RECOMMENDATION: The Planning Staff recommended approval of the planned development rezoning request and issuance of a Class A Special Use Permit withattached . conditions of approval . The Planning Board recommended denial of the planned development rezoning request and issuance of a Class A Special Use Permit . However, should the Board of Commissioners approve the request , the Planning Board recommends that approval be subject to the conditions specified in the attachment . i i . to IF W.'.o k r •ia a� �iijltxest - Suhdhiison • ••• to `a• j• 4 tj It = _ • a � f f ra, i . ! '9 5Y r i Apr.Rea A H C.�-.J.. ., a• 4H Go4 on,L + '�i 296.0± AC. I + Tormp.le-� Y �•' \ • P•vwx•d ian.n Z%a<rv.R•7, i 77laun R-., fOp'1111' rmn + R =4 l'.d00' 1W 1 22.3{ AC. too •. w � ' +�•aKi �`S,af+ziT`-iffiii7'"-""!Y+•+q*�_ wit& , iai r .ry • `r 12.4± y SCOTSINOOD AC. ,•'• Eastwood i Sa6division k 1 • ! �_ r„�,.—� ZONFNCi MAP _ ♦, - —'J/ - 1 JIM B A.H. Orafwm,Jy . t; �I��I�Il YI�. Ii 111iV li.�1t:311:\\IS 11.t,\Il'r\IvY.11�f.. -�-- _ - _ - _-_- .. . EXCERPT FROM February 18 , 1986 BOCC MINUTES 3 engineering fees for Priority I roofs at Stanback Jr. Hi h 2 and A.L. Stanback Schools. g 3 4 4. REQUEST FOR PREPARATION OF SKETCH THOROUGHFARE PLAN BY 5 NCDOT • Request NCDOT to initiate the development of a sketch 7 thoroughfare plan for Orange County. Motion was made by 8 that the forgoing action be taken by the Board. 9 VOTE: UNANIMOUS. • 10 • 11 H. ITEMS FOR DECISION-OTHER 12 1. Z-1-86 DONNIE CHAPMAN REZONING REQUEST 13 Director of Planning Marvin Collins presented for consideration 14 of approval the rezoning request submitted by Donnie Chapman to correct an 15 error in the Zoning Atlas. On October 1, 1984 when . zoning became 16 effective in Cheeks Township, the property of Donnie H. Chapman was placed 17 in an EC-5 Existing Commercial zoning category. The land placed in that 18 designation was thought to include those buildings associated with Mr. 19 Chapman's automotive service. The buildings located on an adjacent tract 20 (in the same ownership) are presently zoned AR. The intent of the 21 rezoning is to match the building locations with the appropriate zoning 22 classification. The Planning Board recommended approval of the rezoning 23 request to correct an error in the Zoning Atlas. 24 Motion was made by Commissioner Lloyd, seconded by Commissioner 25 Walker, to approve the recommendation of the Planning Board. 2 C VOTE: UNANIMOUS. 27 ' 2. PD-5-85 SCOTSWOOD 28 Director of Planning Marvin Collins presented for consideration 29 of approval a proposed planned development and rezoning request submitted 30 by John W. Graham and A. H. Graham, Jr. This item was submitted to public 31 hearing on November 25, 1985 and January 6, 1986. The Grahams have 32 requested rezoning for 331. 12 acres of land located along Highway 70 33 Bypass and St. Mary's Road northeast of Hillsborough. The property is 34 currently designated as Ten Year Transition and Commercial Transition 35 Activity Node in the Orange County Land Use Plan. The present zoning is R- 36 1. The applicants are requesting 290. 03 acres to be rezoned PD-H-R2, 37 29.50 acres to be rezoned PD-H-R5 and 10.43 acres to be rezoned PD-GC4. 38 Commissioner Lloyd referred to two documents in the agenda packet 39 and questioned the validity of receiving additional information after 40 the public hearing was held. 41 Attorney Gledhill maintained that the documents present arguments 42 and do not contain any new evidence that is not already in the Planning 43 Board minutes. The public hearing was continued to receive the Planning 44 Board recommendation. He pointed out the importance of making a decision 45 on the evidence submitted at the public hearing. 46 Chair Wilihoit pointed out the public hearing was held open to 47 receive the Planning Board recommendation which would include the process 48 they followed in reaching the final decision. The arguments that are put 49 forth during the Planning Board meeting are important as part of that 50 decision process. During deliberations on any item, the planning staff 5 1 . provides to the Planning Board their technical expertise to assist them in 52'5` making a decision. This information may or may not have been brought out 53 at the public hearing and would be considered as professional consensus 54 type information. 55 56 . : DRAFT = F . 4 1 C. Planning Board Chair Barry Jacobs stated that nothing is in the 2 document that was not heard at the public hearing or was not presented at. 3 the public hearing. He summarized the Planning Board action: 4 Recommendation: Deny planned development and rezoning by a 5-3 5 vote. 6 Issues Raised: (1) Water shortage in central and northern Orange 7 County, as identified in county manager's report, (2) traffic hazards and 8 congestion created by the proposed development on nearby roads and in 9 Hillsborough, (3) plan for Scotswood inconsistent with intent of County 10 Land Use Plan, and (4) impacts on public facilities. 11 Explanation of Dissenting Votes: (1) placed more credence in 12 Hillsborough water estimates than those by County Manager, and (2) 13 believed it unfair to penalize this developer for impacts inevitably 14 arisin from any development. 15 Chair Willhoit noted he received a telephone call from the Water i6 Resources Division of NRCD indicating they would be sending a final letter 17 regarding the water issue requesting the County make a decision on the 18 instream flow matter. Since the water is a major concern and a consensus 19 has not been reached between the Town of Hillsborough and Orange Alamance 20 and the County staff, he suggested delaying action on Scotswood until a 21 decision has been made on the water situation. 22. Commissioner Carey agreed with the delay on the project to allow 23 time for a consensus to be reached on the amount of unused capacity 24 available. There are also concerns about the traffic impact this project 25 would present. 26 After a brief discussion on water resources and water 27- availability, it was decided that since new information had and is still 28 being received that should be considered in the decision for the Scotswood 29 Project that a new public hearing would be in order to present this new 30 evidence. 31 Motion was made by Commissioner Lloyd, seconded by Commissioner 32 Marshall to adjourn the public hearing on Scotswood to March 5, 1986 for 33 the receipt of additional information on water resources and receipt of 34 additional public comment on the project. 35 VOTE: UNANIMOUS. 36 37 3 . EUBANKS ROAD SUBDIVISION-PRELIMINARY 38 Marvin Collins presented for consideration of approval the 39 Preliminary Plan for Eubanks Road Subdivision. Brooks and Son 40 Construction Company has requested approval of a subdivision for 6.36 41 acres of land located south of Eubanks Road (SR , 1727) in Chapel Hill 42 Township. A five lot subdivision with lot #5 reserved for use as a 43 community septic system drainfield is proposed. The property is located 44 within the Twenty year: Transition area and within the Joint Planning Area 45 and subject to joint approval of the Town of Chapel Hill and Orange 46 County. Both the Orange County Planning Board and the Chapel Hill 47 Planning Board recommended approval with the following conditions: 48 (1) that a stormwater management plan which satisfies the 49 standard for control of the first one-half (1/2) inch of 50 stormwater runoff from impervious surfaces be submitted for 5LT review and approval prior to approval of the final plat. 52t (2) that engineered plans for the community sewer system be 53 submitted for review and approval by the Orange County 54 Health Department prior to approval of the final plat. 55 56 REVISED WATER USE PROJECTIONS - HILLSBOROUGH SERVICE AREA Below is a summary of the estimated water use for both approved and proposed developments within the Hillsborough service area . On March 17 , the Hillsborough Town Board reviewed water use figures for Wildwood , Cornwallis Hills , Gateway Apartments , Coachwood Apartments , Oakdale Mobile Home Park , and several commercial establishments . Based on these figures , the. Hillsborough Town Board agreed to use a consumption estimate of 100 gallons per person per day for residential development and current commercial water use figures to arrive at an overall estimate for water use . • The Orange County Planning Department concurs with these estimates . WATER USE CALCULATIONS Water Usea (GPD) 1 . Approved Developments a . Meadowlands b 300 ,000 b . Wood sedge o 52 mobile homes 13 ,936 c . Cedar Creek Condominiums o 160 multi-family units 42 , 880 • d . Cornwallis Hills o 111 single family units 29 ,748 e . Oakdale Woods o 78 townhouse units 20 ,904 TOTAL ESTIMATED USE 407 ,468 CURRENT USE 1 ,400 ,000 TOTAL USE 1 , 807 ,468 2 . Proposed Developments a . Wildwood Section III , R-4 zoning o 35 single family units 9380 b . Weng property , R-3 zoning o 41 .8 acres , assume 35 .53 acres developedc o 44 single family units 11 ,792 e . Scholar property , R-3 zoning o 12 .4 acres , assume 10 .54 acres developed o 31 single family units 8308 t d . Wildwood Section IV, R-2 zoning o 28 .8 acres , assume 24 .48 acres . developed o 53 single family units 14 ,204 e . Oakrise Subdivision 10 ,988 o 41 single family units f. Scotswood 09 ,8$0 o 410 single family units 109 ,880 o 216 multi-family 4888 o Shopping centerd SUB-TOTAL (Proposed developments) 226 ,945 TOTAL ESTIMATED USE 2 ,034,413 3 . Water Treatment Capacity a . Current capacity 3 ,000 ,000 b . Remaining. capacity (minus TOTAL 965 ,587 ESTIMATED USE) a Assume 2 .68 persons per household . 1980 average house- size for Orange County . 1980 U .S. Census data . b "Sewer System Feasibility- Study for Central Orange Study Area" . E .C . Maguire , - Inc . May , 1985 . e Subtracted out 15% for roads . d Applied the following 1985 average water use figures. ( June through August consumption figures) : Wlar_Uag.- GPD Grocery store : Foodlion 1713 Drugstore: Revco 63 Miscellaneous shops: Huey 's 17714 Hardee 's 533 Colonial Florist 66 Super dollar 121 Apple Tree Clothing 29 S & S Hair Salon 206 TOTAL 4505 Ask WATER S U P P L Y I N O R A N G E C O U N T Y • = i 'Lake \ . . Orange t 86 'j i t j ■ Ili _,. , , . . . . . • ,, : 1 j Corporation ' ,,,' . Lake HILLSBOROUGH . X __ . _ -_ Ben 44 r 41111111164 ' '+ Johnson Lake ;;�. WT 1�1 S`'P 0 fel - • I • 4,• , - . . . • o • . . • FINDINGS BY N. C DIVISION OF WATER al•-.:-,',OURCES • • 1. WATER USAGE IS AT OR NEAR CAPP.V.ITY IN CENTRAL ORANGE 'OUNTY 2. A KINIMUM FLO- OJf.D A,:NrJ511,INEO IN THE RIVER • • 0 '!„ -.• . • . . . CAPACITY - A FUNCTION OF SUPPLY VERSUS DEMAND SUPPLY SAFE YIELD RATE IN :-IILLION GALLMs (tIGD) 2.20 LAKE ORANGE A . IS .12 ADDITION WITP CLASHBOAROS 02 1 .79 CORPORATION T•:■KE IF I3YPA9 fMSTALLED .44 LAKE BEN JO-,INSON OPERATE;) BELOW FULL .20. ADDITION WITU FiAsullORDS 3.75 TOTAL SAFE • DEMAND = WATER BEING USED 1.33 HILLSBOROUG1-; .41 APPROV::.; • • .91 PROPOS WENG :Cr.-Mf-J.SOk Faff)TVISTOT,1, OAKR S-!'• !':"COT3S,;-100.T) .60 ORANGE ALMAI':;.:1'; WZ-v .50 to 1.7 .40 to 1.1 3.44 to 5.34 fr!:%7.,A DIFFERENCE +31 to -1.59 0 • r'• • " . . .• • ' ISSUES REGARDING SUPPLY 1. EXTENT TO WHICH EXIST IN(i RESERVOIRS VOLUME CAN BE INCREASED OR MADE MORE OSUABLE - LAKE ORANGE 1. FT. FLASHBOAaD 120,WD GD 2. FT. FLASHBOA 7 250,00 OD • - CORPORATION LAKE I • BY-PASS PIPE METES- -- LAKE PEN JOHNSOH FLASHBARD op 2. EXTENT TO 1.,MicH LxIST ; 5,1[1-..:,pLEmENTED BY WATER PURCHASES - 1.2 MOD MAY BE --JP,LINOTON - DURHAM AMOUNT UH-.)M fOMPTPIN'O • ISSUES PERTAINING TO WATER USE HILLSBOROUGH I. WILL ALL PROPOS0) DEVELOYAENT EE APPROVED? ' 2. HOW QUICKLY WILL THE PROJECTS BE BUILT IT: PHASED? 3. DURING A DROUEH DOW MUCH ON THE USE CAN BE BY PURCHASED WATER.' 1 ORANGE ALAMANCE 1. HOW MUCH AND HO :,AST ULLIT -rT..MTHER DEVELOPMENT OCCUR? 2. DURING A DROUGH- HOW USE CAN PD BY PURCHASED WATER? ORANGE WATER AND SEWER : ITHORITY 1. HOW MUCH AND H:(1H i!'AST DINELONENT OCCUR? 2. DURING A DRCTJE DOW MUCH Ot! ti-YE USE CAA BB BY PURCHASED W.:-.72EF 2,C NED CORNER D1-'N N • • 1111, ISSUES - INSTREAM FLOW 1. WHAT IS THE MINIMUM AMOUNT AND FOR WHAT PURPOSE? . • WATER QUALITY, AQUATIC. '-.IFE, RECREATION • AESTHETICS • 2. WHETHER TO SET AT Ti0: 7 Q. 10 LOW ?LOW AMOUNT (7-LOWEST DAYS WITHIN A 10 YEAR PERIOD) ? 3. HOW SHOULD `.f'HF 1. AS MEASURED IN 1 ;:',Y US LOGICAL ;:UEVEY 2, AS ADJUSTED FOR %TVERSI i:: WATER. THAT NO NOT • RETURN TO THE R. a. O ':'•n.,, A -....AT- .44 MUD b. (Y:?AS.- i. MC-J) 4. HOL• MUCH AND HOW F1-1.,- - SHO:.i_:. :KE,r.I FLOW 4,f,E REDUCED DURING DROUGHTS? { • . . ... .,_,... . ocr. ;101‘ .1, IN „. e N. tr.d.z; . NAl'IL t-ii . r,- -it ,J: - °'''. , D \\,: i,,,,,;„i.;, 10, 1-i .,,,\..ib i , ik . . ,... , .: so ..._. ): \ . / ),:ril;ake • • -.1/ _ r. -r,..5 [85 i 7. '-'=1. is . / bj 0 s tN,ia.i.:47_,.-.),7,0- ,0 .4±_.,'-:i. , , '., , _i _ f .1.7 i Corporation \'1/4\1),r ...y. i':-;. . '-',...-7,,,,,...,,,, ,. .....„; --'',..,:, .-..-7--- ,--,,,: 85 . -I-_---.-.-,--7,-;-:7,1:::_,_.‘ cl---- 1 I:/ -.-,,,=:7.- ,... 0-."....?..S. ?7, ei-:4 _\ 1 ' '-.) '.:41 : :;,,,r7L::'t‘.,1•■•k,1 17::,,.;.2'.... .,,:-...:...,:;..',::.s.,....6,.41 7::::\ll'.......):1: NI (:., ,' t ''''-vii:---. ,,,,,...-,:.:„..:-...:.‘......_..,_...s,t,.4...z.,........,......'...7,-,..._....:,z...„„.11,--,,,::,....;,,,...;_. o :„. ,,......., ,,,,, . ,, ,,.:., ,... .,...--,7:, ' •o ' LONG RANGE ISSUES • 1. TO WHAT EXTENT SHOULD EXISTI UPPLIES EE NANhGED? - USE OF FIXED WIT1JDRA9AL LIMTTS - - BOTTOM LINE ON PUR(:UASE DIVERSIONS hl'hY INSTREAM FLOW - CONSERVATION - VOLTARY AK1., MANDATORY - PHASED DEVELOPMENT c)1R. DEVELOPMENT MORATORIUMS - EQUAL RATE OF RESEOIR DRAWDOWN 1(-!0.qTRAL AND SOUTH) 2. WHAT TIMING TO EX-PEC lN SUPPLIES - EUPLT,NGION - CANE =ET:, TO HILL ()ROUGH - NEW RES.: RVOIE Oa P ::(ONAL SYSTY 3. WHO WILL PAY EDT I-1E : TM SC. SP 1i'ITC ST 5Ei<Vii IS? 4. WHO WILL PAY FOR NEW :. ERVOTP. )NS5=11105 AND BY WHAT' METHODS - WATER RATES AND Cr..: TION' - IMPACT FEES - BONDS • O R A N G E C O U N T Y INTEROFFICE MEMORANDUM TO: Board Members FROM: County Manager SUBJECT: Manager Communication DATE: February 26, 1986 Scottswood Hearing In order for John Wray of the NRCD Division of Water Resources to be present we had to reschedule the hearing from March 5 to March 25. February 12 , 1986 Letter of NRCD (Attached) The letter is in follow-up to the call the Chairman received from John Wray. Second Hearing on the Land Use Plan for the Joint Planning Area The date of April 17 is agreeable to all jurisdiction. An item to confirm this date will be on the next agenda. Social Service Department Staff Study This study by the Regional Office, Division of Social Services, is being undertaken at County request to address staffing adequacy within the department. A meeting Tuesday, February 24 served to discuss and reconcile differences of view over the methodology to be employed. A report will be available in time to consider any budget ramifications. Public Transportation Study DOT has enlisted to the aid of the Department of City and Regional Planning to undertake a study of traffic growth within the Region. This is in recognition that conditions are becoming more severe. I gathered from the briefing I received last week from David King, Doug Sharer and Gorman Gilbert that DOT is prepared to not limit the study to problem definition. There will be a consideration of service options that could be installed (such as drive sharing, INTEROFFICE MEMORANDUM: 8602-505 Manager Communication February 26, 1986 Page 2 buses, commuter lines and even passenger railway) , and organization and financing options for these measures. The study will formally begin as soon as Secretary Harrington has made his announcement. It will take 6 months to complete. I will ask Gorman Gilbert to orally brief the Board once the announcement is made. Your input may be sought later on such key questions as whether to form an authority for operating a regional transportation system; and the degree to which user fees should be employed for financing versus proceeds from a sales tax or suballocation of costs back for the Counties and municipalities to pay. Kenneth R. Thompson KRT/srs FE, 2 0 1966 d� �w °Aa State of North Carolina Department of Natural Resources and Community Development Division of Water Resources 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor S. Thomas Rhodes, Secretary John N. Morris ta Director February 12, 1986 Mr. Donald Willhoit, Chairman Board of County Commissioners 203 Lexington Road Chapel Hill , North Carolina 27514 Dear Mr. Willhoit; Based on our work with Mr. Kenneth R. Thompson and his staff and our analysis of water supply storage in Orange County, we are concerned that the potential for a serious water supply shortage exists. Unfortunately, the development of new storage or backup supplies has not kept pace with the withdrawal of water for municipal needs. The Division of Water Resources is available to assist you and individual water systems with long-range water supply planning needs. We urge you to continue your efforts to make water supply a priority issue and remain hopeful that a formal notification of a potential for a water supply shortage in Orange County, in accordance with the duties and responsibilities entrusted to the Environmental Management Commission by the General Assembly, G.S. 143-354(a) (3) , will not be necessary. The increasing use and diversion of water from the Eno River during low streamflow periods has resulted in a "drying up" of the Eno River below Hillsborough for longer and longer intervals each year, with the accompanying denial of downstream property owners' riparian rights; a loss of habitat for fish and other aquatic life; reduction in water quality; and the loss of a valuable backup fire fighting source. According to the August 1977 Feasibility Study by Rose, Pridgen & Freeman, Inc. , "The Eno River has good quality water, and the low-flow problem can be adequately overcome by releases of water from Lake Orange, a secondary water supply for flow augmentation in the Eno River." And as stated in the environmental data submitted in October 1977 to the Department of Human Resources in support of the August 1977 application for clean water grant funds, "No NPDES permits will be violated. The additional draw will not decrease downstream flow in the Eno River." As mentioned in my letter of May 15, 1985, subsequent history indicates that these conditions, with regard to downstream flow as outlined above, have not been met. Serious consideration P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 9I9-7334064 An Equal Opportunity Affirmative Action Employer Mr. Donald Willhoit Page Two February 12, 1986 should now be given to providing minimum downstream flows on the Eno River. Options open to the State include the designation of a "Capacity Use Area" under the Water Use Act of 1967 or the beneficial use procedures under the Water Authorities Act or the minimum release provision under the Dam Safety Law. We urge the county and the water systems involved (Orange-Alamance, Orange Water and Sewer Authority, and the Town of Hillsborough) to work to- gether to develop procedures and actions to insure that both their own and future water needs are met and that a reasonable percentage of available streamflow passes downstream to other riparian users, including the Eno River State Park. As always, we stand ready to continue to work with you and your staff in resolving these difficult problems. Very truly yours, ohn D. Wray,/ P.E. Deputy Director cc: Mr. Kenneth R. Thompson ✓ Mr. John Morris References for Review: G.S. 143-215. 11 through 215.32 G.S. 143-354(a) (3) G.S. 1S3A-285 G.S. 162A-7 • • RESEARCH TRIANGLE REGION PUBLIC TRANSPORTATION STUDY Proposal to Public Transportation Division North Carolina Department of Transportation January 1986 By Department of City and Regional Planning Research Triangle Area Project University of North Carolina Chapel Hill , NC 27514 in cooperation with Institute for Transportation Research and Education University of North Carolina I. INTRODUCTION AND PROBLEM STATEMENT The spectacular growth of the Research Triangle Park in recent years has brought with it a number of important benefits to the Triangle area. The Park has stirred economic development with many new jobs in research and development industries. As a result of this growth, the region has enjoyed an extremely low unemployment rate and a booming local construction industry. Along with the growth, however, there has also been increased stress on local services. One such service is transportation. The growth in population and employment in the Triangle area has created tremendous stress on the local system of roads and highways. Highway congestion, once almost unknown in the then rural Research Triangle Park area, is now a matter of increasing concern to commuters within the region. Ironically, many of these commuters have recently moved to the Triangle from urban areas in which traffic congestion was a serious deterent to the quality of life. Now these same commuters are finding traffic congestion to be a major problem in their new location. In fact, the quality of life advantages of central North Carolina, which attracted many of the businesses and people to the Triangle area, may potentially deteriorate to the point at which economic growth is hindered. Clearly, there are a number of possible measures which could alleviate the transportation problem within the Triangle region. Highway improvements, such as the completion of I-40, are one such measure. Alone, more highways will not solve the problem. As it has been demonstrated in countless cities across the country, more highways lead to more travel , and highway planners are forever put in the position of trying to catch up with the demand for highway travel . In addition, highway construction is exceedingly expensive. The recent Wilbur Smith study for the Reseach Triangle Foundation identified $11.9 million of road improvements needed just for the Research Triangle Park. Even with these improvements and with the completion of I-40, the transportation problem in the Triangle area will continue. There are other possible contributors to the solutions. One is to improve the provision of public transportation services within the Triangle area. Currently there are three urban bus systems serving the three principal cities in the Triangle, yet none of these systems serves the Research Triangle Park, and no two of these systems are linked together. Thus a commuter who wishes to travel either from one city to the other or from one city to the Triangle Park does not have bus service as a travel option. One possible way to relieve the transportation problems in the area would be to improve the level of service and the coverage provided by fixed- route buses. The regional ridesharing organization, TRI-A-RIDE, which is housed at the Triangle J Council of Governments, provides carpool and vanpool matching services and leases vans to private individuals who want to head up vanpools. A dramatic increase in these commuter pooling efforts could be a viable way to provide relief to traffic congestion. • • Also within the realm of public transportation are several more exotic and more expensive transportation modes. Monorails, light rail transit, and rapid transit modes all are candidates for consideration within the Triangle area. In addition, it is possible that people mover systems, such as the one now operating at Duke Hospital , may also have applicability within • certain.portions of the Triangle area. • Finally, several approaches that are grouped in what is known as transportation systems management (TSM) and which represent departures from standard highway construction as the principal means of addressing transportion needs could resolve the Triangle's highway congestion. Among these approaches are various traffic engineering strategies (signalization improvements, lane restriping to create more lanes without construction, and intersection improvements) , demand management practices such as flexible work schedules for peak travel spreading, and changes in parking policy which promote carpooling. Perhaps the most promising of the TSM approaches, though the most expensive, is the construction of dedicated communter lanes on existing highways. While all of these public transportation and non-traditional , TSM options hold some promise for the Triangle area, their implementation points to the need for a comprehensive, region-wide approach to the transportation problem. This is because whereas traditional highway planning and construction are the responsibilities of the state (and, indeed, the federal funding for implementation of highway plans is controlled by the state and matched typically only with state funds, not local funds) , public transportation planning and provision of services are the responsibilities of the cities (with federal transit funds flowing directly to the cities with little or no state matching funds) . Planning for thoroughfares in the Triangle is done at the metropolitan scale which encompasses large areas outside municipal boundaries as well as multiple municipalities (Raleigh-Cary-Garner- Morrisville and Durham-Chapel Hill-Carrboro areas) , thereby enhancing the ability of the state, as the central coordinator and leader, to address region travel needs to be met by the highway system. On the other hand, the provision of public transportation services is limited to municipal boundaries because of the direct tie between the source of funding (local property taxes and other local revenues) and the provider (local units of government) . Thus, although there are legitimate transportation needs that could be met or problems that could be solved through public transportation approaches, there is not an adequate organizational structure to deal with these extra-municipal public transportation needs. Thus, it can be seen that there are mobility problems in the Triangle area which, while they are regional in nature, fall between the natural jurisdicition of the cities and the state. All of the urban areas in the Triangle, as well as the Research Triangle Park, have conducted public transportation studies. However, there has never been a region-wide look at the mobility problems of commuters which focuses on the organizational issues of how to attain the potential benefits of various forms of public transportation and TSM-type actions in solving these mobility problems. A region-wide problem requires a regional solution. With the current rapid growth of the Research Triangle area, this is a particularly opportune time to consider alternative transportation strategies. Transportation infrastructures are long-lasting, and decisions made today regarding these infrastructures will affect the region for future decades. Before growth has forclosed some transportation options, it is important to consider a wide range of public transportation and TSf4 solutions, ranging from low capital cost alternatives, such as vanpools and fixed-route bus service, to more expensive options, such as fixed guideways and high-occupancy highway lanes. An essential , yet currently missing, element in a regional transportation strategy is the existence of an appropriate regional organization to provide public transportation services. For example, as noted earlier, there are three fixed-route bus systems in the Triangle region, yet none of these serves the Research Triangle Park. If there were a regional public transportation organization, this organization could conceivably provide fixed-route bus service throughout the region, not just in individual cities. Or, the organization could construct appropriate public transportation facilities to serve the region. Without such an organization, the individual jurisdictions within the Triangle area will forever be approaching a regional problem on a piece-meal basis. Regardless of its form, a regional public transportation organization cannot be considered in the abstract. To be effective, such an organization must be created with a definite and agreed-upon purpose in mind. The purpose of such an organization must be based upon a common perception of what the transportation problems in the Triangle area are and what types of solutions are most appropriate to solve these problems. This proposal addresses the mobility needs in the Triangle area, the development of options for public transportation services and TSM-type actions to mitigate these needs, and the development of a consensus on how to approach solutions to these problems. There are four subsequent sections to this proposal . In Section II , we describe a set of goals and objectives for the proposed study. Section III discusses the overall approach that we propose to follow in conducting the study. Section IV describes in greater detail the specific services that we will provide within the study. The final section provides information on the proposed budget. II. GOALS AND OBJECTIVES It is important to specify what this proposed study will accomplish. There is one over-riding goal for this study: To develop a consensus among local and state officials regarding an appropriate course of action to mitigate the transportation problems within the Triangle region through methods other than traditional highway development. This goal is clearly an ambitious one. There are many local and state officials, and their views on any single issue are, of course, varied. It is not reasonable to expect that all officials will agree on an appropriate transportation solution, particularly within the scope of time covered by the study. However, it is reasonable to expect sortie level of consensus regarding what the transportation problems are and what a general strategy should be to resolve these problems. Thus, this goal results in several more specific objectives for the proposed study: a. To develop a clear, accurate assessment of the emerging transportation trends and the future transportation needs in the Triangle area; b. To explore, analyze, compare and evaluate the effectiveness of alternative public transportation and TSM-type actions for alleviating the transportation problems facing the region; c. To assess the alternative organizational structures that might be used in developing a regional public transportation entity; and, d. To develop among local and state officials a clear understanding of the relative merits of each alternative organizational structure and each alternative service and TSM option in solving the region's transportation problems. As a result of this study, the ability of the jurisdictions within the Triangle area to resolve the ongoing transportation problems should be significantly improved. All local and state officials will have access to the study documents which will include a clear presentation of the transportation problems and trends within the region. All officials will also have the opportunity to discuss the relative merits of different organizational and service strategies. Based upon these study results it should be possible to proceed with the development and implementation of a regional structure to help solve the region's transportation problems. In addition, the study results will suggest which public transportation services and TSM-type actions hold the most promise for mitigating the region's transportation problems. • • III. STUDY APPROACH There are two major thrusts to the proposed study. The first of these is to examine alternative public transportation service and TSM strategies for the Research Triangle .region. The second is to explore the optional organizational structures that might be suitable for the Triangle area. Our approach in dealing with the transportation needs assessment is to emphasize the presentation of existing information rather than to collect new travel data. We shall rely on travel data that have already been collected by the N.C. Department of Transportation and local jurisdictions within the region. We shall not collect new travel data. Rather, we shall focus on developing effective formats for displaying these data. Relying on charts and graphs and high quality graphics, we shall attempt to portray the current transportation trends and the likely future problems facing travelers within the region. Our primary focus in doing so shall be on commuting travel , but we shall also provide information describing problems faced by non-commuters, such as persons without access to cars, students, the elderly, and the handicapped. We shall examine approximately six public transportation service options and various TSM-type actions and assess the ability of each to meet the needs of the region. We shall work closely with a steering committee established by NCDOT and comprised of local and state representatives. The steering committee shall assist us in identifying appropriate options and in reviewing the analysis. In examining the alternative organizational structures, we shall attempt to be creative in considering organization stuctures that do not now exist in North Carolina. Our approach here will be expansive and creative while at the same time realistic. We will attempt to encourage local officials to think about new ways to approach a regional problem. After the organizational structure options have been identified, we shall analyze each organizational option and evaluate its appropriateness for the Triangle area. We shall also examine the relation of each organizational option to the existing instituional arrangements for guiding development of our highway system. The key element in this portion will be ongoing, extensive liaison with local officials throughout the region. IV. SCOPE OF SERVICES We propose a study design that includes four separate tasks. This section describes each of these work tasks. Task 1: Analysis of Current and Future Transportation Trends. Working with the steering committee, we shall assemble all the available travel data for the Triangle area. Most of this information we already have in hand, so this part of the task should require primarily that we verify with the cities and with the N.C. Department of Transportation that our data are complete and up-to-date. As part of this task we shall also collect information from the jurisdictions within the Triangle area regarding their transportation decision making. We shall interview the transportation staff members in each jurisdiction as well as the Research Triangle Foundation. We shall collect all documents describing the organizational structures as they pertain to transportation in their jurisdiction. We shall meet with the Metropolitian Planning Organizations (MPO) in the two urbanized areas. We shall collect and review all planning documents for these jurisdictions. We shall also interview the primary private transportation providers in the region, including Raleigh Transportation Services, Carolina Trailways, and Southern Coach. Finally, during the Task 1 we shall prepare a detailed plan for conducting the interviews and meetings in Task 3. Task 2: Analysis of Alternative Service and TSM Strategies. We shall then identify approximately six public transportation service options for further analysis. These options shall include fixed-route transit services, carpool and vanpool approaches and light rail and other more exotic technologies, as well as TSM actions, including development of commuter lanes. They shall be selected with the advice of the steering committee. We shall examine each one at the level of detail sufficient to identify the capital and operating costs, the ease of implementation, the required management structure, any pertinent legal constraints, and the overall impact on the regional travel problems. This analysis will be a first-cut feasibility analysis and shall identify which options warrant further consideration. The analysis in Task 2 will provide particular emphasis on the involvement of private operators in the transportation service options. For each option, we shall identify the opportunities for contracts with private providors of services, and other actions by local governments that will promote private sector participation. One of the criteria to be used in evaluating the service options is the extent to which the service option encourages private participation. Task 3: Analysis of Alternative Organizational Structures. An essential component of the proposed study is close liaison with local officials throughout the Triangle region. This liaison will begin at the outset of the study. We propose that the Secretary of Transportation send a letter. to local public officials, including elected officials and managers, describing the study and notifying the officials that the study team will be contacting them during the study. We propose that this initial letter not ask the officials for any information but simply inform them that the study effort is beginning. • Our intensive liaison work will begin at the conclusion of Task 2. At that time the study team will send to each public official a copy of the technical report which will outline the transportation trends developed in Task 1 and the preliminary service and TSM alternatives from Task 2. Along with this report will be a letter describing the study process and informing the officials that the study team welcomes the opportunity to receive their input and comments. The letter will further explain that the study team will be in contact with the public officials to further discuss the study. After that, the study team will undertake a round of one-on-one meetings with prominent local officials. This liaison work will initially focus on the city and county managers within the region and then quickly . move to the mayors and county commission chairmen. The purpose of these meetings is two-fold. First, we shall seek to clarify any information from the technical report that may not be clear to the officials.. During this process we shall ask them for comments and reactions concerning the report. Second, we shall ask the officials to express their thoughts about how the transportation problem may be solved in the region. While service options will be outlined, emphasis in this phase of the study shall be on exploring with these officials ways to address the organizational issues. We intend that his portion of the discussion will last as long as the officials wish and will be open-ended. The study team's role will be to facilitate discussion, to provide suggestions regarding alternative service and organizational strategies, and to guide the discussion. We shall not be proposing a particular service and organizational strategy, but rather we shall be eliciting from the officials their comments and suggestions. After each meeting, we shall follow up with a letter thanking the official and suggesting a further meeting. After this initial set of meetings, we shall prepare an interim document which outlines service options and which proposes and analyzes a series of different organizational options for the Triangle region. One such option will be a region-wide transportation authority. Another option will be a region-wide transportation management association composed of the jurisdictions and the major private employers. There will also be other options as yet unspecified. For each of these options, there will be a description of what they are, how they might function, how they might be operated, what they could legally do, and how much they would likely cost. We shall also examine how each of the alternative organizations would relate to the already existing institutional structure for developing our highway system. This interim report would be intended to elicit discussion and to • focus that discussion on the viable organizational alternatives. This report would also be sent to all the local public officials, and again a second set of meetings would be scheduled with these officials. During the second round, we shall attempt to meet with more than one public official at one time. In so doing, we will hopefully develop a basis for understanding and communication among the public officials as well as a consensus regarding which organizational and service options are most appealing. _._—_ L • Task 4: Final Report. At the conclusion of Task 3 we shall prepare a written report that will accomplish two objectives. First, the report will completely describe the activities in which we have engaged during the study. It will describe the analysis and data, as well as the liaison efforts. Second, the final report will focus on an in-depth evaluation of the organizational options and will provide guidance on which service and TSM options appear to be most feasible for the Triangle area. This part of the report will be a revised version of the interim report that was used in the second round of public officials meetings. It will describe each organizational option, and it will provide in a matrix form a detailed evaluation of the advantages and disadvantages of each organizational option. Among the evaluation criteria will be the following attributes: operations capabilities; ability to provide area-wide service; ability to raise capital ; and accountability to local elected officials. The service and TSM options will be outlined and evaluated according to relative capital and operating requirements, effectiveness in meeting transportation needs, and liklihood of private sector participation. This report will be provided in draft form to the Department of Transportation for review and will then be revised. A final camera-ready copy will be provided at the conclusion of the project to the Department of Transportation. " z-A5/54:. • Tiz-of-iRx:ra,.-T-L -t 1.4 -rz-roc. . . . . • • . . _ OF N o;- L--(--"Thrztj&_11,1r S 4-1 Z:LE_ • r2 . -1z._;17 (LI-r1 -47cr.ve rc-rzzt- C C.,45172 tJ-.1 L..rjazr2-1 ) 41 g not_A G 1-40-411-* • • . 4:TN'"="- 1;-;7_, . -7-1-"? — • • GORMAN GILBERT ft Professor Department of City and Regional Planning A}" UNIVERSITY OF NORTH CAROLINA ) f t )j Chapel Hill, NC.27514 • 919.962-5204 North Carolina • Department of Transportation Public Transportation Division David D. King Director P. O. Box 25201 Raleigh, N. C. 27611 ' % Office (919) 733-4713/ North Carolina 1 Department of Transportation - Public Transportation Division Douglas M. Sharer Urban Program Manager P. O- Box 25201 \Ra:eigh, N. C 27511 °" § Office (919) 733.4713/ _ _ Pefei 1 ., atileqf (044- '&11.2i 1 j 0 , _ . . . . . _ . _ ....___ . _ . _ _ . . _ _ . _ _ . _