HomeMy WebLinkAboutAgenda - 03-13-2007-5oORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: March 13, 2007
Action Agenda
Item No. ~~_
SUBJECT: Approval of Contract Amendment: Design Services Central Orange Senior
Center
DEPARTMENT: Purchasing PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
CRZ Proposal
Pam Jones, (919) 245-2652
INFORMATION CONTACT:
PURPOSE: To consider approving an amendment to the contract for design services associated
with the Central Orange Senior Center.
BACKGROUND: The Board originally approved a contract with Corley Redfoot Zack (CRZ) to
provide schematic design for work at the Sportsplex that would become the Central Orange
Senior Center. The fee proposal for this work provided Basic Services fora 15,000 square foot
senior center, which consisted of a 10,000 square foot addition and 5,000 square feet of
renovated space. The project was expanded to include an Adult Day Health Center, which
reduced the Sportsplex area by another 4,100 square feet.
Sportsplex operations have flourished under the management of Recreational Factory Partners
(RFP), who the County retained when it purchased the property in December 2005. In order to
maintain sufficient operational space for the Sportsplex, County Commissioners authorized the
addition of a mezzanine area over the ice rink and other more minor renovations within the
common areas of the Sportsplex. This replaces the space assumed by the Senior Center and
added some minimal growth space for Sportsplex operations.
All components of the project now equal approximately 35,000 square feet.
CRZ proposes a total of $407,200 for Basic Services architectural and engineering fees through
construction administration. This equates to approximately 8.3% of the estimated $4.9 million
budget set aside for construction of the project. Additional services, which include regulatory
approval and interior design services, are estimated at $21,540. The original contract amount for
schematic design ($28,940) is offered as a credit, thereby setting the total contract approved by
this action at $400,160.
FINANCIAL IMPACT: The Board had previously authorized anot-to-exceed budget of
$6,000,000, which was included in the Debt Issuance Schedule presented during the September
14, 2006 work session ($4.5 million/Senior Center, $1.5 million/Sportsplex). As a reminder, the
project budget includes owner responsibility items outside of construction, including but not
limited to, construction materials testing, design fees, relocation expenses, teledata wiring,, etc.
Funding to support the design fee cost of $400,160 is included in the budget considerations for
the project.
RECOMMENDATION(S): The Manager recommends that the Board approve the contract
amendment with Corley Redfoot Zack for architectural/engineering services associated with the
Central Orange Senior Center Project in the amount of $400,160; and authorize the Chair to sign
on behalf of the Board.
~ "
'3 .
`~~.A '~L J7J~ !L ~i. '2.~~.k ~~~ ~~~ LAIC.
3
A 1? L H I T F CTS ~ E N i; 11 L' L' R ti o i' L i~ ~J ~I f: I{ :~
October '17, ?Ot.1G
Nls. Pamela K. Jones, Director
Department of T'urchasing and Central Sel-~~ices
GLENN D. CORLEI', ATA
President, cca County of Or~u-tge
PO Box ~1S1
KC•NNE•Tli E. TLEDFOOT, ATA
Vice President IIillsboroUgll, 1`1C 27211
A7ARK ZACI:, AlA
vice Preside~it RE: Proposed Central Orange Senior Centex at Sportsplex
MICHAEL L. IiA~~fiY1ERST.EY, I'E Hillsborough, NC
Pri~iciPut CRZ #0515
LAURENCETN.BUNCH,AIA REVISED PROPOSAL FOR PROFESSIONAL DESIGN SERV-"ICES
.Associate
ANDRL•W R. CRULCKSHANK, AIA Dear Ms. Jones:
Associate
CHARLENE E. HANLEY, AIA As you lcno~~v, th.e scope of work for the above-referenced project has increased
AS,SOCZ4ItP. since ou.r original fee proposal tATas presented to you.
DAVID A1. TAYLOR, AIA
Associate The project no~v inc]udes not only renovations to the existing building and an
HARRX M. )ENSEN addition that will house the Central Orange Senior Canter, but also
Associate accorrunodations" for the Adult Day Health Center (ADI-IC) i, a renovated area
KENNETH E. SMTTH directly adjacel~t to the Senior Center. Two other components of the scope of
Associate work are related to the Sportsplex operations: building a mezzanine with a
locker roon-L below in the ice ru-Ik area, and renovati~lg existing areas associated
• with tl-Ie Commons to better seine the fiulctional and operational needs of the
Sportsplex.
CRTs original fee proposal dated S/1/05 provided Basic Services fora 15,000-
SF Se>_uor Center, ~~~lucl-t consisted of a 10,000-SF addition and 5,000 squ~Lre feel
of renovated space. Our proposal was based on a floor plalz dated 3/15/0,5
no BoY 236s ivitli the understandilg that our desiglz ~~Tork ~nrould be completed i, a tilne-
Chapel Hill, IBC 2757,5-2368 frame that led to a grand openilig ii mid-DecemL~er, 2006.
222 Cloister Cowt
Chapel Hill, NC 2751.4-2212
~~
YEARS
r<~ II
The four components of work proposed at this ti~.ile increase the original square
footage fran-L 15,000 to approximately 35,000, ilcludi~g both ne~~r additions
(mezzanine i~ ice hockey rink aT~d renovations), and cost csti.mates arc
undertvav for the increased sco}?e of z~vork based on our latest- dra~~vings.
llased c-gin the revised scope of ~•~rc:rrl<, and nn our unclcrstvu-iing c.~f the budget
and schedule, eve propose a professions] design services fee of ~~1f)7,20(1;
however, fees paid under the original letter of agreement (date.cl 5/"].If):.-~) for the
Schematic f~e~;ig n plus a portion of .the fees hail for the Programming and
1'relini-Lary Desig~l letter dated August 22, 2006, are csffered as a cred.i.t to the:
overall fee. This credit amounts to 32$,90; th~refor~, we prnpnse a fire of
5375,260 for Basic Sel-~-ices on the I?rojec.t.
(919) 401-8586 Telephone
(919) 49~-i3Q6 Fcix
ww-w.corle~+red Eootzack.com
~%ls. 1~a111C)tn ~. ~011eS
RE: C~~nh-al Orange Senior Center at Sportsp)ex
77ie breal:dot~-n of Basic Services by phase shall be as folloc•vs:
Design and Constriction Document phase: $256,100
'Bidding I'11ase: 20,360
Construction Administration Phase: 101.,800
Total: X378,260
Additional Sci-~~ices beyond the Basic Services include dne folloln%i1g:
:l. Resubnnittal of ret-ised project to the Town of
Hillsborough's Board of Adjustment For reviete~ and
approval: S 1,540
2. Furniture selection and interior desigin: 20,000
Total fee for Additional Services: $ 21,540
Octot~cr l;', 20f?i~
page ~
We propose ilcludi:ng aln Allolva~lce of $30,000 for reimbursable expenses. Rei~lbursab)c expenses
~~Til.l be billed at direct cost on the monthly statements ~u1d will include, but are not 1uilitcd to,
printing and copying costs, postage, and shipping for overall project. Additional information
pertainilg to reimbursable expenses is iicluded in the Owner and Architect Agreement.
Sen~ices not included in Sasic S~i-vices, Additional Services or Reimbursab).e Expenses are clearly
outluzed in the aforementioned Agreement.
We have attached aln AIA Agreement Between Owner and Architect for the scope of work outlined
u1 this letter. Please review this document and contact us if you have any 131LC'st1o11S Or COLTU11.entS
regarding the revised proposals letter or the contract.
We look fors-yard to continuing owe work on this very innportant and exciti.~ig project for Orange
Cotunty.
Sincerely, :,~ ~,~;
loth E. Redfoot, AIA
ice President
ICER:esw /0515-Pro.2
GZdosure
d a A Cor~LF~~ Rznroo-r Zncl; ~:~-.