Loading...
HomeMy WebLinkAboutAgenda - 02-17-1981 �Z . ��` _ ��` �'` --�r ~ '� -���' '��.` �-'` . �_`�.`^`r' ��^� c. ` ^ ' •'� - ` ^`' -�� ^' -'' -^ - ' - � . - _ xp=~ ___ FDTURE FARMERS OF AMERICA PROCLAMATION FFA WEEK - 1481 WHEREAS, The Future Farmers of America with vocational agriculture; and WHEREAS, members of the FFA are playing an outstanding role in assuring the future progress and prosperity of our nation; and WHEREAS, the FFA motto--"Learning to do, doing to learn; earning to live, living to serve"--gives a direction of purpose to these future leaders for tomorrow's agriculture; and - WHEREAS, the FFA performs the valuable service of develop- ing leadership, encouraging cooperation, promoting good citizen- ship, teaching modern agricultural information, and inspiring patriotism among its members, THEREFORE, WE, The Orange County Board of Commissioners, do designate the week of February 22-28, as FFA WEEK, Anne Barnes, Chair Orange County Board of Commissioners „IAA...014; FLOOD DAMAGE PREVENTION ORDINANCE ARTICLE 1. STATUTORY AUTHORIZATION FINDINGS OF FACT PURPOSE AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of North Carolina has in Section 110 of the Flood Disaster Protection Act of 1968 (Title XIII of tha Housing and Urban Development Act of 1968 (Pub. L. 90-448) , 42 U.S.C. 4001-4128, and 44 CFR Part 67.4(a) delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the Board of County Commissioners of Orange County, North Carolina does ordain as follows: 1.2 FINDINGS OF FACT (a) The flood hazard areas of Orange County are subject to periodiC Anundat which results in loss of life, property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare. (b) These flood losses are caused by the cumulative effect of obstructions in flood plains causing increases in flood heights and velocities, and by the occupancy in flood hazard areas by uses vulnerable to floods or hazardous to other lands which are inadequately elevated, flood-proofed, or otherwise protected from flood damages. 1.3 STATEMENT OF PURPOSE It is the purpose of this ordinance to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to: (a) restrict or prohibit uses which are dangerous to health. Qafal+,, (e) prevent or regulate the construction of flood barriers whic unnaturally divert flood waters or which may increase flood to other lands. 1.4 OBJECTIVES The objectives of this ordinance are: (a) to protect human life and health; (b) to minimize expenditure of public money for costly flood con projects; (c) to minimize the need for rescue and relief efforts associate flood and generally undertaken at the expense of the general (d) to minimize prolonged business interruptions; (e) to minimize damage to public facilities and utilities such a6 and gas mains, electric, telephone and sewer lines, streets bridges located in flood plains; (f) to help maintain a stable tax base by providing for the sound and development of flood prone areas in such a manner as to z future flood blight areas; and, (g) to insure that potential home buyers are notified that properi in a flood area. N. ARTICLE 2. DEFINITIONS Unless specifically defined below, words or phrases used in this ordinan, shall be interpreted so as to give them the meaning they have in common 1 and to give this ordinance its most reasonable application. "22.pjal.." means a request for a review of the building inspector's interpx of any provision of this ordinance or a request for a variance. "Area of s.ecial flood hazard!! is the land in the flood plain within a co subject to a one percent or greater chance of flooding in any given year. 3 the Mobile home is to be affixed (including, at a minimum, the installation of utilities, either final site grading or the pouring of concrete pads, and the construction of streets) is completed before the effective date of this ordinance. "Ex ansion to an existing mobile home park or mobile home subdivision" means the preparation of additional sites by the construction of facilities for servicing the lots on which the mobile homes are to be affixed (including the installation of utilities, either final site grading or pouring of concrete pads, or the construction of streets). "IloodLoyfilaadine means a general and temporary condition of partial or complete inundation of normally dry land areas from the unusual and rapid accumulation or runoff of surface waters from any source. "Flood Hazard Boundary Map (FHBM)" means the official maps for Orange County, issued by the Federal Insurance Administration, where the boundaries of the areas of special flood hazard have been designated as Zone A. "Flood Insurance Rate Map (FIRM)" means the official maps for Orange County, on which the Federal Insurance Administration has delineated both the areas of special flood hazard and the risk premium zones applicable to the community. "2:122LInsurans2_Slude is the official report written for Orange County by the Federal Insurance Administration. The report contains flood profiles, as well as the Flood Hazard Boundary-Floodway Map and the water surface elevation of the base flood. "Floodplain" any land area not in the floodway susceptible to being inundated by water from the base flood, and designated on the Flood Hazard Boundary Map preparE by the U.S. Department of Housing and Urban Development, orzif not deSignated 'on t maps, then designated in the Soil Survey of Orange County as Altavista OW., Chewa (Ch), or Congaree (Cp) soils, or these soils are identified by a' site survey and attendant topography, vegetation patterns, and physical flood evidence, such as ma on trees or vegetation. "Floodway" means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. As used 4- 1 . Mobile .home shall also mean a doublewide mobile home whidh is two or manufactured housing units designed for transportation on their own c connect on site for placement on a temporary or semi-permanent founds thirty-two feet in length and over eight feet in width. ".121212jgAjkoLszKle a parcel of land occupied or intended to be occup: only one mobile home, and for the exclusive use of the occupants of s; "New donstructionu means structdres for which the "start of constructs commenced on or after the effective date of this ordinance. "New mobile home 'ark or mobile home subdivision" means a lot in singl (or contiguous parcels) propoSed to be used for the placement of two o homes for use as dwelling units for which the construction of faciliti servicing the lot on which the mobile hoMe is to be affixed (including minimum, the installation of utilities, either final site grading or ti of concrete pads;; and the construction of streets) is completed on or effective date of this ordinance. "Start of construction" means the first placement of permanent construe structure (other than a mobile home) on a site, such as the pouring of or footings or any work beyond the stage of excavation, including the r of a structure. Permanent construction does not include the installatil streets and/or walkways; nor does it include excavation for a basement, piers or foundations or the erection of temporary forms; nor does it inc installation on the property of accessory buildings, such as garages or not occupied as dwelling units or not as part of the main structure. Fo structure (other than a mobile home) without a basement or poured footin the "start of construction" includes the first permanent framing or asse the structure or any part thereof on its piling or foundation. For mobi not within a Mobile home park or mobile home subdivision, "start of cone; means the affixing of the mobile home subdivisions, "start of constructic date on which the construction of facilities for servicing the site on TA the mobile home is to hp aff4y.A -------■m".11111111111111.111.11111M 5 has been damaged and is being restored, before the damage occurred. For the purposes of this definition "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include either (1) any project for improvement of a structure to complyywith existing state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions, or (2) any alteration of a structure listed on the National Register of Historic Places or the State of North Carolina Inventory of Historic Places. "Variance" a relaxation of the terms of this ordinance where such variance will not be contrary to the public interest and, where, owing tO conditions peculiar to the property and not the result of actions or the situation of the applicant, a literal enforcement of the ordinance would result in unnecessary and undue hardship. A variance is authorized only for the dimensional controls of this ordinance; establishment or expansion of a use otherwise prohibited shall hot be permitted by a variance. ARTICLE 3. GENERAL PROVISIONS 3.1 LANDS TO WHICH THIS ORDINANCE APPLIES This ordinance shall apply to all areas of special flood hazard within the jurisdiction of Orange County. 3.2 BASIS FOR ESTABLISHING THE AREAS OF SPECIAL FLOOD HAZARD The areas of special flood hazard identified by the Federal Insurance Administratif through a scientific and engineering report entitled "The Flood Insurance Study for Orange County, North Carolina," dated September 16, 1980, with accompanying Flood Insurance Rate Maps and Flood Boundary and Floodway Maps and any revision thereto are hereby adopted by reference and declared to be a part of this ordinance. ammilmolum asiprovided in 4.2. (b) For purposes of this section, an artificial obstruction is other than a natural Obstruction, that is capable of reduci carrying capacity of a Stream Or 'that may accumulate debris reduce the flood carrying capacity of a stream. A natural includes any rock, tree, gravel, or analogous natural matte] obstruction and has been located within the floodway by a II( 4.2 PERMISSIBLE USES WITHIN FLOODWAYS The following uses may be made of floodways as a matter of right and a to this ordinance: (a) general farming, pasture, outdoor plant nurseries, horticult1 wildlife: sanctuary, game farm, and other similar agricultura: and related uses; (b) ground level loading areas, parking areas, aircraft runways a similar ground level area uses; (c) lawns, gardens, play areas and other similar uses; (d) golf courses, tennis courts, driving ranges, archery ranges, grounds, parks, hiking or horseback riding; (e) streets, bridges, overhead utility lines, railway lines and ri creek and storm drainage facilities, sewage or waste treatment outlets, dams, water supply intake structures, and other simil community or utility uses; (f) temporary facilities (for a specified number of days) such as circuses, carnivals, or similar transient amusement enterprise: (g) boat docks, ramp, piers or similar structures. 4.3 CONSTRUCTION WITHIN FLOODWAYS AND FLOODPLAINS RESTRICTED (a) No structure may be constructed and no substantial improvement existing structure may take place within any floodway. 0. • 7 (d) Whenever any portion of a floodplain is filled in with fill dirt, sic)] shall be adequately stabilized to withstand the erosive force of the base flood. 4.4 WATER. SUPPLY AND SANITARY SEWER Systems in Floodways and Floodplains. (a) Whenever any portion of a proposed development is located within a fix way or floodplain the agency or agencies responsible for certifying to the County the adequacy of the water supply and sewage disposal system for the development shall be informed by the developer that a specifie area within the development lies within a floodway or floodplain. 'Thereafter approlial of the .proposed system by that agency shall-consti tute a certification that: (1) such water supply system is designed to minimize or eliminate infiltration of flood waters into it. (2) such sanitary sewer system is designed to eliminate infiltration, of flood waters into it and discharges from it into flood waters. (3) any on-site sewage disposal system is located to avoid impairment to it or contamination from it during flooding. 4.5 MOBILE HOMES (a) No mobile home shall be placed in a floodway except in an existing mobi home park or existing mobile home subdivision. (b) All mobile homes located in the floodway after the adoption of this ordinance shall be anchored to resist flotation, collapse, or lateral movement by providing over-the-top and frame ties to ground anchors. Specific requirements shall be that: (1) over-the-top ties be provided ateach end of the mobile home, with one additional tie per side at an intermediate location on mobile homes of less than fifty feet and one additional tie per side for 4.6 SPECIAL PROVISIONS FOR SUBDIVISIONS (a) An applicant for final plat approval of a subdivision shall by the planning department of the use and construction rest/ contained in 4.1 thru 4.5 if any portion of the land to be s lies within a floodway or floodplain. (b) Final plat approval for any subdivision containing land that a floodway or floodplain may not be given unless the plat sh boundary of the floodplain or floodway and any lots created partly or wholly within floodway or floodplain areas are clei use of land within a floodway or floodplain is substantially by the Orange County Flood Damage Prevention Ordinance. ARTICLE 5, ADMINISTRATION 5.1 BUILDING PERMIT REQUIRED Building Permits shall be required in conformance with the provisions o ordinance. 5.2 DESIGNATION OP BUILDING INSPECTOR The building inspector is hereby appointed to administer and implement t sions of this ordinance. 5.3 DUTIES AND RESPONSIBILITIES OF THE BUILDING INSPECTOR Duties of the building inspector shall include, but not be limited to: (a) Review all building permits to assure that the requirements of ordinance have been satisfied. (b) Advise permittee that additional federal or state permits may 1 and if specific federal and state permits are known, require 0 of such permits be provided and maintained on file with the del permit. (c) Notify adjacent communities and the North Carolina Department c . _ 9 (f) Verify and record the actual elevation (in relation to mean sea level) to which the new or substantially improved structures have been flood- proofed. (g) When flood-proofing is utilized for a particular structure, the buildi inspector shall obtain certification from a registered professional engineer or architect. (h) Where interpretation is needed as to the exact location of the boundar of the areas of special flood hazard (for example, where there appears be a conflict between a mapped boundary and actual field conditions) ti building inspector shall make the necessary interpretation. The persor contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. (i) When base flood elevation data has not been provided in accordance with Article 3, Section B, then the building inspector shall use the Orange County Soil Survey and any other data available from a federal, state or other source, in order to administer the provisions of Article 5. (J) All records pertaining to the provisions of this ordinance shall be maintained in the office of the building inspector and shall be open for public inspection. 5.4 PERMIT PROCEDURES Application for a building permit shall be made to the building inspector. Information requested on the application:shall include all information as:ptovided for on a building permit. In addition the following may be required: (a) Plot plans drawn to scale showing the nature, location, dimensions, and elevations of the area in question. (b) Existing or proposed structures, fill storage ok materials; drainage facilities, and the location of the foregoing. Specifically, the ,! following information is required. (c) Elevation in relation to mean sea level, of the lowest floor (including 5.5 VARIANCE PROCEDURES (a) The Board of Adjustment as authorized by the Orange County I Commissioners shall hear and decide appeals and requests fox from the requirements of this ordinance. (b) The Board of Adjustment shall hear and decide appeals when i there is an error in any requirement,: decision, or determine by the building inspector in the enforcement or administrati, Ordinance. (c) Any person aggrieved by the decision of the Board of Adjustm( taxpayer may appeal such decision to the Orange County Superj as provided in Section l60A-388, f the North Carolina General (d) Variances may be issued for the reconstruction, rehabilitatio restoration of structures listed on the National Register of Places or the State of North Carolina Inventory of Historic P without regard to the procedures set forth in the remainder o: section. (e) In passing upon such applications, the Board of Adjustment shz consider all technical evaluations, all relevant factors; stall specified in other sections of this ordinance, and: (1) the danger that materials may be swept onto other lands t injury of others; (2) the danger to life and property due to flooding or erosioi (3) the susceptibility of the proposed facility and its contex flood damage and the effett of such damage on the individt (4) the importance of the services provided by the proposed fa to the community; (5) the necessity to the facility of a waterfront location, wh applicable; (6) the availability of alternative locations, not subject to . . action, if applicable, expected at the site; and, (11) the costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and wat systems, and streets and bridges. (f) Upon consideration of the factors listed above and the purposes of th ordinance, the Board of Adjustment may attabh such conditions to the granting of variances as it deems necessary to further the purposes of this ordinance. (g) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (h) Conditions for Variances (1) Variances shall only be issued upon a determination that the 'varianceija the minimum necessary, considering the flood hazard, afford relief. (2) Variances shall only be issued upon (i) a showing of good and sufficient cause; (ii) a determination that failure to grant the variance would result in exceptional hardship to the applicant; and, (iii) a determination that the granting Of a varia will not result in increaded flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances. (3) Any applicant to whom a variance is granted shall be given written notice specifying the difference .between 'the base flood elevation7. and the elevation to which the structure is to be build and stating that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation. (4) The building inspector shall maintain the records of all appeal arfinT,0 A (2) non-residential Construction - New construction or substant improvement of any commercial, industrial or other non-resi structure shall either have the lowest floor, including bas elevated to the level of the base flood elevation or, toget attendent utility and sanitary facilities, be flood-proofed below the base flood level the structure is water tight witl substantially impermeable to the passage of water and with components having the capability of resisting hydrostatic at hydrodynamic loads and effects of buoyance. A registered pr engineer or architect shall certify that the standards of th subsection are satisfied. Such certification shall be provi the official as set forth in Article 4, Section C(3). (3) Mobile Homes (a) No mobile home shall be placed in a floodway, except in mobile home park or existing mobile home subdivision. (b) All mobile homes shall be anchored to resist flotation, or lateral movement by providing over-the-top and frame ground anchors. Specific requirements shall be that: (1) over-the-top ties be provided at each end of the mo home, with one additional tie per side at an interm location on mobile homes of\less than fifty feet an additional tie per side for mobile homes of fifty f( (ii) frameties be provided at each corner of the home wit additional ties per side at intermediate points for homes less than fifty feet long and one additional t Mobile homes of fifty feet or longer; (iii) all components of the anchoring system be capable of a force of 4,800 pounds; and, (iv) any additions to the mobile home be similarly anchor( (c) For new mobile home parks and subdiviRinno. so that the lowest floor of the mobile home will be a:3 or above the base flood level; (ii) adequate surface drainage and access for a hauler are provic and, (iii) in the instance of elevation on pilings: (1) lots are large enough to permit steps; (2) piling foundations are placed in stable soil no more than ten feet apart, and, (3) reinforcement is provided for pilings more than six feet above the ground level. (4) Floodways — Located within areas of special flood hazard established in Article 3, Section B, are areas designated as floodways. Since the flood waters which carry debris, potential projectiles and erosion potential, the following provisions shall apply: (a) Prohibit encroachments, including fill, new construction, substantial improvements and other developments unless certification by a registered professional engineer or architect is provided demonstrating that encroachments shall not result in any increase in flood levels during occurence of the base flood discharge. (b) If Article 5, Section B(4) (a), is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of Article 5. (c) Prohibit the placement of any mobile homes, except in an existing mobile home park or existing mobile home subdivision. ARTICLE 6. COMPLIANCE No structure or land shall hereafter be located, extended, converted, or structurally altered without full compliance with the terms of this ordinance and other applicable regulations. f ARTICLE 8. INTERPRETATION In the interpretation and application of this ordinance all provisions (1) considered as minimum requirements; (2) liberally construed in favc protection of the public health; safety, and welfare. ARTICLE 9, WARNING AND DISCLAIMER OF LIABILITY The degree of flood protection required by this ordinance is considered reasonable for regulatory purposes and is based on scientific and engin considerations. Larger floods can and will occur on rare occasions. F heights may be increased by man-made or natural causes, This ordinance imply that land outside the areas of special flood hazard or uses permit within such areas will be free from flooding or flood damages. This orc shall not create liability on the part of Orange County or by any office employee thereof for any flood damages that result from reliance on this ordinance or any administrative decision lawfully made thereunder. ARTICLE 10. PENALTIES FOR VIOLATION Violation of the provisions of this ordinance or failure to comply with its requirements, including violation of conditions and safeguards estab. in connection with grants of variance or special exceptions, shall const: a misdemeanor. Any person adjudged in violation of this ordinance shall punished as provided in G.S. 14-4. Each day such violation continues she considered a separate offense. Nothing herein contained shall prevent Or County from taking such other lawful action as is necessary to prevent or any violation. FUTURE FARMERS OF AMERICA PROCLAMATION FFA WEEK - 1981 WHEREAS, The Future Farmers of America with vocational agriculture; and WHEREAS, members of the FFA are playing an outstanding role in assuring the future progress and prosperity of our nation; and WHEREAS, the FFA motto--"Learning to do, doing to learn; earning to live, living to serve" gives a direction of purpose to these future leaders for tomorrow's agriculture; and WHEREAS, the FFA performs the valuable service of develop- ing leadership, encouraging cooperation promoting good citizen- ship, teaching modern agricultural information, and inspiring patriotism among its members, THEREFORE, WE, The Orange County Board of Commissioners, do designate the week of February 22-28; as FFA WEEK. —--- Anne Barnes, Chair Orange County Board of Commissioners . ORANGE CIOUNTY PLANNING DEPARTMENT HILLSBOROUGH NORTH CAROLINA 27278 evig ar 0104. '...lat.11 7410-7. t41:;,0■0* MEMO TO: County Managers Office FROM: Planning Staff DATE: January 30, 1981 SUBJECT: Alternatives for the application of the Flood Damn? Prevention Ordinance, The Planning Staff :feels there are two distinct alternatives possible for the Flood Damage Prevention Ordinance. Basically, the two alternatives I are Alternative B, which would allow no development within the flood plain or Alternative A, which would allow some development provided the first floor elevation is higher the Base Flood elevation (Alternative A is contained in Section 4.2 of the draft ordinance) Alternative B would require few changes in the attached ordinance. The major changes would occur in Article 4, Sectior 4.3 which would read: 4.3 Construction within Floodwa s and Flood.lains Restricted a. No structure may be constructed and no substantial improvement of an existing structure may take place within any floodway of floodplain, other than allowed in 4.2; Section. 4.3 (1)), 4/3 (q), and 4.3 (d) would be deleted under Alternati ' . B. /le �~ ��� �^�~ ^v �~ =~ , J Orange County Proposed 1980-81 Budget Ordinance Amendment The 1980-81 Budget Ordinance of Orange County . June 23, 1980 and subsequently amended, is hereby amended as followo� Increase ���rease,� "To Total Fund - Iten General Planning - Operations I,600 29"9I0 1 Buildings & Grounds 160 208,783 Tree House - Operations 1,320 1,320 Janus House - Operations 4,080 4,000 School/Family Service - Operations 4"2$8 4,293 Fund - Resources General Buildings & Equipment (1,600) 167"074 t1 Recreations - Operations ( 160) I8,873 32O 5,320 Crime Control Grant 5,320 293 4,293 Human Resources Grant 4,293 '-7t^~ Adopted this the , 7~~ day of " 1981. /111 • 4,• Orange County Proposed 1980-81 Project Ordinance Amendment The 1980-81 Project Ordinance of Orange County as adopted on December 1, 1980 is hereby amended as follows: Increase Fund -J (Decrease) To Total CETA - Admin. Pool - Personnel , 2,213 44,941 CETA - Adaih- P001 - 0Perati"s ''' 431 7,694 CETA YCCIP BG - Personnel 38,473 38,473 CETA YCCIP BG - Operations 2,667 2,667 CETA YCCIP BG - Equipment :2 3,300 3,300 CETA IV,- Services - Personnel 2,402 2,402 CETA IV - Services - Operations 514 514 Fund - Resources CETA ■, CETA IV - Administration 2,644 52,638 CETA IV - YCCIP BG 47,356 47,356 Adopted this the day of TL61, a,t,1 , 1981. ' • ' "'77" ' ' _• 174/ AGENDA ATTACHMENT 20 ORANGE COUNTY PLANNING DEPARTMENT FITT.T.SBOROUGH NORTH CAROLINA, 27275 60.10 ° 41-24;51 W115 cc.e0,\$. MEMO TO: Sam Gattis FROM: Rick Cannityff, DATE: January 29, 1981 SUBJECT: Fee Schedule Analysis and Recommendation There are several conditions that may dramatically change some of the numbers indicated in this memo.* If the County Commissioners should extend zoning to un- zoried townships the number of rezonings and zoning permits would increase some- what over those shown on the following pages. Cases going before the Board of Adjustment would also increase not only because of the greater number of zoned townships but also because of the larger number of special uses. The number of subdivisions varies each year depending on the fluctuations in the economy. The Planning Staff feels that the division of land through the minor subdivision process should not be encouraged. Overall planning for the County is easier with major subdivision covering larger tracts of land. The staff recommends that requests for interpretation of the new ordinance to theoloard of Adjustment or requests for rezonings in the presently unzoned townships not be charged a fee. After the adoption of the new ordinance the following fees could be established. SUMMARY OF REVENUES TO COSTS Total Current Planning Costs: $ 67,815.00 Total Cost (January, 1981) of fee generating Jobs: 26,622.00 Total Annual Revenues with all Proposed Fees: 15,845.00 (Based on 1980 Activity) Total Annual Revenues with all Proposed Fees: 14,295.00 (Based on 1979 Activity) Total Annual Revenues with all Proposed Fees: 23,070.00 (Based on 1981 estimates including 5 zoned Townships) Total Annual Revenues with only Recommended Fees: 19,770.00 (Based on 1981 estimates including 5 zoned Townships) /le =..-c-,-;,,-...----.:.,--..,-. . .. . . . ,.' 4. . 1 .... „, .._ ,.... . _ ......_ —_..........._—. Sam Gattis, MEMO January 29, 1981 Page 2 TOTAL REVENUE FOR PROPOSED FEES (Based on the number of permits and subdivisions in 1981) Cases Fees Revenues ZONING PERMITS 1000 @ 5.00 $ 5,000.00 MINOR SUBDIVISIONS Filing Fee 120 8 60.00 7,200.00 Lots on Final Plat 240 @ 5.00 1,200.00 MAJOR SUBDIVISIONS Less than 15 Lots Filing Fee 10 8210.00 2,100.00 4 . Lots on Final Plat / 80 8 5.00 400.00 i MAJOR SUBDIVISIONS More than 15 Lots . Filing Fee 5 @370.00 1,850.00 Lots on Final Plat 260 @ 5.00 1,300.00 PRIVATE ROADS 24 8 30.00 720.00 REZONING REQUESTS 15 @120.00 1,800.00 BOARD OF ADJUSTMENT 25 8 60.00 1,500.00 TOTAL REVENUE $ 23,070.00 ;' - , 1 . Sam Gattis, MEMO January 29, 1981 Page 3 TOTAL REVENUE FOR PROPOSED FEES (Based on the'number of permits and subdivisions in 1979) ZONING PERMITS 576 @ $ 5.00 $ 2,880.00 MINOR SUBDIVISION Filing Fee 111 8 60.00 6,660.00 Recording Fee 202 8 5.00 1,010.00 MAJOR SUBDIVISIONS Less than 15 Lots Filing Fee 6 0 210.00 1,260.00 Recording Fee 46 Lots 8 5.00 230.00 MAJOR SUBDIVISIONS More than 15 Lots Filing Fee 3 @ 370.00 1,110.00 Lots on Final Plat 55 Lots 0 5.00 275.00 PRIVATE ROADS 13 0 30.00 390.00 REZONING REQUEST 3 @ 120.00 360,00 BOARD OF ADJUSTMENT CASES 2 0 60.00 120.00 REVENUE GENERATED $14,295.00 TOTAL REVENUE FOR PROPOSED FEES (Based on the number of permits and subdivisions in 1980) ZONING PERMITS 650 0 $ 5.00 $ 3,250.00 MINOR SUBDIVISIONS Filing Fee 87 0 60.00 5,220.00 Recording Fee Per Lot 143 0 ZOO 715.00 MAJOR SUBDIVISIONS Less than 15 Lots i Filing Fee 8 8 210.00 1,680.00 Lots on Final Plat 64 0 5.00 320.00 MAJOR SUBDIVISIONS More than 15 Lots Filing Fee 5 0 370.00 1,850.00 Lots on Final Plat 370 0 5.00 1,850.00 PRIVATE ROADS 24 0 30.00 720,00 REZONING REQUESTS 1 0 120.00 120.00 • BOARD OF ADJUSTMENT CASES 2 0 60.00 120.00 REVENUE GENERATED $15,845.00 i ,. -7;2-^-,----7..-=------..7---;---- ----..!.:-- -.."*" ' •----7--- -^'-- ' ' ,..-2-..:._L _:..2.....2.122.:.:_-__:::__;2,.:::.2-____.-.2_.2.-=.. . - • . . Sam Gattis, MEMO January 29, 1981 -. Page 4 STAFF TIME IN CURRENT PLANNING ACTIVITIES (Based on 250 Work Days) Percent of Time Percent of Salary Total Hours Director 20% = $ 6,010.00 400 Planner II 10% = 1,985.00 200 Planner II 10% . 1,820.00 200 . Planner II 90% = 16,182.00 1800 Planner I 100% 4. 17,246.00 2000, Draftsman 25% = 3,462.00 50Ck - Staff Support (2 Clerks) 50% = 10,474.00 2000 $57,179.00 7100 . .2 STAFF TIME SPENT IN FEE GENERATING ACTIVITIES Percent of Time Percent of Salary Total Hours - Director 5% = $ 1,502.00 100 Planner II 21/2% = 496.00 50 Planner II 21/2% = 455.00 50 Planner II 15% = 2,697.00 300 Planner I 80% = 13,796.00 1600 Draftsman 10% . 1,384.00 200 Staff Support 10% . 2,094.00 200 Total Salaries in Review of $22,424.00 2500 Fee Generating Activities II . Sam Gattis, MEMO January 29, 1981 Page 5 STAFF TIME AND COST ON VARIOUS JOBS Activity Time Cost Staff Cost ZONING PERMIT 1.4 hour $ 1.83/permit MINOR SUBDIVISION - on site inspections 1 hour 7.31 - staff review of plat 5 hours 36.55 Total hours/cost 6 hours $43.86 MAJOR SUBDIVISION (less than 15 lots) - on site inspection ,4 hours $14.62 - sketch plan review 4 hours 29.24 preliminary plan review . 12 hours 87.72 - presentation of subdivision to Planning Board and County Commissioners 1 hour 7.31 - final plat review 2 hours 14.62 Total hours/cost 21 hours $153.51 1 MAJOR SUBDIVISION (More than 15 lots) - on site inspection 4 hours $ 29'1.24 - sketch plan review 6 hours 43.86 - preliminary plan review 24 hours 175.44 - presentation of subdivision to Planning Board and County • Commissioners 1 hour 7.31 - final plat review 2 hours 14.62 Total hours/cost 37 hours $270.47 ' . Sam Gattis, MEMO January 29, 1981 Page 6 -COST COMPUTATION DATA Current Salaries in Fee Generating Activities $ 22,424.00 Total Planning Department Budget 189,319.00 Minus Total Salaries 151,427.00 $ 37,892.00 Minus Professional Services 9,900.00 Total Planning Department Other Expenses $ 27,992.00 Percent of Fee Generating Activity Salaries to Total Salaries 15% Percent of Fee Generating Activity to Total Other Expenses (20% x 27,992) ; $ 4,198.00 Total Costs of Fee Generating ActivitY. Salaries 22,424.00 Total Costs of Fee Generating Activity Other Expenses 4,198.00 $ 26,622.00 $ 26,622.00 Cost/hour of fee generating activities $ 3,640.00 $7.31/ 1 kfc r--,— 77 . .. . . .. , . . .... _ ......,. .. . . , ... . . . . m , AGENDA ATTACHMENT 20 ORANGE COUNTY PLANKS:NG DEPARTMENT HILLSBOROUGH NORTH CAROLINA 27278 6.„,aa or we, d-- sAl Ir. 44,4"LS MEMORANDUM TO: Sam Gattis FROM: Planning Department 7 Tulautteici,AaLoi DATE: December 10, 1980 SUBJECT: Proposed Fee Schedule: Sedimentation and Erosion Control - Total Budget for Soil and Erosion $40,425.00 Costs not associated with review 1 . of plats/permits 25% i Costs that are associated with 1 review of plats/permits $30,245.00 I Total Annual Revenue for Soil Erosion with Recommervied Fees $30,245.00 J Total hours spent on review plans/permits 2,080 hrs./yr. x 2 . 4,160 hrs./yr. 4,160 hrs./yr. x .25 = 3,120 hrs./yr. r 4 $30,245.00 i, 3,120 hrs./yr. . $10.00/hr. 1. Less than 20,000 sq. ft. disturbed: No permit needed. No fee charge. 1 2. PLAN EXEMPTION FORM: 20,000 sg.ft.-40,000 sg.ft. disturbed Conference with landowner 1 hour a I Initial site inspection 1 hour !.. Periodic site inspections ( 2 per month) „ 2 hours 1 TOTAL HOURS ........ ....... 4 hours I Charges to grade: $10.00/10,000 sq.ft. disturbed R . li PLAN EXEMPTION: $40.00 flat fee is recommended i .r. _ - z "I) Memorandum - Sam Gattis 9-29-80 Page 2 3. PLAN REVIEW: 40,000 sq.ft. - 80,000 sq. ft. disturbed Conference with landowner 1 hour Initial site inspection 1 hour Review of plan -4 hours Letter to owner enumerating plan modifications *2 hours TOTAL HOURS 8 hours (1 working day) A $80.00 flat fee per review is recommended (based on $10.00/hr.) 4. PLAN REVIEW: over 80,000 sq. ft. disburbed More complicated plan review 8 hours May require several site visits 2 hours More time on modifications/ammendment letter 4 hours TOTAL HOURS 16 hours (2 working days) $160.00 flat fee per review is recommended ,5. GRADING PERMITS: 40,000 sq. ft. - 80,000 sq. ft. disturbed A grading permit is issued when Sedimentation and Erosion Control Plan is approved. Involves periodic site inspections (4 per month). Involves use of County vehicle. RECOMMENDATION:, $10-007 10,000 square feet disturbed. 6. GRADING PERMITS: Over 80,000 sq. ft. disturbed A grading permit is issued when Sedimentation and Erosion Control Plan is approved. Involves more site inspections ( 6 per month). Involves use of County vehicle. 4 More inspection time per inspection. Longer construction time. RECOMMENDATION: $12-00/ 10.000 square feet disturbed. 7. RENEWALS: A permit time limit of one year from the date of issuance is recommended. In order to reduce the negative impact on projects lasting, for example, 15 months, it is suggested that renewal of a permit be valid for six months at one-half the original application fee. __-�� ORANGE COUNTY S&E CONTROL Total Budget (FY '80-'81) $41,735 Personnel " (1 officer, l inspector, 1/3 secretary) 30,785 Consulting Services , Telephone (WATS) 750 Supplies, maintenance, equipment 9" (includes l vehicle) Travel *Orange County charges each department .5`300 33ami' for the use of county vehicles A permit is required where mvr='than 20,000 sq. ft. is u7nturuuu' A plan and permit is required where more than 40,000 sq. ft. is disturbed. -Permit Fees None at present. Rate system under study. Workload Active 109 sites 365 disturbed acres Permitted* 32 sites 60+ disturbed acres About 40% of staff time is spent on subdivision and site plan review, administration of the private road and drainage sections of the subdivision regulations, and administrative duties related to the federal flood insurance program. . . • . . •. /111- -17J/ .. -. REQUEST FOR EMERGENCY JJDP FUNDING ORANGE ..;------;-- County Project Project Number Name Mental Health Preventive, Service _ 09-178-D03--J002 Additional Funds ' ----T----- Line Item Original Budget LLne Requested by I,' item - Total Budget, Personnel $9473.00 1500.00 $10,973.00 Consultants -0- -0- -0- .--- Travel 829.00 50.00 879.00 Operating Expenses 1551.00 310.20 1,861.20 Equipment' -0- -0- . -4- TOTAL , — -- $13,713.20 $11,653.00 1 Justification for for Additional Funds: Last year, OPC was able to provide services to Chapel Hill High School's Summer Scho Program because the grant period Started 3 months late. The program was very successf and the high school is interested in continuing the program this summer (1981) . With a summer extention under this project, OPC is prepared to provide consultation teachers (20 hours) , and two problem-oriented discussion groups twice a week (50 hours In addition, we would like to extend our services under this grant to pilot two parent educational-support groups for the parents of the children who have been or who are currently in the discussion groups. / ........4._AA..../ ______..?".12mitiLs(t__ l • .Authorizing Official Project Director Gretchen R. Dawson