HomeMy WebLinkAboutAgenda - 05-06-1985 ORANGE COUNTY
BOARD OF COMMISSIONERS
AGENDA
REGULARNMETENG
MONDAY, MAY 6, 1985
COMMISSIONERS ROOM
HILLSBOROUGH, N.C.
7:30 P.M.
A. BONDLCOMMENTS
B. ADEIENCESOKBERES
1. Matters on the Printed Agenda
2. Matters not on the Printed Agenda
C. AINMES
D. APPOINTMENTS
E. Man
1. Rescue Squad Reports
2. Affirmative Action Progress Report
PAGE # F. ITEMS FOR DECISION
004 1. Older Americans Month Proclamation
006 2. Revised Preliminary Report—Ef land Sewer
007 3. Preliminary Assessment Resolution—Wilkins Drive
023 4. Heart's Ease Subdivision
031 5. Amend Orange County Private Road Standards to /A
Eliminate Requirement for Road Sign on Roads Is
Than 500 Feet
038 6. Advertisement of Proposed Zoning Ordinance and
Subdivision Regulations Text Amendments
042 7. Update on State-Local Action Agenda, Falls and
Jordan Watersheds
046 8. Addition of Winningham Road and Camp Ground Road to
the State Maintained Road System
051 9. Handicapped Ramp 911 Center
053 10. Change Order—Old Courthouse
056 11. Memorandum of Understanding—Agricultural Extension
060 12. Second Year Funding of the School Repair/Replace-
ment Program
068 13. CETA Repayment
069 14. Budget Work Session Schedule
072 15. Budget Amendments
G. ADJOURNMENT
ORANGE COUNTY 001
BOARD OF COMMISSIONERS
Action Agenda
Item, No.
ACTION AG&N9a.A. zre4 ABSTRACT
NEETMG DATE May 6, 1985
Subject: MINUTES
DeparMent: . BOARD OF COMMISSIONERS lublic Hearing: yes Yn°
•
Attachment(s): Information Contact: Beverly A. Blythe
WIDER SEPARATE COVER Alcoa Numbers 732-8181, 968-4501, 227-0231
PURPOSE: To correct and/or approve the minutes as submitted for consideration:
•
March 11, 1985..- Special Meeting
March 19, 1985 - Regular Meeting
March 20, 1985 - Continuation of March 19 Meeting
NEED: Approval so the minutes may be entered into the official minute book in
the Clerk's office.
RECONVENDATION: As the Board decides.
•
002
ORA,'\= COONT:a
BOARD OF ccumrssioNERs
Action Agenda
Item No.
AcrIoN AGE\1DA. ITEM ABSTRACT .
MET.EgG DATE_May G, 1985
Subject: APPOINTMENTS
Deparbrent: BOARD OF COMMISSIONERS x
Attach:matt(s): Information Contact: Beverly. A. laythe
"UNDER SEPARATE COVER Phone. Number: 132-8181, 968-4501 or 227-0321
PURPCSE: To maintain membership at effective levels on Commissioners' appointed. Boards.
NEED: The following vacancies are announced for the first time for information only:
A-4 - COMMISSION FOR WOMEN - 7 vacancies (expiration of terms for Alethea
• Burt, Ann McPherson, and Judith Wegner; resignations received from Gail
McClain Hayes, Elaine Parker, Dana Baldwin and Bettye Clark).
Br-1 - BOARD OF HEALTH - 1 vacancy - due to termination of Eli Ross.
B-10 - NURSING HOME COMMUNITY ADVISORY COMMITTEE - 2 vacancies (expiration of
terms for Nary Mn Matteson and Carol S. Weissert.
C-7 - ORANGE COUNTY BOARD OF ADJUSTMENT - 2 vacancies (expiration of terms
for Jim Carter and. Joseph Suggs).
The following vacancies are announced together with the indication of the status
of securing candidates for possible appointment consideration. All vacancies have
been duly advertised.
- COMMISSION FOR WOMEN - 3 vacancies. 3 resumes have been received.
A-6 — INDUSTRIAL DEVELOPMENT REVENUE BOND AUTHORITY - 4 vacancies. 1
resume has been received.
A-13 - RECREATION AND PARKS ADVISORY COUNCIL - 3 vacancies. No resumes have
been received.
A1-14 - SECONDARY ROAD IWPROvEMENTADVISORY COMMITTEE - 1 vacancy. No resumes
have been received.
•
B-5 - DOMICILIARY HOME ADVISORY COMMITTEE - 3 vacancies. I resume has been
received.
B-11 - SOLID WASTE TASK FORCE - No new resumes have been received.
B-15 - SCHOOL MERGER STUDY COMMISSION - 10 resumes have been received.
IMPACT: To maintain 100% membership on Commissioners' appointed Boards and Commissions.
RECOMMENDATION:
As the Board decides.
003
ORANGE COUNTY
BOARD OF COMMISSIONERS Action Agenda
ACTION AGENDA ITEM ABSTRACT Item No. F..1.
• Meeting Date: May 6, 1985
SUBJECT: RESCUE SQUADS ANNUAL REPORT
DEPARTMENT: EMERGENCY SERVICES PUBLIC HEARING: Yes X No
ATTACHMENT(S): INFORMATION CONTACT: Bobby Baker
TELEPHONE NUMBER:
Hillsbrough - 732-8161
Chapel Hill - 929-8109
PURPOSE: To allow Rescue Squads to report,on their own, their accomplishments
and goals related to providing emergency medical services for
Orange County.
NEED: To inform the Board of Commissioners of the Rescue Scruad's
involvement in providing emergency medical services and of
future need.
IMPACT: This report would not have any impact on the County budget. Funding
request for this service is included in the Emergency Services
. Budget.
RECOMMENDATIONS:
•
•
MANAGER' S REPORT
Orange County's Equal Employment Opportunity/Affirmative Action
ilk
Program has been in effect for the past four years for the purpose of
MP, insuring fair and equitable hiring and employment opportunities. The
employment objectives of the program are two-fold:
• 1. All persons hired by the County shall meet
• the stated qualifications for the position; and
• 2. The County's work force will match as closely
• as possible the make-up of the County's available
labor force in race and sex.
Provided below is a chart illustrating a comparison of Orange
County torkforce to the Orange County available labor force by race and
sex.
SUMMARY OF THE ORANGE COUNTY WORKFORCE BY RACE AND SEX
• Total number of employees 343 100%
Total non-minority 250 73%
Total minority 93 27%
Total females 198 58%
Total males 145 42%
*SUMMARY OF THE ORANGE COUNTY LABOR FORCE BY RACE AND SEX
Total available labor force
111/1 45,340 100%
Total non-minority 37,990 84%
Total minority 7,350 16%
Total females 22,320 49%
Total males 23,020 51%
*Source: N.C. Employment Security Commission 1980 Census Data
Clearly this illustrates that overall the County has been successful in
• achieving the stated employment objectives.
While progress has been made county-wide, continuing efforts are under-
way to assure that each department of County government will reflect the make-up
of the County's available labor force in race and sex. To that end, January
1985 Orange County set forth placement goals by departments to be achieved during
a five year time period. The goals were established in conformance to guidelines
prescribed and used by the State of North Carolina. The following process was
used in establishing placement goals by departments:
• -an analysis of the County's workforce compared to labor force •
• availability data was conducted to discover job classes or
• occupational groups in which minorities and/or females are
underrepresented in the jurisdiction;
411111k
-projection of job opening estimates, based on average attrition,
III, where the analysis showed underrepresentation to measure the
County's capacity to improve the representativeness of the
workforce; and
•
-through mathematical formula establishment of goals and
timetables for improved minority and/or female representation
• in the workforce.
The placement goals established reflect the change necessary to assure
that the department's workforce will meet the labor force standard for each
occupational category. Meetings were held with all county department heads to
communicate goals and re-affirm the County's commitment to affirmative action.
I am pleased to report that, the response was positive and further progress has
been made in achieving our goals since January.
Provided herein is a summary of the Affirmative Action Placement Goals
established for all departments that have areas of underrepresentation.
• - .
SUMMARY OF PLACEMENT GOALS BY DEPARTMENTS
OF ORANGE COUNTY LOCAL GOVERNMENT
DEPARTMENT JOB CLASS GOALS ( 1985-1989)
• REGISTER OF)DEEDS Office/Clerical one minority
COUNTY MANAGER Officials/Administrators one female; *one minority
*progress made - one
minority placed since 1/85
TAX SUPERVISOR
111/1 _ Professional
Technician one minority
*two females; *one minority
*progress Trade - one female
and one minority placed
since 1/85
• PLANNING Professional one female; one minority
Technician one female
Office/Clerical one minority
SOCIAL SERVICES Professional • *one minority
• *goal achieved since 1/85
Paraprofessional *one minority
*goal achieved since 1/85
HEALTH • Professional • two minorities
Protective Services one minority
Ash AGING Office/Clerical • one minority
•411,
EMERGENCY MANAGEMENT Technician one female; one minority
DEPARTMENT JOB CLASS GOALS (1985-1989)
PUBLIC WORKS Skilled Craft two females
Service Maintenance four females .
HOUSING & COMMUNITY Professional one female
DEVELOPMENT
RECREATION Professional one female
one minority
SHERIFF Protective Services *two females; *three minorities
*progress made - one female
and one minority placed
since 1/85
Office/Clerical one minority
While placement goals have not been established with respect to those over
55, due to a lack of sufficient data, they represent 11% of our workforce.
The establishment of placement goals by departments is only one of many
components of our EEO/AA Program. Other improvements measures to the program
that have been started included:
_
111/0
(1) Evaluation of the EEO/AA achievements of all management
personnel as a part of their overall job performance;
(2) An applicant pool of minority and female candidates for
selection referral;
(3) Refinement of the County's recruitment and selection process;
(4) Validation of testing instruments; and
(5) Publication of an EEO/AA annual report.
Efforts are currently underway to begin training on affirmative action and
management skills effective July 1985. We plan to offer the training to all
management and supervisory personnel. Our primary goal in the program is to
help all staff recognize the application of equal employment opportunity
principles as tools of sound management rather than mandated responses to
• government regulations.
I appreciate the continuing commitment of the Board of County Commissioners
and staff to the provision of equal employment opportunity through affirmative
action efforts.
,..„... -- .
Kenneth R. Thompson
1110
Attachments
w
BOARD OF COMMISSIONERS DEPARTMENT WORKFFORCE BY OCCUPATION
OCCUPATIONAL GROUP
NON-MINORITY MINORITY TOTAL TOTAL
MALE . FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS -
PERCENT
PROFESSIONALS
PERCENT .
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS 1 2 I
PERCENT 100.0 100.0 ' too.0:*: 1
OFFICE & CLERICAL
PERCENT 100.0 200.0 100.0 I
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT « :
TOTAL WORKFORCE 2 2 2
2
. 100.0 100:0 100.0
' BOARD OF COMMISSIONERS DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS .L ADMINISTRATORS (_)
PROFESSIONALS
TECHNICIANS
PROTECTIVE SERVICE WORKERS (_}
PARAPROFESSIONALS (_}
Minority 0.0% 46.3% Minorities -46.3%
OFFICE & CLERICAL.
a .
Minority 0.0% 19,0% Minorities -19.0%
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
PLACEMENT GOALS '
BOARD OF COMMISSIONERS DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY
b PARITY
100
OFFICIALS & ADMINISTRATORS X
100
PROFESSIONALS
X
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS
Minority 46.3 K 1
100 .46
OFFICE & CLERICAL Minority 19.0 X 1
.36
100
SKILLED CRAFT WORKERS t`
:�. X
100
SERVICE-MAINTENANCE WORKERS R
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP 14ORKERS ARE UNDERREPRESENTED
BOARD OF COMMISSIONERS DEPARTMENT TURNOVER RATE FOR FY '8.3 - '84 = O.O$
FOR 1985 FOR 1985 - 198°
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS, (NET INCREASE).r OPENINGS (NLT INCREASE)*
UNDERREPRESENTATION**
r� N/A
It
.r
lE
**Itldicate which pro-
tected group (minority,
taxmen, handicapped) or
sub-group (e.g. , black
females, other minor-
TOTALS
i ty "ales. etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
( . arnount of underrepre- ,,"Net Increase" does not include placements of minority groupworicers, women., and/or bandi capped
sent tion,
persons which become necessary cause of turnover,'to keep their representation at p . ent levels.
ELECTIONS DEPARTMENT WORKFORCE BY OCCUPATION
i
OCCUPATIONAL GROUP
NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1
1
PERCENT 100.0 100.0 1
i 100.0
' PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 2 2
2
PERCENT 100,0 100.0 2
SKILLED CRAFT WORKERS 100.0
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT '+=•
ETOTALORKFORCE 3 3 3
• 3 .
100.0 100.0 100.0
ELECTIONS DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-.
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS (_}
Minority '0.0% 21.2% Minorities -22.2%
PROFESSIONALS
TECHNICIANS {-}
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL. t_}
Minority 0.0% 19.07 Minorities -29.0%
SKILLED CRAFT WORKERS
a
a-=
SERVICE-MAINTENANCE WORKERS �_}
Admmm
PLACEMENT GOALS
ELECTIONS DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY = PARITY
100
OFFICIALS & ADMINISTRATORS Minority 21,2 x 1
i
.2I2
100
PROFESSIONALS
X .
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL
Minority �g,p x 2
• .38
100
SKILLED CRAFT WORKERS .
;;. X
100
SERVICE-MAINTENANCE WORKERS X
100
Adak
**PLACEMENT GOALS FOR OCCUPA'T'IONS
IN WHICH PROTECTED GROUT? WORKERS ARE UNDERREPRESENTED
ELECTIONS DEPARTMENT TURNOVER RATE FOR I'Y183 - 184 = 0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINGS (NL:T INCREASE')*
f
UNDERREPRESENTATION**
,f N/A
f
i
,r
7
`Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black f
females, other minor- TOTALS
ity males, etc.) is un-
derrepresented, and **
p Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include lacements'of minorit
sen ion. P y group workers, women, and/or handicapped
persons which become necessar ecause of turnover, to keep their representation at p ent levels .
SOIL & WATER CONSERVATION DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP
NON-MINORITY MINORITY TOTAL . TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
PROFESSIONALS
i
PERCENT
TECHNICIANS .1 1 2 1 1 2
PERCENT 50.0 50,0 100:0
s0 0 50 0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 Z 1
PERCENT 100.0 100.0
- 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 2 3' 1 2 3
33.3 66.7 100.0 33.3 66.7
SOIL & WATER CONSERVATION DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE- .�
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS {_}
PROFESSIONALS
TECHNICIANS
Minority 0.0% 20.1 Minority - 20.1
PROTECTIVE SERVICE WORKERS {_}
PARAPROFESSIONALS {_}
OFFICE & CLERICAL. {-}
Minority 0.0% •19.0 Minority -19.0%
SKILLED CRAFT WORKERS {_}
a
i
SERVICE-MAINTENANCE WOMERS
. ... ........................
' PLACEMENT GOALS
SOIL & WATER DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD R IN OCCUPATIONAL CATEGORY
• PARITY
100
OFFICIALS & ADMINISTRATORS X
100
PROFESSIONALS
X
100
TECHNICIANS
Minority 20. 1 X 2 .402
100
PROTECTIVE SERVICE WORKERS
X
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL
Minority I9.0 x 1 .19
100
SKILLED CRAFT WORKERS .
X
100
SERVICE-MAINTENANCE WORKERS
X
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED CROUP WORKERS ARE UNDERREPRESENTED
SOIL & WATER CONSERVATION DEPARTMENT TURNOVER RATE FOR ry 183-184 = ().0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED ' PLACEMENT GOALS ESTIMATED P-LACEMENT GOAL`-
OPENINGS (NET INCREASE)* OPENINGS (NET. INCREASE)*
TECHNICIANS
OFFICE & CLERICAL
t U-\DERREPRESENTATION**
dF N/A
**Iridicate which pro-
tected group (minority,
women'. handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity.males, etc.) is un-
dvrreprescnted, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net increase" does not include placements of minorit
senLation. y gx�oupworkers, women, and/or handicapped
persons which become necessary&cause of turnover, to keep their representation at pffent levels-
REGISTER OF DEEDS DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP 'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
PROFESSIONALS
PERCENT
TECHNICIANS 1 1 1 1
PERCENT •
100.0 100.0 100.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT ,
OFFICE & CLERICAL 6 6 1 1 7 7
PERCENT 86.0 96.0 14.0 14.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 6 6 2 2 8 8
75.0 75.0 25.0 25.0 100.0
Allk
------- --=------------------------- ---------------------------------
REGISTER OF DEEDS DEPARTMENT UTILIZATION Oft UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE—
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS (_}
PROFESSIONALS (_}
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS (_}
OFFICE & CLERICAL. •
Minorities 14.0 (_} 19.0% Q Minorities -5.0
SKILLED CRAFT WORKERS {_}
SERVICE-MAINTENANCE WORKERS
. ...... ...
PLACEMENT GOALS
REGISTER OF DEEDS - DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD •X IN OCCUPATIONAL CATEGORY a PARITY
100
OFFICIALS & ADMINISTRATORS X
100
PROFESSIONALS
' X
100
TECHNICIANS X
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS X
100
OFFICE & CLERICAL
Minorities 19.0 X T Minorities 1.33
100
SKILLED CRAFT WORKERS p
�. X
100
SERVICE—MAINTENANCE WORKERS X
100
•**PLACEMENT• GOALS i'OR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
REGISTER OF DEEDS DEPARTMENT TURNOVER RATE-FOR FY °83-=84 =-0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS • ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)'
OFFICE/CLERICAL 1 l Minority
i
UNDERR PRESENTATIOl+**
OFFICE'CLERICAL
4.1 Minority
i
J
{1
*Indicate which pr'o-
i tccted group (minority,
women. h indicapped) or
i sub-group (e.g. , black
females, other minor- TOTALS 1 1 Minority
i tv males.. etc.) is un- -__--
de',represented, and **Refers to Placement goals, NOT simply "hiring goals.."
amount of undexrcpre- :':"Net Increase" does not include placements of minority group workers, women, and/or harAicapped
yenta
persons which become necessary, ause of turnover, to keel their representation at present levels
mill
COUNTY MANAGER DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, '1989
OCCUPATIONAL GROUP •NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE. TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 2 2 2 2
PERCENT 100.0 100.0 100.0-
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 1 1
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
2 1 3 2 1 3
TOTAL WORKFORCE
66.7 33.3 100.0 66.7 33.3
....._..__._.......... .
COUNTY MANAGER DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE- •
STANDARD LABOR FORCE
FEMALE O.OX 45,2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS
MINORITY 0.0% 21.21. MINORITY -21.2%
PROFESSIONALS
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL.
MINORITY 0.04 l9sORS MINORITY —19.0%
SKILLED CRAFT WORKERS (_)
SERVICE—MAINTENANCE WORKERS
PLACEMENT GOALS
COUNTY MANAGER DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD K IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2% 3 FEMALE 1:36
OFFICIALS & ADMINISTRATORS MINORITY 21.2% % 3 MINORITY .64
100
PROFESSIONALS K
100
TECHNICIANS X
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS K
100
OFFICE & CLERICAL
MINORITY 19.0% $ 1 MINORITY .190
100
SKILLED CRAFT WORKERS '' X
100
. SERVICE-MAINTENANCE WORKERS S
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED� ,
• t
COUNTY MANAGER DEPARTMENT TURNOVER RATE FOR FY •'83 - '84 0.03
f FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB GLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* ' OPENINGS (NET INCREASE)*
Officials S Administrators
OFFICIAL'S &
ADMINISTRATORS i 1 FEMALE 2 1 MINORITY '
� M MINORITY
i
1 UNDERREPRESENTATION**
! _r 1 FEMALE
3 MINORITY
I
**Indicate which pro-
tected group (minority,
womcn, handicapped) or
? sub-group (e.g. , black
femiales, other minor- TOTALS 1 1 k'EMALE 2 1 FEMALE
j it ralea, etc.) is un- 1 MINORITY
c:^—epresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Not,Increase" does not include placements of minority group workers, women, and/or n 'capped
sentagan.
persons ;vnich become necessary} cause: of turnover, to keep their representation at'prese nt levels
11111111 IN,,
PERSONNEL DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL CROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT 100.0 100.0 100.0
PROFESSIONALS 1 1 I 1 2 2
PERCENT 50.0 50.0 50.0 50.0 100.0
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT.
OFFICE & CLERICAL
PERCENT
SKILLET? CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE
1 1 2 2 . 3 3
33.3 33.3 66.7 66.3 100.0
Am
qw
......____.__..........
PERSONNEL DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE, LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
PROFESSIONALS
FEMALE 0.0$ 45.0 FEMALE -45.0
TECHNICIANS FEMALE
0.0% (-} 20.1 MINORITY -20.1
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS (_}
OFFICE & CLERICAL. (-}
SKILLED CRAFT WORKERS
Et _
SERVICE-MAINTENANCE WORKERS
f A-
?LAMMENT GOALS
PERSONNEL DEPARTMENT.
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN'THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY PARITY
100
OFFICIALS & ADMINISTRATORS x
100
PROFESSIONALS x
100
TECHNICIANS FEMALE 45.0 1 FEMALE .450
MINORITY 20.1 x 1 MINORITY .201
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS x
100
OFFICE & CLERICAL x
100
SKILLED CRAFT WORKERS : x
100
SERVICE-MAINTENANCE WORKERS x
100.
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
PERSONNEL DEPARTMENT TURNOVER RATE FOR FY 183-184 = 0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS . ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOATS
OPENINGS (NET INCREASE)* OPENINGS WT INCREASE)*
UNDERREPRESENTATION**
tc N/A
:r
JL •
It
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other rianor- TOTALS
icy rules, etc.) is un-
derrepresented, and "Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include lacements of minority g rou aorkers women, and/or handicapped
sentation.
persons which become necessar ecause of turnover, to keep their representation at Sent levels.
1111111,1 Mg,
FINANCE DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1954
OCCUPATIONAL CROUP 'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT 100.0 100.0 100.0
PROFESSIONALS 1 1 1, 1
PERCENT 100.0 100.0 100.0
TECHNICIANS 2 2 f 2 2
PERCENT
100.0 100.0 100.01
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 2 2 1 1 T 3 3
PERCENT .66.7 66.7 33.3 33.3 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 4 5 1 1 2 2 5 7
14.3 57.1 71.4 ' 14.3 14.3 28.6 28.6 71.4
FINANCE DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 45.26 FEMALE -45.2%
OFFICIALS & ADMINISTRATORS {_)
MINORITY 21.2% a MINORITY -21.2%
PROFESSIONALS FEMALE 0.0%': { ) 45.a�; ° F-EMALE -45.296
TECHNICIANS
MINORITY . 0.0% 20.1% MINORITY -20.1%
PROTECTIVE SERVICE WORKERS {_)
PARAPROFESSIONALS
OFFICE & CLERICAL.
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
ills
PLACEMENT GOALS
FINANCE DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2 1. FEMALE .452
OFFICIALS & ADMINISTRATORS
X
MINORITY 21.2 1 MINORITY .212
100
PROFESSIONALS FEMALE 45.2 . 1 FEMALE .452
• X
100
TECHNICIANS
MINORITY 20.1 X 2 MINORITY .402
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS X
100
OFFICE & CLERICAL %
100 '
SKILLED CRAFT WORKERS
}•. X
100
SERVICE-MAINTENANCE WORKERS X
100
Ask
1p
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP. WORKERS'ARE UNDERREPRESENTED
FINANCE DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 14.0%
FOR 1985 FOR 1985 -/ 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)' OPENINGS (NET INCREASE)*
OFFICIALS & ADMINISTRA-
TORS
UNDERREPRESENTATION**
N/A
T�
lj
**Indicate which pro-
te.cted 'group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- O'Net Increase" does not include placements of•minority group workers: women, And/or handicapped
'Aft sentation.
persons which become necessary cause of turnover, to keeg their representation it I. levels.
PURCHASING & CENTRAL SERVICES DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31,• 1984
i
QCCUPATIONAL CROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT 100.0 1 100:0
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 3, 2 2 2 1 3 4
PERCENT 25.0 25.0 50.0 50.0 50.0 25.0 75.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL. WORKFORCE, 2 1 3 2 2 2 • 3 5 •
40.0 20.0 60.0 40.0 40.0 40:0 60.0
PURCHASING & CENTRAL SERVICES DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP X IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
;
FEMALE 0.0%• 45.2X FEMALE . -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0.0% (-) 21.2% MINORITY -21.2%
PROFESSIONALS
TECHNICIANS {-).
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS (_)
OFFICE & CLERICAL. (_)
SKILLED CRAFT WORKERS
I
1..
P`
SERVICE-MAINTENANCE WORKERS
PLACEMENT GOALS
PURCHASING & CENTRAL S"DEPARTMENT'
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP. TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY a PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS MINORITY 21.2 X 1 MINORITY .212
100
PROFESSIONALS
X
100
TECHNICIANS X
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS %
100
OFFICE & CLERICAL X
100
SKILLED CRAFT WORKERS X
100
SERVICE-MAINTENANCE WORKERS %
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED CROUP WORKERS ARE UNDERREPRESENTED
PURCHASING & CENTRAL SsRV DEPARTMENT TURNOVER RATE FOR FY '83-'84 = •25.0%
FOR 1985 FOR 1985 - 1489
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS . (NET INCREASE)' OPENINGS (NET INCHEASE)*
OFFICIAL & ADMINISTRATORS
i UNDERREPRESENTATION**
N/A
Jc -
1 �r
I �
1�
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity finales, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or 11andieapped
sent- ion.
persons which become necessary cause of turnover, to keep their representation atp' igent levels I�
Tax Supervisor DEPARTMENT WORKFORCE BY OCCUPATION December 31, 1984
OCCUPATIONAL GROUP •NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE LUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT 100.0 100.0 100.0
PROFESSIONALS 2 1 3 2, 1 3
' PERCENT -66.7 33.3 100.0 66.7 33.3
TECHNICIANS 2 2 2 2
PERCENT 100.0 100.0 100.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 7 7 1 1 8 8
PERCENT 87.5 87.5 12.5 12.5 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 5 8 13 1 1 S 9 14
35.7 57.2 92'.9 7.1 7.1 35.7 64.3
Amok
TAX ,SURERVI,SOH DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY '0,0X {-} 21.2% - MINORITY -21.2%
PROFESSIONALS
MINORITY 0.0% 21.2% ' MINORITY -21.2%
TECHNICIANS FEMALE 0.0% (_� 45.0 FEMALE -45.0%
MINORITY 0.0% 20.1 MINORITY -24.1%
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS (_)
OFFICE & CLERICAL. (-)
MINORITY 12.5% 19.0% MINORITY -6.5%
SKILLED CRAFT WORKERS
4
SERVICE-MAINTENANCE WORKERS
Pill
I
PLACEMENT GOALS
TAX SUPERVISOR ' DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY a PARITY
100
FEMALE 45.2 1 FEMALE .
OFFICIALS & ADMINISTRATORS MINORITY 21.2 X 1 MINORITY .212
100
PROFESSIONALS MINORITY 21,2 X 3 MINORITY .636
•100
TECHNICIANS FEMALE 45.0 4 FEMALE 1.80
MINORITY 20.1 X 4 MINORITY •804
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS X
100
OFFICE & CLERICAL
MINORITY 19.0 X 10 MINORITY 1.40
100
SKILLED CRAFT WORKERS
:�. X
100
SERVICE-MAINTENANCE WORKERS X •
100
Ask
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
TAX SUPERVISOR DEPARTMENT TURIOVER RATE FOR FY"83 - '84 0.0%
FOR 1988 FOR 1985 - 1989
OCCUPATION: 30B CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NL'r lyCREASE)*
Professionals
1 Female 2- Female
Technicians 2 1 Mifiority 3 1 Minority
UNDERREPRESENTATION**
Professionals
?. 1 Minority
Office and Clerical 1 1 Minority 1 1 Minority
Technicians
# 1 Minority
# 2 Female
. a
Office & Clerical
lc 1 Minority
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black 1 Female 2-Females
females, other minor- TOTALS 3 j 2 Minorities 5 3 Minorities
ity rules, rtc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals'
c11110unt at undcrrepre- *"Nei: Increase" clogs trot include placements of minority group workers, women, and/or handicapped
setita ''on.
persons which become necessary, ause of turnover, to keep their representation at pre wt levels.
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP- WORKERS ARE UNDERREPRESENTED
TAX SUPERVISOR DEPARTMENT TURNOVER RATE FOR FY"83 - '84 = 0.0%
FOR 1985 FOR 1985 - 1989 '
OCCUPATION:. JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
Professionals 1 —1-Minority
I Female 2 Female
Technicians 2 1 Minority 3 1 Minority
UNDERREPRESENTATION**
Professionals
?� 1 Minority
Office and Clerical 1 1 Minority 1 1 Minority
Technicians
1� 1 Minority
2 Female
r _
Office & Clerical
!b 1 Minority,
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black 1 Female 2 Females
females, other minor- TOTALS 3 2 Minorities 5 3 Minorities
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals." '
,mount of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or handicapped
sentation.
persons which become necessary, Ouse of turnover, to keep their representation at pre levels,
LAND RECORDS DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP !, -NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT 100.0 100.0 100.0
PROFESSIONALS 1 1 1 1
PERCENT 100.0 100.0 100.0
TECHNICIANS 1 1 1 1
PERCENT 100.0 •
100.0 100.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 1 1
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 3 4 1 3 4
25.0 75.0 100.0 25.0 75.0
LAND RECORDS DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0$ 45.25h FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0.0!h {-} 21.2% ' MINORITY -21.2%
PROFESSIONALS {-)
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS'
MINORITY 0.0% 20.1% MINORITY -20.1t.
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL C-)
MINORITY 0.08 19.0% MINORITY -19.0%
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS {-}
PLACEMENT .GOALS
LAND RECORDS DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY = PARITY
100
FEMALE 45.2% 1 FEMALE .452
OFFICIALS & ADMINISTRATORS MINORITY 21.2 x 1
MINORITY .212
100
PROFESSIONALS '
MINORITY 21.2 x 1 MINORITY .212
100
TECHNICIANS
MINORITY 20.1 x 1 MINORITY .201
100
PROTECTIVE SERVICE WORKERS x '
100
PARAPROFESSIONALS x
100
OFFICE & CLERICAL
MINORITY 19.0 x 1 'MINORITY .191
100.
SKILLED CRAFT WORKERS x
100
SERVICE-MAINTENANCE WORKERS x
100
.......... ...
....._...__.............
**PLACEMENT GOALS FOR OCCUPATIONS
IN WIICH PROTECTED GROUP 14ORICERS ARE UNDERREPRESENTED
LAND RECORDS DEPARTMENT TURNOVER RATE FOR FY '83- 89 = 0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENING$ (NET INCR)ASE)* OPENINGS (N4T 1NCHE'ASE)-,
LAND RECORDS
UNDERREPRESENTATION**
N/A
�6
Sf .
1 J}
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females,. other minor- TOTALS
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *''Net Increase" does not include Placements of minority group workers, women, and/or handicapped
sentation.
persons which become necessary, Wanuse of turnover, to keep their representation at pre t levels.
REVENUE DEPARTMENT WORKFORCE 'BY OCCUPATION
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL, MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS i 1 1
PERCENT 100.0 100.0 100.0 1
PROFESSIONALS
1 1 1
PERCENT 100.0 100.0 100.0 1
TECHNICIANS 1 1 1 1
PERCENT 1
100.0 100.0 100.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 1 I 2
PERCENT 2
50.0 50.0 50.0 50.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
2 2 4 1 1 2 3
TOTAL WORKFORCE
5
40.0 40.0 80.0 20.0 20.0 40.0 60.0
REVENUE DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
i FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS (-)
MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS
MINORITY .0.0% 21.2% MINORITY -21.2%
FEMALE 0.0% 45.0% FEMALE -45.0%
TECHNICIANS (-}
MINORITY 0.0% 20.11 MINORITY -20. 1%
PROTECTIVE SERVICE WORKERS {-}
PARAPROFESSIONALS {-}
OFFICE & CLERICAL.
SKILLED CRAFT WORKERS {-)
ti..;
F SERVICE-MAINTENANCE WORKERS
Alk
Will
I •
PLACEMENT GOALS
i
REVENUE DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY = PARITY
100
FEMALE •45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS MINORITY 21.2 X 1 MINORITY .212
100
PROFESSIONALS MINORITY 21.2 X 1 MINORITY .212
100
FEMALE 45.0 FEMALE .
TECHNICIANS MINORITY 20. 1 X I MINORITY .201
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS X
100
OFFICE & CLERICAL X
100
SKILLED CRAFT WORKERS f X
100
SERVICE-MAINTENANCE WORKERS X
100
Rp
Will
.._...._._.................... ...
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
REVENUE DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
01'L'NINGS (NET INCREASE)* OPENINGS {NI:T INCREASE)*
OFFICIALS & ADMIN
,
PROFESSIONALS
TECHNICIANS
{ UNDERREPRESENTATION**
N/A
if
**Indicate which pro-
; tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- "Net Increase" does not include placements of minority group workers, women, and/or handicapped
sentation. Aft
persons which become necessary, cause of turnover, to keep their representation at pr t levels
.........___...............
CHILD SUPPORT ENFORCEMENT DEPARTMENT WORKFORCE BY OCCUPATION
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL.
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT 1
100.0 100.0 100.0
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT.
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
• 1 1 2 1
PERCENT 100.0 100.0 100.0
OFFICE & CLERICAL 1 1 1
PERCENT 100.0 100.0 100.0 1
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS ,
PERCENT "'.
TOTAL WORKFORCE, 2 2 1 1 3
66.7 66.7 33.3 33.3 100,0 3
I
rHIT.D ,SUPPORT ENFORCEMENT DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP X IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS (-) a
MINORITY 0.0% 21.2% MINORITY -21.2X
PROFESSIONALS
TECHNICIANS {-}
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL. {-)
MINORITY 0.0% 19.0 MINORITY -19.0%
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS (-}
PLACEMENT GOALS
CHILD SUPPORT ENFORCEMENT
DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
j IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY Q PARITY
100
1
OFFICIALS & ADMINISTRATORS MINORITY 21,2 X 1 MINORITY .212
} 100
PROFESSIONALS
' X
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS X
loo
PARAPROFESSIONALS X
100
OFFICE & CLERICAL
MINORITY 19,0 X 1 MINORITY , 190
100
SKILLED CRAFT WORKERS p
X
100
SERVICE-MAINTENANCE WORKERS x
100
I
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
rHTT.n SITPRORT ENFORCEMENT DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
OFFICIALS & ADMIN
OFFICE & CLERICAL
UNDERREPRESENTATION**
# N/A 1
I
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un-
derrepres•ented, and **Refers to Placement goals, NOT simply "hiring goals."
amopnt of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or handicapped
sentation.
persons which become necessary, cause of turnover, to keep their representation at pr t levels. ,
DARER PROCESSING DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 i
PERCENT 100.0 100.0 100.0
PROFESSIONALS 1 } 2 1• 1 2
PERCENT 50.0 50.0 100.0 50.0 50.0
TECHNICIANS
1
PERCENT 100.0 100.0 100.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT `
OFFICE & CLERICAL
PERCENT
SKILLED CRAFT WORKERS
PERCENT
I SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 3 1 4 3 1 4
75.0 25.0 100.0 75.0 '25.0
Aft
i .
DATA PROCESSING DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0%. 45.2% FEMALE -45.2%
! BFFICIALS & ADMINISTRATORS MINORITY 0.0% (�} 21.2% a MINORITY -21.2%
f
PROFESSIONALS {-) _ FEMALE
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS {-}
MINORITY 0.0% 20.1% MINORITY -20. 1%
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS {-)
OFFICE & CLERICAL, (�)
SKILLED CRAFT WORKERS
' pr
SERVICE-MAINTENANCE WORKERS
PLACEMENT GOALS
DATA PROCESSING
DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER-OF EMPLOYEES
IN THE LABOR FORCE STANDARD K IN OCCUPATIONAL CATEGORY = PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS .
MINORITY 21.2 K 1 MINORITY .212
3 100 ._.---•-_--
PROFESSIONALS -
K
MINORITY 21..2
• 2 MINORITY
100
TECHNICIANS
MINORITY 20.1 X 1 MINORITY .402
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS K
100
OFFICE & CLERICAL R
100
SKILLED CRAFT WORKERS
.�: X
100
SERVICE-MAINTENANCE WORKERS x
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP 14ORKERS ARE UNDERREPRESENTED
DATA PROCESSING DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE')*
OFFICIALS & ADMIN
PROFESSIONALS
TECHNICIANS
UNDERREPRESENTATION**
N/A
JC
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un-
derrepresented, and . **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre-. *"Net Increase" does not include placements of minority group workers, women, and/or lhandicapd
sentation.
persons which became necessary Mikcaus e of turnover, to keep their representation at piont levels.
PLANNING DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS• 1 1 1 1
PERCENT 100.0 100.0 100.0
PROFESSIONALS 3 1 4 3 1 4
PERCENT 75.0 25.0 100.0 75.0 25.0
TECHNICIANS
• 4 2 6 1 1 . •2 5 3 •8
PERCENT 50.0 25.0 75.6 12.5 12.5 25.0 62.5 37.5
PROTECTIVE SERVICE WORKERS
PERCENT
•PAltAPP.OFESSZONALS -
PERCENT
OFFICE & CLERICAL 2 2 2 2
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 8 5 13 1 1 2 9 6 15
53.4 33.4 86.8 6.6 6.6 13.2 60.0 40.0
Ah
qw
PLANNING DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP - % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2E FEMALE -45.2%
OFFICIALS & ADMINISTRATORS (-) a
MINORITY 0.,0% • 21.2% MINORITY -21.2%
PROFESSIONALS FEMALE 25.0% (_} 45.2% . = FEMALE -20.2%
MINORTTV 0.0% 21.2% MINORITY -21.2%
TECHNICIANS FEMALE 37.5% (-) 45.0% FEMALE -7.5%
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL.
MINORITY 0.0% 19.0% MINORITY -19.0%
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS (-)
r
PLACEMENT GOALS
PLANNING DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD R IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS
_ X
MINORITY 21.2 1 MINORITY .212
100
PROFESSIONALS FEMALE 45.2 4 FEMALE 1.808
MINORITY 21.2 X 4
100 MINORITY . . 848'
TECHNICIANS
FEMALE 45.0 X 9 FEMALE 4.05
MINORITY 20.1 9 MINORITY 1.809
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS X
100
OFFICE & CLERICAL MINORITY 19.0 X 3 ' MINORITY .00
• 100
SKILLED CRAFT WORKERS ` X
L
100
SERVICE-MAINTENANCE WORKERS X
100
AM
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED 'CROUP 14ORICERS ARE UNDERREPRESENTED
PLANNING DEPARTMENT. TURNOVER RATE FOR FY 183-184 6�
FOR 1985 FOR 1985 - 1982
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACL'.1JEKT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)* �
1 FEMALE
PROFESSIONAL 2 1 MINORITY
t TECHNICIAN 1 1 FEMALE ] 1 FEMALE
i UNDEkREPRESENTATION*
1 PROFESSIONAL
�• I MINORITY
OFFICE CLERICAL 1 1 MINORITY 1 1 MINORITY
;r 1 FEMALE,
TECHNICIAN
I
t F FEMALE
• OFFICE CLERICAL
?i 1 MINORITY
-Indicate which pro-
tected group (minority,
women, handicapped) or '
sub-_group •(e.g. , black 1 FEMALE 2 FEMALES
fe.�.ales, other minor-
1
2 1. MINORITY 4 2 MINORITIES
it :°.°.les , etc.) is un- '
derrepresented, and **Refers to Placement goals, NOT simply. "hiring goals."
amount of underrepre- *"Net Incxease"does not include placements of minority groupwcrkers, women, .and/orhandicapped
sentad n.
persons which become necessary, ause'of turnover, to keep their representation at ' r ntleve2s.
ECONOMIC DEVELOPMENT DEPARTMENT WORKFORCE BY OCCUPATION
i
I •
r
OCCUPATIONAL GROUP ' NON MINORITY MINORITY TOTAL TOTAL
1
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1
PERCENT 100.0 100.0 100.0 1
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT '
OFFICE & CLERICAL I 1 1
PERCENT 100.0 100.0 100.0 1
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
2 2 " 2
TOTAL WORKFORCE 2
100.0 100.0 100.0
ECONOMIC DEVELOPMENT DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS (-)
MINORITY 0.0% 21.2% MINORITY -21.2X
PROFESSIONALS {-}
TECHNICIANS {-}
PROTECTIVE SERVICE WORKERS (_}
i
! PARAPROFESSIONALS (_}
t ,
• OFFICE & CLERICAL. (-}
MINORITY 0.0% 19.0X MINORITY -19.Q
SKILLED CRAFT WORKERS {-}
SERVICE-MAINTENANCE WORKERS {-}
................. .. .....
IN liiiiii Illig 011111111
PLACEMENT GOALS
ECONOMIC DEVELOPMENT DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP . TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD S IN OCCUPATIONAL CATEGORY PARITY
100
OFFICIALS & ADMINISTRATORS MINORITY 21.2 x 1 MINORITY ,212
100
PROFESSIONALS K
100
TECHNICIANS X
100
PROTECTIVE SERVICE WORKERS g
100
. PARAPROFESSIONALS X
100
OFFICE & CLERICAL MINORITY 19.0 g 1 MINORITY . 190
•
100
SKILLED CRAFT WORKERS R
100
SERVICE-MAINTENANCE WORKERS g
100
i
**PLACEMENT GOALS FOR OCCUPATIONS'
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
ECONOMIC DEVELOPMENT DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 0.0%
FOR 1989 FOR 19BS - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPGNiNcs. WT INICREASE)*
QFVTr_I•AT.S f AI)MTN
OFFICE & CLERICAL
UNDERREPRESENTATION**
�i N/A
:r
**Indicate which pro-
tected group (minority,
women: handicapped) or
sub-group (e.g. , black
females,* other minor- TOTALS
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Ne•tIncrease" does not include placements of minority group workers, women, and/or handicapped
sentation.
persons which become necessary cause of turnover, to keep their representation at pjwnt levels.
SOCIAL SERVICES DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP -NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT 1 00.0 100.0 100.0
PROFESSIONALS 4 23 27 3 3 6 7 " 26 33
PERCENT 12.1 69.7 81.8 9.1 9.1 18.2 21.2 78.8
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS 12 12 8 S ' 20 20
PERCENT 60.0 60.0 40.0 40.0 100.0
OFFICE & CLERICAL 10 10 2 2 12 12
PERCENT 83.3- 83.3 16.7 16.7 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 5 45 50 3 13 16 8 58 66
7.6 68.2 75.8 4.5 19.7 24.2 12.1 87.9
qw
SOCIAL SERVICES DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMAL$ 0.0% 45.2% FEMALE -45.2%
OFICIALS & ADMINISTRATORS MINORITY 0.0� {-} 21.28 MINORITY -21.28
PROFESSIONALS {"}
MINORITY 18.2% 21.2% MINORITY -3.0%
TECHNICIANS {-}
PROTECTIVE SERVICE WORKERS {-}
PARAPROFESS1014ALS
MINORITY 40.08 46.3% MINORITY -6.38•
OFFICE & CLERICAL
MINORITY 16.7% 19.0% MINORITY -2.38
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS {-} a
Milli
PLACEMENT GOALS
DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP X TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY s PARITY
100
FEMALE 45.2 1, FEMALE .452
OFFICIALS & ADMINISTRATORS MINORITY 21.2 X 1 MINORITY .212
100
PROFESSIONALS MINORITY 21.2 R' 34 MINORITY 7.208
100
TECHNICIANS X
100
PROTECTIVE SERVICE 14ORKERS X
100
PARAPROFESSIONALS X MINORITY 9.26
MINORITY 46.3 20
100
OFFICE & CLERICAL X 12 MINORITY 2.28 MINORITY 1c) 100
SKILLED CRAFT WORKERS X
100
SERVICE—MAINTENANCE WORKERS X
100
qp
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED CROUP WORKERS ARE UNDERREPRESENTED
SOCIAL SERVICES DEPARTMENT TURNOVER RATE FOR FY t83-184 = 14%
FOR 1985 FOR 1985 1986,
OCCUPATION: JOB CUSS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASW OPENINGS (NET INCREASE)*
OFFTciAT,s z ADMINISTRA
TORS
PROFESSIONALS
PROFESSIONAL 1 1 MINORITY 1 1 MINORITY
PARAPROFESSIONALS
OFFICE & CLERICAL
PARAPROFESSIONAL 1 1 MINORITY
UNDERREPRESENTATION**
PROFESSIONAL
I MINORITY
PARAPROFESSIONAL
# 1 MINORITY
F
**Indicate which• pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un- 1 1 '-MINORITY 1 2 1 2 MINORITIES
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net increase" does not include placements of minority group workers, women, and/or handicapped
sentation. ANk
perso ns which beddifid iiedegg, dust;dust; bf turnbVerj to keep theif representation at pr t levels.
IN
______.....................
HEALTH DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP . -NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 Z 1
PERCENT 100.0 100.0 100.0
PROFESSIONALS 1 12 13 Z 1 1'• 13 14
PERCENT 7.1 85.8 92.9 7.1 7.1 7.1 92.9
TECHNICIANS ' 4 3 7 1 Z 2 5 4 9
PERCENT 44.•4 33.4 77.8 11.1 11.1 22.2 55.5 44.5 ,
PROTECTIVE SERVICE WORKERS 3 3 3 3
PERCENT . 100.0 100.0 100.0
PARAPROFESSIONALS 3 3 3 3
PERCENT. 100.0 100.0 100.0
OFFICE & CLERICAL 3 3 2 7 9 2 10 12
PERCENT 25.0 25.0 16.7 58.3 75.0 16.7 83.3
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 9 18 27 3 12 15 12 30 42
21.5 42.8 64.3 7.1 28.6 35:7 28.6 7Z.4
IN
HEATH DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0%• 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0.0% (-} 21.2% s MINORITY -21.2%
PROFESSIONALS (-)
MINORITY 7.1% 21.2%' MINORITY
TECHNICIANS FEMALE 44.5% (-) 45.0% - FEMALE -•50�
s
PROTECTIVE SERVICE WORKERS FEMALE 0.0% (_} ,14.6% FEMALE -14.6%
MINORITY 0.0% 28.5% MINORITY -28.5%
PARAPROFESSIONALS
OFFICE & CLERICAL. (-)
SKILLED. CRAFT WORKERS
k-
at-
SERVICE-MAINTENANCE VORKERS (-}
• i
PLACEMENT GOALS
HEALTH DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY a PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS
MINORITY 21.2 X 1 '•MINORITY .212
100
PROFESSIONALS MINORITY 21.2 X 15 MINORITY 3.18
100
TECHNICIANS FEMALE 45.0 x 9 FEMALE 4.05
100
FEMALE 14.6
FEMAT F .438
PROTECTIVE SERVICE WORKERS
. MINORITY 28.5 X 3 MINORITY .855
100
PARAPROFESSIONALS X
100
OFFICE & CLERICAL x
100
i.
SKILLED CRAFT WORKERS ' x
100
SERVICE-MAINTENANCE WORKERS x
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
HEALTH DEPARTMENT TURNOVER RATE FOR FY 183-84 = 28,0$
rOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* ' OPENINGS NET INCREASE)*
OFFICIALS & ADMIN
PROFESSIONALS
PROFESSIONAL 1 1 MINORITY 2 2 MINORITIES
TECHNICIANS
PROTECTIVE SERVICE
PROTECTION SERVICES 1 1 MINORITY
UNDERREPRESENTATION**
PROFESSIONALS
r
2 MINORITIES
PROTECTIVE SERVICES
�F 1 MINORITY
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- -TOTALS. 1 1 MINORITY 3 3 MINORITIES
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or handicapped
sentation.
persons which become necesgat3ocause of turnover, to keep their representation at P ent levels.
AGRICULTURE DEPARTMENT WORKFORCE BY OCCUPATION
OCCUPATIONAL GROUP NON MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1
PERCENT 100.0 100.0 100.0 1
PROFESSIONALS 1 3 4 1 1 2 2 4
6
PERCENT 16.7 50.0 ' 66.7 16.7 16.7 33.3 33.3 66.7
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS 1 1 1
PERCENT 1
100.0 100.0 100.0
OFFICE & CLERICAL 2 2 1 1 3
PERCENT 66.7 66.7 33.3 33.3 100.0 3
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS -
PERCENT.
TOTAL 14ORKFORCE 2 5 7 1 3 4 3 8
• 11
18.2 45.4 63.6 9.1 27.3 36.4 27.3 72.7
AGRICULTURE DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS
MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS {-)
TECHNICIANS (-}
PROTECTIVE SERVICE WORKERS {-}
PARAPROFESSIONALS
OFFICE & CLERICAL.
SKILLED CRAFT WORKERS (-)
•
SERVICE-MAINTENANCE WORKERS
...........................
PLACEMENT GOALS
AGRICULTURE DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD R IN OCCUPATIONAL CATEGORY Q PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS X
• MINORITY 23..2 I , MINORITY .212
100
i
PROFESSIONALS X
100
TECHNICIANS X
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS X
100
OFFICE & CLERICAL X
100
.SKILLED CRAFT WORKERS R
100
SERVICE-MAINTENANCE WORKERS X
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
AGRICULTURE DEPARTMENT TURNOVER RATE FOR FY '83-184 9.0%
�- FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS . (NUT INCREASE)*
OFFICIALS & ADMINISTRA-
TORS
UNDERREPRESENTATION**
N/A
JL
dr .
i 70
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
itv males, etc.) is un-
derrepresented, and **'Refers to Placement goals., NOT simply. "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or handicapped
sentation.
persons which become necessary cause of turnover, to keep their representation at p nt levels.
f
RECREATION DEPARTMENT WORKFORCE AY OCCUPATION AECEMBER 31r 1984
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT
100.0 10010 100.0
PROFESSIONALS 3 1 4 3
PERCENT 75.0 25.0 100.0 75.0 25.0 4
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 1 1
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
4 2 6 4 2 6
TOTAL WORKFORCE
66.7 33.3 100.0 66.7 133.3
RECREATION DEPARTMENT UTILIZATION OR UNDERUTILIZAT.ION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% x+5.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0.0% (-)
21.2% MINORITY -2I.2!
PROFESSIONALS FEMALE 25.0 (_} 45.2 FEMALE -20.2
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS (-)
PROTECTIVE SERVICE WORKERS (-}
PARAPROFESSIONALS
OFFICE & CLERICAL.
MINORITY 0.0% 19.0% MINORITY -24.0%
SKILLED CRAFT WORKERS (-)
Y'•
SERVICE-MAINTENANCE WORKERS
._..._..__................
-PLACEMENT GOALS
RECREATION DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
I IN THE LABOR FORCE STANDARD R IN OCCUPATIONAL CATEGORY = PARITY
100
i FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS
i MINORITY 21.2 X 1 , MINORITY .212
` 100
FEMALE 45.2 4 FEMALE 1.808
PROFESSIONALS
MINORITY 21.2 X 4 MINORITY .848
100
TECHNICIANS X
100
PROTECTIVE SERVICE WORKERS g
I
100
PARAPROFESSIONALS %
100
OFFICE & CLERICAL
MINORITY 19.0 R 2 MINORITY. .38
100
SKILLED CRAFT WORKERS X
;
100
SERVICE-MAINTENANCE WORKERS g
100
**PLACEMENT GOALS FOR OCCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
RECREATION DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 29.0%
FOR 1985 FOR 1985 •- 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEINEXT GOATS
OPENINGS (NET INCREASE)*. OPENINGS . (NET INCREASE)-
OFFICIALS & ADMIN
1 FEMALES
PROFESSIONALS
PROFESSIONALS 2 1 MINORITIES
OFFICE & CLERICAL
UNDERREPRESENTATION**
,PROFESSIONALS
#
n f FEMALES
MINORITIES
**indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black 1 FEMALES
�enmales, other minor- TOTALS 2 1 MINORITIES
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, andf or handicapped
sentation.
persons which become necessarti cause of turnover, to keep their representation at p nt levels.
AGING DEPARTMENT WORKFORCE BY OCCUPATION
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
4
OFFICIALS & ADMINISTRATORS 1
. 1
PERCENT 100.0 lb`0.0 100.0 1
PROFESSIONALS
PERCENT 100.0• 100.0 100.0
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT 1 I 1 1
100.0 100.0 100.0
OFFICE & CLERICAL 3 3 3
PERCENT 100.0 100.0 100.0 3
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 5 6. 1 5
6
16.7 83.3 100.0 16.7 83.3
Aftk
AGING DEPARTMENT UTILIZATION OR UNDERUTILIZATION
{
OCCUPATIONAL GROUP IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0.0% - t-? 21.2% a MINORITY -21.2%
PROFESSIONALS
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS t-) -
MINORITY 0.07. 46.3% MINORITY -46. 3% •
OFFICE-& CLERICAL. t-)
MINORITY 0.0% 19.0% MINORITY -14.0%
SKILLED CRAFT WORKERS
' 4 -
SERVICE-MAINTENANCE WORKERS t-) _
qp
MI
PLACEMENT GOALS
AGING DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS MINORITY 21.2 x 1 MINORITY 212
100
PROFESSIONALS
MINORITY 21.2 x 1 MINORITY .212
100
TECHNICIANS x
100
PROTECTIVE SERVICE WORKERS x
' 100
PARAPROFESSIONALS MINORITY 46.3 X 1 MINORITY .463
100
OFFICE & CLERICAL MINORITY 19.0 X 3 MINORITY .570
100
v.
SKILLED CRAFT WORKERS X
100
SERVICE-MAINTENANCE WORKERS x
100
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
Aging DEPARTMENT TURNOVER RATE FOR FY 183 184 =17.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS -7, 1
ESTIMATED PLACEMENT GOALS ESTIMATED PLACED�IRXT G(0)ALS
0 iNGS
(NET INCHEASE)* OPENINGS (N1-1' 1NC141-A.S1`)*
Officials & Admin.
office & Clerical 1 Minority
Professionals
Paraprofessionals
Office & Clerical
UNDERREPRESENTATION**
office & Clerical
I Minority
#
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS 1 Minority
ty 'males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements aE minority gi P�ou workers, women, and/or hindicappvd
nentation,
persons which become necessar2ftecause of turnover, to keep their representation at Abent levels.
Commission For Women DEPARTMENT WORKFORCE BY OCCUPATION December 31, 1984
OCCUPATIONAL GROUP
-NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL -MALE_ FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
'PROFESSIONALS
PERCENT 100.0 100.0 100.0 1
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL
PERCENT
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE
100.0 100.0 100.0 1
Alk
--------------- --------- -------
------- -- -----
COMMISSION FOR WOMEN DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUT' % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
PROFESSIONALS
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS
i
PROTECTIVE SERVICE WORKERS {-)
PARAPROFESSIONALS
OFFICE & CLERICAL. FEMALE 0..0% {'� 74.3y ° FrMAL -74.3%
MINORITY 0.0% 19.0% MtN01tTY -14.0%
SKILLED CRAFT WORKERS (-)
SERVICE-MAINTENANCE WORKERS (-)
nnu�rmmonn�ui�nn�nnnne�n
PLACEMENT. GOALS
COMMISSION FOR WOMEN DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY PARITY
100
OFFICIALS & ADMINISTRATORS x
100 .
PROFESSIONALS MINORITY 21.2 X 1 MINORITY .212
100
TECHNICIANS X
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS x
100
OFFICE & CLERICAL FEMALE 74.3 FE14ALE .743
MINORITY 19.0 X 1 MINORITY . 190
100'
SKILLED CRAFT WORKERS
X
100
SERVICE—MAINTENANCE WORKERS x
100
......__.___._.........
JOB OPENING ESTIMATES AND PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
COMMISSION FOR WOMEN DEPARTMENT TURNOVER RATE FOR ,FY '83 - '84 = 50.0%
_ FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
PROFESSIONALS
• OFFICE & CLERICAL
Office and Clerical 1 1 Female 1 1 Female
UNDERREPRESENTATION**
Office & Clerical
# 1 Female
#
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- Totals 1 1 Female 1 1 Female
ity males, etc,) is un-
derrepresented-, and
amount of underrepre- '*11Net Increase" does not include placements of minority groupworkers, women, and/or handicapped
sentation.
persons which become inecessar demise 6k tiirrioirer, to keep their representation at p ent levels.
Sheriff DEPARTMENT WORKFORCE BY OCCUPATION December 31, 1984
OCCUPATIONAL GROUP 'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS 36 3 39 10 3 13 46 6 52
PERCENT 69.2 5.8 75.0 19.2 5.8 25.0 88.5 11.5
PARAPROFESSIONALS
PERCENT
OFFICE &CLERICAL 3 3 3
PERCENT 100.0 IOO.Q 100.0 3
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS 1 1 1
PERCENT 100.0 100.0 100.0 1
TOTAL WORKFORCE 36 7 43 10 3 13 46 10
64.3 12.6 76:9 17.8 5.3 23.1 82.1 17.9 56
. SHERIFF DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP Y IN WORKFORCE LABOR FORCE WORKFORCE—
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
s PROFESSIONALS
TECHNICIANS {—)
FEMALE 11.5% 14.6% FEMALE —3.1%
PROTECTIVE SERVICE WORKERS
MINORITY 25.0% 28.57. MINORITY —3.5%
PARAPROFESSIONALS {—)
OFFICE & CLERICAL.
MINORITY 0.0% 19.0% MINORITY —19.0%
SKILLED CRAFT WORKERS
SERVICE—MAINTENANCE WORKERS
MINORITY 0.0% 48.0% MINORITY —48.0%
PLACEMENT. GOALS
SHERIFF DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY . PARITY
100
OFFICIALS & ADMINISTRATORS X
100
PROFESSIONALS R
100
TECHNICIANS g
100
FEMALE 14.6 56 FEMALE 8.176
PROTECTIVE SERVICE WORKERS X
MINORITY 28.5 56 MINORITY' 15.96
100
PARAPROFESSIONALS g
100
OFFICE & CLERICAL MINORITY 19.0 x 3 MINORITY .57
100
x•.
SKILLED CRAFT WORKERS f'
100
SERVICE-MAINTENANCE WORKERS MINORITY 48.0 x 3 MINORITY .48 .
100
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
Sheriff DEPARTMENT TURNOVER RATE FOR '83 184 +18.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* orENiNcs (NET INCREASE)*
2 Females 2 Females
Protective Services 4 2 Minorities 5 3 Minorities
Office & Clerical 1 1 Minority
UNDERREPRESENTATION**
Protective Service
# 2 Females
# 3 minorities
Office & Clerical
Minority
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black 2. Females
2 Females
females, other minor- TOTALS 4 2 Minorities 6 4 Minorities
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals; NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority grpupwarkers, women, and/or handicapped I
sent ion.
persons which become necessary cause of turnover, to keep their representation at plWne levels
EMERGENCY MANAGEMENT SERVICES DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31 , 1984
OCCUPATIONAL GROUP 'NON—MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT 100.0 10x.0 100.0 1
PROFESSIONALS
PERCENT
TECHNICIANS 13 '8 21 If 3 4 14 11
25
PERCENT 520 32.0 84.0 4.0 12.0 16.0 56.0 44.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL
PERCENT
SKILLED CRAFT WORKERS
PERCENT
SERVICE—MAINTENANCE WORKERS
PERCENT
14 8 22 1 3 4 15 11
TOTAL WORKFORCE 26
53.8 30.8 84.6 3.9 11.5 15.4 57.7 42.3
Aft
lam-
EMERGENCY MANAGEMENT SERVICES DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP Y IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2 FEMALE -45.2%
i
OFFICIALS & ADMINISTRATORS C-} _
MINORITY 0.0% 21.2 MINORITY -2I.2%
i PROFESSIONALS
I
FEMALE 44.0% 45.0 FEMALE -1.6%
TECHNICIANS (-}
MINORITY 16.0% 20.1% MINORITY
PROTECTIVE SERVICE WORKERS
1
PARAPROFESSIONALS (-)
i
r
OFFICE & CLERICAL. (-)
r .
SKILLED CRAFT WORKERS {-)
SERVICE-MAINTENANCE WORKERS
Adak
I
PLACEMENT GOALS
EMERGENCY-MANAGEMENT SRV DEPARTMENT
t
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
` IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY PARITY
i
200
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS MINORITY 21.2 X 1 MINORITY .212
100
i
PROFESSIONALS X
100
FEMALE 45.0 26 FEMALE 11.7
' TECHNICIANS '
MINORITY 20.1 X 26 MINORITY 5.3
. i
100
PROTECTIVE SERVICE WORKERS X
100
t
PARAPROFESSIONALS R
100
: OFFICE & CLERICAL X
100
SKILLED CRAFT WORKERS X
200
SERVICE-MAINTENANCE'WORKERS X
100
Aft
**PLACEMENT COALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
EMERGENCY MANAGEMENT SERVICES DEPARTMENT TURNOVER RATE FOR FY '83 - '84 =401
FOR 1185 FOR 1985 - 1484
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
1 1 MINORITY
TECHNICAIN 1 1 FEMALE
i f
OFFICE & CLERICAL
UNDERREPRESENTATION**
TECHNICIANS
1 FEMALE
1 MINORITY '
Tr _
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black 1 FEMALES
females, other minor- TOTALS 2
ity males, etc.) is un- 1 MINORITY
derrepresented, and **Refers to Placement goals, NOT simply. "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, -ind/orhandicapp
sentation.
persons which become necessar" dcaijse dt trnovex, to keep their representation at cent levels.
FUBLIC WORKS DEPARTMENT WORKFORCE BY OCCUPATION DECEM13ER 31 , 1984
OCCUPATIONAL GROUP •NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1
PERCENT 100.0 100.0 -100.0• 1
PROFESSIONALS
1 1 1 i
PERCENT 100.0 100.0 100.0
i TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 1
PERCENT 1
100.0 100.0 100.0
SKILLED CRAFT WORKERS 5 5 3 3 8 8
PERCENT 62.5 62.5 37.5 37.5 100.0
SERVICE-MAINTENANCE WORKERS 4 4 10 4 14 14 4 18
PERCENT 22.2 22.2 55.6 22.2 77.8 77.8 22.2
TOTAL WORKFORCE 10 1 11 14 4 18 24 5
29
34.5 • 3.4 37.9 48.3 13.8 62.1 82.8 17.2
Amok
PUBLIC WORKS DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS (_)
MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS FEMALE 0.0% (-) 45.2% FEMALE -45.2%
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL. (..)
MINORITY 0.07. 19.0% FEMALE -19.0%
SKILLED CRAFT WORKERS FEMALE 0.0% (-} 25.8% = FEMALE -25.8%
SERVICE-MAINTENANCE WORKERS FEMALE 22.2% ?' t-) 42.47 FEMALE
i
PLACEMENT GOALS
PUBLIC WORKS DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS
MINORITY 21.2 X 1 MINORITY .212
100
PROFESSIONALS FEMALE 45,2 X 1 FEMALE .452
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS R
100
PARAPROFESSIONALS R
100
OFFICE & CLERICAL MINORITY 14.0 X 2 MINORITY .38
100
t.
SKILLED CRAFT WORKERS FEMALE 25.8 � X 8 FEMALE 2.064
100
SERVICE-MAINTENANCE WORKERS FEMALE 42,4 g lg FEMALE 7.632
100
' |
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
PUBLIC WORKS DEPARTMENT TURNOVER RATE FOR FY '83 '84 19.0%
FOR 1985 FOR 1985 1989'
OCCU I PATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS—
SKILLED CRAFT 2 '2 FEMALES *
SERVICE MAINTENANCE 4 4 FEMALES
SKILLED CRAFT
SERVICE MAINTEMANCE
**Indicate which pro-
tected group (minority,
women, handicapped) or
females, other minor- TOTALS 6 11 FEMALES
ity lytales, etc.) is un-
derrepresented, and .**Refers to ,Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Inc.reasc" does not include placements of minority groupworkers, women, and/orhandicapped
persons which become necessaMbecause of turnover, to keep their representation atosent levels
|
Housing/Community Ddvelopment DEPARTMENT WORKFORCE BY OCCUPATION
OCCUPATIONAL GROUP
'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL
MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT 100.0 100.0 100.0 1
PROFESSIONALS
3 3 .3
PERCENT 100.0 100.0 100.0 3
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS 1 1 2
PERCENT
33.3 33.3 66.7 66.7 100.0 3
OFFICE & CLERICAL
PERCENT 100.0 100.0 100.0 2
SKILLED CRAFT WORKERS
PERCENT
.SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE Z Z 4 4 8 4
11.2 11.2• 44.4 44.4 88.8 44.4 55.6 9
Ask
COMMUNITY DEVELOPMENT ___ DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE
WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
FEMALE o.ox 45.2% FEMALE -45.2%
' {_}
i
PROFESSIONALS FEMALE 0.0% 45.2% FEMALE -45.2%
TECHNICIANS -�
PROTECTIVE SERVICE WORKERS {_}
PARAPROFESSIONALS -}
OFFICE & CLERICAL, {_}
SKILLED CRAFT WORKERS {-}
SERVICE-MAINTENANCE WORKERS � {_}
1p
PLACEMENT GOALS
COMMUNITY DEVELOPMENT DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP x TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY F- PARIrTY
• 100
OFFICIALS & ADMINISTRATORS FEMALE 45.2 x FEMALE .452
100
PROFESSIONALS FEMALE 45.2 x 3 FEMALE 1.356
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS
X
100
PARAPROFESSIONALS
X
100
OFFICE & 'CLERICAL
X
loo
SKILLED CRAFT WORKERS
X
100
SERVICE-MAINTENANCE WORKERS x
100
"PLACEMENT COALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORT(MRS ARE UNDERREPRESENTED
Housing and Community DevelopmenMEPARTMENT TURNOVER RATE FOR FY '83 '84 + 14.0%
FOR 1985. FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINCS (NET INCREASE)*
Professional 1 Female
LINDERREPRESENTATION**
Professional
Female
A
JLL
**Indicate which pro-
tected group (minority,
women. handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un-
Female
derrepresented, and *•Refers to Placement goals, NOT simply "hiring goals."
ama.unt. of underrepre- *"Net increase" does not include placements of minority group workers, women, and/or handicapped
se il tt,atton.
persons which become ncdess because or turnover, to keep their representation a e sent levels,
W
004
ORANGE COUNTY
BOARD OF CCMMISSIONERS Action Agenda
ACTION AGENDA ITEM ABSTRACT Item No. El
Meeting Date: MAY 6, 1985
SUBJECT: OLDER AMERICANS MONTH PROCCAMATIal
DEPARTMENT: AGING PUBLIC HEARING: Yes X No
ATTACHMENT(S): INFORMATICN CONTACT: JERRY PASSMORE
X282
TELEPHONE NUMBER:
YES Hillsborough - 732-8181
Chapel Hill - 968-4501
Mebane - 227-2031
Durham - 688-7331
PURPOSE: To proclaimfty 1985 as Older Americans Month in Orange County.
NEED: To show appreciation to the older citizens who reside in the
County.
RECGOIENDATION:
Board to declare May as Older Americans Month by giving the
Chair authorization to sign proclamation.
00b
PROCLAMATION
WHEREAS, According to the latest population figures, there are over
9,000 persons over 60 years of age in Orange County; and,
WHEREAS, Orange County is proud of the older adults who live here and
wishes to show appreciation for what they have given and for
what they have contributed to their County, State and Nation;
and,
WHEREAS, Because of them, the rest of the citizens enjoy the fruits of
their visions and their labors, and their example is an
inspiration to continue to make Orange County a good place
in which to live; and,
WHEREAS, Our President and Governor have proclaimed May as Older
Americans Month, Orange County wishes to set aside a special
month for recognition of the older segment of its citizenry;
NOW, THEREFORE, We, the Orange County Board of Commissioners, join the
Governor of North Carolina and the President of the United
States in PROCLAIMING May, 1985
OLDER AMERICANS MONTH
AND, further, . do encourage all citizens to join us in honoring our older
Americans.
Don Willhoit, Chair
Orange County Board of Commissioners
•
O5i
ORANGE COUNTY
BOARD OF COMMISSIONERS Action Agenda
ACTION AGENDA ITEM ABSTRACT Item No. FICI
Meeting Date: MAY 6, 1985
SUBJECT: OLD COURTHOUSE ORANGE ORDER
DEPARTMENT: COUNTY MANAGER PUBLIC HEAPING: __Yes _X_No
ATTACHMENT(S) : INFORMATION CONTACT: MANAGER'S
OFFICE X501
TELEPHONE NUMBER:
YES Hillsborough - 732-8181
Chapel Hill - 968-4501
Mebane - 227-2031
Durham _- -.. _6118-7331
PURPOSE: To add $6,231.50 in the form of a change order to the contract
of Durham Construction Company. This would bring the contract
total to $253,931.50.
NEED: In order for the stairway to fit within the room the concrete
must be removed. It was believed to be plaster on brick or wood
lath. Once the plaster was removed the concrete was discovered.
IMPACT: The impact of this change order is $6,321.50 and an additional
fifteen days extension to contract.
RECOMMENDATION:
Approve change order.
05•
•
''t�
Ifiune v i ii:471-407
Durham Construction Company. Inc.
112 Brilama Avenue
i Pusi Office Box 15028
N.C.Lic.#6533 Durham, North Carolina 27704-0028
April 30, 1985
Mr. Roman Kolodij , Architect •
701 East Rosemary Street
Chapel Hill , North Carolina 27514
Re: Orange County Courthouse
Hillsborough, North Carolina
Dear Mr. Kolodij:
The rooms on the main floor that_were shown to have 12" of _masonry
facing are actually 12" of solid concrete and 5" of concrete ceiling. (400 s.f.)
To remove this concrete is going to be very time consuming and costly.
I am providing you with a •breakdown of costs below.
COST BREAKDOWN:
1) Labor to remove 900 s.f. of wall concrete $ 2,900,00
2) Air compressor and accessories ..0,0.....0...00.,..0.0.00 800.00
3) Labor to remove 400 s.f. of ceiling concrete 1,200.00
. 4) Shoring and securing ceiling concrete 250.00
5) Removing flooring on second floor (400 s.f.) 300.00
6) Reinstalling second floor wood flooring 500.00
7) Credit for removing specified masonry wall (800.00) F--
• SUBTOTAL .............e..0000.e...0...................Mo5,150.00
8) Durham Const. Co., Inc., overhead (10%) 515.00
9) Durham Const. Co., Inc. , profit (10%) OOOOO 000.0 OOOOOO of 566.50
TOTAL ADDITIONS ..0000........0........0.00000.....0.......0 $ 6,231.50
** Additional twenty (20) days needed.
As you are aware from our meeting on April 22, 1985, this portion
of the demolition work needs to be started now. Please issue us a
change order to do this work if there are no other problems that might '
hinder us.
•
If I can be of further assistance, do not hesitate to contact me.
Sincerely yours,
ir.;g >"1—
Kenneth A. Hunt
President
KAH/l rs •
056
ORANGE COUNTY
BOARD OF COMMISSIONERS Action Agenda
ACTION AGENDA IIEM ABSTRACT Item No. Ea
Meeting Date: MAY 6, 1985
SUBJECT: AGRICULTURAL EXTENSION SERVICE--MPFDRANDER OF UNDERSIANDING
DEPARTMENT: MONTY MANAGER PUBLIC HEAPING: Yes _X_No
ATTACHMENT(S) : INFOESIATICNO3NTACT: MANAGER'S
OFFICE X501
TELEPHONE NUMBER:
YES Hillsborough -732-8181
Chapel Hill - 968-4501
- Mebane - 227-2031
Durham -688-7331
PURPOSE: lb consider approving a revised Memorandum of Understanding
between the North.Carolina Extension Service and the Board.
NEED: Over the past several months the Board has expressed an interest
in modifying the recruitment and selection process for agricul-
tural extension positions. Determining the level of salary,
percentage of funding split and the time for extending the job
offer are the specific areas of concern. Items 4 through 8
under Agriculture Extension Responsibilities and Relationships
have been revised in accordance to the Board's previous recomr.
nendation.
IMPACT: A revised Memorandum of Understanding between the North Carolina
Extension Service and the Board would better clarify the State
and County roles.
RECOMMENDATION:
To approve the attached Memorandum of Understanding and submit
same to the North Carolina Extension Service.
057
4'F
rt
f;
f '
OF
UNDERSTANDING
Between
the N. C. Agricultural Extension Service
North Carolina State University
A&T State University
and
the Board of County Commissioners
•
058
MEMORANDUM of UNDERSTANDING qualifications for
between employment in Extension
work.
The N. C. Agricultural Extension Service
N.,C. State and A&T State Universities , 2. Receive and examine
and applications for employment.
The Board
.-f County Commissioners
. 3. Interview and screen
The North.Carolina Agricultural Legislation provided that applicants to determine their
Extension Service was Agricultural Extension work be a qualifications and availability established as a part of the partnership among three levels 4. Review with the County
School of Agriculture and Life of government—Federal,State Manager the most qualified
Sciences of North Carolina State and County. Extension Agents applicant or applicants'
University by Federal and State are officially appointed as qual ifications, existing
legislation for the specific purpose members of the U. S. salary and salary
of extending' the educational Department of Agriculture and
requirements
service of the University to the charged with carrying out 5. Determine jointly--between
people of the State on subjects educational work of the _ District Extension Chair-
people Upon acceptance man, County Extension _
relating to agriculture,home eP by Chairman, and County
economics,4-H and youth, and the Board of County Manager--the 'salary to be
community and natural resource Commissioners,they are also offered, taking into
development.The laws creating designated as field faculty - account its compatibility
members of either North salaries of other
Extension were specificially employees within the
designed to ensure that the Carolina State University,with State and County.
findings of research in these professional rank,or A&T State .
areas were communicated to the University.
people. Under the To assure that educational 6- Determine jointly with
Appropriations Act of 1972 programs offered by Agricultural the Board of Commissioners
funds were provided to the 1862 the share of salaries to
P Extension at both land-grant be paid by each and
Land Grant Universities to institutions meet the needs of provide the State and
enhance the extension outreach local clientele, it is important that Federal share of these
of the 1890 Universities,of both elected and appointed salaries.
which A&T State University is officials of each level of 7. Extend the job offer.
one The Food and Agriculture government understand their
Act of 1977 stipulated that these respective responsibilities and 8. Recommend the sal ari es
funds would be appropriated relationships in the conduct of of Extension secretaries
directly to the 1890 Institutions this work and pay the State portion
and formalized the Extension according to the State
program as an official part of the Responsibilities and Personnel Pay Plan. •
School of Agriculture at this Relationships g, Prepare and submit an
institution. However,to provide annual budget request to
effective coordination, The North Carolina the Board of Commissioners
administrative contacts will be Agricultural Extension for the county's share of
funds for sal ari es and
handled by the county and Service and the A& T operating expenses
district chairmen of North State Agricultural
Carolina State University with gn
appropriate attention given to A Extension Program will
&T State University personnel. 1_ Establish minimum
requirements and
: 1g. Proud a funds for official 15. Provide Extension workers
travel necessary in the with training programs as 1 The.North'Carolina
conduct of Extension work • needed to maintain ! Agricultural Extension
- to the extent that funds effective program delivery. Service and the A&T
are available and for
purposes authori zed by 16. develop and maintain a State Agricultural
State and Federal County Advisory Leadership . ensign Program and
policies. System to insure that ' the Board of County
county Extension programs Commissioners
•11. Provide Extension agents are based on the mutually with official envelopes, particular needs of people 9
bulletins (designated for in their respective county.
free distribution), leaf- 1. That all county Extension
lets, and other publ i•ca- appointments and separations
tions for educational are to be worked out jointly
purposes, between the North Carolina
12. Accept responsibility and Agricultural Extension Service
provide the leadership and the Board of County
for administration and The Board of County Commissioners,and that no
supervision for Extension Commissioners will official action will be taken by
programs and personnel, either party regarding
including compliance with
the requirements of 1. Provide the county's share of appointment or separation
Affirmative Action and salaries for Extension prior to discussion of the
Equal Employment personnel. matter with the other party.
Opportunity guidelines.
13. Develop and admi ni star a 2. Provide office space and 2. That the policies established
personnel management pl an equipment, utilities, by the State of North Carolina
that will provide for; telephone,office supplies, and followed by the University
a. The annual review of demonstration materials and be used as a guide in granting
each worker's other items needed for annual,sick, civil and military
performance.
b. Counseling for job efficient operation of the leave for Extension personnel.
improvement where County Extension Office and •
needed. program. 3. To cooperate in applying
c. Periodic county program Affirmative Action and Equal
reviews. 3. Review and consider the Employment Opportunity
14. Provide a staff of annual budget request from plans of the North Carolina
opeci al i sts to continuously the Extension Service and Agricultural Extension Service.
train agents in current take appropriate action by
technol ogy and other July 1 of each fiscal year 4. That Extension agents will not
changes affecting be classified under a county
agriculture, home
economics, 4-H and youth, 4. Confer and advise with the clasAification system.
communi ty and natural District and County Extension
resource devel opment and Chairmen and Extension 5. That Extension agents will
to assist them in the • Advisory Council relative to follow County policies relative
conduct of work in these county Extension programs. to office hours and holidays.
areas, y
W ., F
We are in agreement with the above description of the responsibilities and relationships,and that this
memorandum of understanding maybe reviewed at any time but shall be reviewed once each four years.
Date: .,Chairman
Board of . County Commissioners .
Date: ,Director
North Carolina Agricultural Extension Service
061
ORE COUNTY
BOARD OF COMMISSIONERS Action Agenda
ACTION AGENDA ITEM ABSTRACT Ran No.FIP,
Meeting Date: MAY 6, 1985
SUBJECT: SEC= YEAR FUNDING OF THE SCHOOL RF2AIR/REPLACEMT PROGRAM
EEPARTMENT: COUNTY MANAGER PUBLIC HEAPING: Yes X No
ATTACHMENT(S): INFORMATTON CONTACT: MANAGER'S
OFFICE X501
TELEPHCRE NUMBER:
YES Hillsborough -732-8181
Chapel Hill - 968-4501
Mebane - 227-2031
Durham 688-7331
PURPOSE: To consider giving the school systems assurance of an appropria-
tion for the program in the 1985-86 County budget.
NEED: Cm April 29, 1985 the Orange County School Board approved the
Agreement (with accompanying Exhibits A and B) to proceed with a
consolidated bidding process. Chapel Hill-Carrboro Schools
tabled action on the Agreement until May 6, 1985. While bids
have been let in anticipation of both boards approving the
Agreement no contract award or awards can be made without the
assurance of County funding for the work under the 1985-86
County budget per North Carolina General Statute
115C-432(a) (4).
IMPACT: The fact that the school system incorporated general and special
conditions recommended by the County into their specification
gives added safeguard for the investment that will be made.
Moreover, the consolidated bidding process could result in cost
savings to the County while not posing a financial disadvantage
to either system. In return the schools need the assurance of
funding in order to get the work started in a timely fashion.
RECOMmENDATI(N:
Subject to Chapel Hill-Carrboro School system's approval of the
Agreement, adopt the attached resolution assuring funding of the
six school system roofs (Cameron Park Elementary School, Central
Elementary School, Glenwood Elementary School, Carrboro Elemen-
tary School, Estes Hills Elementary School, Chapel Hill Senior
High School-B Building) as an appropriation in the 1985-86
County budget exclusive of the appropriations for other current
and long-range capital needs.
061
RESOLUTION
mammas, upon completion of a 1984 survey of County and
school system roof conditions by Law Engineering
the County committed to a three year, repair/
replacement program, and
WBERF,AS, the County appropriated $360,500 in 1984-85, and
WHEREAS, an estimated expenditure of $767,000 is needed in
1985-86 to carry forward the second year of the
repair/replacement program, and
WHEREAS, both school systems have developed specifications
and terms for a joint bidding of the total work to
be done, and
WHEREAS, if contracts can be awarded May 20, 1985 construc-
tion can be completed between June and August 1985,
and
WHEREAS, without the assurance that the funds will be appro-
priated to the school system by Orange County the
school systems are prevented under North Carolina
General Statute 115C-432(a) (4) from awarding bids.
Nan, THEREFORE, BE IT RESOLVED, that the Board of
Commissioners authorizes the Chapel Hill-Carrboro
and Orange County School Systems to proceed with
the letting of a contract or contracts according to
attached Agreement conditions including Exhibits A
and B,
BE IT FURTHER RESOLVED that the Board of Commissioners
assures the boards of education that funds will be
appropriated for the six school roofs in the 1985--
86 County budget exclusive of the appropriations
for other current and long range capital needs.
Adopted this sixth day of May, 1985.
Don Wilihoit, Chair
Board of Commissioners
ATTEST:
Beverly Blythe
Clerk to the Board of
Commissioners
• ,
062
AGREEMENT
THIS AGREEMENT, made and entered into this day
of , 1985, by and between the Orange County
Board of Education, a body corporate of the State of North
Carolina (hereinafter referred to as the "County Board")
and the Chapel Hill/Carrboro Board of Education, a body
corporate of the State of North Carolina (hereinafter
referred to as the "City Board") :
WITNESSETH:
WHEREAS, the County Board and the City Board must
undertake the repair of certain school roofs between June
and August 1985, as described in Exhibit A attached; and
WHEREAS, the Orange County Board of Commissioners has
agreed to allocate the necessary funds for the repair of
said school roofs through a project ordinance; and
WHEREAS, the Orange County Board of Commissioners has
indicated its desire that bids for completing the repair of
• 06&
said roofs be solicited through a consolidated bid process,
as described in Exhibit B attached, for the purpose of
reducing construction costs; and
WHEREAS, the County Board and the City Board have
determined that engaging in the consolidated bid process as
described may result in cost savings to the County and will
not result in any financial disadvantage to either school
board, given the method of funding for the aforementioned
roof repair projects;
NOW, THEREFORE, pursuant to N.C.G.S. 1160A-460 and in
consideration of such other mutual promises and covenants
as hereinafter are contained, the County Board and the City
Board do hereby agree as follows:
The Orange County Board of Education and the Chapel
Hill/Carrboro Board of Education shall engage in a consoli-
dated bid process as described in Exhibit B attached and
incorporated herein by reference for the solicitation and
-2-
_ .
064
acceptance of bids for the repair of certain school roofs
as described in Exhibit A attached and incorporate herein
by reference.
IN WITNESS WHEREOF, the Orange County Board of Educa-
tion has caused this Agreement to be signed in its name by
its Chairman, attested by its Secretary, and sealed with
its corporate seal, and the Chapel Hill/Carrboro Board of
Education has caused this Agreement to be signed in its
name by its Chairman, attested by its Secretary, and sealed
with its corporate seal, and all by authority duly given,
the day and year first above written.
ORANGE COUNTY BOARD OF CHAPEL HILL/CARRBORO
EDUCATION BOARD OF EDUCATION
•
By: By:
Mr. Norman Haithcock Mr. Theodore Parrish .
ATTEST: ATTEST:
Dr. Dan G. Lunsford Dr. Pamela S. Mayer
Secretary Secretary
-3-
013E
NORTH CAROLINA
WAKE COUNTY
, a Notary Public in and
for the aforesaid State and County, certify that Dan G.
Lunsford personally appeared before me this day and acknow-
ledged that he is Secretary-Superintendent of the Orange
County Board of Education, a body corporate under the laws
of the State- of North Carolina, and that by authority duly
given and as the act of the corporation, the foregoing
instrument was signed in its name by its Chairman, sealed
with its corporate seal, and attested by himself as its
Secretary-Superintendent.
Witness my hand and notarial seal this day of
, 1985.
Notary Public
My commission expires:
•
NORTH CAROLINA
WAKE COUNTY
The undersigned, a Notary Public, hereby certifies
that Pamela S. Mayer personally appeared before me this day
and, being duly sworn by me, acknowledged that she is
Secretary/Superintendent of the Chapel Hill/Carrboro Board
of Education, a body corporate under the laws of the State
of North Carolina, and that by authority duly given and as
the act of the Corporation, the foregoing instrument was
signed in its name by its Chairman, sealed with its corpor-
ate seal and attested by herself as its Secretary.
Witness my hand and notarial seal this day of
, 1985.
•
Notary Public
-
My commission expires:
-4- •
066
EXHIBIT A
ROOF REPAIR PROJECTS
A. Orange County Public School System
1. Cameron Park Elementary School
2. Central Elementary School
B. Chapel Hill/Carrboro Public School System
1. Glenwood Elementary School
2. Carrboro Elementary School
3. Estes Hills Elementary School •
4. Chapel Hill Senior High School--B Building
•
•
. -
EXHIBIT B
067
CONSOLIDATED BID PROCESS
A. Solicitation of Proposals
1. One advertisement is issued requesting proposal for
repair to the roofs of both school systems.
2. The bid documents consist of:
a. one set of instructions to bidders and common
general conditions governing work to be per-
formed.
b. two sets of specifications: one for Orange
County Schools' roofs prepared by its engineer,
and one for Chapel Hill/Carrboro Schools' roofs
prepared by its engineer.
c. a bid form eAewi,9430414. requesting bids as
follows:
1) Part I: A single bid for repair of all
listed Orange County School roofs,
and/or
2) Part II: A single bid for repair of all
listed Chapel Hill/Carrboro School roofs,
and/or
• 3) Part III: A consolidated bid for repair to
all listed Orange County School roofs and
Chapel Hill/Carrboro School roofs, reflect-
ing subtotals for the separate school
system jobs.
B. Bid Award
1. Each school system shall accept the lowest respon-
sible bid for work to be performed on its roofs and
enter into a separate contract with that bidder if
the following condition exists:
The lowest consolidated bid submitted for repair to
Orange County Schools' and Chapel Hill/Carrboro
Schools' roofs is equal to or greater than the sum
of the separate lowest responsible bids submitted
for parts I and II.
2. If the lowest consolidated bid is less than the sum
of the lowest bids for parts I and. II, then this
bid shall be accepted by both boards of education
upon agreement by both boards that this is the
lowest responsible bid.
•
06E
ORANGE COUNTY
BOARD OF COMMISSIONERS Action Agenda
ACTION AGENDA ITEM ABSTRACT Item No. V:15
Meeting Date: MAY 6, 1985
SUBJECT: CETA REPAYMENT
DEPARTMENT: COUNTY MANAGER PUBLIC HEARING: __Yes X No
ATTACHMENT(S): INFORWTICIst CONTACT: MANAGER'S
OFFICE, X501
TELEPHONE NUMBER:
NO Hillsborough - 732-8181
Chapel Hill - 968-4501
Mebane - 227-2031
PURPOSE: TO consider repaying Fiscal Year 1978-79 di ]lowed Comprehenr
sive Employment and.Training Act (CA) costs to the N. C.
Department of Natural Resources and Comaunity Development
(MD).
NEED: In October 1983 NRCD auditors conducted a financial, audit of
County CETA contracts covering fiscal years 1978 through 1983.
Auditors questioned $1.5 million of expenditures because of
insufficient documentation. During calendar year 1984 the
finance staff reviewed five years of voluminoug COM records and
net with NRCD periodically to reduce a major portion of the
questionable costs. In February 1985 NRCD informed the County
$7,453 of costs remain disallowed. The specific cost relates to
1978-79 OJT subgrantee contracts in which County initiated
contract provisions stipulated a reimbursement rate greater (80%
to 100%) than the prescribed federal reimbursement rate (50%).
The subgrantees paid CETA participants the correct amount,
however, the subgrantees received 30% to 50% more funds than
required by federal regulations. Although the finance staff and
NRCD have been engaged in numerous conversations since February,
the disallowed costs have not been resolved or reduced.
IMPACT: All avenues for dal have been exhausted. NRCD has requested
repayment of funds.•
RECOMMENDATION:
Authorize expending $7,453 from Commissioners Contingency
Account to repay NRCD for 1978-79 disallowed CETA costs.
_ 4.
06E 1
ORANGE COUNTY
BOARD OF COMMISSIONERS Action Agenda
ACTION AGENDA ITEM ABSTRACT Item No.F.A.
Meeting Date: MAY 6, 1985
SUBJECT: BUDGET WORE SESSION SCHEDULE
DEPARTMENT: COUNTY MANAGER PUBLIC HEARING: Yes X No
ATTACHMENT(S) : INFORMATICiN CONTACT: MANAGER'S
OFFICE X501
TILEPHONE NUMBER:
YES Hillsborough - 732-8181
Chapel Hill - 968-4501
Mebane - 227-2031
Durham - 688-7331-
PURPOSE: Tb establish dates to consider requests and different aspects of
the proposed budget for 1985-86.
NEED: Attached is the budget calendar. Yet to be established are
dates for Board work sessions prior to the projected adoption
date of June 18, 1985. With agency representatives making
remarks at the June 4 public hearing on the budget and revenue
sharing separate meetings may be desired to discuss:
1. Schools' current expense requests
2. Revenue projections
3. Capital requests--schools and County
4. Tax rate increase requests--Hillsborough Fire Districts and
the Special School Supplemental Tax
IMPACT:
REOMENDATICN:
As the Board decides.
071 - ,- •
. .
- . -
. . 1985-86
. . _
BUDGET CALENDAR
COMPLETION PERSON
. • DATE RESPONSIBLE . .
1. Distribute BudgeePreparation Manual and
Calendar to Board. - ' 2/04/85 County Manager
2. Issue Budget Guidelines; distribute. Budget , County Manager
Manual, -
.
nual, Personnel Detail, and 1/31/85 Revenue and
and Expense to. Department Heads 2/08/85 Budget Office
3. Meet with Chapel. Hill-Carrboro and Orange 2/13/85 County Mapager/
County Schools' Superintendents and - - Finance Director
• . Finance Directors to discuss value base
information, financial outlook, and status •
- -
of capital planning. .
. .
•
4. Return "Personnel Detail" printout to Per- _ • . - _
sonnel Department (with corrections noted).
Submit "Request for New Position or'Reclass-
.
ification of Existing Position" request to • .
Personnel Department. • 2/15/85 Department Needs•
. . . . - ' - • • ,
- 5. Return corrected "Personnel Detail" print-
out to Department Heads. 3/01/85 Personnel Dept.
• .
6. Submit "Departmental Revenue Up-Date" for - .
current year and "Estimated Departmental
Revenue" for upcoming year to Budget Office 3/08/85 Department Reads
7. Submit revenue estimate43(using data furnished . .
on 3/08/85 by Department Heads) to Manager. 3/15/85 Finance Director
• 8. Submit 2 copies of completed Departmental, Agency, Department Heads,
and Fire District Budget requests for fiscal year Agency Heads and
• 1985-86 to Budget Office. - • 3/18/85 Fire Chiefs I
9. Review Budget Requests with Department Heads, 4/01/85- County Manager .
Agency Heads and Fire Chiefs. 4/16/85
10. Submit Superintendents' Preliminary School - Orange County and
Budgets • • 4/12/85 Chapel Hill-Carrboro
Schools
i
•
•
071
1985-86 Budget Calendar
Page 2
11. Notify Department Heads, Agency Heads and County Manager
Fire Chiefs of Manager's Recommended Budget;
compile Preliminary Budget. 4/26/85
12. Decide dates for Board Work Sessions with County Manager
Department Heads, Agency Heads, and Fire and
Chiefs on Manager's Recommended Budget. 5/06/85 Board of Comm.
13. Hold Budget Work Sessions. 5/13/85 thru Board of Comm.
6/07/85
14. Hold Budget Work Sessions with Schools:
Orange County 5/13/85 Board of Comm.
Chapel Hill-Carrboro 5/14/85 Board of Comm.
15. Submit Manager's Recommended Budget to Board County Manager
of Commissioners. 5/24/85
16. Advertise Public Hearing on Budget and Revenue County Manager
Sharing. 5/24/85
17. Hold PUblic Hearing on Budget and Revenue Board of Comm.
Sharing. 6/04/85
18. Complete revisions to Budget. 6/10/85 County Manager
19. Public Hearing on the Revised Budget. 6/18/85 Board of Comm.
20. Hold Board Meeting to adopt Budget, Tax Levy 6/19/85 Board of Comm.
and Resolution.
•
...dr..... vouni .
BOARD OF COMMISSIONERS • .
. ACTION AGENDA
. .ACTION AGENDA ITEM ABSTRACT ITEM NO.F1S
•
MEETING DATE ,may 6. 1985.
072
' . 4
. .
. .
SUBJECT: BUDGET AMENDMENTS .
. .
... . c
- DEPARTMENT: FINANCE 1 PUBLIC HEARING: YES x NO
.. . . - - • ,
• .
ATTACHMENT(S): Proposed Budget Amendments INFORMATION CONTACT: DONNA CLAYTON
' • - • PHONE NUMBERS: HILLSBOROUGH — 732-8181
•
• HILLSBOROUGH — 732-9361
• .
• CHAPEL HILL — 967-9251
--, • MEBANE — 227-2031 - *
• - . - • . . DURHAM — 688-7331
• - -• .
. . . .
PURPOSE: Consideration Of proposed budget amendments. ' •
i .
, . .
. • . .
• . .
NEED: • GENERAL FUND. . . -
- • •
. - . . •
1. To appropriate funds -for unanticipated increase- in costs for "umbrella"
insurance •
policy coverage. • . .
. . . - . .
2. To appropriate funds by project, from the School Capital Reserve Fund to .
- the Chapel Hill - Carrboro Schools.
. .
SCHOOL CAPITAL RESERVE FUNDS . •
. * .
. To appropriate funds, by project; to the General Fund for the Chapel Hill-
, . . Carrboro Schools. • , .
•
IMPACT:
GENERAL FUND ' .
. - .
- .
1. This amendment will increase funds available in the Central Services
'Insurance account while it reduces funds available in the Commissioners'
. Contingency account..
. ,
. .
2. This amendment will increase the Chapel Hill - Carrboro Schools' capital
• . appropriations for the architectural design schematics and design develnpMent.
• . .
SCHOOL CAPITAL RESERVE FUND . .
• -
• This amendment will decrease the School Capital Reserve Fund for
architectural.design schematics and design development for the Chapel Hill -
Carrboro Schools.
- . . .
. -
RECOMMENDATION(S): Approve motion to amend 1984-85 budget ordinance by proposed
budget amendments.
• .
,
- .
O7;:];
ORANGE COUNTY
PROPOSED
1984-85 BUDGET AMENDMENT
The 1984-85 Budget Ordinance of Orange County as adopted on June 28, 1984,
and subsequently amended, is hereby amended as follows:
GENERAL FUND
Before After
Amendment Amendment Amendment
1. Appropriation:
Central Services $276,638 $33,221 $309,859
Source:
Contingency 99,880 33,221 66,659
To budget for unanticipated increase in costs for "umbrella" insurance policy
coverage.
2. Appropriation:
Chapel Hill-Carrboro-
Schematics & Design 0 $48,452 $ 48,452
Source:
Transfer from School
Capital Reserve 368,520 48,452 416,972
To appropriate funds by project, to Chapel Hill-Carrboro Schools from the
School Capital Reserve Fund.
' I
SCHOOL CAPITAL RESERVE FUND
Appropriation:
Transfer to General Fund $368,520 $48,452 $416,972
Source:
Remittance to School Capital
Reserve Fund 341,080 48,452 292,628
To appropriate funds, by project, to Chapel Hill-Carrboro Schools from the
School Capital Reserve Fund.
Approved this day of , 1985.
-006
ORANGE COUNTY
BOARD OF COMMISSIONERS Action Agenda
Meeting Date MAY 6, RAM Item No. _
&]BJECT: REVISED PRELIMINARY REPORT--EFLAND SEWER
DEPARTMENT: C( JNTY MANAGER PUBLIC HEARING: Yes ..LNo
ATIACHMENT(S): INFORMATION CONTACT: MANAGER°S
OFFICE X 501
TELEPHONE NUMBER:
YES Hillsborough -732-8181
Chapel Hill - 968-4501
Mebane - 227-2031
Durham *'s;!a8-7331
PURPOSE: 7.b consider findings by Hazen and Sawyer P.C., the new engineer-
ing firm commissioned for the project.
NEED: Before beginning detailed design work the Engineer was to
examine the layout of lines, line size, pump stations and cost
estimates as proposed for the project by the John R. McAdams
Company. If changes were to be made in project-scope or cost
they were to be presented for review and approved by the County
and Farmers Home before proceeding to the design phase.
Preliminary analysis shows a need for revisions to be
considered. Findings and alternatives will be presented at the
May 6 meeting.
IMPACT:
RHCCMM 20l:
As the Board decides.
HAZEN AND SAWYER, PC.
ENGINEERS
MAILING ADDRESS:P.O.BOX 30428 RALEIGH,NORTH CAROLINA 27622 (919)782-8333
OFFICE LOCATION:302 COTTON BUILDING 4505 CREEDMOOR ROAD CRABTREE VALLEY
May 3, 1985
Mr. Kenneth R. Thompson
County Manager
- County of Orange
106 East Margaret Lane •
Hillsborough, NC 27278
Dear Mr. Thompson:
In accordance with our agreement dated February 21, 1985,
Hazen and Sawyer, P.C. is pleased to present herewith our report
on the Phase 1 Sewer Improvements for Cheeks Township in Orange
County. Our report makes specific recommendations concerning
modifications to the proposed sewer improvements plan and
includes a comprehensive financial analysis of construction costs
and anticipated user charges.
Based on our study, we have determined that the estimated
cost to construct those facilities included in the Phase 1 Sewer
Improvements is significally greater than previously reported.
• It would appear that it is not presently economically viable to
proceed with construction of the complete Phase 1 Improvements.
For consideration by the County, we have developed information
• concerning a reduced construction program and the associated
cost. Information pertaining to anticipated user charges will be
provided in detail during the oral presentation of this report.
During the course of our study, we have explored several
possible sources of additional grant funding, primarily from the
Farmers Home Administration. It is our judgement that the
prospect of additional grant funding from the Farmers Home
Administration, now or in the immediate future, is quite remote.
We recommend that the County consider a course of action that
will permit phased construction of the proposed facilities to the
limit of the currently available funding: If desired, we have
been advised that the additional Farmers Home loan funding
required for construction of Alternates A and C can be secured if
the County acts promptly to request such funds.
OFFICES IN NEW YORK,RALEIGH,AND HOLLYWOOD,FLORIDA
•
•
Mr. Kenneth R. Thompson
May 3, 1985
Page 2
We appreciate the opportunity to have worked for the County
on this assignment. The assistance extended to us by yourself
and Mr. William T. Laws is sincerely appreciated. We would be
glad to respond to any questions you might have and are anxious
to proceed with the design if the County determines that this is
the appropriate course of action.
Very truly yours,
HAZEN AND SAWYER, P.C.
/LicAag44zAP
Donald L. Cordell, P.E.
Associate
DLC/jhl
Enclosure
TABLE OF CONTENTS
REVISED
• PRELIMINARY ENGINEERING REPORT
" CHEERS TOWNSHIP SEWER IMPROVEMENTS
• PHASE 1
• Background
• Project Description
• Recommended Modifications to the Proposed Plan
• Estimated Construction Cost
• Financial Considerations
• Projected User Changes
• Possible Methods of Rate Reduction
LIST OF TABLES AND ATTACHMENTS
Table 1 Comparison of Total Project Costs
Original vs Revised Plan
Table 2 Projected Sewer Customers
Table 3 Preliminary Financial Analysis
Table 4 Comparison of Various Methods for
Reducing the Typical Monthly Sewer Bill
Attachment 1 and 2: Map of Phase 1 Sewer Improvements
Attachment 3: Alternate Construction Phasing
REVISED
PRELIMINARY ENGINEERING REPORT
CHEEKS TOWNSHIP SEWER IMPROVEMENTS
PHASE I
Background
The proposed sewer improvements for Cheeks Township are
described in a report prepared by the John R. McAdams Company,
Inc. of Chapel Hill, N. C. dated February 1984. Hazen and
Sawyer, P.C. of Raleigh, North Carolina was retained by Orange
County in March of 1985 for the purpose of designing and
administering construction of those facilities included in Phase
1 of the improvements recommended in the McAdams' report. Per
the terms of the engineering agreement between the County and
Hazen and Sawyer, the initial Hazen and Sawyer effort was to be
directed to a general review, of the overall sewer system plan,
technical evaluation of certain elements of the proposed plan and
a review of the project cost estimate and financing plan. The
purpose of The Revised Preliminary Engineering Report is to
summarize the conclusion and recommendations relative to Phase 1
1
. .
Project Description
The study area for the proposed project as described in the
McAdams' report generally consists of the area bounded by the
Town of Hillsborough on the east, by Buckhorn Road (SR 1114) on
the west, by Seven Mile Creek on the south, and by McGowan Creek
on the north. For planning purposes, the study area is further
divided into two sub-areas; the immediate planning area which
consists of that area generally lying along US 70 in the center
of the total study area where development already exists and the
future planning area which consists of the area in the McGowan
Creek basin to the north of the immediate planning area and the
area to the south of the immediate planning area along the 1-85
corridor. The proposed sewer improvements for the immediate
planning area consists of various elements to be constructed in
six phases. Phase I of the recommended plan was intended to
• provide the primary interceptor system, pumping stations and
force mains to collect the wastewater from the Efland Estates
Subdivision, the Efland Cheeks School , the central Efland area,
and Graham' s Trailer Park near Maple Street. Wastewater thus
collected would be pumped from a main pumping station off
Brookhollow Road via a force main along US 70 East to the point
of tie-in with the Town of Hillsborough collection system.
Phases II through VI of the recommended sewer improvements would
2
gradually extend sewer service to all areas of the immediate
planning area.
Recommended Modifications to the Pro.osed Plan
Attachments 1 and 2 are taken from the McAdams Report to
illustrate the Phase I sewer improvements as originally proposed
and the specific modifications recommended by Hazen and Sawyer.
In order to evaluate the feasibility of the proposed Phase I
sewer improvements, Hazen and Sawyer has reviewed the data
contained in the McAdams' Report, made a windshield survey of
each of the proposed pipeline routes, performed preliminary
engineering surveys at critical points and discussed the project
at length with the County staff to define overall objectives.
Based on our assessment of these factors, we believe that one of
the major objectives of the sewer facilities constructed during
Phase I should be to provide sewer service to the existing
development along US 70 to the extent possible based on current
financing while at the same time maintaining the maximum
flexibility for future extensions to service the McGowan Creek
basin to the north and possible industrial development along the
1-85 corridor. If this objective is to be fully realized, then
we recommend that the County consider several modifications to
the Phase I sewer improvements:
3
1. Construction of a 12-inch diameter interceptor in the
McGowan Creek basin from Tinnin Road (SR 1313) to
Brookhollow Road (SR 1338) in lieu of the force main and
pumping station included in the McAdams report. This
outfall would have the immediate benefit of eliminating
a pump station at Tinnin Road and the approximately 7500
• feet of 6-inch force main through. the central part of
Efland along US 70. We further believe that the gravity
outfall can be constructed at a comparable cost, to the
present pump station force main concept. Future
benefits are potentially much more significant and
include:
a. The outfall will provide an initial key component
for extensions of sewer service into the
transition area north of Efland.
b. The presence of the gravity outfall will permit
extension of gravity sewers into the central part
of Efland thus eliminating an additional pump
station that would have been required in Phase II
of the original sewer plan.
c. Service to those areas included in Phases III
and IV in the original plan and the industrial
corridor along 1-85 would be readily available
provided that the wastewater is pumped across the
4
ridge line along the southern railroad track.
The proposed 12-inch outfall would have
sufficient hydraulic capacity to accommodate the
existing development in Phases III and IV as well
as industrial growth along the 1-85 corridor
provided that the industries that might locate
there are not heavy water users.
2. . Construction of a gravity collection sewer and pumping
station to serve the existing mobile homes in Graham's
Trailer Park and the houses alon. US 70 East to the
ridge line west of Lloyd Dairy Road which was not
included in the previous report. The force main from
the proposed pump station would discharge into the
gravity sewers tributary to the main pumping station on
Brookhollow Road. Under the original plan, it is not
clear how sewer service would have been provided to this
area, even though the area is located within the Phase I
boundary. It has been suggested that individual house
pumps at each residence would have discharged into the
main force main along US 70 to Hillsborough. Given the
anticipated operating pressure for this force main, the
technical feasibility of such a solution is
questionable, and at best could present long-term
maintenance problems. There are a significant number of
5
potential customers in the area and the gravity
collection system and single pumping station represents
a much more technically viable solution.
3. The .um. station sro•.sed to serve Efland Cheeks School
and Efland Estates Subdivision should be resized
to.ether with a reali.nment of the •ro,osed force main
to reduce the total length required. Under the original
plan, wastewater collected from the Perry Hills area
• (Phase VI) would have been"pumped into the gravity
collection system tributary to the pump station below
• Efland Cheeks School. By extending the force main from
Perry Hills further along US 70, it is possible to
discharge into the gravity sewer tributary to the
proposed interceptor on McGowan Creek allowing for a
significant reduction in the size of the Efland Cheeks
School pump station. Extension of the force main would
• also avoid the cost of repumping wastewater from the
Perry Hills area resulting in lower annual operational
costs. It is also feasible to significantly reduce the
force main length required for the Efland cheeks School
pump station. The pump station lies only some 800 feet
west of a- proposed gravity sewer in School House Road
that will be tributary to the interceptor on McGowan
Creek. By securing an easement across private property,
6
it is possible to eliminate approximately 2 ,500 linear
feet of 4-inch force main at a cost savings of at least
$10,000.
4. The existing topography along the unnamed street east of,
Gaines Avenue will not .ermit a •ravit sewer flowin. in
a westerly direction since the east end of the street is
approximately 15 feet lower than the west end. In order
to provide sewer service to the existing residences
along this street, it is recommended that a gravity
sewer be extended along the existing draw to the north
crossing US 70 and connecting to the proposed
interceptor on McGowan Creek. Likewise, the existing
gravity sewer off Tinnin Road tributary to the
originally proposed Pump Station No. 2 does not appear
to be feasible due to topographic restraints. In order
to construct a gravity sewer in this area, it will be
necessary to pivot the line further to the east in the
direction of more favorable topographic features.
5. Other less significant modifications to the proposed
Phase I sewer improvement are indicated below:
a. In The Efland Estates Subdivision, it is
recommended that the gravity sewer shown on
private property behind the existing houses on
Gregg Street be relocated to the right-of-way on
7
Gregg. Street to avoid the expense of easement
acquisition.
b. The gravity sewer shown at the intersection of
Richmond Road and US 70 should be relocated to
utilize the public street right-of-way. While
the present alignment appears to be most
favorable given the existing topography, we have
conducted preliminary field surveys at this
intersection to establish the feasibility of
extending the sewer along the existing street
right-of-way. Granted the depth of excavation
will be somewhat greater, but the cost of
excavation should be more than offset by avoiding
the need for acquisition of easements.
c. The original boundaries for the Phase I sewer
improvements along US 70 on both the west and
east ends are inconsistent with the existing
topography. The boundry lines shown on
Attachment 1 have been shifted to reflect the
prevailing topography. Sewer service to those
residences shown outside the new boundry could be
provided by individual house pumps to the closest
gravity sewer manhole.
8
, I
We believe that implementation of the above improvements
will significantly improve the reliability of the proposed sewer
improvements by reducing the dependence on raw sewage pumping.
The revised plan can be readily expanded to serve future
development in the transition areas and the industrial
development along the 1-85 corridor.
Estimated Construction Cost
One of the primary objectives of the additional study by
Hazen and Sawyer was to evaluate the construction cost estimate
for the proposed Phase I sewer improvements. Our initial
assessment indicated that the prevailing construction costs in
the Orange County area were significantly higher than the unit
prices used in the previous report. In order to confirm this
possibility, we collected cost data from the Farmers Home
Administration for a number of similar projects constructed over
the last several months. The cost data was analyzed to determine
typical or average construction prices for each element of the
proposed sewer construction. These costs were then used to
develop updated construction cost estimates for both the original
Phase I sewer improvements plan and the Phase I improvements as
modified by Hazen and Sawyer. The tabulated construction costs
are included herein in Table 1.
As suspected, the analysis indicates that the construction
costs for both the original plan and the modified plan
9
recommended by Hazen and Sawyer are substantially greater than
the previous report had indicated and well above the current
available financing. This information was reviewed with the
County staff and it was generally agreed that it is not presently
viable to proceed with construction of all the facilities
included in Phase I of the recommended plan.
Financial Considerations
We recognize the financial constraints the County faces in
attempting to extend sewer service into the Cheeks Township.
Regardless of the long term benefits of any project, there can be
no substitute for the lack of capital financing. in these
situations, we feel the best approach is to develop a sequenced
construction program that preserves to the maximum extent
possible the long-term objectives of the overall plan without
exceeding available financial resources.
The County presently has commitments from the Farmers Home
Administration for both grant and loan funding to defer a portion
of the construction cost for the Phase I improvements.
Representatives of Hazen and Sawyer and the County met with
officials from the Farmers Home Administration to discuss the
possibility of additional Farmers Home participation. -
Unfortunately, the Farmers Home Administration regulations
concerning distribution of grant funds have changed since the
County's original grant request was approved. Specifically, the
10
medium family income in Cheeks Township based on the salary
survey conducted by the County exceeds the minimum income level
that triggers eligibility. for Farmers Home grant funding. The
original grant amount ($598,300) is not in jeopardy but the
County is not eligible for any additional grant funding. The
project would be eligible for additional Farmers Home loan
participation provided that financial resources are available to
• offset the additional debt service payment required. Any
additional Farmers Home loan would be at the prevailing market
interest rate (presently 9.5%) . Other possible sources of grant
funding have been explored and discussed but no promising sources
have been identified.
The prospect of additional grant funding during the next
fiscal year was also discussed with the Farmers Home
Administration. Based on their assessment of the prevailing
attitude and anticipated federal funding, it appears that Farmers
Home participation (both grant and loan) could be substantially
reduced in the upcoming fiscal year. It is no secret that the
current Administration is attempting to reduce the Federal budget
deficit by substantially cutting certain existing Federal
programs, including the Farmers Home Administration. We believe
the possibility of additional Farmers Home Administration grant
participation in this project during the next fical year and the
foreseeable future is extremely remote.
11
It would appear that the County is faced with having to make
the best use of the currently available financing. While it will
not be possible to construct all of the sewer facilities included
in Phase I, it is feasible to construct certain key elements of
the overall plan. In Attachment 3, we have identified various
portions of the Phase I sewer improvements that could be
constructed in an initial phase to reduce the capital funds
required while maintaining the long-term plan and concepts. For
purposes of consideration •by the County, the particular segments
are identified as follows:
Base Bid - includes those facilities serving the Efland
Estates Subdivision, the Efland Cheeks School, and the
existing residences west of the central part of Efland
served by the collection system shaded in green on the
attachment. A pumping station would be constructed at the
upstream end of the proposed McGowan Creek interceptor with
a force main along US 70 to the original point of tie-in
with the existing Hillsborough collection system. The
facilities included in the base bid would provide service to
those areas with the most severe septic tank problems and
eliminate the existing package treatment plant at the Efland
Cheeks School. Also, sewer service to the economically
disadvantaged areas would be maintained.
12
' -
Alternate A - would consist of the upstream portion of the
proposed McGowan Creek interceptor. The pumping station
included in the base bid would be relocated to the
downstream end of the proposed interceptor. A six-inch
force main would connect to the force main constructed under
the base bid along uS 70. This alternative readily lends
itself to extension of gravity sewers into the central
Efland area at a later date.
Alternate B - includes the remainder of the proposed McGowan
Creek interceptor and the Brookhollow Road pump station
which discharges into the force main along US 70 constructed
under the base bid. This alternative will readily lend
itself to extension of sewer service to serve Graham's
Trailer Park and the surrounding area
Alternate C - consists of the gravity collection system in
the central Efland area.
13
The estimated project cost (derived from Table 1) for the
base bid and the various combinations of alternatives available
are shown below.
Alternative/Combination Estimated Project Cost
Base Bid $1,104,000
Base Bid + Alt A 1,210,400
Base Bid + Alt A+B 1,285,600
Base Bid + Alt A+B+C 1,443,000
Base Bid + Alt A+C 1,369,400
The project cost shown for the base bid is less than the
current committed funding and the project cost for several of the
alternative combinations does not greatly exceed the committed
funds. While the capital resources would appear to be available
to construct at least some portion of the Phase I sewer
improvements, additional analyses must be made to determine
projected operating costs and the projected user charges.
Projected User Charges
The user charges applicable to the Phase I sewer
improvements should provide sufficient revenue to offset the cost
of operating the collection system, the cost for treatment paid
to the Town of Hillsborough and the annual debt service payment
14
required to retire the loan secured from the Farmers Home
Administration. The following costs must be accounted for
Treatment Cost - $1.16/1000 gallons of wastewater
treated; includes $0.05/1000
gallons blanket tap fee
Billing Charges - approximately $100/month
Electricity - $3800/year to operate two pumping
stations plus individual house
pumps
Maintenance and Repair - $5000/year paid to a reserve fund
to provide for maintenance
expenses
Debt Service - to retire the loan(s) from FrnHA.
The current loan amount of
$200,000 is repayable over
38 years at 7.75 percent interest.
Any additional FmHA loans would
be subject to market interest
rates which are currently 9.5
percent.
We recommend that the County adopt a user charge system that
subdivides the above cost into "fixed" and "variable" components
with factors to reflect the hydraulic capacity dedicated to large
15
•
volume users. Fixed costs would be those costs that do not vary
with the amount of wastewater generated. Variable costs vary
directly in portion to flow and in this case consist of the
treatment charge paid to the Town of Hillsborough. All other
costs do not vary appreciably with a flow volume and can be
reasonably- assumed to be fixed. By developing the user system
based on this separation of charges, the County is assured of
developing sufficient revenue to offset the fixed expenses.
Assumptions as to the quantity of wastewater to be treated are
not critical to the budget process.
The remaining unknown in establishing a projected user
charge is to determine the number of customers that will be
served by the sewer system. Table 2 was developed from
information furnished to us by the County staff and is based in
part upon the commitments received from the residents in the area
concerning connection to the sewer system. The table shows the
anticipated number of customers that could be served by the
various combinations of alternate projects. You will note from
the table that we are recommending that the user charge analysis
be based on a slightly higher customer count than the number of
present commitments. While we admit that there is some financial
risk in this assumption, we believe it is reasonable to assume -
that the availability of the sewer will be an inducement to some
16
. _
of the existing customers that failed to commit to sewer service
during the previous survey.
Table 3 (to be furnished at oral presentation) was prepared
using the previously developed data concerning project cost and
the estimated sewer customers from Table 2. The table is
intended to reflect the typical monthly sewer bill for the low
volume user in the system. For the larger volume user, the fixed
cost component of the monthly bill would be the same and the
variable portion of the bill would be computed at a rate of .$1.16
per thousand gallons of water used. The financial analysis is
preliminary in that the monthly rates must be adjusted at a later
date based on the actual number of sewer customers connected to
the system. If the County elects to proceed with some
combination of the alternatives for the Phase I construction, we
believe the rates shown in Table 3 are representative of the cost
likely to be incurred by the end user.
Possible Methods of Rate Reduction
In meetings with the County staff, various methods for
reducing the typical monthly sewer bill have been examined.
Several of these methods are discussed below relative to the
anticipated impact on the typical sewer bill.
(a) Modest growth in the number of sewer customers which
is to be expected or the policy of mandatory sewer
hookup would have the immediate effect of increasing
17
" -
the number of rate paying customers. As to the
latter, the concept of required connection to an
available sewer system is not uncommon and is
mandated by many sewer use ordinances in effect in
North Carolina.
(b) Waiver of the 0.05 per thousand gallon blanket tap
fee would reduce the rate for computation of the
variable portion of the typical bill to $1.11 per
thousand gallons. Based on 3,000 gallons per month
usage, the net savings per customer would be $0.15
per month. This savings would be applicable to the
base bid and all combinations of alternatives.
(c) The original financial plan called for a cash
contribution from Orange County based upon the
anticipated cost of the malfunctioning wastewater
treatment plant at Efland Cheeks School. The cost
to repair this plant was estimated at $50,000.
Although Hazen and Sawyer has not made a detailed
inspection of the plant, we suspect that the cost to
repair the existing plant is likely to approach
$75,000. The higher cost is attributed to the need
for flow equalization facilities to reduce peak
hydraulic loading on the plant, the addition of
phosphorous removal based on the nutrient sensitive
is
classification of the receiving stream and the need
to protect elements of the plant that have
experienced past problems with freezing. An
increase in the County cash contribution would
directly reduce the amount of the Farmers Home loan
required and result in lower debt service payments.
(d) Optional financing for those sewer facilities
included in Alternate C is a possibility. It might
be feasible to generate the capital resources
required for construction of the gravity sewers to
serve the central Efland area by assessing the cost
to the land owners that would benefit from the .
facilities. This type of financial arrangement is
not uncommon and is used by many municipalities and
County sewer systems to recover all or some portion
of the cost of extending sewer into previously
unsewered areas. In this case, we envision that the
County would make a loan to cover the cost of the
sewer construction and recover this money from the
individual land owners over some specified time
period. The exact formula to be used to recover the
cost is beyond the scope of our study, but several
varied systems have been used. Typically, the cost
allocation is based on acreage owned or "front
19
footage" , or some other method that varies relative
to the amount of wastewater generated by a given
user. Assuming that the cost of construction for
those facilities included in Alternate C is financed
in this manner, the amount of any increased loan
from the Farmers Home Administration would be
reduced by approximately $159,000.
20
..........._.._._.._...
TABLE 1
COMPARISON OF TOTAL PROJECT COSTS
CRIGINAI, VS. REVISED PLAN
PHASE I SEKM IMPROVEMENTS
Item Unit Price Original Plan modified Plan
Extended Estimated Estimated Extended
Quantity Total Quantity Total
Clearing and Grubbing 3500/ac 105a 360800 10.5 $ 36,800
Surface ,Restoration 1500/ac 326a 48,900 32.6 48,900
Gravityy Sewer Pipe
12"
dia. 23/lf - b -- b 6600 151,800
8" dia. 15/lf 34,900c 523,500 37,235 558,500
Force Main
2 V2" dia. 3.25/lf 1100 3,600 -- b N b
3" dia. - 3.75/lf 1200 4,500 -- b -- b
4" dia. 4.00/lf -- b - b 2,300 9,200
6" dia. 6.00/lf 7,500 45,000 b b
8" dia. 8.00/if 15,700 1-25,600 16,200 129,600
4' dia. manholes 950/ea 133 126,400 153 145.400
Rock Excavation 35/cy 3175c 111,000 3175 111,000
House Services 30 0/ea 241c 72,300 241 72,300
Bored Highway Crossing 90/if 290 26,100 -- --
90/if -- -- 330 30,000
Sewage Grinder Pumps 300 0/ea 23 69,0003 6 3,000e
Sewage Pump Station is 4 200,000 3 160,000
Misc. Construction LS - 66,600 -- b -- b
SUBTOTAL, ESTIMATED CONSTRUCTION COST 1,459,300 1,456,500
Technical 145,300 145,000
Legal and Administrative 21,000 21,000
Real Estate Interest 20,000 30,000
Interest During Construction 46,000 46,000
Contingency (10%) 146,000 146,000
TOTAL ESTIMATED P.RQJBCT COST $1,837,600
$3,849,500
Cost for this item not included in .original report. Quantity added by Hazen and Sawyer.
b Not required for this alternative
c Original quantity adjusted by Hazen and Sawyer based on field study.
d Although a cost is shown for this item, it is not clear that the intended plan of individual house pumps discharging
into a high head force is technically viable.
e Since these units would discharge into a gravity manhole, a lower unit cost has been assumed.
Y
Table 2
PROJBCIW SEWER CUSTOMERS
CHEEKS TOMSHiP SEWER IMPROVEMENTS
Alt/ Camdtted Uncamni.tted Subdivision Oranges Total Potential No. of Customers
Combination Customers Customers Lots Heights Existing Customers Used for Analysis
Base Bid 101 18 18 34 171 130
Base Bid +
Alt A 101 18 18 34 171 130
Base Bid +
Alt A+B 101 18 18 34 171 130
Base Bid +
Alt A+B+C 116 23 18 34 191 150
Base Bid +
Alt A4C 116 23 18 34 191 150
a The proposed tie-in point with the existing Town of Hillsborough collection system is .located in the
orange Heights Subdivision. Since this area is not presently sewered, it is recamrended that sewer
service be made available to this area.
. ...... .. .. . .._ . . ,- .. * .-- - _. .... -__. -....' ''
tt' ;- ' ���JJJ . Courttp of /Durban'
S,{� \�r PLANNING,ZONING & INSPECTION DEPT.
ma. _ c Teo a. �urfjam. art j c� ro1(na
a0. .�. v:
�
► 4 1 May 16, 1985
•
-
Susan Smith,. 'Planner
Orange County Planning Department - - • -
Hillsborough, North Carolina 27278 - . • -
Dear Susan: • -
• This letter is in response to the proposed single family • •
subdivision "Hearts- Ease" on the west side of Craig- Road and . •
; straddling the Durham County/Orange County -line. Oakwood Estates ,
was' formerly proposed for this property. . • _
• Durham County see• no conflict with this :subdiv .sion or the streets
. which shall cross over Durham County• to Craig Road. This
• subdivision shall be- included on the Agenda for the -June 4, .1985
Planning Commission-meeting and reviewed as a courtesy. • . , .
Thank-you for contacting me concerning this subdivision -and the .
cooperative spirit you have expressed towards Durham County. -
Respectfully yours; : - -
* .CCIaeit' CCV-". • - .
•
Susan Suggs - _
Operations Planner
SS:jh -
• •
•
- I
ORANGE COUNTY
HILLSBOROUGH
NORTH CAROLINA
Ji 4anageti Officz EStatilU 1752
May 13, 1985
Mr. Thurman Murphy, Jr.
Farmers Home Administration
630-A South Garnett Street
Henderson, North Carolina 27536
Dear Mr. Murphy:
Orange County transmits herewith a revised preliminary
engineering report prepared by Hazen and Sawyer, P.C. relative to
the proposed sewer improvements for Cheeks Township in Orange
County. This report is transmitted to the Farmers Home
Administration for comments and acceptance of the revised project
scope.
The report prepared by Hazen and Sawyer, P.C. concluded that
the cost to construct all of the facilities originally included
in Phase 1 of the sewer improvements would be significantly
greater than the currently available funding. Based on this
determination, the Orange County Board of Commissioners has
agreed to a reduced scope of construction which will maintain
most of the project objectives and can be constructed without
exceeding the currently available funding or placing an undue
burden on the end users of the system.
The County is most anxious to proceed with the revised
project. We would appreciate your earliest attention to the
enclosed information. If you have any questions, representatives
of the County and Hazen and Sawyer, P.C. would be happy to meet.
with you.
Sincerely yours,
Kenneth R. Thompson
County Manager
KRT/dve
Copy to Board Members
Don Cordele, Hazen & Sawyer Engineers
PROCLAMATION
WHEREAS, According to the latest population figures, there are over
9,000 persons over 60 years of age in Orange County; and,
WHEREAS, Orange County is proud of the older adults who live here and
wishes to show appreciation for what they have given and for
• what they have contributed to their County, State and Nation;
• and,
WHEREAS, Because of them, the rest of the citizens enjoy the fruits of
their visions and their labors, and their example is an
inspiration to continue to make Orange County a good place
in which to live; and,
• WHEREAS, Our President and Governor have proclaimed May as Older
Americans Month, Orange County wishes to set aside a special
month for recognition of the older segment of its citizenry;
NOW, THEREFORE, We, the Orange County Board of Commissioners, join the
Governor of North Carolina and the President of the United
States in PROCLAIMING May, 1985
OLDER AMERICANS MONTH
AND, further, , encourage all citizens to join us in honoring our older
Americans.
ki4.14,/
Don Willhoit, Chair
Orange County Board of Commissioners
• NAIY
z../
•
( - \ T•
r 4
• I
•
ASSESSMENT ROLL IN CONJUNCTION
WITH THE FINANCING AND ASSESSING BY
ORANGE COUNTY OF THE LOCAL
SHARE OF THE COST OF PAVING
NORTH CAROLINA STATE ROAD #1803,
ALSO KNOWN AS WILKII■ DRIVE,
IN CHAPEL HILL TOWNSHIP, ORANGE COUNTY, NORTH CAROLINA
pe
The property described below, the names of the owners of said
p
property, the assessment levied against each parcel of property, the
basis for the assessment levied against said parcel and the terms of
payment of the assessment all set forth below, together with tax maps of
the project, constitute the assessment roll for the paving of North
Carolina State Road #1803, also known as Wilkins Drive, in Chapel Hill
Township,. Orange County, North Carolina.
• _
• BASIS FOR ASSESSMENT
. • The basis for assessment against the property described below
is frontage abutting the road at an equal rate per foot of frontage which
represents the total local share of the cost of this project.
TERMS OF PAYMENT OF ASSESSMENT
A. Within thirty (30) days after notice of the confirmation of
assessment roll is 'published each owner of assessed property may pay his
or her assessment in full without interest.
B. Any assessment p aid
in full a
s provided o vi de
d abo
ve shall be
paid in five ( 5) equal annual installments with the first such
• installment, with interest, due sixty (60) days after the date that the
assessment roll is confirmed, and the remaining installments, with
•
• interest, due on the same date in each successive year until the
assessment is paid in full.
Map, Property Owners Amount of
• Block & Mailing Address Assessment
& Lot
15.A.1 Clyde A. William, Jr. $ 81 4.6 0
Ger da Williams
100 Wilkins Drive
Durham, NC 27705
15.A.3 Joseph B. Slaughter $ 3 2 6. 10
Estelle Slaughter
• 101 Wilkins Drive
• Durham, NC 277 05
15A.A.5 Labarre Weston 21 7. 40
Maurine Weston
172 Carol Woods
Chapel Hill, NC 27514
15A.A.5A Labarre Weston $ 804. 38
Maurine Weston .
172 Carol Woods
Chapel Hill, NC 27514
15A.A.5C An Labarre $ 108.70
234 Daniel Drive
Auburn, CA 95603
15A.A.5D Thomas Price, Jr. $ 326. 10
Sandra Price
116 Wilkins Drive
• Durham, NC 277 05
15A.A.6 • Mary Garner McKeel $ 1 0 8,70
120 Wilkins Drive
Durham, NC 27705
-2-
15A.A.6A Mary Catherine C. Mc Keel $ 217. 40
120 Wilkins Drive
Durham, NC 277 05
15A.A.7 Mary Catherine C. MeKeel $ 2 1 7. 40
120 Wilkins Drive
Durham, NC 277 05
15A.A..8 Wade C. Parrish $ 32 6. 1 0
Nancy Parrish
Route 5, Box 525
• Shaw Road
Durham, NC 277 04
15 A.A.11 Wade C. Parrish
2
4
Nancy Parrish 50 . 1
• Route 5, Box 525
Shaw Road
Durham, NC 27704
15A.B.1 • Joseph B. Slaughter
Estelle C. Slaughter • 953. 73 3.
101 Wilkins Drive
Durham, NC 277 05
15A.B.2 John C. Kluttz $ 1 0 8. 70
Lucille Kluttz
• 2308 Woodrow Street
• Durham, NC 27705
K•
15A.B.3 Frances Ann Nichols $ 326. 10
107 Wilkins Drive
Durham, NC 27705
15A.B.4 Frances Ann Nichols $ 217.40
107 Wilkins Drive
Durham, *NC 27705
- 15A.B.5 Clarence Edward Wiggins $ 217. 40
. Tarlouh H. Wiggins
• 111•Wilkins Drive
Durham, NC 27705
I5A.B.6 Thomas Johnson Price • $ 434.80 •
Margie Price
115 Wilkins Drive
Durham, NC 27705
15A.B.7 A. B. Ray, Jr. $ 1 81 . 16
117 Wilkins Drive
• Durham, NC 27705
15A.B.8 Albert Byron Ray • $ 180. 79
Helen Ray
117 Wilkins Drive
Durham, NC 27705
15A.B.9 Albert Byron Ray $ !
Helen Ray 181 . 16 . •
117 Wilkins Drive
Durham, NC 27705
15A.B.10 • William R. Baucom, Jr. $ 217. 40
• Route 1, Wilkins Drive
Durham, NC 27705 -
•
15A.B.11 Clyde A. Williams, Jr. $ 652:2
Ger da Williams
100 Wilkins Drive
Durham, NC 27705
•
• I
•
RESOLUTION
WHEREAS, upon completion of a 1984 survey of County and
school system roof conditions by Law Engineering
the County committed to a three year, repair/
replacement program, and
WHEREAS, the County appLopriated $360,500 in 1984-85, and 1
WHEREAS, an estimated expenditure of $767,000 is needed in
1985-86 to carry forward the second year of the
repair/replacement program, and
WHEREAS, both school systems have developed specifications
and terms for a joint bidding of the total work to
be done, and
WHEREAS, if contracts can be awarded May 20, 1985 construc-
tion can be completed between June and August 1985,
and
WHEREAS, without the assurance that the funds will be appro-
priated to the school system by Orange County the
school systems are prevented under North Carolina
General Statute 115C-432(a) (4) from awarding bids.
NOW, THEREFORE, BE IT RESOLVED, that the Board of
Commissioners authorizes the Chapel Hill-Carrboro
and Orange County School Systems to proceed with
the letting of a contract or contracts according to
attached Agreement conditions including Exhibits A
and B,
BE IT FURTHER RESOLVED that the Board of Commissioners
assures the boards of education that funds will be
appropriated for the six school roofs in the 1985-
86 County budget exclusive of the appropriations
for other current and long range capital needs.
Adopted this sixth day of May, 1985.
a-V.040a,
Don Wilihoit, Chair
Board of Commissioners
ATTEST:
_ 1
.4410. .14111';
rly ythe -
Clerk to the Board of
Cbmmissioners
MANAGER' S REPORT
' I
Orange County's Equal Employment Opportunity/Affirmative Action
Program has been in effect for the past four years for the purpose of
insuring fair and equitable hiring and employment opportunities. The
employment objectives of the program are two-fold:
1. All persons hired by the County shall meet
the stated qualifications for the position; and
2. The County's work force will match as closely
as possible the make-up of the County's available
labor force in race and sex.
Provided below is a chart illustrating a comparison of Orange
County workforce to the Orange County available labor force by race and
sex.
SUMMARY OF THE ORANGE COUNTY WORKFORCE BY RACE AND SEX
Total number of employees 343 100%
Total non-minority 250 73%
Total minority 93 27%
Total females 198 58%
Total males 145 42%
*SUMMARY OF THE ORANGE COUNTY LABOR FORCE BY RACE AND SEX'
Total available labor force 45,340 100%
Total non-minority 37,990 84%
Total minority 7,350 16%
Total females 22,320 49%
Total males 23,020 51%
*Source: N.C. Employment Security Commission 1980 Census Data
Clearly this illustrates that overall the County has been successful in
achieving the stated employment objectives.. .
While progress has been made county-wide, continuing efforts are under-
way to assure that each department of County government will reflect the make-up
of the County's available labor force in race and sex. To that eud, January
1985 Orange County set forth placement goals by departments to be achieved during
a five year time period. The goals were established in conformance to guidelines
prescribed and used by the State of North Carolina. The following process was
used in establishing placement goals by departments:
-an analysis of the County's workforce compared to labor force
availability data was conducted to discover job classes or
occupational groups in which minorities and/or females are
underrepresented in the jurisdiction;
11111 -projection of job opening estimates, based on average attrition,
where the analysis showed underrepresentation to measure the
.County's capacity to improve the representativeness of the
I workforce; and
-through mathematical formula establishment of goals and
timetables for improved minority and/or female representation
•in the workforce.
The placement goals established reflect the change necessary to assure
that the department's workforce will meet the labor force standard for each
occupational category. Meetings were held with all county department heads to
communicate goals and re-affirm the County's commitment to affirmative action.
I am pleased to report that, the response was positive and further progress has
been made in achieving our goals since January.
•
Provided herein is a summary of the Affirmative Action Placement Goals
established for all departments that have areas of underrepresentation.
• SUMMARY OF PLACEMENT GOALS BY DEPARTMENTS .
OF ORANGE COUNTY LOCAL GOVERNMENT
DEPARTMENT JOB CLASS GOALS ( 1985-1989)
REGISTER OF)DEEDS Office/Clerical one minority
COUNTY MANAGER Officials/Administrators one female; *one minority
*progress made - one
minority placed since 1/85
TAX SUPERVISOR
111/1 Professional
Technician one minority
*two females; *one minority
*progress made - one female
and one minority placed
since 1/85
• PLANNING Professional one female; one minority
Technician one female
Office/Clerical one minority
SOCIAL SERVICES Professional • *one minority
• *goal achieved since 1/85
Paraprofessional *one minority
*goal achieved since 1/85
HEALTH • Professional • two minorities
Protective Services one minority
,
Aft AGING Office/Clerical • one minority•,
1111,
EMERGENCY MANAGEMENT Technician one female; one minority
1
DEPARTMENT JOB CLASS GOALS (1985-1989),
PUBLIC WORKS Skilled Craft two females
Service Maintenance four females
HOUSING & COMMUNITY Professional one female
DEVELOPMENT
... ,
RECREATION Professional one female
one minority
•
SHERIFF Protective Services *two females; *three minorities
• *progress made - one female
and one minority placed
since 1/85
Office/Clerical one minority
While placement goals have not been established with respect to those over
55, due to a lack of sufficient data, they represent 11% of our workforce.
The establishment of placement goals by departments is only one of many
components of our EEO/AA Program. Other improvements measures to the program
that have been started included:
111/1 - (1) Evaluation of the EEO/AA achievements of all management
personnel as a part of their overall job performance;
(2) An applicant pool of minority and female candidates for
selection referral;
(3) Refinement of the County's recruitment and selection process;
(4) Validation of testing instruments; and
• (5). Publication of an EEO/AA annual report.
Efforts are currently underway to begin training on affirmative action and
• management skills effective July 1985. We plan to offer the training to all
management and supervisory personnel. Our primary goal in the program is to
• help all staff recognize the application of equal employment opportunity
principles as tools of sound management rather than mandated responses to
• government regulations.
I appreciate the continuing commitment of the Board of County Commissioners
and staff to the provision of equal employment opportunity through affirmative
action efforts.
-.\---..
Kenneth R. Thompson
111/1
- Attachments
100000111111O■N■
BOARD OF COMMISSI0NERS DEPARTMENT TIORmaORCE BY OCCUPATION
OCCUPATIONAL GROUP
NON—MINORITY MINORITY TOTAL TOTAL
MALE . FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NU,iBER
OFFICIALS & ADMINISTRATORS -
PERCENT
PROFESSIONALS '
PERCENT .
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS 1 1 2
PERCENT 200.0 100.0 x,00.Q:* �
OFFICE & CLERICAL 1 1 , I
PERCENT 100.0 100.0 10O,0 1
SKILLED CRAFT WORKERS
PERCENT
SERVICE—MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 2 2 2
2
100.0 100:0 100.0
Admull
' BOARD OF COMMISSIONERS DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP Z IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS {_)
PROFESSIONALS
! TECHNICIANS (_}
a
PROTECTIVE SERVICE WORKERS {_)
PARAPROFESSIONALS
Minority 0.0% 46.3% Minorities -46.3%
OFFICE & CLERICAL.
Minority 0.0% 19.0% Minorities -19.0%
SKILLED CRAFT WORKERS
n+:
fir
SERVICE-MAINTENANCE WORKERS {-}
PLACEMENT GOALS
BOARD OF COMMISSIONERS DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY b PARITY
100
OFFICIALS & ADMINISTRATORS x
100
PROFESSIONALS
x .
100
TECHNICIANS x
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS
Minority 46.3 x 1
100 .46
OFFICE & CLERICAL Minority 19.0 x 1 .3B
100
SKILLED CRAFT WORKERS
:E. X
100
SERVICE-MAINTENANCE WORKERS x
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
BOARD OF COMMISSIONERS DEPARTMENT TURNOVER RATE FOR FY '83 - '8A = 0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS- (NET INCREASE)* OPENINGS (NL'T INCIIEASL')*
UNDERREPRESENTATION**
r� NSA
x
;r
J�
*Igdicate which pro-
tected group (minority,
toomen, handicapped) or
sub-;group (e.g. , black
females, other minor-
ity males.. etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
� . amount of undo rrepre- *"Net Increase" does not include placements of minority group workers, women., and/or handicapped
sent tion,
persons which become necessary cause of turnover,*to keep their representation at p . ent levels.
ELECTIONS DEPARTMENT WORKFORCE SY OCCUPATION
[OFFICIALS CCUPATIONAL GROUP
NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
& ADMINISTRATORS
' 1 1 1
PERCENT 100.0 100.0 1
i 100.0 '
' PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 2 2
2
PERCENT 100.0 100.0 2
100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT }=•
ETOTALKFORCE 3 3 3
• 3 •
100.0 100.0 100.0
...........
ELECTIONS DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS {_}
Minority 0.0% 21.2% Minorities -21.2%
PROFESSIONALS {-}
TECHNICIANS {-}
PROTECTIVE SERVICE WORKERS {_}
PARAPROFESSIONALS
OFFICE & CLERICAL. {_}
Minority 0.0% 19.0% Minorities -19.0%
SKILLED CRAFT WORKERS
Q
a'
SERVICE-MAINTENANCE WORKERS �• �_}
PLACEMENT GO.ALS
ELECTIONS DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED CROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY = PARITY
• 100
OFFICIALS & ADMINISTRATORS
' Minority 21,2 X 1
.212
100
PROFESSIONALS
X .
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS
X
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL
Minority .19.0 X 2
.38
100
SKILLED CRAFT WORKERS .
;;. X
100
SERVICE-MAINTENANCE WORKERS X
100
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED CROUP WORT(ERS ARE UNDERREPRESENTED
—ELECTIONS DEPARTMENT ' TURNOVER RATE FOR FY183 '84 = 0,0%
FOR 1985 FOR 1985 1989
OCCUPATION:
JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
UNDERREPRESENTATION**
aF N/A
**Indicate which pro-
tected group (minority,
s
women, handicapped) or
ub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un-
dorrepresented, and
'r **Refers to Placement goals, NOT simply
o
amount of underrepre- *"Net Increase" does not include hiring goals."
I
serot&tion. placements*of minority grpupworkers, women, and/or handicapped
AM,
qW
persons which become necessarAnecause of turnover, to keep their representation at pMent levels ,
SOIL & WATER CONSERVATION DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1384
OCCUPATIONAL GROUP
NON-MINOftiTY MINORITY TOTAL . TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
i PROFESSIONALS
PERCENT
TECHNICIANS 1 1 2
1 1 2
PERCENT
50.0 50.0 100.0 50 0 50.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1
' 1 1
PERCENT 100.0 100.0
100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 2 3' 1 2 3
33.3 66.? 1QO.O 33.3 66.7
lw
MEN
SOIL & WATER CONSERVATION DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE
WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS {_}
PROFESSIONALS {`}
• a
TECHNICIANS {_}
e
Minority 0.0% 20.1 Minority : -20. 1
PROTECTIVE SERVICE WORKERS
• m -
PARAPROFESSIONALS
OFFICE & CLERICAL. {-}
Minority O.O� I9.0 Minority -19.0%
SKILLED CRAFT WORKERS
a
i
SERVICE-MAINTENANCE WOMERS
PLACEMENT GOALS
SOIL & WATER • DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY
100 PARITY
OFFICIALS & ADMINISTRATORS
X
100
PROFESSIONALS
X
100
TECHNICIANS
Minority 20. 1 R 2
.402
100
PROTECTIVE SERVICE WORKERS
X
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL
Minority 19.0 X 1
19
100
SKILLED CRAFT WORKERS �
X
100
SERVICE-MAINTENANCE WORKERS
X
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED CROUP WORKERS ARE UNDERREPRESENTED
SOIL & WATER CONSERVATION DEPARTMENT TURNOVER RATE FOR ry '83-'84 = 0.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED ' PLACEMENT GOALS ESTIMATED PLACLNEENT COALS
TECHNICIANS OPENINGS (NET INCREASE)* OPENINGS (NET. INCREASE)*
OFFICE & CLERICAL
UNDERREPRESENTATION**
N/A
**Iridicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g• , black
fenales, other minor-
ity.zilales.. etc.) is un-
derrepresented, and "Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre-
sentation. *"Net Increase" does not include Placements of minority groupworkers, women, and/or handicapped
141h, Am
persons which become necessary cause of turnover, to keep their representation atpdWent levels-
REGISTER OF DEEDS DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP
-NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
PROFESSIONALS
PERCENT
TECHNICIANS 1 1 1 1
PERCENT
100.0 100.0 100.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 6 6 1 1 7 7
PERCENT 86.0 86.0 14.0 14.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 6 6 2 2 8 8
75.0 75.0 25.0 25.0 100.0
REGISTER OF DEEDS
DEPARTMENT UTILIZATION 09 UNDERUTILIZATION
OCCUPATIONAL GROUP
, % IN WORKFORCE LABOR FORCE
WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
PROFESSIONALS
TECHNICIANS
PROTECTIVE SERVICE WORKERS
a
PARAPROFESSIONALS
OFFICE & CLERICAL.
Minorities 14,0 {-) Q
19.0X Minorities -5.0
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS r'
Akk
n��
PLACEMENT GO.kLS
REGISTER OF DEEDS - DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP X TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY
100 PARITY
OFFICIALS & ADMINISTRATORS
X '
100
PROFESSIONALS
X
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS
x
100 •
PARAPROFESSIONALS "-
X
100
OFFICE & CLERICAL
Minorities 19.0 X 7 Minorities 1.33
• 100
S WORKERS 4�
.: X
100
SERVICE—MAINTENANCE WORKERS
X
100
•**PLACEMENT• GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
REGISTER OF HEEDS, DEPARTMENT TURNOVER RAW FOR FY 183-=84 =•0.01,
FOR 3985 FOR 1985 - 1989
{}CCLi'AiIAA't JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
UPL'NINGS (NET INCKEASE)* OPENINGS (NET INCREASE)*
OFFICE/CLERICAL 1 I Minority
i
UN ERREPRESENTATION**
OPFICE `CLERICAL
'=1 Minority
s .
' Gt
°*Indiczte which pro-
i tccted group (minority,
Women. 1111ndicapped) or
sub-B—ZOUp black
fes^ales, other minor-
ity ;sales; etc.) is un- TOTALS 1
i Minority
d^;iep:cse;Tted, and **Refers to Placement goals, NOT simply "hiring
amount of underrepre- ;„ „ g goals-."
senta *"Net Increase does not include placements of minority groupcuorlcers, women, and/or ha 'capped
persons which become necessary, ause of turnover, to keep their representation at present levels
I
couriTy MANAGER DEPARTMENT WORKFORCE BY OCCUPATION * DECEMBER 31, 1984
OCCUPATIONAL GROUP 'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 2 2
PERCENT 10010 100.0
100.0
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 2 1 3 2 1 3
66.7 33.3 100.0 66.7 33.3
COUNTY MANAGER DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
FEMALE 0,0% 45.2% FEMALE -45.2%
�
MINORITY 0,0% 21.2% MINORITY -21.2%
PROFESSIONALS
TECIINICIk%NS
PROTECTIVE SERVICE WORKERS {_}
PARAPROFESSIONALS {_}
OFFICE & CLERICAL.
MINORITY 0.04 19.0% MINORITY
SKILLED CRAFT WORKERS {_}
SERVICE-MAINTENANCE WORKERS {_} -
AWL
PLACEMENT GOALS
COUNTY MANAGER DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY
- - = PARITY
100
FEMALE 45.2% 3 FEMALE 1:36
OFFICIALS & ADMINISTRATORS X
MINORITY 21.2% 3 MINORITY .64
100
PROFESSIONALS
X
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL
MINORITY 19.0% X 1 MINORITY .190
100
SKILLED CRAFT WORKERS
X
100
, SERVICE-MAINTENANCE WORKERS R
100
*PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
COUNTY MANAGER DEPARTMENT TURNOVER RATE FOR FY '183 '84 0.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* - OPENINGS (NET INCREASE)*
Officials S .Adminarators
OFFICIALS &
ADMINISTRATORS I FEMALE 2 .1 FEMALE
I MINORITY
UNDEPREEPRESENTATION**
FMIALE
MINORITY
**Indicate which pro-
tacted group (minority,
woman, handicapped) or
sub-group (e.g. , black
L erilal.es, Other minor- TOTOTALS 1, FEMALE
tV
i males; etc.) is un- I FEMALE 2 1 MINORITY
do_,reprcsented, and **Refers to Placement goals, NOT simply "hiring goals
amount of underrepre-
*"Net,Increase" does not include2lacements of minority group workers, women, and/or bqU 'capped
persons whicb becone necessary.wcause of turnover, to keep their representation at'present levels
PERSONNEL DEPARTMENT WORKFORCE BY OCCUPATION .DECEMBER 31, 1984
OCCUPATIONAL GROUP
NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT
100.0 100.0 100.0
PROFESSIONALS 1 1 1 1 2 2
PERCENT 50.0 50.0 50.0 50.0 100.0
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT.
OFFICE & CLERICAL
PERCENT
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 1 2 2 . 3 3
33.3 33.3 66.7 66.3 100.0
PERSONNEL DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
PROFESSIONALS
TECHNICIANS FEMALE 0.0 45.0
MINORITY 0.0% 20.1 FEMALE -45.0
MINORITY -20.1
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL,
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
PLACEMENT GOALS
PERSONNEL DEPARTMENT.
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD' x IN OCCUPATIONAL CATEGORY PARITY
100
OFFICIALS & ADMINISTRATORS X
• 100
PROFESSIONALS
X
100
TECHNICIANS FEMALE 95.0 1 FEMALE .950
MINORITY 20.1 X 1 MINORITY .201
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS
x
100
OFFICE & CLERICAL X
100
• ti .
SKILLED CRAFT WORKERS f: x
100
SERVICE-MAINTENANCE WORKERS x
100•
1p
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
PERSONNEL DEPARTMENT TURNOVER RATE FOR FY 183-184 = 0.0%
7
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMMENT GOATS
OPENINGS (NE'r INCitEASE)* OPENINGS (NET INCREASE')*
UNDERREPRESENTATION**
l N jA
1
i •
*Indicate uhich pro-
tected group (minority,
women, handicapped) or
sub-group (e.g, , black
females, other ru.nor- TOTALS
ity rules, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase's does not include placements of minority rou workers women
sentation. Y g p. , , and/orltandicappcd
ARL
persons which become necessar ecause of turnover, to keep their representation atAment levels.
FINANCE DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, .1984
OCCUPATIONAL GROUP
'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT 100.0 100.0 100.0
PROFESSIONALS 1 1 1.
PERCENT 100.0 100.0 100.0
TECHNICIANS 2 2 2 2
PERCENT
100-0 100.0 100.0•
PROTECTIVE SERVICE WORKERS .
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 2 2
3 3
PERCENT .66.7 66.7 33.3 33.3 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 4 5 1 1 2 2 • 7
14.3 57.1 71.4 - 14.3 14.3 28#'6 28.6 71.4
FINANCE DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL CROUP IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 45.21 FEMALE -45.26
OFFICIALS & ADMINISTRATORS
MINORITY 21.2% MINORITY -21.2%
PROFESSIONALS
FEMALE FEMALE -45.2%
pr _45.2*
!'MALE
TECHNICIANS MIN.ORITY 0.0%'
20.1% 0 1%
MINORITY -20.1%
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL,
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
PLACEMENT GOALS
FINANCE DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY
PARITY
100
1.
OFFICIALS & ADMINISTRATORS FEMALE 45.2 FEMALE .452•
MINORITY 21.2 X 1
100 MINORITY .212
-`-'
PROFESSIONALS FEMALE 45.2 . X 1 FEMALE .452
•
100
TECHNICIANS
MINORITY 20.1 X 2 MINORITY .402
100
PROTECTIVE SERVICE WORKERS X
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL
X
100
SKILLED CRAFT WORKERS p�
�. X
100
SERVICE-MAINTENANCE WORKERS X
100
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP, WORKERS'ARE UNDERREPRESENTED
FINANCE DEPARTMENT TURNOVER RATE FOR FY 183-'84 = 14.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINGS (t LT INCREASE)*
OFFICIALS & ADMINISTRA-
TORS
UNDERREPRESENTATION**
N/A
7-k
**Indicate which pro-
lected 'group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un-
derrepresented, I
* and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or handicapped
sentation.
A&
persons which become necessary cause of turnover, to keep their representation atp' rWnt levels.
PURCHASING & CENTRAL SERVICES DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31,• 1984
OCCUPATIONAL CROUP
NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT 100.0 loo.'o 100.0
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 2 2
3 4
PERCENT
25.0 25.0 50.0 50.0 50.0 25.0 75.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL. WORKFORCE, 2 1 3 2 2 2 . 3 5
40.0 20.0 60.0 40.0 40.0 40.'0 60.0
PURCHASING & CENTRAL SERVICES
DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS FEMALE 0.0%• 45.2% FEMALE . -45.2%
• MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL.
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
PLACEMENT GOATS
PURCHASING & CENTRAL SRV DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP. X TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY
PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS •
•MINORITY 21.2 x 1 MINORITY .212
100
PROFESSIONALS
X
100
TECHNICIANS
100
PROTECTIVE SERVICE WORKERS
X
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL
X
100
SKILLED CRAFT WORKERS . X
200
SERVICE-MAINTENANCE WORKERS X
100
Boom
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED CROUP WORKERS ARE UNDERREPRESENTED
PURCHASING & CENT,AL sgv— DEPARTMENT TORNOVER RATE FOR FY '83-'84
.25.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATE PLACEMENT GOALS
OFFICIAL OPENINGS , (NET INCREASE)* OPENINGS (NET INCREASE)
ADMINISTRATORS *
UNDERREPRESENTATION**
N/A
Jr
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor-
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals-.0
amount.of underrepre- *IIN*et Increase" does not include placements of minority group workers, women, nqd/ ed
sent=ion. or handicapp
AM
persons which become necessary cause of turnover, to keep their representation at piWent levels
1.0 p • — I
Tax Supervisor DEPARTMENT WORKFORCE BY OCCUPATION
December 31, 1984
OCCUPATIONAL CROUP
'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1 1
PERCENT 100.0 100.0 100.0
PROFESSIONALS 2 1 3 2 3
PERCENT "66.7 33.3 100.0 66.7 33.3
TECHNICIANS
2 2 2 2
PERCENT 100.0 100.0 100.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL '
7 7 1 1 8 8
PERCENT 87.5 87.5 12.5 12.5 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS ,
PERCENT
TOTAL, WORKFORCE 5 8 13 1 1 5 9 14
35..7 57.2 92'.9 7.1 7.1 35.7 64.3
TAX PERVISOH DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY '0.0%
21.2% MINORITY -21.2%
PROFESSIONALS
MINORITY 0.0% 21.2% • MINORITY -21.2%
TECHNICIANS FEMALE 0.0% 45.0 a FEMALE -45.0%
MINORITY 0.0% 20.1 MINORITY -20.1%
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE. & CLERICAL.
MINORITY 12.5% 19.0% MINORITY -6.5%
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
Am
PLACEMENT GOATS
TAX SUPERVISOR DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2 FEMLE .452
OFFICIALS & ADMINISTRATORS MINORITY 21.2 X 1 MINORITY .212
100
PROFESSIONALS MINORITY 21.2 X 3 MINORITY .636
•100
TECHNICIANS FEMALE 45.0 4 FEMALE 1.80
MINORITY 20.1 X 4 MINORITY •804
100
PROTECTIVE SERVICE WORKERS $
100
PARAPROFESSIONALS X
100
OFFICE & CLERICAL .
MINORITY 19.0 X 10 MINORITY 1.90
100
µ
SKILLED CRAFT WORKERS
X
100
SERVICE-MAINTENANCE WORKERS X '
100
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
TAX SUPERVISOR DEPARTMENT TURNOVER RATE FOR FY"83 '84 = 0.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
Professionals I Minority
I Female 2- Female
Technicians 2 1 Minority 3 1 Minority
UNDERREPRESENTATION**
Professionals
Minority Office and Clerical 1 I Minority 1 I Minority •
Technicians
1 Minority
2 Female
Office & Clerical
Minority
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black I Female 2.F?mal?s
females, other minor-
ity males, etc.) is un- TOTALS 3 2 Minorities 5 3 Minorities
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals'
:1111ourit of tinderrepre- O'Net Increase" does not include placements of minority groupworkers, women, and/or handicapped
sctiLat' n.
persons which become necessary, ause of turnover, to keep their representation at pre wt levels'.
"PLACEMENT GOALS FOR occumrws
IN WHICH PROTECTED GROUP- WORKERS ARE UNDERREPRESENTED
TAX SUPERVISOR DEPARTMENT TURNOVER RATE FOR FY"83 - '84 = 0.0%
FOR 1985 FOR 1985 - 1989 •
OCCUPATION:. JOB CLASS
ESTIMATED PLACEMME
NT GOALS ESTIMATED PLACEMENT GOALS
OVENINGS (NET INCREASE)* OPENINGS (NET 1N(;KEAsr,)-.'.
Professionals 1 I Minoritv
I Female, 2 Female
Technicians 2 1 Minority 3 1 Minority
UNDERREPRESENTATION**
Professionals
Minority
Office and Clerical 1 1 Minority 1 I_Minority
Technicians
Minority
is
2 Female
Office & Clerical
Minority
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS I Female 2 Females
ity males, etc.) is un- 3 2 Minorities 5 3 Minorities
derreorcsented, and **Refers to Placement goals, NOT simply "hiring goals'
awount of underrepre- *"Net Increase" does not.include placenicnts of minority group workers women, and/orhandicapped
sentation.
Ah
persons which become necessary, b&ruse of turnover, to keep their representation at pre MW levels.
LAND RECORDS DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP M. -NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1
PERCENT 100.0 100.0 100.0
PROFESSIONALS 1 1 1 1
PERCENT 100.0 100.0
100.0
TECHNICIANS 1 1 1 1
PERCENT
100.0 100.0 100.0 '
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 1 1
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE•-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 3 4 1 3 4
25.0 75 .0 100.0 25.0 75.0
Aft
LAND RECORDS DEPARTMENT UTILIZATION OR UNDERUTILIZATION '
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE—
STANDARD LABOR FORCE
FEMALE 0.0% 45.2sh FEMALE —45.2%
OFFICIALS & ADMINISTRATORS
MINORITY 0.0% 21.'2P6 MINORITY —21.2$
PROFESSIONALS
MINORITY 0.0% 21.2% MINORITY —21.2%
TECHNICIANS*
MINORITY 0.0% 20.1% MINORITY —20.1%
PROTECTIVE SERVICE WORKERS (_}
PARAPROFESSIONALS
OFFICE & CLERICAL
MINORITY 0.0* 19.0% MINORITY —19.0%
SKILLED CRAFT WORKERS
SERVICE—MAINTENANCE WORKERS (_�
PLACEMENT GOALS
LAND RECORDS DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD R IN OCCUPATIONAL CATEGORY
= PARITY
100
FEMALE 45.2% 1 FEMALE .452
OFFICIALS & ADMINISTRATORS
MINORITY 21.2% x 1
lao MINORITY .212
PROFESSIONALS
MINORITY 21.2 x 1 MINORITY .212
100
TECHNICIANS '
MINORITY 20.1 % 1 MINORITY .201
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS x
140
OFFICE & CLERICAL '
MINORITY 19.0 x 1 'MINORITY .191
100.
SKILLED CRAFT WORKERS $
100
SERVICE-MAINTENANCE WORKERS x
100
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
LAND RECORDS DEPARTMENT TURNOVER RATE FOR ry '83- 84 = 0.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTINNATED PLACEIENT GOALS ESTIMATED PLAC621ENIT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NUT INCHE'ASE)*
LAND RECORDS
UNDERREPRESENTATION**
N/A
!,*Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females,• other minor-
TOTALS
ity males, etc.) is un-
derrepresertted, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women., and/or handicapped
sentation.
persons which become necessary levels.
cruse of turnover, to their representation at pre 1 ,
REVENUE DEPARTMENT WORKFORCE BY OCCUPATION
OCCUPATIONAL GROUP
NON-MINORITY • MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
1 1 1
PERCENT 100.0 100.0 100.0 1 2
PROFESSIONALS
PERCENT 100.0 200.0 1
100.0
TECHNICIANS
1 1 2
PERCENT 100.0 100.0 a 1
PROTECTIVE SERVICE WORKERS 100.
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL
1 1 1 2
2 2
PERCENT 50.0 50.0 50.0 50.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
1 1
TOTAL WORKFORCE 2 2 4 2 3
5
40.0 40.0 80.0 20.0 20.0 40.0 60.0
REVENUE DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE .0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS (_)
MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS FEMALE 0.0% 45.0% FEMALE -45.0%
� (-)
MINORITY 0.0% 20.1% MINORITY -20. 1%
PROTECTIVE SERVICE WORKERS (_)
PARAPROFESSIONALS {-}
i
OFFICE & CLERICAL.
SKILLED CRAFT WORKERS (_)
SERVICE-MAINTENANCE WORKERS
i
PLACEMENT GOALS
REVENUE DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY = PARITY
100
FEMALE •45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS MINORITY 21.2 X 1 MINORITY .212
100
PROFESSIONALS MINORITY 21.2 X 1 MINORITY .212
100
FEMALE FEMALE
TECHNICIANS MINORITY 20. 1 ' X MINORITY I '
,201
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS x
100
OFFICE & CLERICAL X .
100
SKILLED CRAFT WORKERS x
100
SERVICE-MAINTENANCE WORKERS x
100
Qp
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
REVENUE DEPARTMENT TURNOVER RATE FOR FY '83-184 0.0%
FOR 1985 FOR 1985 1989
OCCUPATION. JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
OFFICIALS & ADMIN
PROFESSIONALS
TECHNICIANS
UNDERREPRESENTATION**
N/A
11H-Indicate which pro-
; tected group (minority,
women, handicapped) or
sub-group (e.g. , black
femiles, other minor- TOTALS
ity males, etc.) is un-
derrepresented, and "Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre-
sentation. *"Net increase" does not include placements of minority group workers, women, and/or handicapped
Am
Aftk persons which become necessary,ALcause of turnover, to keep their representation at pr levels
CHILD SUPPORT ENFORCEMENT DEPARWNT WORKFORCE By OCCUPATION
OCCUPATIONAL GROUP
NON MINORITY MINORITY TOTAL
TOTAL-
F
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE T FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
100.0 100.0 1
100.0
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT.
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS 7T
PERCENT
100.0 100.0 100.0
OFFICE & CLERICAL
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 2 2 1 1 3
66. 7 66.7 33.3 33.3 100.0 3
CHIT 1) t;ijpppRT ENFORCEMENT DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP X IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL,
MINORITY 0.0% 19.0* MINORITY -19.0%
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
PLACEMENT GOALS
CHILD SUPPORT ENFORCEMENT
DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
! IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY a PARITY
100
i
OFFICIALS & ADMINISTRATORS
MINORITY •21,2 x i MINORITY .212
100
PROFESSIONALS
x
100
TECHNICIANS
x
100
PROTECTIVE SERVICE WORKERS x
105
PARAPROFESSIONALS
x
100
OFFICE & CLERICAL
MINORITY 19,0 x 1 MINORITY .190
100
SKILLED CRAFT WORKERS f'
i x
100
SERVICE-MAINTENANCE WORKERS x
100
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
ENFORCEMENT DEPARTMENT TURNOVER RATE FOR PY '83-'84 = 0.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
OFFICIALS & ADMIN
OFFICE & CLERICAL
UNDERREPRESENTATION**
N/A
t
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
femalet, other minor-
ity males, etc.) is un-
derrepresented, and **Refers to Placement
amopnt of underrepre- Placement goals, NOT simply "hiring goals."
sent at *"Net Increase" does not includi! placements of minority group workers, women, and/or handicapped
persons which become necessary, cause of turnover, to keep their representation at pr4wt levels.
mr
DATR PROCESSING DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
1 1 1 1
PERCENT 100.0 10010
0 0
PROFESSIONALS 1 1 2 1 1 2
PERCENT 50.0 50.0 100.0 50.0 50.0
TECHNICIANS
PERCENT 100.0 100.0
100.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL
PERCENT
SKILLED CRAFT WORKERS
t
(. PERCENT
I SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 3 1 4 3 1 4
75.0 25.0 100.0 75.0 •25.0
AM
qp
DATA PROCESSING DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0%. 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0.0% 21.2% a MINORITY -21.2%
PROFESSIONALS {-} FEMALE
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS {-}
MINORITY 0.0% 20.1% MINORITY -20. 1%
PROTECTIVE SERVICE WORKERS {-}
PARAPROFESSIONALS {_}
OFFICE & CLERICAL, {�}
SKILLED CRAFT WORKERS
• pr
SERVICE-MAINTENANCE WORKERS
,
PLACEMENT GOALS
DATA PROCESSING DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP x TOTAL NUMBER -OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2
OFFICIALS & ADMINISTRATORS x FEMALE .452
INORITY 21.2 MINORITY .212
100
PROFESSIONALS
MINORITY 21.2 x MINORITY
loo .424
TECHNICIANS
MINORITY 20.1 x 1 MINORITY .402
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL
X
100
SKILLED CRAFT WORKERS
X
100
SERVICE MAINTENANCE WORKERS
X
100
Am
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP 14ORKERS ARE UNDERREPRESENTED
—DATA PROCESSING DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 0.0%
FOR 1985 FOR 1985 - 1984
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
OFFICIALS & ADMIN
PROFESSIONALS
TECHNICIANS
UNDERREPRESENTATION**
J� N/A
.r
xf .
Jt
T:
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males, etc.) is un-
derrepresented, and , **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre-. *"Net Increase" does not include placements of minority group workers, women, and/orbandicapped
sentation.
persons which become necessary
NAG
cause of turnover, to keep their representation at ntlevels.
PLANNING DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP ..NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE INUMBER
OFFICIALS & ADMINISTRATORS-
PERCENT 100.0 100.0 100.0
PROFESSIONALS 3 1 4 3 1 4
PERCENT
75.0 25.0 100.0 75.0 25.0
TECHNICIANS
4 2 6 1 1 2 5 3
PERCENT 50.0 25.0 75.6 12.5 12.5 25.0 62.5 37.5
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 2 2 2
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE a 5 13 1 1 2 9 6 is
53.4 33.4 86.8 6.6 6.6 13.2 60.0 40.0
PLANNING DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP - % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS
MINORITY 0;0% (-� . 21.2% � MINORITY -21.21
PROFESSIONALS FEMALE 25.0% (_} 45.2% . = FEMALE -20.2%
MINORTTV 0.0% 21.2% MINORITY -21.2%
TECHNICIANS FEMALE 37.5% (-} 45.0% Q FEMALE -7.5%
PROTECTIVE SERVICE WORKERS (_)
PARAPROFESSIONALS
OFFICE & CLERICAL•
MINORITY 0.0% 19.0% MINORITY
SKILLED CRAFT WORKERS (-}
4•.
SERVICE-MAINTENANCE WORKERS
r
PLACEMENT GOALS
PLANNING DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY =PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS
- R
MINORITY 21.2 1 MINORITY .212
100
PROFESSIONALS FEMALE 45,2 4 FEMALE 1.808
MINORITY 21.2 R 4
100 MINORITY . .848*
TECHNICIANS FEMALE 45.0 9 FEMALE 4.05
MINORITY 20.1 R 9 MINORITY 1.809
100
PROTECTIVE SERVICE WORKERS R
100
PARAPROFESSIONALS %
100
OFFICE & CLERICAL '
MINORITY 19.0 X 3 ' MINORITY .570
? 100
. SKILLED CRAFT WORKERS ' X
L
100
SERVICE-MAINTENANCE WORKERS X
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED 'CROUP WORKERS ARE UNDERREPRESENTED,
PLANNING DEPARTMENT. TURNOVER RATE FOR FY '83-184 6%
FOR 1985 FOR 1983 - .1'.989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACE.MENT' GOALS
OPENINGS (NET INCREASE)* OPENINGS WT INCREASE)*
1 FEMALE
PROFESSIONAL 2 I MINORITY
TECHNICIAN 1 1 FEMALE • 2 I FEMALE
UNDERREPRESENTATIONft
PROFESSIONAL
MINORITY
V,
OFFICE CLERICAL 1 1 MINORITY I 1 MINORITY
F EMALE.
TECHNICIAN
ek - 1 FEMALE
OFFICE CLERICAL
MINORITY
**Indicat'e which pro-
tected group (minority,
women, handicapped) or
sub-group -(e.g. , black 1 FEMALE
r"males, other minor- TOTALS 2 1. MINORITY 4 2 MINORITIES
it males . etc.) is un-
derrepresented, and "Refers to Placement goals, NOT simply. "hiting•goals.11
amount of underrepre- *"Net Increase"'does not include placements of minority grpupworkers) women, and/or handicapped
sentat
persons which become necessary, fkause'of turnover, to keeg their representation at P' rWnt levels.
t ECONOMIC DEVELOPMENT DEPARTMENT WORKFORCE BY OCCUPATION
,
i
i
OCCUPATIONAL GROUP '
j NON MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1 1
PERCENT 100.0 100.0 100.0 1
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL I 1 1
PERCENT 100.0 100.0 100.0 1
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 2 2 2
2
100.0 100.0 100.0
ECONOMIC DEVELOPMENT DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
6
MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS
TECHNICIANS
PROTECTIVE SERVICE WORKERS (-}
a
j
- PARAPROFESSIONALS
OFFICE & CLERICAL.
MINORITY 0.0% 19.0% MINORITY -19.0
SKILLED CRAFT WORKERS (-}
a
�t-
• SERVICE-MAINTENANCE WORKERS • {_}
qp
PLACEMENT GOALS
ECONOMIC DEVELOPMENT
DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP x TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY PARITY
100
OFFICIALS & ADMINISTRATORS
MINORITY 21.2 x I MINORITY .212
100
PROFESSIONALS
X
100
TECHNICIANS
100
PROTECTIVE SERVICE WORKERS x
100
. PARAPROFESSIONALS x
100
OFFICE & CLERICAL
MINORITY 19.0 x 1 MINORITY . 190
100
SKILLED CRAFT WORKERS
X
100
SERVICE-MAINTENANCE WORKERS x
100
AM
"PLACEMENT GOALS FOR OCCUPATIONS'
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
ECONOMIC DEVELOPMENT — DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 0.0%
FOR 1985 FOR 1985 1989
OCCUPATION:
JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
-A 0PENlNGS (NET INCREASW OPENINGS *
. (NET INC14EASE)
QPVTrTA S ADMTM _
OFFICE & CLERICAL
UNDERREPRESENTATION**
N/A
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
femeles,, other minor-
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include ' lacerients of minority group workers, women, and/or handicapped
sentation.
AWL
persons whichbecome necessary cause of turnover, to keep their representation at pJWnt levels.
SOCIAL SERVICES DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31, 1984
OCCUPATIONAL GROUP
MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
100.0 100.0 100.0
PROFESSIONALS 4 23 27 3 3 6 7 26 33
PERCENT 12.1 69.7 81.8 9.1 9.1 18.2 21.2 78.8
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
12 12 20 20
PERCENT 60.0 60.0 40.0 40.0 100.0
OFFICE & CLERICAL 10 10 2 2 12 12
PERCENT 83.3• 83.3 16.7 16.7 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 5 45 50 3 13 16 8 58 66
7.6 68.2 75.8 4.5 19.7 24.2 12.1 87.9
A&
SOCIAL SERVICES DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0'.0% {-} 21.2% MINORITY -21.2%
PROFESSIONALS {•-) .
MINORITY 18.2% 21.2% MINORITY -3.0%
TECHNICIANS (-}
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
MINORITY 40.0% 46.3% MINORITY -6.3$•
OFFICE & CLERICAL (-}
MINORITY 16.7% 19.0% MINORITY -2.3%
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS {-) a
PLACEMENT GOALS
DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP x TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY s PARITY
100
FEMALE 45.2 Z FEMALE .452
OFFICIALS & ADMINISTRATORS x
MINORITY 21.2 I MINORITY .212
100
PROFESSIONALS MINORITY 21.2 x 34 MINORITY 7.208
100
TECHNICIANS x
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS —MINORITY 46 x 20 MINORITY 9.26
100
OFFICE & CLERICAL x MINORITY 2.28
—MINORITY 12
100
SKILLED CRAFT WORKERS x
100
SERVICE—MAINTENANCE WORKERS x
100
NMI
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED CROUP WORKERS ARE UNDERREPRESENTED
SOCIAL SERVICES DEPARTMENT TURNOVER RATE FOR FY '83-'84 = 14%
FOR 1985 FOR 1985 19816
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OFFICIALS-r—ADMINISTRA OPENINGS (NET INCREASE)* OPENINCS (NET INCREASL)*
PROFESSIONALS TORS
PROFESSIONAL l 1 MINORITY 1 I MINORITY
PARAPROFESSIONALS
OFFICE & CLERICAL
PARAPROFESSIONAL 1 1 MINORITY
UNDERREPRESENTATION**
PROFESSIONAL
i MINORITY
JL
PARAPROFESSIONAL
# 1 MINORITY
V1,
**Indicate which• pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
ity males. etc.) is un- 1 1 'MINORITY 2 2 MINORITIES
derrepresented, and **Refers; to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or handicapped
sentation.
persons which bddd6d hedas§ bf EiirnbVer j td keep �them' representation atyr�jwtlevels.
HEALTH DEPARTMENT WORKFORCE BY OCCUPATION 'DECEMBER 31, 1984
OCCUPATIONAL GROUP
. -NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS I
PERCENT
[!!T . 100.0 100.0 100.0
PROFESSIONALS
1 12 13 1 1 1'• 13 14
PERCENT 7.1 85.8 92.9 7.1 7.1 7.1
92.9
TECHNICIANS ' 4 3 7 •1 1 2 5 4
PERCENT 44.4 33.4 77.8 11.1 11.E 22.2 55.5 44.5 ,
PROTECTIVE SERVICE WORKERS 3 3 3 3
PERCENT . 100.0 100.0 100.0
PARAPROFESSIONALS 3 3 3
3
PERCENT.
100.0 100.0 100.0
OFFICE & CLERICAL 3 3 2 7 9 2 10 12
PERCENT 25.0 25.0 16.7 58.3 75.0 16.7 83.3
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 9 18 27 3 12 15 12 30 42
21.5 42.8 64.3 7.1 28.6 35.1 28.6 71.4
HEA7.Tl4_ DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE, 0.0%. 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS
MINORITY 7;1% 21.2%* MINORITY -14.1%
TECHNICIANS FEMALE 44.5% 45.0% FEMALE •50%
PROTECTIVE SERVICE WORKERS FEMALE 0.0% •14.6% ffi FEMALE -14.6%
MINORITY 0.0% 28.5% MINORITY -28.5%
PARAPROFESSIONALS
OFFICE & CLERICAL
SKILLED. CRAFT WORKERS
SERVICE-MAINTENANCE YORKERS
AIL
qw
PLACEMENT 'GOALS
HEALTH DEPARTMENT
OCCUPATIONAL GROUP PERCRNT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD X IN OCCUPATIONAL CATEGORY PARITY
' lao
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS
MINORITY 21.2 '� 1 '•MINORITY .212
100
PROFESSIONALS
MINORITY 21.2 X 15 MINORITY 3.18
100
TECHNICIANS FEMALE 45.0 x 9 FEMALE 4.05
100
FEMALE 14.6
PROTECTIVE SERVICE WORKERS FEMALE .438
MINORITY 28.5 X 3 MINORITY .855
100
PARAPROFESSIONALS X
100
OFFICE 6 CLERICAL X
100
SKILLED CRAFT WORKERS '. X
100
SERVICE-MAINTENANCE WORKERS x•.
100
Ah
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
HEALTH DEPARTMENT TURNOVER RATE FOR FY '83-84 = 28.0%
FOR 1985 FOR 1985 1989'
OCCUPATION:
JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASEW OPENINGS WT INCREASE)--,
OFFICIALS & ADMIN
PROFESSIONALS
TECHNICIANS PROFESSIONAL 1 1 MINORITY 2 2 MINORITIES
PROTECTIVE SERVICE'
PROTECTION SERVICES
1 MINORITY
UNDERREPRESENTATION**
PROFESSIONALS
2 MINORITIES
PROTECTIVE SERVICES
MINORITY
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- -TOTALS. 1 I MINORITY 3 3 MINORITIES
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net increase" does not include placements of minority group workers, women, and/or handicapped
sentation.
Awk Alk
pertions which become necessat5&cause of turnover, to keep their representation at p*Went levels.
AGRICULTURE DEPARTMENT WORKFORCE BY OCCUPATION
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT 100.0 100.0 100.0
PROFESSIONALS
1 3 4 1 1 2 2 4
PERCENT .16.7 50.0 66.7 16.7 16.7 33.3 33.3 66.7 6
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
100.0 100.0 100.0
.OFFICE & CLERICAL 2 2 1 1 3
PERCENT 66.7 66.7 33.3 33.3 100.0 3
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT.
TOTAL WORKFORCE 2 5 7 1 3 4 3 8
18.2 45.4 63.6 9.1 27.3 36.4 27.3 72.7
Adak
r1momm
AGRICULTURE DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS
MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS
TECHNICIANS
PROTECTIVE SERVICE WORKERS {-}
PARAPROFESSIONALS
OFFICE &CLERICAL.
SKILLED CRAFT WORKERS
f=
SERVICE-MAINTENANCE WORKERS
PLACEMENT GOALS
AGRICULTURE DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP x TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS x
MINORITY 21.2 1 MINORITY .212
100
PROFESSIONALS
x
100
TECHNICIANS x
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS x
100
OFFICE & CLERICAL x
100
•SKILLED CRAFT WORKERS
x
100
SERVICE-MAINTENANCE WORKERS x
100
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
AGRICULTURE DEPARTMENT TURNOVER RATE FOR FY 183-1134 9.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* OPENINGS (NET INCREASE)*
-OFFICIALS & ADMINISTRA-
TORS
UNDERREPRESENTATION**
W/A
4
",*Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS
itv males, etc.) is un-
derrepresented, and **Refers to Placement goals•, NOT simply. "hiring goals."
amount of underrep,re- *"Net Increase" does not include
sentation, placements of minority group workers, women, and/or handicapped
persons which become necessary�&cause of turnover, to keep their representation at pWt levels.
RECREATION DEPARTMENT WORKFORCE AY OCCUPI,TION AECEMBER 31, 1984
OCCUPATIONAL GROUP 'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
• • 1 1 1 1
PERCENT
100.0 100.0 100.0
PROFESSIONALS 3 1 4 3 1
PERCENT 75.0 25.0 100.0 75.0 25.0 4
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL 1 1 1 I
PERCENT 100.0 100.0 100.0
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
4 2 6 4 2 6
TOTAL WORKFORCE
66.7 33.3 100.0 66.7 33.3
RECREATION DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% A5.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS MINORITY 0.0% 21.2% MINORITY -21.2%
PROFESSIONALS FEMALE 25.0W 45.2% FEMALE -20.24
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL. *
MINORITY 0.0% 19.0% MINORITY -19.0%
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
PL CEMENT GOALS
RECREATION DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD R IN OCCUPATIONAL CATEGORY = PARITY
i 100
FEMALE 45.2 1 FEMALE .452
OFFICIALS & ADMINISTRATORS
i MINORITY 21.2 A 1 , MINORITY .212
100
FEMALE 45.2 4 FEMALE 1.808
PROFESSIONALS
MINORITY 21.2 R 4 MINORITY .84B
100
TECHNICIANS X
l 100
PROTECTIVE SERVICE WORKERS X
I
100
PARAPROFESSIONALS %
I •
100
OFFICE & CLERICAL
MINORITY 19.0 X 2 MINORITY .38
100
�0-
SKILLED CRAFT WORKERS X
100
SERVICE-MAINTENANCE WORKERS X
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP U16KERS ARE UNDERREPRESENTED
RECREATION DEPARTNCNT TURNOVER RATE FOR FY '83-'84 = 29.0%
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)*. OPENINGS (NrT INCREASE)*
OFFICIALS & ADMIN
PROFESSIONALS FEMALES
PROFESSIONALS 2 1 MINORITIES
OFFICE & CLERICAL
UNDERREPRESENTATION**
PROFESSIONALS
FEMALES
MINORITIES
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black FEMALES
females, other minor- TOTALS 2 1 MINORITIES
ity males, etc.) is un-
derrepresented, and **Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or handicapped
sentation.
AM persons which become necessary cause of turnover, to keep their representation at p&nt levels.
W_
AGING DEPARTMENT WORKFORCE BY OCCUPATION
OCCUPATIONAL GROUP NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
1 .
PERCENT 100.0 10+0.0 I00.0 1
PROFESSIONALS
1 1 1 1
PERCENT 100.0• 100.0 100.0
TECHNICIANS
PERCENT '
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT 1 1 1 100.0 100.0 100.0 1 ,
OFFICE & CLERICAL 3 3 3
PERCENT 100.0 100.0 100.0 3
r
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 5 6. 1 5
16.7 83.3 100.0 16.7 83.3 6
AGING DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2%
OFFICIALS & ADMINISTRATORS (-)
- MINORITY 0.0% 21.2% � MINORITY -21.2%
PROFESSIONALS (-)
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
MINORITY 0.07. 46.3% MINORITY -46. 32 '
OFFICE-& CLERICAL. (-)
MINORITY 0.0% 19.0% MINORITY -19.0%
SKILLED CRAFT WORKERS
4•.
SERVICE-MAINTENANCE WORKERS (-)
AOL
1p
PLACEMENT GOALS
AGING DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED CROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY n PARITY
100
1
OFFICIALS & ADMINISTRATORS FEMALE 45.2 FEMALE .452
MINORITY 21.2 X 1 MINORITY ,212
100
PROFESSIONALS
. MINORITY 21.2 x 1 MINORITY .212
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS MINORITY 46.3 X 1 MINORITY .463
100
OFFICE & CLERICAL MINORITY 19.0 X 3 MINORITY .570
100
u.
SKILLED CRAFT WORKERS *' x
100
SERVICE-MAINTENANCE WORKERS x
100
*'PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
Aging DEPARTMENT TURNOVER RATE FOR FY '83 - 184 =17.0%
FOR 1985 FOR 1985 - 1489
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
0VENINCS (NET INCREASE)* OPENINGS (Nt.T 1NCREASE)*
Officials & Admin. Office & Clerical 1 Minority
Professionals I
Paraprofessionals
Office & Clerical
UNDERREPRESENTATIONit*
Office & Clerical
1 Minority
*Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS 1 Minority
ity ;dales, etc.) is un-
derrepresented, and "Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Not Increase" does not include placemcitL of minority r;roupworkcrs, womnn, and/or iinndic;ipprc!
eentation, -
AMh AWL
persons which become necessa ecause of turnover, to keep their representation at levels.
Commission For Women DEPARTMENT WORKFORCE BY OCCUPATION December 31, 1984
OCCUPATIONAL GROUP
MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE, FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
'PROFESSIONALS
PERCENT 100.0 100.0 100.0 1
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL
PERCENT
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE
100.0 100.0 100.0
ASk
COMMISSION FOR WOMEN DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS (-)
PROFESSIONALS
MINORITY 0.0% 21.2% MINORITY -21.2%
TECHNICIANS (-}
I .
PROTECTIVE SERVICE WORKERS {-)
PARAPROFESSIONALS
OFFICE & CLERICAL. FEMALE 0.0% 1901 M O
TY %MINORITY 0.0% . -19.0
SKILLED CRAFT WORKERS
K.
SERVICE-MAINTENANCE WORKERS (-)
PLACEMENT GOALS
-COMMISSION FOR WOMEN DEPARTMENT'
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP x TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY PARITY
100
OFFICIALS & ADMINISTRATORS x
100
PROFESSIONALS
MINORITY 21.2 X 1 MINORITY .212
100
TECHNICIANS x
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS x
100
OFFICE & CLERICAL FEMALE 74.3 FEMALE .743
MINORITY 19.0 x I MINORITY . 190
loo.
SKILLED CRAFT WORKERS
X
100
SERVICE-MAINTENANCE WORKERS x
100
Alhk
JOB OPENING ESTIMATES AND PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
-COMMISSION FOR WOMEN DEPARTMENT TURNOVER RATE FOR • Y '83 '84 = 50.0%
FOR 1985 FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED�-PLACEMENT GOALS
OPJ�OINCS (NET INCREASE)* OPENINGS (NET INCREASE)*
PROFESSIONALS
OFFICE & CLERICAL
Office and Clericil 1 I Female 1 1 Female
UNDERREPRESENTATION**
Office & Clerical
Female
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
ity males, etc.) is un-
derrepresented; I Female I Female
females, other minor- 'totals
and
amount of underrepre- does not include placements of minority group workers, women, and/or handicapped
sentation.
persons which become heces§drA&dc8L'§e of btifto-Very to keep their representation at pont levels
• _ Sheriff DEPARTMENT WORKFORCE BY OCCUPATION December 31, 1984
OCCUPATIONAL GROUP 'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT
PROFESSIONALS
PERCENT
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS 36 3 39 10 3 13 46 6 52
PERCENT 69.2 5.8 75.0 19.2 5.8 25.0 88.5 11.5
PARAPROFESSIONALS
PERCENT
OFFICE &CLERICAL 3 3 3
PERCENT 100.0 100.0 100.0 3
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS 1 1 1
PERCENT 100.0 100.0 100.0 1
TOTAL WORKFORCE 36 7 43 10 3 13 46 10
64.3 12.6 76:9 17.8 5.3 23.1 82.1 17.9 56
. SHERIFF DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
OFFICIALS & ADMINISTRATORS
PROFESSIONALS (_)
TECHNICIANS (_)
PROTECTIVE SERVICE WORKERS
FEMALE 11.5% 14.6% FEMALE -3.1%
' (-} a
MINORITY 25.0% 28.5% MINORITY -3.57
PARAPROFESSIONALS
OFFICE & CLERICAL.
MINORITY 0.0% 19.0% MINORITY -19.0%
SKILLED CRAFT WORKERS (_}
SERVICE-MAINTENANCE WORKERS
MINORITY 0.0% 48.0% MINORITY -48.07
PLACEMENT. GOALS
SHERIFF DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY PARITY
100
OFFICIALS & ADMINISTRATORS x
100
PROFESSIONALS
R
100
TECHNICIANS x
100
PROTECTIVE SERVICE WORKERS FEMALE 14.6 56 FEMALE 8.176
MINORITY 28.5 x 56 MINORITY* 15.96
100
PARAPROFESSIONALS x
100
OFFICE & CLERICAL MINORITY 1910 x 3 MINORITY .57
100
SKILLED CRAFT WORKERS
X
100
SERVICE MAINTENANCE WORKERS MINORITY 48.0 x I MINORITY .48
100
vp
"PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
Sheriff DEPARTMENT TURNOVER RATE FOR '83 - 184 +18.01
FOR 1985 FOR 1985 - 1989
OCCUPATION: J08 CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINCS (NET INCREASE)
2 Females 2 Females
Protective Services 4 2 Minorities 5 3 Minorities
Office & Clerical 1 1 Minority
UNDERREPRESENTATION**
Protective Service
2 Females
# 3 Minorities
office & Clerical
# 1 Minority
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- •• 2. Females 2 Females .
ity males , etc.) is un- TOTALS 4 2 Minorities 6 4 Minorities .
derrepresented, and **Refers to Placement goals; NOT simply "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority group workers, women, and/or handicapped
sent ion.
persons which become necessar} cause of turnover, to keep their representation at p nt levels.
EMERGENCY MANAGEMENT SERVICES DEPARTMENT WORKFORCE By OCCUPATION DECEMBER 31 , 1984
OCCUPATIONAL GROUP 'NON-MINORITY I MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS
PERCENT 100.0 100.0 100.0
PROFESSIONALS
PERCENT
TECHNICIANS 13 .8 21 h 3 4 14 11
PERCENT 25
52;0 32.0 84.0 4.0 12.0 16.0 56.0 44.0
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL
PERCENT
SKILLED CRAFT WORKERS
PERCENT
SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 14 8 22 1 3 4 15 11 26
53.8 30.8 84.6 3.9 11.5 15.4 57.7 42.3
ANIL
EMERGENCY MANAGEMENT SERVICES DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2 FEMALE -45.2%
OFFICIALS & ADMINISTRATORS
MINORITY 0.0% 21.2 MINORITY -21.2%
PROFESSIONALS
FEMALE 44.0% 45.0 FEMALE -1.0%
TECHNICIANS
MINORITY 16.0% 20.1% MINORITY
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL.
SKILLED CRAFT WORKERS
SERVICE-MAINTENANCE WORKERS
Rp
PLACEMENT GOALS
EMERGENCY-MANAGEMENT SRV DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY
PARITY
loo.
FEMALE 45.2
FEMALE 52
OFFICIALS & ADMINISTRATORS
MINORITY 21.2 x 1 MINORITY .212
100
PROFESSIONALS
X
100
FEMALE
TECHNICIANS 45.0 26 FEMALE 11 .7
MINORITY 20.1 x 26
MINORITY 5.3
100
PROTECTIVE SERVICE WORKERS
X
100
PARAPROFESSIONALS
R
100
OFFICE & CLERICAL
x
100
SKILLED CRAFT WORKERS
X
100
SERVICE-MAINTENANCE'WORKERS x
100
ANk
w
**PLACEMFhIT COALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
EMERGENCY MANAGEMENT SERVICES DEPARTMENT
TURNOVER RATE FOR FY '83 '84 =407
FOR 1985 FOR 1985 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT GOALS
OPENINGS (NET INCREASE)* Oft-NINCS (NET INCREASE)*
1 MINORITY
TECHNICAIN 1 1 FEMALE
A
OFFICE & CLERICAL
UNDERREPRESENTATION*I,
TECHNICIANS
# i FEMALE
1 MINORITY
Tr
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black FEMALES
females, other minor- TOTALS 2 1 MINORITY
ity males, etc.) is un- I I t - -_
derrepresented, and **Refers to Placement goals, NOT simply. "hiring goals."
amount of underrepre- *"Net Increase" does not include placements of minority groupworkers, women, and/or handicapped
sentation. Amb'
persons which become n6de6tar edautd df�turnover, to keep their representation.at pmcent levels.
rUBLIC WORKS DEPARTMENT WORKFORCE BY OCCUPATION DECEMBER 31 , 19B4
OCCUPATIONAL GROUP MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1 1
PERCENT 100.0 100.0 -100.0,
PROFESSIONALS
I 1 1 "
PERCENT .
100.0 100.0 100.0
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS
PERCENT
PARAPROFESSIONALS
PERCENT
OFFICE & CLERICAL
PERCENT 100.0 100.0 100.0 1
SKILLED CRAFT WORKERS 5 5 3 3 8 8
PERCENT 62.5 62.5 37.5 37.5 100.0
SERVICE-MAINTENANCE WORKERS 4 4 10 4 14 14 4 18
PERCENT 22.2 22.2 55.6 22.2 77.8 77.8 22.2
TOTAL WORKFORCE 10 1 11 14 4 18 24 5
29
34.5 ' 3.4 37.9 48.3 13.8 62.1 82.8 17.2
PUBLIC WORKS DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE—
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE —45.2%
OFFICIALS & ADMINISTRATORS
MINORITY 0.0% 21.2% MINORITY —21.2%
PROFESSIONALS FEMALE 0.0% 45.2% FEMALE —45.2%
TECHNICIANS
PROTECTIVE SERVICE WORKERS
PARAPROFESSIONALS
OFFICE & CLERICAL. MINORITY 0.0% 19.0% FEMALE —19.07.
SKILLED CRAFT WORKERS FEMALE 0.0% 25.8% FEMALE —25.8%
of
SERVICE—MAINTENANCE WORKERS FEMALE 22.2% 42.4% FEMALE —20.2%
Alk
PLACEMENT GOALS
PUBLIC WORKS DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP
X TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD IN OCCUPATIONAL CATEGORY PARITY
100
FEMALE 45.2 1 FEMALE, .452
OFFICIALS & ADMINISTRATORS
MINORITY 21.2 x MINORITY .212
100
PROFESSIONALS FEMALE 45.2 X i FEMALE .452
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS
X
100
PARAPROFESSIONALS
X
100
OFFICE & CLERICAL MINORITY 19.0 x 2 MINORITY .38
100
SKILLED CRAFT WORKERS
FEMALE, 25.8 x 8 FEMALE 2.064
100
SERVICE-IM
AINTENANCE WORKERS
FEMALE 42.4 x 18 FEMALE 7.632
100
**PLACEMENT GOALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
PUBLIC WORKS DEPARTMENT TURNOVER RATE FOR FY 183 '84 = 19.Ot
FOR 1985 FOR 1985 1989'
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED P-LACENENT GOALS
OPENINGS (NET INcim.ASW OPENINGS (NET INCREASE)*
SKILLED CRAFT 2 '2 FEMALES -
SERVICE MAINTENANCE 4 4 FEMALES
UNDERREPRESENTATION**
SKILLED CRAFT
# 2 FEMALES'
SERVICE MAINTENANCE
A 4 FEMALES
**Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS 6 6' FEMALES
ity males, etc.) is un-
derrepresented, and .**Refers to Placement goals, NOT simply "hiring goals."
amount of underrepre- *"Not Increase" does not include placements of minorit
se ation. y group workers, women, and/or handicapped
n.t
persons which become necessai&because of turnover, to keep their representation atis sent levels
Housing/Community Development DEPARTMENT WORKFORCE BY OCCUPATION
OCCUPATIONAL GROUP
'NON-MINORITY MINORITY TOTAL TOTAL
MALE FEMALE TOTAL MALE FEMALE TOTAL MALE FEMALE NUMBER
OFFICIALS & ADMINISTRATORS 1
-PERCENT 100.0 100.0 100.0 1
PROFESSIONALS 3 3 .3
PERCENT 100.0 100.0 100.0 3
TECHNICIANS
PERCENT
PROTECTIVE SERVICE WORKERS F-
PERCENT
PARAPROFESSIONALS 2 2
PERCENT
33.3 33.3 66.7 66.7 100.0• 3
OFFICE & CLERICAL
2 2 2
PERCENT 100.0 100.0 100.0 2
SKILLED CRAFT WORKERS
PERCENT
.SERVICE-MAINTENANCE WORKERS
PERCENT
TOTAL WORKFORCE 1 1 4 4 8 4 5
11.2 11.2• 44.4 44.4 88.8 44.4 55.6 9
Ask
Aft
COMMUNITY DEVELOPMENT _�� DEPARTMENT UTILIZATION OR UNDERUTILIZATION
OCCUPATIONAL GROUP % IN WORKFORCE LABOR FORCE WORKFORCE-
STANDARD LABOR FORCE
FEMALE 0.0% 45.2% FEMALE -45.2!
OFFICIALS & ADMINISTRATORS
PROFESSIONALS FEMALE 0.0% 45.2% FEMALE -45,2%
TECHNICIANS {_}
C
PROTECTIVE SERVICE WORKERS
.i
PARAPROFESSIONALS
OFFICE & CLERICAL,
SKILLED CRAFT WORKERS
i -
SERVICE-MAINTENANCE WORKERS {_}
PLACEMENT GOALS
COMMUNITY DEVELOPMENT DEPARTMENT
OCCUPATIONAL GROUP PERCENT OF PROTECTED GROUP TOTAL NUMBER OF EMPLOYEES
IN THE LABOR FORCE STANDARD x IN OCCUPATIONAL CATEGORY
PARITY
100
OFFICIALS & ADMINISTRATORS FEMALE 45.2 - x - 2 FEMALE .452
100
PROFESSIONALS FEMALE 45.2 x 3 FEMALE 1.356
100
TECHNICIANS
X
100
PROTECTIVE SERVICE WORKERS x
100
PARAPROFESSIONALS
X
100
OFFICE & 'CLERICAL
X
100
SKILLED CRAFT WORKERS
X
100
SERVICE-MAINTENANCE WORKERS x
100
' PLACEMENT COALS FOR OCCUPATIONS
IN WHICH PROTECTED GROUP WORKERS ARE UNDERREPRESENTED
Housing and Community DevelopmerOEPARTMENT TURNOVER RATE FOR FY '83 '84 + 14.0%
FOR 1985. FOR 1985 - 1989
OCCUPATION: JOB CLASS ESTIMATED PLACEMENT GOALS ESTIMATED PLACEMENT COALS
OPENINGS (NET INCREASE)* OPENINGS (NEE' INCREASE)*
Professional 1 1 Female
UNDERREPRtSENTATIONw•
Professional
Female
I if
*f�-Indicate which pro-
tected group (minority,
women, handicapped) or
sub-group (e.g. , black
females, other minor- TOTALS Female
ity males. etc.) is un-
derrepresented, and "Refers to Placement goals, NOT simply "hiring goals."
amc).un t. of underrepre- 'A"Net Increase" does not include placements of minority
s t on, group workers, women, and/or handicapped
persons which become nedess;& because of turnover, to keep their representations
Wesent levels
007
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date May 6. 1985
Action Agenda
Item 4%5
SUBJECT: PRELIMINARY ASSESSMENT RESOLUTION-WILKINS DRIVE
DEPARTMENT: PLANNING PUBLIC HEARING _K_Yes No
0.1.••••.• •■•,••••••••■•■•■■••••411.00.....1■■• 04••■•■•
Attachment(s) Information Contact: SUSAN SMITH
a) Preliminary Assessment Resolution
b) Final Assessment Resolution
c) Certificate of Meeting
Telephone Numbers
Hillsborough - 732-8181
Durham - 688-7331
Mebane - 227-2031
Chapel Hill - 968-4501
PURPOSE: To obtain public comment on the Preliminary Assessment
Resolution approved by the Board of Commissioners on April 16,
1985 and to take action on the adoption of the Final Assessment
Resolution for Wilkins Drive (SR1803) .
To schedule the public hearing on the Preliminary Assessment
Roll for April 21, 1985.
NEED: To fulfill the legal requirements for the program. Public
input on the assessment basis of an equal amoumt per foot as
described in the Preliminary and Final Assessment Resolutions
is required.
The Clerk to the Board has filed a Certificate of Mailing which
will certify that the notices of this public hearing were
mailed on or before April 26, 1985 to each property owner
subject to assessment. The Certificate of Mailing is an
attachment to this item.
To provide for continuation of the Participatory Paving Program
procedures for this project.
IMPACT: If the Board finds the Preliminary Assessment Resolution
satisfactory, then the Board can by subsequent action adopt the
Final Assessment Resolution for the project.
008 •Upon adoption of the Final Assessment Resolution, the
• Preliminary Assessment Roll can be prepared and a public
hearing set to obtain public comment on the Roll.
In addition, the Department Of Transportation can be forwarded
• the local share of the construction cost of the project with an
anticipated paving date for Wilkins Drive during the
summer/fall of 1985.
RECOMMENDATION: Adoption of the Final Assessment Resolution for Wilkins
Drive.
Accept the Certificate of Mailing offered by the Clerk to
the Board and attached to this agenda item.
Schedule the public hearing on the Preliminary Assessment
Roll for April 21, 1985. •
•
• .t'r �..
009
CERTIF!CATE OF MAILING
I , Beverly Blythe, Clerk to the Board of Commissioners of
Orange County, North Carolina, DO HEREBY CERTIFY that on or before the
26th day of April, 1985, I mailed, by first-class mail, postage prepaid, a
copy of the Preliminary Assessment Resolution for the financing by Orange
County of the local share of the cost of paving North Carolina State Road
# I803, also known as Wilkins Drive, in. Chapel Hill Township, Orange
County, North Carolina, to each owner, as shown on the County tax
records of property subject to assessment if the project is undertaken.
WITNESS my hand and official seal of the Board of
Commissioners of Orange County, North Carolina, this the _ day of
April, 1985.
• BEVERLY LITHE, Clerk to the Board of
Commissioners of Orange County, North
Carolina
(SEAL)
01.0 • •
.A meeting of the Board of Commissioners of Orange County, North
Carolina, was held at Chapel Hill, North Carolina, the regular place of
meeting, at 7:30 o'clock p.m., on the 16th day of April, 1985. -
Presen t:
• •
Absent;
**************************************************************************
The following resolution was read to the Board:
PRELIMINARY ASSESSMENT RESOLUTION
FOR THE FINANCING BY ORANGE COUNTY OF
THE LOCAL SHARE OF THE COSTS OF
PAVING NORTH CAROLINA STATE ROAD #1803,
ALSO KNOWN AS WI LKINS DRIVE,
IN CHAPEL HILL TOWNS HIP, ORANGE COUNTY, NORTH CAROLINA.
WHEREAS the Board of County Commissioners of Orange County
has received a petition requesting the paving of 'North Carolina State
Road #1803, also known as Wilkins Drive, in Chapel Hill Township,
Orange County, North Carolina, which petition has been signed by at
least seventy-five percent (75%) of the owners of property adjoining the
said roads, which property represents at least seventy-five percent (75%)
of the lineal feet of frontage of the lands abutting the said roads,
pursuant to North Carolina General Statute Section 153A-206(c); and
WHEREAS the Board of Commissioners of Orange County has
elected to finance the local share of the costs of paving the said roads,
as permitted by North Carolina General Statutes Section 153A-185(4) and as
provided for in North Carolina General Statute Section 153A-205; -
IT IS HEREBY RESOLVED THAT
•
-1-
all
•
1. Orange County shall undertake financing of the local share
of paving North Carolina State Road #1803, also known as Wilkins Drive, -
in Chapel Hill Township, Orange County, North Carolina.
2. That the basis for assessment for the local share of the
costs of this project shall be frontage abutting the road at an equal rate
per foot of frontage.
3. Orange County will assess the total local share according to
the basis set out in number 2 above which local share represents
approximately thirty- three percent (33%) of the total project cost.
4. No assessments of this project will be held in abeyance.
5. The assessments shall be paid in the following manner:
a. Within thirty (30) days after the notice of confirmation of
the assessment role is published, each owner of the property
may pay his or her assessment in full.
b. Any assessment not paid in full as provided above shall be
paid in five equal annual installments with the first such
installment, with interest, due sixty (60) days after the
date that the assessment role is confirmed, and the
remaining installments, with interest, due on the same date
in each successive year until the assessment is paid in
full.
IT IS FURTHER RESOLVED AND ORDERED that a public hearing on
all matters covered by this preliminary assessment resolution will be held
on the 6th day of May, 1985, at 7:30 o'clock p.m., during the regular
meeting of the Board of Commissioners of Orange County, Orange County
•
-2-
012
Courthouse, Hillsborough, North Carolina.
The Clerk to the Board of Canmissioners is hereby authorized
and directed to cause a notice of the public hearing to be given by
pubication one time, not less than Ten (10) days prior to May 6, 1985, the
date set for the hearing, in a newspaper having a general circulation in
Orange County. Such notice shall be in substantially the•following form:
NOTICE OF PUBLIC HEARING
ON
PRELIMINARY ASSESSMENT RESOLUTION ADOPTED BY
•
THE ORANGE COUNTY BOARD OF COMMISSIONERS TO
FINANCE THE LOCAL SHARE OF THE CCSTS OF PAVING
NORTH CAROLINA STATE ROAD #1803,
ALSO KNOWN AS WI LKI I5 DRIVE, IN CHAPEL HILL
TOWNSHIP, ORANGE COUNTY, NORTH CAROLINA.
Notice is hereby given that, pursuant to Article 9 of Chapter
I53A of the General S tatutes of North Carolina, the Board of Commissioners
of Orange County has adopted a Preliminary Assessment Resolution as
follows:
1. Orange County shall undertake financing of the local share
of paving North Carolina State Road #1803, also known as Wilkins Drive,
in Chapel Hill Township, Orange County, North Carolina.
2. The basis for assessment for the local share of the costs of
this project shall be frontage abutting the road at an equal rate per foot
of frontage.
3. Orange County will assess the total local share according to
the basis set out in number 2 above which local share represents
approximately thirty- three percent (33%) of the total project cost.
• 4. No assessments of this project will be held in abeyance.
-3- •
013
5. The assessments shall be paid in the following manner:
a. Within thirty (30) days after the notice of confirmation of
the assessment roll is published, each owner of the property
may pay his or her assessment in full.
b. Any assessment not paid in full as provided above shall be
paid in five equal annual installments with the first such
installment, with interest, due sixty (60) days after the
date that the assessment role is confirmed, and the
remaining installments, with interest, due on the same date
in each successive year until the assessment is paid in
full.
A public hearing will be held at 7:30 o'clock p.m., on the 6th
day of May, 1985, at the Orange County Courthouse, Hillsborough, North
Carolina, the regular place of meeting of the Board of Canmissioners of
Orange County, North Carolina, in order to discuss all matters covered by
the preliminary assessment resolution.
At the time and place above stated any resident of Orange
County. or any other Interested person may appear and be heard.
This the of April, 1985.
BEVERLY BLYTHE,
Clerk to the Board of Commissioners for
Orange County, North Carolina
The Clerk to the Board of Commissioners is hereby authorized
and directed to cause a copy of this Preliminary Assessment Resolution to
be mailed by first-class mail to each owner, as shown on the county tax
•
-4-
a .r
014 •
records of property subject to assessment if the project is undertaken, not
less than Ten (10) days prior to May 6, 1985.
The Clerk to the Board of Commissioners is hereby directed to
file fvith the Board of Commissioners a certificate that the Preliminary
Assessment Resolution was mailed as directed using a. form substantially
as follows:
CERTIFI CATE OF MAILING
I , Beverly Blythe, -Clerk to the Board of Commissioners of
Orange County, North Carolina, DO HEREBY CERTIFY that on or before the
26th day of April, 1985, I mailed, by first-class mail, postage prepaid, a
copy of the Preliminary Assessment Resolution for the financing by Orange
County of the local share of the cost of paving North Carolina State Road
# 1803, also known. as Wilkins Drive, in Chapel Hill Township, Orange
County, North Carolina, to each owner, as shown on the County tax
records of property subject to assessment if the project is undertaken.
WITNESS my hand and official seal of the Board of
Commissioners of Orange County, North Carolina, this the day of
April, 1985.
• BEVERLY BLYTHE, Clerk to the .Board of
Commissioners of Orange County, North
Carolina
(SEAL)
This resolution is effective upon its passage.
Thereupon Commissioner moved the .passage of the
foregoing resolution and Commissioner seconded the motion, and
the res ul tion was passed by the following, vote:
-5-
•
015
Ayes:
•
Noes:
**************************************************************************
I , Beverly Blythe, Clerk to the Board of Commissioners for'
Orange County, North Carolina, DO HEREBY CERTIFY that the foregoing is
a true copy of the proceedings of said Board of Commissioners at a
meeting held on the 16th day of April, 1985, so 'far as the same relate to
the Preliminary Assessment Resolution for the financing by Orange County
of the local share of the cost of paving North Carolina State Road #1803,
also known as Wilkins Drive, in Chapel Hill Township, Orange County,
North Carolina, as such proceedings are recorded in Minute Book
WITNESS my hand and the offical seal of said Board, this the
day of April, 1985.
•
BEVERLY BLYTHE, Clerk to the Board of
Commissioners of Orange County, North
Carolina
(SEAL)
-6-
o -E
A meeting of the Board of Commissioners for Orange County,
North Carolina, was held at Hillsborough, North Carolina, the regular
place of meeting at 7;30 o'clock p.m., on May 6, 1985.
Present:
Absen t:
*******************s*s****************************************************
The following resolution was read to the Board:
FINAL ASSESSMENT RESOLUTION FOR THE FINANCING BY ORANGE
COUNTY OF THE LOCAL SHARE OF THE COST OF PAVING NORTH
CAROLINA STATE ROAD # 1803, ALSO KNOWN AS WILKINS DRIVE,
LOCATED IN CHAPEL HI LL TOWNSHIP, ORANGE COUNTY, NORTH
CAROLINA.
WHEREAS the Board of County Canmissioners of Orange County
has elected to finance the local share of the cost of paving North
Carolina State Road #1803, also known as Wilkins Drive, located in Chapel
Hill Township, Orange County, as permitted by North Carolina General
Statute Section 153A-185(4) and as provided for in North Carolina General
• Statute Section 153A-205.
IT IS HEREBY RESOLVED THAT:
1. Orange County shall undertake financing of the local share
of paving North Carolina State Road #1803, also known as Wilkins Drive,
in Chapel Hill Township, Orange County, North Carolina.
• 2. That the basis for assessment for the local share of the
costs of this project shall be frontage abutting the road at an equal rate
per foot of frontage.
3. Orange County will assess the total local share according to
is
the basis set out in number 2 above which local share represents
approximately thirty-three percent (33%) of the total project cost.
4. No assessments of this project will be held in abeyance.
5. The assessments shall be paid in the following manner:
a. Within thirty (30) days after the notice of confirmation of
• the assessment role is published, each owner of the property
may pay his assessment in full.
b. Any assessment not paid in full as provided. above shall be
paid in five equal annual installments with the first such
installment, with interest, due sixty (60) days after the
date that the assessment role is confirmed, and the
remaining installments, with interest, due on the same date
in each successive year until the assessment is paid in
full.
IT IS FURTHER RESOLVED AND ORDERED that:
The total project cost and the amount to be financed and
assessed by Orange County is $7,639.25, as follows:
Local _Costs
Total To Be Financed
Costs By Orange County
construction cost $23,000.00 $7,040.00
legal services 500.00 500.00
publication costs 75.00 75.00
mailing and other 24.25 24.25
Total project cost $23,599.25 $7,639.25
The County Manager is hereby directed to prepare a preliminary
assessment roll which roll shall contain a tax description of each lot,
parcel or tract of land assessed, the basis for the assessment, the amount
-2-
•
018
•
assessed against each lot, parcel or tract of land assessed, the terms of
payment and the name of the owner of each lot, parcel, or tract as far as
can be ascertained from the County tax records. •
After the preliminary assessment roll is corn plete d, it shall be
filed in the office of the Clerk to the Board of Canmissioners, there to be '
available for public inspection until a public hearing is held on the said
preliminary assessment roll.
.A public hearing on the preliminary •assessment roll shall be
held on 1985 at .m. , during the regular meeting of the
Board of Commissioners of Orange County,
, North Carolina.
•
The Clerk to the Board of Commissioners is hereby authorized
and directed to cause a notice of the public hearing to be given by
publication one time, not less than Ten (10) days prior to
1985, the date set for the hearing, in a newspaper having a general
circulation in Orange County. Such notice shall be in substantially the '
following form:
• NOTICE OF PUBLIC HEARING ON PRELIMINARY
ASSESSMENT ROLL FILED WITH THE CLERK
TO THE BOARD OF COMMISSIONERS
OF ORANGE COUNTY PURSUANT TO THE DIRECTION
OF THE ORANGE COUNTY BC2ARD OF COMMISSIONERS
AND PURSUANT TO THE BOARD'S DECISION
TO FINANCE THE LOCAL SHARE OF THE OCST OF PAVING
NORTH CAROLINA STATE ROAD #1803,
ALSO KNOWN AS WILKINS DRIVE,
IN CHAPEL HILL TOWNSHIP, ORANGE COUNTY, NORTH CAROLINA
Notice is hereby given that pursuant to Article 9 of Chapter
153A of the General Statutes of North Carolina, the Board of Commissioners
-3-
tX
019
of Orange County. has completed and filed a Preliminary Assessment Roll.
• Pursuant thereto:
1. Orange County shall undertake the financing of the local
. share of paving North Carolina State Road #1803, also known as Wilkins
Drive, in Chapel Hill Township, Orange County, North Carolina. The
amount to be financed by Orange County is estimated to be Seven
Thousand Six Hundred Thirty- nine and 25/100 Dollars ($7,639.25),
including costs and attorneys fees. That portion of the costs of paving .
the above roads not financed by Orange County will be borne by the
Department of Transportation or the State of North Carolina.
2. The assessment roll completed is on file with the Clerk to
the Board of Commissioners of Orange County, and available to the public
for ins pection.
3. The Public Hearing will be held at o'clock .m. on
1985, at the ^, • , North
Carolina, the regular place of .meeting of the Board of Commissioners of
Orange County, North Carolina, in order to discuss all matters pertaining
b the Preliminary Assessment Roll.
At the time and place above stated, any resident of Orange
County or any other interested person may appear and be heard.
Dated, this the __ day of , 1985.
•
Beverly Blythe, Clerk to the Board of
Commissioners of Orange County, North
Carolina •
The clerk to the Board of Commissioners is hereby authorized
02C
and directed to cause a notice of the hearing to be mailed by first-class
mail to each owner of property as listed on the roll, not less than Ten
(10) days prior to , 1985, the date set for the hearing. The
notice shall be in substantially the following form:
NOTICE TO: [owner and property description from assessment roll)
SUBJECT: PRELIMINARY ASSESSMENT ROLL IN CONJUNCTION WITH THE
ORANGE COUNTY BOARD OF COMMISSIONERS ' DECISION TO
FINANCE AND ASSESS THE LOCAL SHARE OF THE CCST OF PAVING
NORTH CAROLINA STATE ROAD # 1803, ALSO KNOWN AS WILKINS
DRIVE, IN CHAPEL HILL TOWNSHIP, ORANGE COUNTY, NORTH
CAROLINA.
PLEASE TAKE NOTICE that a Public Hearing will be held by the
Orange County Board of Commissioners on , 1985 at
o' clock .m. , at the -, -, North
Carolina, to discuss all matters pertaining to the subject Preliminary
Assessment Roll.
The Preliminary Assessment Roll has been filed with the Clerk
to the Board of Commissioners of Orange County at the Orange County
Courthouse, Hillsborough, North Carolina, and is available for public
inspection.
Please note that the amount of assessment on the property
• described in this Notice is $ , as shown on the Assessment Roll
on file in the Office of the Clerk to the Board of Commissioners of Orange
County, North Carolina.
Beverly Blythe, Clerk to the Board of
Commissioners of Orange County, North
Carolina
-5-
•
•
021
The Clerk to the Board of Commissioners is hereby directed_ to
file with the Board of Commissioners a certificate that the notice of the
public hearing on the preliminary assessment roll was mailed as directed
using a form substantially as follows:
F ~
CERTI FI CATE OF MAILING
1 , Beverly Blythe, Clerk to the Board of Commissioners of
Orange County, North Carolina, DO HEREBY CERTIFY that on or about
, 1985, I mailed, by first-class mail, postage prepaid, a Notice
to each property owner of the Public Hearing to be held on the
•
Preliminary Assessment Roll for the financing by Orange County of the
local share of the cost of paving North Carolina State Road #1803, also
known as Wilkins Drive, located in Chapel Hill Township, Orange County,
North Carolina. The Notice mailed set the date and time of the Public
Hearing and also the amount of assessment on the property owned by the
person to whom the Notice was sent according to the County tax records.
WITNESS my hand and official seal of the Board of
Commissioners of Orange County, North Carolina, this the day of
1985.
• Beverly Blythe, Clerk to the Board of
Commissioners of Orange County, North
Carolina
This resolution is effective upon its passage.
Thereupon, Commissioner moved the passage of the
foregoing resolution and Commissioner seconded the Motion,
•
-6-
r— mismanor
• • -
022
and the resolution was passed by the following vote:
• Ayes:
Noes:
**************************************************************************
I , Beverly Blythe, Clerk to the Board of Commissioners of
Orange County, North Carolina, DO HEREBY CERTIFY that the foregoing is
a true copy of the proceedings of said Board of Commissioners at a
meeting held on , 1985, so far as the same relate to the Final
Assessmen t Resolution, determination of the project costs and preparation
of the Preliminary Assessment Roll for the financing by Orange County of
the local share of the cost of paving North Carolina State Road #1803,
also known as Wilkins Drive, located in Chapel Hill Township, Orange
County, North Carolina, as such proceedings are recorded in the Minute
Book.
WITNESS my hand and the official seal of said Board, this the
day of , 1985.
Beverly Blythe, Clerk to the Board of
Commissioners of. Orange County, North
Carolina
(SEAL)
• •
-7-
• 023
ORANGE COUNTY
• BOARD OF COUNTY COMMISSIONERS
• ACTION AGENDA ITEM ABSTRACT
Meeting Date flay 6. _1985
Action Agenda
Item tiF4-
SUBJECT: HEART'S EASE SUBDIVISION
DEPARTMENT: PLANNING - PUBLIC HEARING Yes X No
Attachment(s) Information Contact: Eddie Kirk
Checklist
Vicinity Map
Plan
DOT Letter
Draft April 15, 1985 Planning Board
Minutes
Telephone Numbers
Hillsborough.- 732-8181
Durham - 688-7331
Mebane - 227-2031 -
Chapel Hill - 968-4501
PURPOSE: To consider approval of the Preliminary Plan for Heart's Ease
Subdivision,
NEED: Chuck Sneed has requested a subdivision for 34.7 acres of land
from a 40.0 acre tract located west of SR 1450 Craig Road in
Eno Township. The purpose of this request is to permit
construction of a 33-unit subdivision.
The property in question is known as lot 24A of Tax Map 16 in
Eno Township. The property is partially located, within Lebanon
Township in Durham County. 5.3 acres of the 40.0 acre tract is
within Durham County. The applicant is requesting approval of
those lots wholly within Orange County. Public roads
constructed to state standards are proposed for the
subdivision.
The property is located within an Agricultural-Residential area
designated in the Orange County Land Use Plan. That
designation permits single-family residential. housing. The
present zoning classification of the property is Agricultural-
Residential (A-R) .
This tract was originally proposed as Oakwood Estates, a
planned development-housing project that was submitted for the
public hearing on February 28, 1985. The applicant has
subsequently withdrawn his request for a special use permit in
order to pursue this subdivision request.
024
IMPACT: Approval of the request would allow a 33-lot subdivision to be
constructed on the site.
Development of a 33-unit subdivision would add 178 trips per
day to Craig Road. The 1982 average daily traffic count on
Umstead Road is 1200 ADT. The Durham County division of DOT
estimates that the traffic count at this point on Craig Road is
500 - 700 ADT.
RECOMMENDATION: The Planning Board recommends approval.
....._...._..
MAJOR SUBDIVISION CHECKLIST
NAME OF SUBDIVISION HEART'S EASE SUBDIVISION OWNER OR DEVELOPER Bill Snead
ADDRESS RT.6,Box 122, Hillsborough, NC 27278 732-4403
TOWNSHIP ENO TAX MAP 16 BLOCK LOT 24A
NAME of SURVEYOR OR ENGINEER Phil Post B Associates
Total number of lots 33 To be- developed in • 1 phases), Total number of acres 34.7 In Orange County .
Typical dwelling units at present or proposed 33
WATER SUPPLY:• Public (Name) Commnuity Individual X
SEWAGE TREATMENT: Public -Community Individual Septic tank X
SCHOOL DISTRICT range FIRE DISTRICT 'Eno Rural '
Access onto State Road 1#� �Road Standard: Public �, or Private Class A_ , B , C
Existing critical areas such as streams ( ), Flood prone areas ( ), Watershed. ( }, Historic Sites ( ), other { )
Explain:
Land uses in the general area
SKETCH PLAN RECEIVED (Date) Approved ( ) Recommended Changes ( }
PRELIMINARY PLAN RECEIVED (Date) REVISED PRELIMINARY PLAN RECEIVED (Date)
Preliminary Review by Health Department Shown od Qinn Erosion Control Officer -4-9-85
Board of Education c Department of Transportation 9-t -g.
4-tt}-I3�
OT-79SA (if possible)
other -Mebane (if possible)
Hillsborough (if possible)
-Orange/ATamance .(if possible)
Preliminary Action 'by the Planning Board Recommended Approval 4-1545 .
Preliminary Action 'by the County Commissioners
FINAL PLAT RECEIVED (Date)
( } All lots were approved by the Health Department
( ) Lots failing Health Departments approval are combined or listed properly on the plat.
( } Road Maintenance Agreement- submitted' (where applicable) . Approved
( ) improvements have been provided fort completed; bond, letter of credit, cash. ' Date
( ) Final OWASA approval (where applicable) on'all plans & specifications, Date
( ) Final DOT approval on plat ;
( } Final action by the Planning Board
O"
.
0 2E • -
•
• r, T.,
.,1 O. ••
•
"poseur -,. �. �n.;b:a. / ENG i-:P.G X757 L/ r .y{y.IC ..• .b([�' �. -_, r
•
ti• --?
• •
•
•
.....
...---- C fir„• -
.• /.' .1,— .. .. .4... ...L. , . .
ot
• F
�.
. A A' ..T% di
® gig 73
c
c tt _s..\ ....--.. . ,
•
At e g Vi r 5
u 4i ref
■
— 0 0 i -
■•
. N , 1_ O
:•.1, •• n•: w V 0 d• : •. .
�` -4 i c W" . w 4 057.."• •• a o 0 ••�
• 0
r. .
•. 21 ¢ �` �
- :'�� S Q N •-J ) e v st •.
•i A •
(� r+ i- ti ri
�V t
•
•
-f•ice,•_..- J'`r__ '�.•�. - •
•__g_.,,--....1 —� -
ti n^„ I
~ Ct
...:..i:�a• v` -
•
•
.....--.........+•..r.rv..nw._.:..•iM`[.'.h•IVr sNT4:4'"-n•+:11•:Irn.+i'•!•."ShY•a.,.o..i.!"Y.•...•'K.v:• !`!!:.!F-..,p44/+0.'.•.!•Iw.sww..........-.-_...
•
•
• O2 7 • -
"CV1:71.1:u
.4 4'45
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
•
February 14, 1985
JAMES G.MARTIN
GOVERNOR • -
DIVISION OF HIGHWAYS
JAMES E.HARRINGTON • •
SECRETARY
—'
•
Ms. Susan J. Smith
Orange County Planning Dept.
• Hillsborough, North Carolina 27278
•
. Dear Ms. Smith:
we have completed a traffic engineering study of your request
concerning access from Oakwood Estates onto SR 1455 (Craig Road)
in Durham County.
• •
. Based on this study, it is our recommendation that Oakwood Estates
be limited to one access point for safety purposes and that Ad-
equate sight distance should be reserved at the proposed entrance.
• - A recommended'entrance design is shown on the attached plan.
. If further information is needed, please advise.
Yours very truly,
W. D. Smart, P. E.
DIVISION TRAFFIC ENGINEER •
wps/JTG/ir
Atta.
cc: C. C. Painter -
D. B. Kelly (Div. 7 CSf216)
R. A. Smith
• Ty
-`11g5-- re Alidiv/5°72
•
•
•
• •
•
. •
OR4Fr 1/0/45- 7iAWN(6 2t01/21> Afrit/015
02S
• 4
Motion: Kizer moved approval. Seconded by Shanklin.
Vote: Unanimous.
b. Loretta R. Smith - Final
• Presentation by Kirk.
The purpose- of this agenda item is to consider
• approval of the Final Plat for Loretta R. Smith
subdivision. The Planning Board recommended
approval of the plan on 3-18-85. The County
Commissioners approved the preliminaryplan
4-1-85.
The property in question is located in Cheeks
• Township on East Lebanon Road (SR 1306) . It is
known as part of Lot 7, Tax map 14. There is
one 7 acre lot proposed. The property is zoned
A-R and is designated Agricultural-Residential
and Water Supply Watershed in the Land Use
Plan. The lot has state road frontage and is
located in the Efland Rural Fire District.
The addition of one 7 acre lot will have
minimal impact.
The Planning Staff recommends approval.
This subidvision was originally five (5) acres
but was increased to seven (7) acres to enable
placement of a septic tank.
Motion: Shanklin moved approval. Seconded by Yuhasz.
Vote: Unanimous.
C. Heart's Ease Subdivision
Presentation by Kirk.
The purpose of this agenda item is to
consider approval of the Preliminary Plan for
Heart's Ease Subdivision.
Chuck Sneed has requested a subdivision for
34.7 acres of land from a 40.0 acre tract
located west of SR 1450 Craig road in Eno
Township. The purpose of this request is to
permit constructionof a 33-unit subdivision.
The property in question is known as lot 24A of
Tax Map 16 in Eno Township. The property is
partially located within Lebanon Township in
02S
5
Durham County, . 5.3 acres of the 40.09 acre
• tract is within Durham County. The applicant
• is requesting approval of those lots wholly
within Orange County. Public roads constructed
to state standards are proposed for the
subdivison.
The property is located within an Agricultural
-Residential area designated in the Orange
County Land Use Plan. That designation permits
single-family residential housing. The present
zoning classificatnion of the propertyt is
Agricultural-Residential (A-R) .
This tract was originally proposed as Oakwood
esates, a planned development-housing project
that was submitted for the public hearing on
February 28, 1985. The applicant has
subsequently withdrawn his request for a
special use permit in order to pursue this
subdivision request.
Approvalof the request would allow a 33-lot
subdvision to be constructed on the site.
Development of a 33-unit subdivision would add
178 trips per day to craig road. The 1982
average daily traffic count on Umstead Road is
1200 ADT. The Durham County division of Dot
estimates that the traffic count at this point
on Craig Road is 500 - 700 ADT.
The Planning Staff recommends approval.
Gordon noted that the checklist was incomplete.
The source of water supply was not check on
the list and also the type of dwelling units
that would be placed in the subdivision.
Kirk responded that with a sstraight subdivisio
there could be either mobie. homes or stick-
built houses. The water supply will be
individual wells.
Pearson noted that since a straight subdivision
could have either mobiles or stick-built homes,
the question of type of dwelling units would
not matter.
Margison questioned 'individual wells and
septci/tanks. The owner Mr. Sneed noted the
lots would be sold as individual lots and would
all have wells and septic tanks.
Wer--
03C
6
Smith added that there was no public water and
sewer available in this area.
Pilkey stated that she had questions on the LPP
on the site plan. The Health Department told
her that LPP menas Low Pressure Pipe system.
According to Pearson, this kind of septic
system is more trouble-free and takes up less
space than -a traditional system.
Pilkey also noted that Lot #14 was shown as
questionable. Kirk responded that the Health
Department had not yet found suitable sites.
It is possible that the areas marked
questionable may not be used at all.
Mr. Sneed stated that only one site had been
tested but that he was willing to pay permit
• fees for the remainder of the acreage to be
tested for suitability.
• Kizer noted that the property could be
subdivided even if some of the lots were not
usable.
Yuhasz inquired about lot 11.
Smith responded that all those lots in
were under Durham County's jurisdiction and the
applicant has not yet applied to DurhamCounty
for subdivisionof these lots.
Motion: Pearson moved approval. Seconded by Shanklin.
Vote: 6 in favor.
2 opposed.
Pilkey opposed due to the feeling that more
cars and more developmentare not needed on
Craig Road.
Gordon opposed due to incomplete information
• regarding water and sewer.
Smith explained the preliminary and final
process for the benefit of new Board members.
(Walters left at 8:05 p.m.)
Item #7: Matters for Decision•
Presentation by Smith.
031
• ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date May 6. 1985
Actionlrnda
Item W
SUBJECT: AMEND ORANGE COUNTY PRIVATE ROAD STANDARDS TO ELIMINATE REQUIREMENT
FOR ROAD SIGN ON ROADS LESS THAN 500 FEET
DEPARTMENT: PLANNING PUBLIC BEARING Yes _11. No
• Attachment(s) Information Contact: Janet Van Handel
Orange County Private Road Keith Rosemond
Standards -Page 1 & Page 5
Draft April 15, 1985 Planning Board
Minutes
Telephone numbers
Hillsborough - 732-8181
Durham - 688-7331
Mebane - 227-2031
Chapel Hill - 968-4501
PURPOSE: To amend Orange County Private Road Standards to eliminate the
requirement for a road sign on Class C roads less than 500 feet
in length.
To receive the Planning Board's recommendation to delete this
requirement.
NEED: Since the revision of the Private Road Standards on July 5,
1981, Class C private roads under 500' do not have to be
constructed or inspected by the Planning Department, However,
a road sign is still required. The citizen is often required
• to purchase a sign at a cost of $50 to $75 for a road that is
never constructed. In most cases, the road sign is never
erected. If we would require erection of the sign, it often
would not indicate where a road .is located, but would be placed
by a woods or field. This expense has been major complaint of
citizens over the past nineteen months and it is difficult for
staff to justify this requirement.
When the Private Road Standards were reviewed by the Planning
Board in July, 1983, there ws a discussion of road signs needed
for Class C roads under 500 feet, At that time, the Board
decided to require road signs on all, private roads. Since then
staff experience has indicated a need to bring this requirement
before the Board for reconsideration.
032
Approximately 20% of the private roads would be affected by
this revision. There are an average of 30 private roads
approved each year.
The Planning Board considered this matter for recommendation at
their April 15, 1985 meeting. The Board also directed staff to
prepare information on road maintenance agreements and
construction and/or bonding of private roads for the Board's
consideration at a subsequent meeting.
IMPACT: Citizens would not have to purchase a road sign for Class C
roads under 500 feet in length.
RECOMMENDATION: The Planning Board recommends that the Private Road
Standards section Road Name ang Sigm be amended to provide as
follows; "Class C roads under 500' in length are required to
be named, but are not required to have a road sign provided."
rroposea may 114 Lats3
• _
• Approved July 5, 1983
/ -
•
•
ORANGE COUNTY PRIVATE ROAD STANDARDS
Orange County allows the construction of Private Roads to serve lots within
subdivisions that do not have accesd to state-maintained roads. The purpose of a
Private Road is to insure that all lots have docUtdented legal right-of-way and to
provide adequate access for residents and emergency vehicles.
Private Roads may be permitted in situations where one- or more of the following
conditions exist: •
•
1. traffic volume would be small
2. the subdivision consists of less than 10 (ten) lots
3. the division would preserve a natural, area through deed restrictions
and special design features
4. the division is adjacent to property using an existing Private Road for
access
5• the property does not abut any important street
6. the road would not be accepted by the State even if built to their
standards because of the low housing density or length
• After initial construction of the Private Road, maintenance must be provided by
the property owners that use the road. A Road Maintenance Agreement or Declaration
between the lot owners is required to insure that the needed repairs are made. Since
Private Roads are not constructed to North Carolina Department of Transportation
standards, they will not be added to the Secondary Road System and-will not be main-
-tained by- the State or Orange County.
• The standards and specifications for Private Roads apply to subdivisions in Orange
• County and the class of road required depends on the number of lots served by the road.
A Class C road serves 1 to 3 lots, a Class B road serves 4 to 9 lots and a Class A road
serves 10 or more lots. ' (Class A road requires approval of the Board of County
Commissioners). Generally, subdivision with ten (10) or more lots are required to .
construct a road to the standards of the North Carolina Department of Transpcirtation.
(Exceptions to this may be allowed under the conditions listed above.) Before the final
plat of the subdivision can be recorded, the Private Road must be built and approved,
or the applicant must post a security imtrument with the County in an amount that would
cover the cost of constructing- the roadliplass- C Private Roads that are 500' OZ- less in
length are not required to be constructed to Orange County Standards or to be inspected
before recordation of the final plat. However, Orange County recommends that these
Class C roads Vbebuilttothesest&ndards in-order to provide adequate access, es.ecially
for emeruenc- 'vehicles which reauire the clearances and turn areas shown on
111 tE_ERasi7
fications. *-
Construction of the Private Road must be inspected ad approved by the Orange
County Planning Depart-mint. The road should be inspected during construction in order
that any changes necessary to insure approval can be made before the final inspection.
' In order for these inspections to be made during construction, the property owner must
inform the Planning Department prior to the start of grading so that the inspections
can be scheduled. The inspections by the Planning Department are made only to insure
the road is built to the required dimensions, that an acceptable stone surface is pro-
vided, any disturbed areas are seeded in permanent vegetation and the road sign is in
place. The County does not assume responsibility for such qualityV control inspections
as compaction of fill or construction materials. • The person having the road built should
have a qualified grading •contractor to insure that adequate methods and materials are
'used.
• 1 VV
- - . • - .
. .
. .
. 03 4
• .
Drainace .
• Ditches shall be constructed to psoaqide drainage frma the road and adjacent
areas. The ditches shall be built with sufficient depth to carry the expected
volume'of water. The side slopes shall be , -aded so that they can be stabilized '
and to prevent vehicles too= becoming stuck if they slide into the ditch.
• Where the road crosses streams or minor watercourses, culverts shall, be
installed to =event zonding and washouts of the road. Co streams where it is
not economical to install a large culvert of the raszired size, the Erosion
Conft.ol Officer may allow the installation of a smaller culvert if provisions
are m.P.OA to protect the road surface and fill slopes from erosion when runoff
tops the road..
Turn— rounds
• •
Vehicle turn-around areas shall be provided at the end of all, dead end
roads. This can be accomplished by ending the road in a cul-de-sac or a "T".
Cul-de-sacs shall have a min4m',m diameter of 70' . A "T" turn-around must conform
to the dimensions in the diagram below. The "T" type turn-around is prefered.
• The location of the turn-around will, depend on the arrangement of the lots in the
subdivision. If the Private Road serves only one lot the turn-around should be
located near the building site. In a subdivision with several lots the turn-
around should be at the end of the road and the necessary right-of-way provided.
• - : --I
.0— • 50' . ' 1 - .
1- 40'
a.1
. .
12' •Travelway _____
40'
50'
Wsbt,of-Way
1:
1.-_---
1 .
I
20'
1
. . .
Road Name and Sico
• • .. .
The road nnvb shall be verified with the Orange County Planning Depa- m-nt
to insure that the oroposed name doss not duplicate an existing name. 'Ille road
sign must have one blade showing the name of the Private Road and anco-her showing
the name of the existing State maintained road. Class C roads of any length are re-
quired to be named and to have a road sign Posted *
.. . . _ „...... . __ . . _.__ _
. .
JAAFT lefr Fatki 4.3a4-Rb M/A/07e6
O. z
tit
7
2,06: - 0 . I , • o_ $t wr: - t. • . _•• Elinlia-k-te--ReaRaglaant-- on RoadA
l'ess
The purpose of this agenda item is to amend
Orange County Private Road Standards to
eliminate the requirement for a road sign on
Class C roads less than 500 feet in length.
Since the revision of the Private Road
Standards on July 5, 1981, Class C private
roads under 500 ' do not have to be constructed
or inspected by the Planning Department.
However, a road sign is still required. The
citizen is often required to purchase a sign at
cost of $50 to $75 for a road that is never
constructed. In most cases, the road sign is
• never erected. If we would require erection of
the sign, it often would not indicate where a
road is located, but would be placed by a woods
or field. This expense has been a major
complaint of citizens over the past ninteen
• months and it is difficult for staff to justify
this requirement.
When the private Road Standards were reviewed
by the Planning Board in July, 1983, there was
a dicussion of road signs needed for Class C
roads under 500 feet. At that time, the Board
decided to require road signs on all private
roads. Since then staff experience has
indicated a need to bring this requirement
before the Board for reconsideration.
• Approximately 20% of the private roads would be
affected by this revision. There are an
average of 30 private roads approved each year.
Citizens would not have to purchase a road sign
for Class C roads under 500 feet in length.
The Planning Staff recommends that the Planning
Board consier the following alternatives:
1) No change in the provisions of the Private Road
Standards.
2) Amend Private Road Standards section Road_Namg•
And Sign to provide as follows: "Class C roads
under 500' in length are required to be named,
but are not required to have a road sign•provided. " •
03€
8
3) Amend Private Road Standards (page 1) to delete
the provision regarding Class C roads less than
500' or less in length, thereby requiring that
they be constructed.
Gordon asked if staff had , spoken with the
County Attorney. Smith, responded that they
had, and that the attorney has raised questions
regarding the matter of actual construction
versus bonding of roads to be constructed.
The Board discussed the difference private
roads versus driveways.
The Board discussed volunteer fire department
needs for signs on private roads. Best
indicate that each volunteer fire district maps
the roads in the district.
Yuhasz expressed concern of old roads having
problems meeting current subdivision standards.
Kizer emphasized that the key standard was the
legal guarantee of access over time. He noted
that even if the road is never built access is
recorded for the future.
Shanklin questioned requiring signs on private
roads. The Board discussed this matter.
Shanklin preferred that property owners have an
option in providing road signs.
Motion: Shanklin moved alternative #2 amend Private
Road Standards section ' .a. N. ._to to
provide as follows: "Class C roads under 500'
in length are reqired to be named but are not
required to have a road sign provided.
Yuhasz seconded.
Best inquired how roads were named. Smith
responded, staff reviews proposed names to
prevent road name duplication with road names
in the County and surrounding area and
indicated that staff maintained an available
road name file.
Yuhasz asked if the Board should consider
deleting the road maintenance agreement for
Class C roads under 500' . Kizer responded that
it was premature to discuss whether other
statutes are applicable, indicating a desire to
discuss- the matter with the County Attorney.
Gordon advised the Board to keep to the narrow
037
9
focus of the road sign question. She added
that the Board could discuss the broader issues
raised regarding the legal question about road
maintenance agreements and constructions of
Class C roads under 500' in length on April 29.
The Board -discussed the value of private road
signs in providing emergency services. .
Vote: 5 in favor.
3 opposed. (Best, Gordon, Margison)
O3
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date May §. 1985
Action
Item Fr
SUBJECT: ADVERTISEMENT OF PROPOSED ZONING ORDINANCE AND SUBDIVISION
REGULATIONS TEXT AMENDMENTS
DEPARTMENT: PLANNING PUBLIC HEARING Yes JL No
Attachment(s) Information Contact: SUSAN SMITH
LEGAL NOTICE
Telephone Numbers
• Hillsborough - 732-8181
Durham - 688-7331
Mebane - 227-2031
Chapel Hill - 968-4501
PURPOSE: To review the legal advertisements for matters to be presented
to public hearing.
To set a public hearing for May 28, 1985.
NEED: The Board of Commissioners has expressed a desire to review any
proposal for text amendments to. the County Ordinances and the
legal notices advertising the same prior to advertisement.
• The Planning Board reviewed the proposed text amendments and
endorsed their submittal to public hearing at their April 29,
1985 meeting.
The planning staff is proposing several ordinance amendments
including:
* provide for Non-Profit Educational Cooperatives as
permitted uses with a Class A Special use Permit in the A-R
zoning district
* allow for the replacement of non-conforming mobile homes on
individual lots outside of mobile home parks
* revise minimum lot area requirements for the watershed
districts to refer to square footage versus acreage in a
manner consistent with lot area requirements for other
zoning districts
* add the definitions of No - o *tra_PrhIclucsitjsnals&
and OgatilLeInlidental and delete the definitions of Farming
and Bona-Fide Farm
Oab
revise the standards of evaluation for partial width rights-
of-way for subdivisions.
IMPACT: Review of the proposed advertisements would insure that the
legal notice of the public hearing is in a form that can be
understood by persons not familiar with the subject.
RECOMMENDATION: Accept as to form.
Schedule a public hearing on these matters for May 28, 1985.
04C
1
NOTICE OF PUBLIC HEARING ON PROPOSED AMENDMENTS
TO THE ZONING ORDINANCE AND SUBDIVISION REGULATIONS OF ORANGE COUNTY, N.C.
Pursuant to the requirements of the General Statutes of North Carolina,
Chapter 153A, Section 323 and Section 34a, Article 20.5 and Article 20.6 of the
Orange County . Zoning. Ordinance and Section VIII of the Orange County
Subdivision Regulations, notice is hereby given that a public hearing will be
held in the Superior Courtroom of the Orange County Courthouse, 106 East
Margaret Lane, Hillsborough, North Carolina on Tuesday, May 28, 1985 at 7:30
p.m. for the purpose of giving all interested citizens an opportunity to speak
for or against the adoption of proposed amendments to the Orange County Zoning
Ordinance, Zoning Atlas and Subdivision Regulations.
The amendments under consideration are as follows:
1. ZONINCz ORDINANCL TEXT AMENDMENTS
a. Amend Section 4.3 Permitted Use Table to permit non-profit
educational cooperatives with a Class A Special Use Permit in the
Agricultural-Residential (A-R) zoning district.
This use is not specifically permitted in the Zoning Ordinance.
b. Amend Section 5.1.2 Schedule for Non-Residential Development to
specify minimum lot area of 200,000 square feet for the Protected
Watershed-Industrial (PW-I) zoning district.
The minimum lot area for the PW-I district erroneously reads
400,00 square feet in the table of dimensional requirements, but
is specified as five acres in the text describing the zoning
district and applicable standards.
c. Amend Sections 6.16.6.1 d) Home Occupap Lions in Ali, Rea dentiej
Districts e pt AR_ and RR-1 and 6.16.2 c) some Occupations in the
AR and R-1 Districts to clarify that only the on-premises sale of
goods produced by a home-occupation or incidental to the
provision of a service are permitted in a home occupation.
The intent of the current provision in the ordinance is not
clear.
d. Amend Sections 6.23.5 Minimum Size regulated_ , 6.24.1 Miff Lot
51,2e Regulated, and 7.19.1 PD-PWI D,strict• De ined, ID ent
Mere Permitted to provide for lot area minimums in the watershed
districts in terms of square footage as opposed to acreage.
Minimum lot area requirements elsewhere in the ordinance are
provided in terms of square footage.
041
2
e. Amend Article 8 by adding Section 8.8.24 lionducAtjamsli
Cooperative as a permitted use requiring a Class A Special Use
Permit.
This use is not specifically permitted in the Zoning Ordinance.
f. Amend Section 11.9 on Confgrming Uses of Bajor Structurqs. or
Structures an0 Premises in Combination by adding 11.9 e) which
would allow replacement of individual non-conforming mobile homes
outside of mobile home parks.
The replacement of non-conforming mobile homes on individual lots
is not currently permitted.
g. Amend Article 22 Definitions to add definitions of a "Non-Profit
Educational Cooperative" and "Goods, Incidental"; to delete the
definitions of "Farming" and "Bona-fide Farm"; and to delete the
reference to "Farming" in the definition of "Farming
Definitions".
The definitions of "Non-profit Educational Cooperative" and
"Goods, Incidental" are required in association with proposed
ordinance amendments. Orange County does not presently have the
statutory authority to define "Farming" or "Bona-fide Farm".
2. 30 ‘,SRKGELAMDEs...232 ^ AT
Amend Section 1V-B-3-C-2 Partial Widths to provide for additional
standards of evaluation for requests for partial width rights-of-
way in subdivisions.
The current ordinance provides only for a 25' partial width
right-of-way where the property subject to subdivision adjoins
undeveloped land.
All interested citizens are invited to attend this hearing and be heard.
Changes may be made in the advertised proposals which reflect debate,
objections and discussions at the hearing.
•
Citizens unable to attend the hearing may express their views by writing
to the Orange County Planning Department, 106 East Margaret Lane, Hillsborough,
North Carolina 27278. For your concerns to be fully considered, they must be
received by the Planning Department prior to the public hearing.
Questions regarding the proposals should be directed to the Orange County
Planning Department. Copies of the proposed full amendments are available in
the Planning Department for public review. The Planning Department is located
in the New Courthouse, 106 East Margaret Lane, Hillsborough. Office hours are
from 8:00 a.m. to 5:00 p.m. , Monday through Friday.
PUBLISH: May 15, 19o5
May 22, 1985
MARVIN COLLINS, PLANNING DIRECTOR
042
ORANGE COUNTY
BOARD Ca4MISMONERS Action Agenda
ACTION AGENDA l'ITN ABSTRACT Item No. Fl
Meeting Date: MAY 6, 1985
SUBJECT: SMTE-LOCAL ACTION AGENDA, FALLS AND JORDAN WATERSHEDS
DEPARTMENT': BOARD OF COMMISSIONERS PUBLIC HEARING: __Yes A_No
ATTACHRENT(S) : INFURIATION CONTACT: DON WILLHOIT
X 505
TELEPHONE NUMBER:
YES Hillsborough - 732-8181
Chapel Hill - 968-4501
Mebane - 227-2031
Durham _ - 688-7 3 31
PURPOSE:
To update the Board on current status of the State's watershed
protection efforts and request a study by the Planning Board and
Planning Staff.
NEED: Orange County has not fully responded to the State-local Action
Agenda that has been adopted by the State and local governments.
A copy of the Local Action Plan Matrix for each of the water-
sheds is attached which indicates that Orange County has not
completed action on the Local Hazardous Materials Inventory, nor
have the 1/2" stormwater infiltration or the 50-foot stream
buffer been made applicable throughout the Falls watershed in
Orange County.
IMPACT• Completion of the items cited above would place Orange County in
full conlaiance with the resolution adopted by the Board on
November 15, 1983.
RECOMMENDATION:
1. Request the Planning Board and Planning Staff to complete
their consideration of the hazardous materials inventory
issue and report their reconmendation to the Board of
Ccaudssioners.
2. Add for the May 28, 1985 Public Hearing, a proposed amend-
ment to the Subdivision Ordinance which would incorporate
the 1/211 stormwater infiltration and the 50-foot stream
buffer protection measures within the Falls and Jordan
Watersheds.
O44
ORANGE COUNTY COMMISSIONERS
106 EAST MARGARET LANE
ITILLSBO ROUGH, N. C.
27278
RICA 1RD L.WIIITFFD
UN LLOYD
CHM FT F MARSHALL
NORMAN WALKER
PON WILLHOIT
April 25, 1985
W. Lee Fleming, Jr.
Water Quality Section Chief
NRCD
512 North Salisbury Street
Raleigh, NC 27611
Dear Mr. Fleming:
We have reviewed the Local Action Plan Matrix for the Falls
and the Jordan Watersheds and find that they indicate the current
status for Orange County.
The Orange County Planning Department has included in its
1985-86 Work Program, proposals for area studies of the two un-
zoned townships. These studies will be addressing water quality
protection issues as they relate to Little River and Cedar Grove
Townships. Both drain into the Falls Watershed and have been
designated, or considered, as potential water supply
watersheds on the local level . We will also be considering
amendments to the Subdivision Ordinance, which is applicable
county-wide, as a means of addressing the water quality concerns
in these townships.
A Planning Department Intern recently completed a report on
efforts of surrounding counties in hazardous waste control. The
report also included suggestions for a model program which the
Planning Staff will consider in its 1985-86 Work Program.
Copies of ordinances enacted by the Orange County Board of
Commissioners are enclosed for your information. If any addi-
tional information is needed, please let me know.
rerely,
CALV8--,
Don Willhoit, Chair
LOCAL ACTION PLAN MATRIX FOR FALLS WATERSHED 044
MAY 9 ;1985
LEGEND
NA. NOT APPLICABLE
RACTION REJECTED •ACTION BEING IMPLEMENTED
01ACTION BEING CONSIDERED 4414CiTIZZONE240140LIC"OARD.
ACTION ENDORSED BY POLICY BOARD ,i_kc 'pay
A INTpuRnoti uFicouNTTNTED\
cz;
CZ1 (S
44 4, ° 4.41
,zt. N4 CI
!ACTION , 'Zik; ,,st-/""
Ca iCt. /qv
LOCAL SEDIMENTATION/EROSION 42) 411 • 0 0 0 42) 41, .
PROGRAM
COUNTY SOIL & WATER PLANS FOR I NA INA 40 41, 411 NA 410
CRITICAL EROSION AREAS
INDUSTRIAL PRETREATMENT ,4A- 411 INA INA 411 INA INA 410 INA
PROGRAM
LOCAL HAZARDOUS MATERIALS . (2) (z)
1/2" STORMWATER REQUIREMENT ( • 4!) 0 () A (:) S .
50-FOOT STREAM BUFFERS 00 , 00A00.0
WATER QUALITY CRITICAL AREAS INA 411 4!) (2) INA NA INA 410 410
' DESIGNATED:
6% IMPERVIOUS LIMIT INA • e 0 INA NA I NA
RESTRICTED • INA e
C/I DEVELOPMENT NA NA INA _—
NO SEWER EXTENSIONS INA * 4!)., (2) INA INA INA 410 410
12% IMPERVIOUS LIMIT:
(UNSEWERED/NON—CRITICAL)
--
30% IMPERVIOUS LIMIT:
(SEWERED/NON—CRITICAL) e AINA e) NA INA INA
LIMITED INDUSTRY AREAS
DESIGNATED 4!) 410 4!). NA iNA
* ALLOW GRAVITY FLOW SEWER EXTENSIONS, BUT INCREASE STORMWATER
REQUIREMENT TO 1".
CH
INDICATES RECENT CHANGES
LOCAL ACTION PLAN MATRIX FOR JORDAN WATERSHED
MAY 9 1985
LEGEND
RA NOT APPLICABLE
ACTION BEING IMPLEMENTED
[!ACTION REJECTED I
ACTION BEING CONSIDERED ACTION ENDORSED BY POLICY BOARD
I IN,PORTION OF COUNTY
ACTION ENDORSED BY POLICY BOARD iACTION BEING IMPLEMENTED
IN PORTION OF COUNTY
I .
cam.. v .O • O '4
h /° 0
• ACTION' /a / r o /a i'c"ti /t7 % /a~' 3�
LOCAL SEDIMENTATION/EROSION ® 0 -" 0
PROGRAM
COUNTY CRITICAL OEROSION AREAS SANS FOR INA INA INA INA INA
INDUSTRIAL PRETREATMENT NA • INA, I NA INA Q? INA
LOCAL HAZARDOUS MATERIALS
INVENTORY 040
1/2" STORMWATER REQUIREMENT 0 0 •DIVA
50-FOOT STREAM BUFFERS 000000. INA LA O'. •
WATER •QUALITY CRITICAL AREAS ;NA NA INA INA ANA INA :NA.
' DESIGNATED:
6% IMPERVIOUS LIMIT INA INA INA" ® 411 0 INA NA INA INA
RESTRICTED
INA INA INA 0 INA INA INA INA
C/I DEVELOPMENT
NO,SEWER EXTENSIONS ANA INA INA 0 * , NA INA INA INA
12% IMPERVIOUS
(UNSEWERED/NON-CRITICAL) A 0 . NA
30% IMPERVIOUS LIMIT: a
(SEWERED/NON-CRITICAL) 'NA INA INA NA INA (�
LIMITED DESIGNATED NA AREAS NA INA 410 Q INA INA INA (2)
* ALLOW GRAVITY FLOW SEWER EXTENSIONS, BUT INCREASE ,
- STORMWATER REQUIREMENT TO 1".
cN INDICATES RECENT CHANGES
046
• ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date May 6, 1_985
Action Agenda
Item
SUBJECT: ADDITION OF WINNINGHAM ROAD AND CAMP GROUND ROAD TO THE STATE
MAINTAINED ROAD SYSTEM
DEPARTMENT: PLANNING PUBLIC HEARING Yes g No
Attachment(s) Information Contact: SUSAN SMITH
a) (2) April 26, 1985 letters-
Sam Jones
b) DOT addition investigation report
c) Location Map
Telephone Numbers
Hillsborough - 732-8181
Durham - 688-7331
Mebane - 227-2031
Chapel Hill - 968-4501
PURPOSE: To consider NCDOT petitions for approval of the addition of
Winningham Road in the Clyde Bowden subdivision and Camp Ground
Road to the state-maintained secondary road system.
NEED: Addition of Winningham Road, a paved road, to the state
maintained road system.
Addition of Camp Ground Road, an unpaved road, to the state-
maintained road system.
IMPACT: The Board's decision will be forwarded to the N.C. Board of
Transportation for their deliberation on acceptance of the road
to the state-maintained secondary road system.
RECOMMENDATION: Approval of the addition of Winningham Road to the state-
maintained road system.
Not recommend _addition of Camp Ground Road to the state-
maintained road system due to excessive cost of
approximately $5000.00 per house for improvements.
RECID APR 2 9 1985
41, sw.
Ci -14
STATE OF NORTH CAROLINA
DEPARTMENTOFTRANSPORTAT1ON
Graham, NC 27253-0766
JAMES C.MARTIN
GOVERNOR April 26, 1985
DIVISION OF HIGHWAYS
JAMES E.HARRINGTON
SECRETARY
Orange County
Mr. Kenneth R. Thompson, County Manager
Orange County
106 East Margaret Lane
Hillsborough, NC 27278
Subject: Petition for Addition - Winningham Road,
Property of Clyde H. Bowden
Dear Mr. Thompson:
Attached is Form SR-4, Secondary Road Addition In-
vestigation Report, for Winningham Road, property of Clyde H.
Bowden.
• This is being forwarded to you for review by your
Board of Commissioners.
Yours very truly,
4=5:0 AOlfete.:410-1"teK4
S. H. Jones
DISTRICT ENGINEER
/jbh
Atte.
cc: Mr. J. W. Watkins
An Equal Opportunity/Affirmative Action Employer
r
I
,
04E
NORTH CAROLINA STATE DEPARTMENT OF TRANSPORTATION
. a
DIVISION OF HIGHWAYS
-
SECONDARY ROAD ADDITION INVESTIGATION REPORT
County Orange Co. File No. Date
Township ch,ppi pm Div. File No.
Local Name Winningham Road Subdivision Name Clyde U. Bowden Property
Length 0.45 Width 20' Type G I Condition . Good
Is this a subdivision street subject to the construction requirements for such
streets? yes Recorded**see RemarkBOOk**See Remarlaage **Bee Remarks
Is this a subdivision street subject to participation paving? jag _
Number of homes having entrances into road vino
Other uses having entrances into road NnTy,
• Does right-of-way obtained meet present Division of Highways requirement? Dedicated
If not, why? __
Is petition (SR-1) attached? yes
Is the County Commissioners' Approval (SR-2) attached?
If not, why?
• Does the road meet present minimum Division of Highways construction requirements?
Yes
If not, state what is needed to place the road in an acceptable maintenance
condition under Remarks and Recommendations.
Is a map attached indicating information for reference in locating road by the
•Planning Department?
Cost to place in acceptable maintenance condition: Total Cost $ 0.00
Grade, drain, stabilize $ , Drainage $ , Other $
Remarks and Recdmmendationsmeata minimum requirements; thence recommend addition.
**Phase One - 01-16-78 - Book 27. Page 173
***, - - 4 a - • -0'-79 - Book 30 Pale 15
**Phase Three 10-24-83 - Book 38, Page 1
Reviewed and approved •
Board of Transportation Member
......_______
Reviewed and approved J. W. Watkins Sr R. Jones
DIVISION ENGINEER DISTRICT ENGINEER
'.I
(Do not write in this space -
i
...,_ :Tr
For use of Secondary Roads Dept.)
• .
. ... .... 1-1 1' '-44 '.---
. , Ms • 19°' .-.. ... —1111t,,t •■ 44
.1 _op_ __ /.4.,,p •..7,-91-\,,,. Petition No.
I ' ll n
ma :•. -i-R-1 b' P.m! v - . pill
7
sum nm V ,of .
.a•• A. 41.
. ....... (Do not write in this space -
For use of Planning Dept.)
C H A T H A M
• /
REgq) APR 2 9 1985
0. •
0 4 Et
lk
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Graham, NC 27253-0766
JAMES G.MARTIN
GOVERNOR April 26, 1985
DIVISION OF HIGHWAYS
JAMES E.HARRINGTON
SECRETARY
Orange County
Mr. Kenneth R. Thompson, County Manager
Orange County
106 East Margaret Lane
Hillsborough, North Carolina 2727S
Subject: Petition for Addition - Camp Ground Road
Petition No. 12115
Dear Mr. Thompson:
Attached is Porn SR-4, Secondary Road Addition In-
vestigation. Report for Camp Ground Road.
This is being forwarded to you for review by your
Board of Commissioners.
Yours very truly,
cn5: 4,15/4: 0,22.46-
S. H. Jone 4
DISTRICT ENGINEER
/jbh
At ta.
cc: J. W. Watkins
An Equal Opportunity/Affirmative Action Employer
!
s'
, 05C
Ft
NORTH CAROLINA STATE.DEPARTMENT OF TRANSPORTATION
= - ---," DIVISION OF HIGHWAYS
SECONDARY ROAD ADDITION INVESTIGATION REPORT -
County Orange Co. File No. Date
Township Chapel Hill • Div. File No.
x
Local Name Camp Ground Road (Petition.No. 12115) Subdivision Name N/A,
Length 0.55 Width 10' Type B Condition Poor
t Is this a subdivision street subject to the construction requirements for such
streets? No Recorded ---- Book -�--- Page --- -
Is this a subdivision street subject to participation paving? .No
Number of homes having entrances into road seven. (7)
r Other uses having entrances into road churcl, Camp (trot used regularly)
Does right-of-way obtained meet present Division of Highways requirement? No
If not, why? Not acquired.
Is petition (SR-1) attached? Yes
Is the County Commissioners' Approval (SR-2) attached?
If not, why?
Does the road meet present minimum Division of Highways construction requirements?
No
If not, state what is needed to place the road in an acceptable maintenance
condition under Remarks and Recommendations.
Is a map attached indicating information for reference in locating road by the
Planning Department? Yes
Cost to place in acceptable maintenance condition: Total Cost $_34,000.00
Grade, drain, stabilize $33,000.00. , Drainage $ 1,000.00 , Other $- 1,000.00
Remarks and Recommendations Grade, drain, and stabilize. Meets minimum reguiremau-ts,
however, cost too excessive for number of homes served; therefore, recommend do not add.
Reviewed and approved
Board of Transportation Member
Reviewed and approved J. W. Watkins S.- H. Jones
DIVISTnM cm"T"IER DISTRICT ENGINEER
(Do not write in this space -
a,
Al . For use of Secondary Roads Dept. )
Jo
d
: 'A' �' Petition No.
�ry � 4
(Do not write in this space -
For use of Planning Dept.)
oet
r los
,
`_�
4 ..
051
ORANGE COUNTY
BOARD OF COMMISSIONERS Action Agenda
ACTION AGENDA ITEM ABSTRACT Item No.F7C‘
Meeting Date: May 6, 1985
SUBJECT: HANDICAPPED RAMP 911 CENTER
DEPARTMENT: EMERGENCY SERVICES PUBLIC HEARING: YES X NO
ATTACHMENT(S): INFORMATION CONTACT: BILL LAWS
• YES TELEPHONE NUMBER:
Hillsborough - 732-8181
Chapel Hill - 967-9251
EXT. 501
PURPOSE: To present drawing and cost estimates to the Board of Commissioners
for approval.
NEED:, The attached sketch is a result of our self evaluation of the '
facility for handicapped access.
•
IMPACT: The total estimate for this project is $2,150.00. Fundina would•
come from the Handicapped Access Project in the 1984-85- Capital
Fund.
RECOMMENDATIONS:
Board approve design and funding for ramp and slab for parking.
• I
It\
I)
- • _-_ • _ . -
ne.
•
• esti.
)4f.
(
. •
. _
052
•
•
•
•
•
I
•
is
_ P
J•.
fi