Loading...
HomeMy WebLinkAboutAgenda - 09-06-2016 - 6-m - Comprehensive Plan and Unified Development Ordinance (UDO) Amendment Outline and Schedule – Erosion Control & Stormwater 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 6, 2016 Action Agenda Item No. 6-m SUBJECT: Comprehensive Plan and Unified Development Ordinance (UDO) Amendment Outline and Schedule — Erosion Control & Stormwater DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. Comprehensive Plan and Unified Howard W. Fleming, Jr., PE, Development Ordinance (UDO) Engineering/Stormwater Supervisor, Amendment Outline Form (919) 245-2586 Craig Benedict, Planning Director, (919) 245-2575 John Roberts, County Attorney, (919) 245-2326 PURPOSE: To consider and approve process components and schedule for an upcoming government-initiated Unified Development Ordinance (UDO) amendment for the February 2017 Quarterly Public Hearing that addresses necessary revisions to procedures and technical provisions in the UDO pertaining to erosion & sedimentation control and stormwater regulations. BACKGROUND: These proposed text amendments to Orange County's UDO seek to bring the County's processes and terminology into alignment with regulatory reform initiatives currently in process at the North Carolina Department of Environmental Quality (DEQ), as well as historical standard operating procedures of both DEQ and the Planning & Inspections Department. Coincident with this goal, Orange County's Engineering/Stormwater Division seeks to refine the processes associated with the implementation phase of the Land Management Central Permitting Software (LMCPS), define more simplified procedures, incorporate more concise text, eliminate duplication, correct inaccuracies and correct former misplacements of requirements. Orange County's UDO currently regulates erosion & sedimentation control for non-farm land disturbing activity, as well as stormwater runoff from new development, under the general oversight of DEQ. The DEQ's Division of Energy, Mineral and Land Resources (DEMLR) staff members provide Orange County Engineering / Stormwater Division with regulatory oversight and technical assistance related to erosion and sedimentation control and stormwater management. For these areas of environmental regulation, the DEMLR staff are subordinate to the Sedimentation Control Commission (SCC) and the Environmental Management Commission (EMC). The Sedimentation Control Commission (SCC) was created to administer the state's Sedimentation Control Program pursuant to the N.C. Sedimentation Pollution Control Act of 1973. The commission is charged with adopting rules, setting standards and providing 2 guidance for implementation of the law. All members are appointed by the Governor. Orange County's "delegated local erosion and sedimentation control program (hereinafter, 'local program')" operates under a Memorandum of Agreement (MOA) with the SCC. The latest update was approved by the BOCC on January 22, 2015 and fully executed by the Chair of the SCC on March 11, 2015. The MOA requires the SCC to review the County's "local program ordinance" and for Orange County to submit its ordinance for such review and updates, as necessary, which infers that this would include proposed edits to the previously approved ordinance. The EMC is a 15-member Commission appointed by the Governor, the Senate Pro Tempore and the Speaker of the House. The Commission is responsible for adopting rules for the protection, preservation and enhancement of the state's air and water resources. The commission oversees and adopts rules for several divisions of the DEQ, including the Division of Air Quality, Land Resources, and Water Resources. One of the sub-divisions of DEMLR is "Stormwater", whose staff reviewed Orange County's UDO amendments in 2012 when the County's stormwater regulations were last amended to incorporate the Falls Lake / Jordan Lake new development stormwater rules. A similar review will be required with this amendment of the County's "stormwater" regulations and, if significant enough, they may be referred to the EMC at the discretion of the DEMLR staff. Attachment 1 contains additional information and analysis regarding the proposed amendment. FINANCIAL IMPACT: Consideration and approval will not create the need for additional funding for the provision of County services. Additional revenue will be realized from the fees to be charged for annual maintenance inspection reviews of Stormwater Control Measures (SCM's) and quality assurance field inspections to be conducted once every 5 years. Costs for the required legal advertisement for the text amendment will be paid from FY2016-17 Departmental funds budgeted for this purpose. Existing Planning staff included in the Departmental staffing budget will accomplish the work required to process this amendment. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this agenda item: • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES The fair treatment and meaningful involvement of people of all races, cultures, incomes and educational levels with respect to the development and enforcement of environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental and commercial operations or policies. RECOMMENDATION(S): The Manager recommends the Board approve the attached Amendment Outline form and direct staff to proceed accordingly. 3 Attachment 1 COMPREHENSIVE PLAN / FUTURE LAND USE MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENT OUTLINE UDO /Zoning-2016-12 Erosion Control and Stormwater A. AMENDMENT TYPE Map Amendments n Future Land Use Map: From: To: n Zoning Map: From: To: n Other: Text Amendments n Comprehensive Plan Text: Section(s): n UDO Text: L UDO General Text Changes L UDO Development Standards UDO Development Approval Processes Section(s): 2.18: Land Disturbing Permits (Procedures) 2.19: Soil Erosion And Sedimentation Control Plans (Procedures) 2.21 Stormwater Management (Procedures) 6.14 Stormwater Management (Development Standards) 10.1: Definitions Table 6.15.7.B.3: Undisturbed Area Additional sections may be identified as work proceeds. n Other: 1 4 B. RATIONALE 1. Purpose/Mission a) To bring the UDO into conformance with State regulations, as well as historical standard operating procedures of both the NC Department of Environmental Quality (DEQ) regulators and the Planning & Inspections Department. b) Refine processes associated with the implementation phase of the Land Management Central Permitting Software (LMCPS), defined by more simplified procedures and described by more concise text. c) Eliminate duplication and correct inaccuracies and former misplacements of requirements. 2. Analysis 2.18.4 Erosion Control Plan Required (Procedures related to land disturbing permits) —This paragraph is a near duplicate of and actually, more correct than 2.19.1, which is where this information should be located (Section 2.19 is where detailed soil erosion and sedimentation control plan procedures reside). It is proposed that 2.18.4 be repealed in its entirety and much of its text be incorporated in 2.19.1 to correct erroneous information therein. 2.19.1 Generally— This paragraph will be corrected to contain the proper land disturbance thresholds. 2.19.2 Application Requirements — This paragraph will be corrected to reflect both electronic submittals that will be an integrated option when the new LMCPS goes live and current submittal practices by the Orange County Erosion Control group. 2.19.3 Components of Complete Erosion Control Plan —The language in this paragraph will be improved to clarify that an application package is more than just a "plan". 2.21.1 Stormwater Management Plan (Procedures) — Incorporate language being promoted by NC DEQ to be more generic by utilizing "Licensed Professional" rather than Professional Engineer, as the State allows other Design Professionals to prepare and certify Stormwater Management Plans, as long as they are performing services within their area of competence. 6.14.10 Operation and Maintenance of Structural Stormwater Measures (Development Standards) • Similar generic License Professional text amendment, as well as broadening and genericizing the current UDO reference to "detention pond" to "stormwater control measure (SCM)". This SCM terminology needs amending throughout the Section 6.14 of UDO to provide consistency within the UDO and with trending terminology at the NC Division of Environmental Quality (DEQ). • Amend "Watershed Protection Compliance Permit" to "Certification", to conform to current County practice. • Update reference to this "certification" being required prior to a building permit, as it is impractical for certain development scenarios (i.e. campus settings). Staff is currently working with DEQ to establish an acceptable procedure. • Substitute the Planning Director for Board of County Commissioners wherever practicable. Many if not all of these procedures are ministerial and do not need to be elevated to the BOCC level. 2 5 • Clarify that the annual maintenance "inspection" fee is actually an "inspection/review" fee, as the owner of the stormwater control measure (SCM) is required to inspect or have the SCM inspected each year and Engineering/Stormwater staff needs to review that inspection report and perhaps follow up with an inspection of any repairs. In addition the ordinance incorporates a quality assurance physical inspection at least once every 5 years. • Establish a two-tiered fee schedule for this annual stormwater control measure annual inspection/review fee, as this is not currently collected. • Clarify when this fee is to be collected. 6.14.11 Amendments to Approved Plans and Specifications • Clarify language, requirements and simplify the amendment procedures. Table 6.15.7.B.3: Undisturbed Area • Make it clear that it is the pervious area that needs to remain undisturbed during construction. • Correct terminology referring to a "grading permit", as that nomenclature is not utilized in the UDO. Various • Bring conformity and uniformity to the use of the title "County Engineer" in lieu of "Staff Engineer" in multiple chapters. • Address any other related variances or inconsistencies that may be found in other sections during this editing process. 3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) Applicable principles, as adopted by the BOCC for the Comprehensive Plan 1. Efficient and Fiscally Responsible Provision of Public Facilities and Services 2. Encouraging Sustainable Growth and Development 6. Water Resource Preservation Chapter 5: Land Use Element - Section 5.6 GOALS Land Use Overarching Goal: Coordination of the amount, location, pattern and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. Land Use Goal 2: Land uses that are appropriate to on-site environmental conditions and features, and that protect natural resources, cultural resources, and community character. Land Use Goal 6: A land use planning process that is transparent, fair, open, efficient, and responsive. 3 6 Chapter 6: Natural and Cultural Systems Element - Section 6.3 GOALS Natural and Cultural Systems Overarching Goal: A sustainable balance and appreciation of natural, cultural and agricultural resources. Natural & Cultural Systems Goal 6: Sustainable quality and quantity of ground and surface water resources. Chapter 8: Services and Community Facilities Element— Section 8.3 GOALS Services and Community Facilities Overarching Goal: Growth consistent with the provision of adequate and sustainable County services and facilities while managing the impacts upon the environmental infrastructure and effectively protecting the County's natural and cultural resources. Services and Community Facilities Goal 5: Efficient and effective drainage, stormwater, floodplain management, and erosion control systems. 5.7: Land Use Element OBJECTIVES Objective LU-2.3: Require non-residential and higher-density residential developments within Transition Areas to use Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoning Ordinance and Sedimentation Control Ordinance, to ensure that potential adverse impacts on the water quality of existing and proposed reservoir sites are avoided. (See also Erosion Control EC-1 and Natural Areas Objective NA-4.) Objective LU-2.5: Adopt and implement policies that specify appropriate land uses and intensities of development in Protected and Critical Water Resource Areas that will not have potential adverse impacts on water resources. (See also Water and Wastewater Objective WW-15.) Objective LU-2.6: Protect prime reservoir sites from adverse development impacts and ensure that regulations for these areas are appropriate. Objective LU-2.8: Develop performance standards for development on lands with non-renewable resources to ensure a sufficient level of environmental protection for these resources. Objective LU-6.1: Undertake a comprehensive effort to inform and involve the citizens of Orange County in the land use planning process. 4 7 Objective LU-6.2: Maintain a cooperative joint planning process among the County municipalities and those organizations responsible for the provision of water and sewer services to guide the extension of service in accordance with the Comprehensive Plan, the Orange County-Chapel Hill-Carrboro Joint Planning Agreement and Land Use Plan, and the policies of the municipalities. (See also Water and Wastewater Objective WW-4.) 6.4.5.3. Natural & Cultural Systems Element OBJECTIVES Objective WR-1: Preserve natural resources such as grasslands, woodlands and wetlands to allow for water recharge of ground water and water quality protection. (See also Natural Areas Objective NA-1.) Objective WR-7: Promote land use patterns that preserve the natural hydrologic system and maintain a sustainable "carrying capacity" balance for the future between ground water and surface water resources (See also Land Use Objective LU-2.9.) Objective WR-20: Promote Best Management Practices for new developments which minimize stormwater runoff. (See also Land Use Objective LU-2.3 and Erosion Control Objective EC-1.) 8.4.2.3. Services and Community Facilities Element OBJECTIVES Objective EC-1: Continue to use Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoning Ordinance, Stormwater Ordinance, and Sedimentation Control Ordinance, to minimize potential adverse impacts on the water quality. (See also Land Use Objective LU-2.3, Natural Areas Objective NA- 4 and Water Resources Objective WR-20.) Objective EC-2: Protect and maintain the chemical, physical, and biological quality and integrity of water supply reservoirs. Objective EC-7: Prevent flood damage to public and private property. 4. New Statutes and Rules N.A. 5 8 C. PROCESS 1. TIMEFRAME/MILESTONES/DEADLINES a. BOCC Authorization to Proceed September 6, 2016 b. Quarterly Public Hearing February, 2017 (Date to be determined.) c. BOCC Updates/Checkpoints December 7, 2016 — Ordinance Review Committee (receive materials) January 4, 2017 — Planning Board Recommendation (receive materials) d. Other: Various 2016 — Review by appropriate DEMLR staff at the North Carolina Department of Environmental Quality (DEQ) 2. PUBLIC INVOLVEMENT PROGRAM Mission/Scope: Public Hearing process consistent with NC State Statutes and Orange County ordinance requirements. a. Planning Board Review: December 7, 2016 — Ordinance Review Committee January 4, 2017 — Planning Board Recommendation b. Advisory Boards: N/A c. Local Government Review: • Towns of Chapel Hill and Carrboro in accordance with the Joint Planning Agreement • Town of Hillsborough - courtesy review • City of Mebane - courtesy review d. Notice Requirements Consistent with NC State Statutes — legal ad prior to public hearing e. Outreach: General Public: Advertised meeting with Home Builders Association of Durham, Orange & Chatham Counties. Date TBD. ❑ Small Area Plan Workgroup: N/A ❑ Other: N/A 6 9 3. FISCAL IMPACT Consideration and approval will not create the need for additional funding for the provision of County services. Additional revenue will be realized from the fees to be charged for annual maintenance inspection reviews and quality assurance field inspections to be conducted once every 5 years. Costs for the required legal advertisement will be paid from FY2016-17 Departmental funds budgeted for this purpose. Existing Planning staff included in the Departmental staffing budget will accomplish the work required to process this amendment. D. AMENDMENT IMPLICATIONS This amendment will result in clarification of the County's requirements and efficiency of operations. E. SPECIFIC AMENDMENT LANGUAGE Will be available at a later date, if staff is authorized to proceed with the amendment. Primary Staff Contact: Howard W. Fleming, Jr., PE Planning & Inspections Department Engineering/Stormwater Division 919-245-2586 hfleming @orangecountync.gov 7