Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. - upgrade skills development HVAC
DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 [Departmental Use Only] TITLE Skills HVAC Upgrade FY 2015/16 NORTH CAROLINA CONSTRUCTION AGREEMENT UNDER$250,000.00 ORANGE COUNTY THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 7th day of July, 2016, by and between Warren-Hay Mechanical Contractors Inc., (hereinafter called the "Contractor"), and Orange County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the"Owner"). WITNESSETH: That the Contractor and the Owner, for the consideration herein named, agree as follows: 1. CONTRACT DOCUMENTS; PRIORITY The Contract Documents consist of this Agreement, the Request ,for Proposals, Proposal, Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the event of any inconsistency between or among the Contract Documents the Contract Documents shall be interpreted in the following order of priority: a. This Agreement. b. Designer Approved Bulletins and/or Field Orders. c. Request for Proposals and addenda thereto. d. Proposal. 2. SCOPE OF WORK The Contractor shall furnish and deliver all of the materials, and perform all of the work required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the Contractor and Owner and in accordance with the following enumerated documents, which are made a part hereof as if fully contained herein: a. Construction Drawings prepared by N/A (Sheet N/A dated N/A) b. Written specifications prepared by the project engineer. c. Warren-Hay Mechanical Contractors Inc, proposal dated June 23, 2016, (for 14.0 Seer Systems with 95% Gas Furnaces), Titled: REVISED 7 Systems 6.2016 Controls Option Warren Hay Proposal (2).pdf. Specifications are included for reference only. This project is to change out (7) existing systems with new reconnecting to existing power, controls, duct system,refrigerant piping as noted (revised 7 systems proposal) which fully describes the work to be perfouued. Such work will hereafter be called the "Work". Revised 6/16 1 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 d. Related documents listed under Section 1 above. 3. TERM AND SCHEDULING a. The Contractor agrees to commence work pursuant to the written Notice to Proceed. b. The Contractor agrees to complete substantially all Work by August 15, 2016. c. Time is of the essence with respect to all dates specified in the Contract Documents as Completion Dates. d. The Contractor shall perform the Work in the time, manner, and form required by the Contract Documents and as stipulated in a written Notice-to-Proceed to be executed by the Contractor and Owner. e. It is expressly understood that the Owner will employ other contractors to perform work as a part of the Project whose work will be performed simultaneously and sequentially with the performance of the Work by the Contractor. It shall be necessary for the Contractor to coordinate its activities with such other contractors, particularly with respect to access to work areas, storage of materials and other common facilities. f. Should the Owner determine that the Contractor is behind schedule Owner may require, at no additional cost to the Owner, the Contractor to expedite and accelerate its efforts, including providing additional resources and working overtime, as necessary, to perform the Work in accordance with the approved project schedule. 4. STANDARD OF CARE a. The Contractor shall exercise reasonable care and diligence in performing the Work in accordance with the highest generally accepted standards of this type of Contractor practice throughout the United States and in accordance with applicable federal, state and local laws and regulations applicable to the performance of these services. Contractor is solely responsible for the professional quality, accuracy and timely completion and/or submission of all work. b. The Contractor shall not load or permit any part of the Work to be loaded with a weight that will endanger its safety, intended performance or configuration. c. Contractor shall be responsible for all errors or omissions caused by its employees, agents, contractors, or assigns in the performance of the Agreement. Contractor shall correct any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional cost to the Owner. d. Contractor is an independent contractor of Owner. Any and all employees of the Contractor engaged by the Contractor in the performance of any work or services required of the Contractor under this Agreement, shall be considered employees or agents of the Contractor only and not of the Owner, and any and all claims that may or might arise under 1 any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Contractor. Revised 6/16 2 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 e. If activities related to the performance of this Agreement require specific licenses, certifications, or related credentials Contractor represents that it and/or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. 5. PAYMENT & TAXES a. The Owner hereby agrees to pay to the Contractor for the faithful perfoimance of this Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not-to- exceed Eighty Thousand Seven Hundred Seventy Four Dollars ($80,774.00). Not later than the fifth (5th) day of each calendar month the Contractor shall submit to the Owner's Representative, generally the architect if an architect is retained on the Work, a Request for Payment for work done during the previous calendar month. i. The Request for Payment shall be in form of a standardized invoice or AIA Document G702-703 appropriately addressed to Owner's Representative at PO Box 8181, Hillsborough NC 27278 and shall show substantially the value of work done during the previous calendar month. ii. The amount due for payment shall be ninety-five percent (95%) of the value of work completed since the last Request for Payment and this amount shall be paid by the Owner on or before the last business day of the month. Owner shall retain five percent(5%). 1. Upon Owner's Representative's certification that ninety percent (90%) of the Work has been satisfactorily completed retainage may be discontinued. Retainage may be discontinued, at Owner's Discretion, so long as work continues to be completed satisfactorily and on schedule. iii. Final payment shall not be due to the Contractor until thirty (30) days after one hundred percent (100%) of the Work, including punch list work, has been satisfactorily completed and an appropriate affidavit as required in Section 7(c) below has been received by Owner. b. Should Owner reasonably determine that Contractor has failed to perfotin the Work related to a Request for Payment, Owner, at its discretion may provide the Contractor ten (10) days to cure the breach. Owner may withhold the accompanying payment without penalty until such time as Contractor cures the breach. i. Should Contractor or its representatives fail to cure the breach within ten (10) days, or fail to reasonably agree to such modified schedule, Owner may immediately terminate this Agreement in writing, without penalty or incurring further obligation to Contractor. ii. This section shall not be interpreted to limit the definition of breach to the failure to perform the Work related to a Request for Payment. c. The Contractor has included in the Contract Price and shall pay all taxes assessed by any authority on the Work or the labor and materials used therein. It shall be the Contractor's responsibility to furnish the Owner documentary evidence showing the materials used and sales and use tax paid by the Contractor and each of its subcontractors. 6. INSURANCE AND BONDS Revised 6/16 3 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 a. Minimum requirements — Contractor shall obtain, at its sole expense, Commercial General Liability Insurance, Automobile Insurance, Workers' Compensation Insurance, and any additional insurance as may be required by Owner's Risk Manager as such insurance requirements are described in the Orange County Risk Transfer Policy and Orange County Minimum Insurance Coverage Requirements (each document is incorporated herein by reference and may be viewed at http://www.orangecountync gov/departments/purchasing division/contracts.php). If Owner's Risk Manager determines additional insurance coverage is required such additional insurance shall be designated here N/A (if no additional insurance required mark N/A as being not applicable). Contractor shall not commence construction work until such insurance is in effect and certification thereof has been received by the Owner's Risk Manager. b. Performance Bonds — Contractor shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising under any of the Contract Documents or related in any way to the Work. Contractor shall immediately furnish a copy of such bonds to any requesting person who appears to be a potential beneficiary of bonds covering payment obligations arising under any of the Contract Documents. This subsection 6(b) applies only to Contracts of fifty thousand dollars ($50,000.00) or more where the total cost for the project is three hundred thousand dollars ($300,000.00) or more. 7. INDEMNITY a. The Contractor shall indemnify and hold harmless to the extent permitted by law the Owner and its agents and employees from and against any and all claims, damages, losses and expenses, including attorney's fees, arising out of or resulting from the performance or nonperformance of the Work, provided that any such claim, damages, loss or expense (A) is attributable to bodily injury, sickness, disease or death or injury to, or destruction of, property, including the loss of use resulting therefrom; and (B) is caused in whole or in part by any breach of any provision of the Agreement or by any negligent or wrongful act or omission of the Contractor, any Subcontractor, or supplier of the Contractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable. The indemnification obligation under this paragraph shall not be limited in any way by any limitation of the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under workers' compensation acts, disability benefits acts or other employee benefit acts. b. The Contractor shall indemnify and hold harmless Owner from any lien of whatever type through the purchase of appropriate bonds and insurance as designated in Section 6 above. In the event any such lien is filed against Owner's property Contractor shall, through such bonds and insurance or at Contractors expense, defend Owner against all such claims of lien. c. Upon completion of the Work the Contractor shall execute an affidavit stating there are no unpaid debts for any work that has been done or materials that have been furnished to the Project prior to and as of the date of substantial completion and further stating that Contractor shall indemnify, save and protect Owner and Owner's lender, if any, harmless from and against any and all claims, liabilities, losses, damages, causes of action, and expenses (including court costs and reasonable attorney's fees related thereto) arising out Revised 6/16 4 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 of, in connection with, or resulting from any such debts and liens. Such indemnification shall be in a form and substance acceptable to Owner. d. By executing this Agreement Contractor agrees to abide by and be bound by the indemnification provisions herein and of Section 7(c) specifically. 8. DISPUTE RESOLUTION AND GOVERNING LAW a. Any dispute with respect to any provision of, or the performance or non-performance of, this Agreement shall be subject to the Dispute Resolution Rules and Procedures for Orange County Design, Building Construction, Renovation, and Repair Projects which rules and procedures are incorporated herein. b. The laws of the State of North Carolina shall apply to the interpretation and enforcement of this Agreement. Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or nonperformance of, this Agreement or the Contract shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina and it is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. c. Notice of any claim by Owner or Contractor must be initiated by written notice to the other Party within thirty (30) days of the occurrence of the event giving rise to the claim or within thirty (30) days of the discovery of the event or condition giving rise to the claim, whichever is later. i. Should any claim be made, regardless of whether such claim is made by Owner or Contractor, Contractor shall continue to faithfully and diligently perform the Work in such a manner as to meet all scheduled timelines. Any failure to faithfully and diligently perform the Work may be deemed, by the Owner, a breach of the Contract. ii. If a claim is made such claim shall be made to the initial decision maker, if applicable, who may request more supporting data, reject the claim in whole or in part, approve the claim in whole or in part or advise the parties the claim is unable to be resolved. iii. If a claim is made by the Owner the Owner may, but is not obligated to, notify the surety. 9. NON—APPROPRIATION a. Contractor acknowledges that Owner is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. b. In the event that public funds are unavailable and not appropriated for the performance of Owner's obligations under this Agreement, then this Agreement shall automatically expire without penalty to Owner immediately upon written notice to Contractor of the unavailability and non-appropriation of public funds. It is expressly agreed that Owner shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. Revised 6/16 5 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 c. In the event of a change in the Owner's statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects Owner's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to Owner upon written notice to Contractor of such limitation or change in Owner's legal authority. 10. NOTICES Any notice required by this Agreement shall be in writing and delivered by certified or registered mail,return receipt requested to the following: Owner: Contractor: Orange County Warren-Hay Mechanical Contractors, Inc. Attn: Angel Barnes Attn: Ron LaPann P.O. Box 8181 PO Box 818 Hillsborough,NC 27278 Hillsborough,NC 27278 11. MISCELLANEOUS a. Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties and Obligations imposed by state, federal or local law, rules, regulations and ordinances. b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or duty granted them under the Contract Documents, nor shall any act or failure to act constitute any approval except as specifically agreed in writing. c. The Work shall be tested and inspected as required by the Contract Documents and as required by law. Unless prohibited by law the costs of all such tests and inspections related to state and federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building Codes shall be borne by the Contractor. The costs for material and structural testing shall be conducted by an independent third party at the expense of the Owner. Delays related to any of the aforementioned tests and inspections shall not be grounds for delaying the completion of the work. If any such tests and inspections reveal deficiencies in the Work such that the Work does not comply with terms or requirements of the Contract Documents and/or the requirements of any code or law the Contractor is solely responsible for the cost of bringing such deficiencies into compliance with the terms of the Contract Documents and/or any code or law. d. Should the Architect, if an architect is retained for the project involving the Work, or Owner reject any portion of the Work for failing to comply with the Contract Documents Contractor shall immediately, at Contractor's expense, correct the Work. Any such rejection may be made before or after substantial completion. If applicable, any additional expense borne by the Architect under this section shall be paid at Contractor's expense. e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its entirety without the prior written consent of the Owner. f. By executing this Agreement Contractor affirms that Contractor and any subcontractors of Contractor are and shall remain in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. Revised 6/16 6 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 g. By executing this Agreement Contractor certifies that Contractor has not been identified, and has not utilized the services of any agent or subcontractor, on the list created by the State Treasurer pursuant to G.S. 147-86.58. h. Contractor shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all state and federal anti- discrimination laws, policies, rules, and regulations and the Orange County Anti- Discrimination Policy. Any violation of this requirement is a breach of this Agreement and County may immediately terminate this Agreement without further obligation on the part of the County. This paragraph is not intended to limit and does not limit the definition of breach to discrimination. i. This Agreement together with any amendments or modifications may be executed electronically. All electronic signatures affixed hereto evidence the intent of the Parties to comply with Article 11A and Article 40 of North Carolina General Statute Chapter 66. 12. CONSEQUENTIAL AND LIQUIDATED DAMAGES a. Owner and Contractor mutually waive any claim against each other for consequential damages. Consequential Damages include: i. Damages incurred by Owner for loss of use, income, financing, or business. ii. Damages incurred by Contractor for office expenses, including personnel, loss of financing, profit, income, business, damage to reputation, or any other non-direct damages. b. Liquidated damages shall be in accord with the Contract Documents. 13. TERMINATION OR SUSPENSION a. The Owner may, without cause, order the Contractor to terminate, suspend, delay or interrupt the Work in whole or in part for such period of time as the Owner may determine. In the event of termination by the Owner under this Agreement, the Contractor shall be entitled to receive its reasonable and documented direct costs prior to termination, including the cost of materials purchased for the Work which purchases cannot be canceled or which material cannot reasonably be used by the Contractor on other work, and the cost of closing down the work in a safe and efficient manner. i. If Owner orders a delay, suspension or interruption of the Work, and such order is not due to or as a result of any fault on the part of the Contractor, the Contractor may recover a per diem amount at a rate calculated by NA. ii. If Contractor elects to accept the amount listed in the General Conditions provision of the Construction Documents Contractor waives any right to further claims for payment of damages sustained as a result of Owner's order to delay, suspend or interrupt the Work. b. Contractor may terminate the Contract if, at the Owner's written direction, the Work is stopped for thirty (30) consecutive days through no act or fault of the Contractor, their Revised 6/16 7 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 agents or employees, or a subcontractor or their agents or employees or any other person performing work pursuant to the Contract Documents. Contractor may terminate the Contract if a Court or other Public authority having jurisdiction enters a lawful order that requires all work to be stopped and such stoppage lasts for thirty (30) consecutive days. 14. ENTIRE AGREEMENT All of the documents listed, referenced or described in this Agreement, the written Notice-to- Proceed, together with Modifications made or issued in accordance herewith are the Contract Documents, and the work, labor, materials and completed construction required by the Contract Documents and all parts thereof is the Work. The Contract Documents constitute the entire agreement between Owner and Contractor. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. If any provision of the Agreement shall be declared invalid or unenforceable, the remainder of the Agreement shall continue in full force and effect. [SIGNATURE PAGE TO FOLLOW] ii Revised 6/16 8 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the day and date first above written wholly or in a number of counterparts each of which shall, without proof or accounting for other counterparts, be deemed an original contract. ORANGE COUNTY CONTRACTOR Docu Signetl by: Docu Signetl by: (lB:i]994R]SSF4]] Signature Signature County Manager Ron LaPann Commercial Division Printed Name and Title Revised 6/16 9 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 ORANGE COUNTY—DEPARTMENT USE ONLY Department Party/Vendor Name: Warren-Hay Mechanical Contractors, Inc. Party/Vendor Contact Person: Ron LaPann (Ron.Lapann a,warren-hay.com) Contact Phone: 919.732.4362 Party/Vendor Address:PO Box 818 City Hillsborough State: NC Zip: 27278 Depaitment: AMS Amount: NTE $80,774.00 Purpose: Upgrade Skills Development HVAC Budget Code(s): 61370035-80000-30018 Vendor # 25352 (N/A if new vendor) Vendor is a BOCC consultant? Yes ❑ NoZ Contract Type:(Check one)New® Renewal❑ Amendment ❑ Effective Date July 7,2016 Approved by Board Yes El No Agenda Date: This agreement is approved as to technical form and content: DocuSigned by 7/8/2016 9oF6 Department Director's Signature Date: Information Technologies (Applicable only to hardware/software purchases or related services)This agreement has been reviewed and is approved as to information technology content and specifications: Office of the Chief Information Officer Date: Risk Management This agreement is approved for sufficiency of insurance standards,specifications, and requirements: D Sy d by lL(Asa �awuffa 7/11/2016 Office of the Risk Management Office Di3nS800 Date: Financial Services This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act: DocuSlgned by Office of the Chief Financial Office Date: 7/12/2016 A , Legal Services This agreement is approved as to legal form and sufficiency: DocuSigned by gun, rokrfs 7/14/2016 Office of the County Attorney Date: Clerk to the Board Received for record retention: All Docusign contracts must be copied to Donna Lloyd upon completion @ Dolloyd a,orangecountync.gov The following signature block is for hard copies only and is not required for Docusign contracts: Office of the Clerk to the Board Date: Revised 6/16 10 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 HEATING, VENTILATION AND AIR CONDITIONING DIVISION 15600 Orange County Skills Center&WCOB IT RKM RE ECE,NOLAND&McELRATH,INC. CONSULTING ENGINEERS 94 Main Street Canton,North Carolina 28716 Phone:828-492-0677 Emat:RNM-engineers.com -4 off; ;.1 ►!� y` y SEAL 02451; °°°F1 //r/- °O°oaoo o / M C'D p \ 3-16-16 15610 GENERAL: A. GENERAL: This Contractor's attention is directed to the requirements of Instructions to Bidders, General Conditions and Supplementary General Conditions as bound in the specifications which apply in full to the heating, ventilation and air conditioning contract. B. SCOPE: Work in this section consists of furnishing of all labor,materials,equipment,and services reasonably incidental and implied for completion of the air conditioning, heating, exhaust and ventilation systems as described in these specifications and shown on the drawings, all in accordance with the contract documents. These drawings may be superseded by later revised or detailed drawings, specifications or sketches prepared by Designer and this Contractor shall conform to all coordination requests. All items not specifically mentioned in the specifications or noted on the drawings but which obviously are required to make the working installation complete shall be included automatically. C. CODES: All work under this contract shall be done in accordance with the plans and specifications and all 15H-1 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 work shall comply with North Carolina Building Code,and with Underwriters'rules and regulations covering work of nature to be performed. Wherever plans or specifications are in excess of such laws, codes, regulations, etc.,the plans and specification shall hold. All equipment so listed shall have U.L. label on it. All work must comply with all local codes and regulations. When more stringent requirements are imposed by governing regulations,they must be complied with. If Contractor notes discrepancies between laws, codes, ordinances, rules and regulations and the specifications or drawings, each discrepancy shall be called to the attention of the Designer in writing before the bids are submitted. D. PERMITS AND FEES: This Contractor shall secure all permits required for the completion of this contract. He shall obtain and deliver to the Owner all certificates of inspection issued by the authorities having jurisdiction, with Contractor paying costs of same. E. VISIT TO JOB SITE: Before submitting a bid, this Contractor shall visit the job site for the purpose of thoroughly examining the site and conditions under which the work must be performed. The submission of a bona fide bid will be construed to mean that this Contractor understands and is satisfied with conditions under which the contract must be fulfilled. No extra compensation will be allowed for situations arising from failure of the Contractor to thoroughly familiarize himself with site conditions, including charges and requirements for connection to utilities as shown for this project. F. WORKMANSHIP: Workmanship in the fabrication, preparation, and installation of materials and equipment shall conform to the best standards of practice of the trades involved. Work shall be performed by experienced and skilled mechanics under the supervision of a competent foreman. Substandard workmanship will be cause for rejection of work and replacement by Contractor. All costs associated with providing engineering assistance due to substandard work by the contractor shall be assumed by the contractor including time expended,telephone, and travel. G. DRAWINGS AND SPECIFICATIONS: The drawings show the location and arrangement of piping, ducts, and equipment, together with details of connections of certain principal items. The layout shown shall be followed as closely as circumstances will permit,but this Contractor shall lay out his work so as to avoid conflict with other Contractors, and trades, and to avoid any unnecessary cutting or damage to walls, floors, and supporting structural members. He shall,therefore, carefully and accurately locate all sleeves and install at the proper time all necessary hangers, inserts, etc., which will be required for the completion of his work and shall be solely responsible for the accurate and proper location of above 15H-2 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 items. This Contractor shall refer to architectural,plumbing, and electrical drawings and shall cooperate fully with other Contractors and trades while installing ducts and other equipment because of close space limits. In case of conflict, notify Designer before proceeding with installation. Refer to architectural drawings for exact building dimensions and location of partition walls, doors,chases, etc. Mechanical drawings are not to be scaled for such dimensions. Because of the small scale of mechanical drawings, it is not possible to indicate all offsets,fittings, and accessories which may be required. Contractor to investigate structural and finish conditions affecting this work and arrange work accordingly,providing such fittings,valves, and accessories required to meet the conditions. The drawings and specifications complement each other and together are intended to give a complete description of the work. Any items of equipment or note of work to be done as shown on plans and not mentioned in the specifications,or mentioned in specifications and not shown on plans,shall be furnished the same as if mentioned or shown in both places. If conflicts exist, then the most stringent method shown or described shall apply. Any switches,controls,or equipment included in this contract work(drawings and/or specifications)that is not specifically shown on drawings shall be located for convenient use and access. Contractor to coordinate all equipment arrangement and lay-out in field prior to beginning any actual installation of his work. If Contractor notes any discrepancy, omission, or conflict found in plans or specifications,he shall call to the immediate attention of the Designer,prior to receipt of bids. After contract is awarded,no claim for extra compensation will be approved for above reasons. It is the intention that piping,air ducts and light fixtures are designed and laid out to clear each other. It shall be the responsibility of this Contractor to coordinate his work with that of other trades to avoid any such conflicts. Any conflicts that occur after work of one trade is installed and was not prior coordinated shall be relocated or rearranged at the total expense of this Contractor,as directed by Designer. Any conflicts that cannot be corrected in field by location or elevation changes shall be report to Designer in writing prior to any installation. Provide all labor, materials, tools, equipment, and transportation and perform all operations necessary for and reasonably incidental to proper execution and completion of all "Mechanical" work,where specifically mentioned or not,all as indicated,specified herein,and/or implied thereby to carry out the intent thereof. H. CUTTING AND PATCHING: This Contractor before installing any of his work shall see that it does not interfere with clearances required for finished walls, partitions, equipment, etc., as shown on mechanical, electrical and architectural drawings and details. If any work is so installed and it later develops that the 15H-3 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 architectural design cannot be followed,this Contractor shall at his own expense,make changes in his work as directed by the Designer so that the architectural design may be followed. Any cutting or patching required by the failure of this Contractor to install sleeves,inserts,hangers, etc.,at the proper time,or failure to accurately locate above items,shall be done at his own expense. This Contractor shall advise General Contractor at proper time an exact location of all roof,wall and floor openings. All such penetrations shall have sleeves. Any cutting of walls or structures required for the installation of work under this division shall be done by this Contractor. Holes for passage of pipe and ducts shall be properly and neatly sleeved and grouted. All sleeve openings to be appropriately sealed at completion of construction. Sleeves through exterior walls shall be effectively sealed against passage of water. All disturbed areas shall be refinished and left in a finished and matching condition and must meet approval of Designer. This Contractor shall properly firestop all floor and wall penetrations utilizing rated assemblies to provide the required fire protection. Firestopping is to be installed in strict compliance with the U.L. through-penetration firestop system(s) applicable or as shown on the plans, or an approved equal. Submit shop drawings showing manufacturer's installation details/sections for approval. Persons installing firestopping shall have on site the approved firestopping submittals during installation,and at final inspection. Firestopping shall be installed per manufacturer's installation instructions and in strict compliance with U.L. rating. All disturbed areas shall be refinished and left in a finished and matching condition and must meet approval of Designer. I. INSPECTIONS AND 'TESTS: No piping, duct work, or other installation shall be covered up or concealed until it has been tested and inspected as called for under appropriate sections of these specifications. This Contractor shall furnish all labor, fuel, equipment or special apparatus required, and bear all expense of such tests. The Designer shall be given advance notice of time tests are to be made, so a representative may be present to observe. J. ALLOWANCE FOR ADDED WORK: Before proceeding with any work for which compensation may be claimed or the Owner may claim credit,a detailed estimate shall first be submitted and approved in writing. No claim for addition to the contract sum will be valid unless so ordered and approved by the Owner and Designer,prior to start of work. Any conflicts corrected by relocation or elevation changes do not constitute extra work. K. AS INSTALLED PRINTS: 15H-4 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 This Contractor shall maintain a set of prints, showing exact locations of all relocated equipment, concealed equipment, service accesses, dampers,underground lines, and all other changes to plans. This set shall be kept current and turned over to the Designer upon completion of the job. Show dimensions to locate all underground piping from permanent reference points. L. STANDARDS: All work performed and equipment furnished by this Contractor shall be in accordance with applicable standards as published by ASHRAE, ANSI,NFPA, SMACNA,ASME, and UL. M. INCIDENTAL CONSTRUCTION WORK: All blocking for openings, ducts and pipes in concrete floors,masonry walls or partitions shall be provided by this Contractor. This Contractor shall do all cutting and fittings of his work and of other work that may be required to make the several parts come together properly and to fit his work to receive or be received by the work of other Contractors as shown upon,or reasonably implied by the drawings and specifications. He shall properly complete and finish up his work after other Contractors have finished as the Designer may direct. All excavating required for the installation of this system shall be done by this Contractor and shall be unclassified; and backfill shall be accomplished as specified in appropriate section of specifications. Chases are prohibited in masonry walls which are not to be plastered or paneled. Set piping and ducts indicated to be concealed in unplastered or unpaneled masonry walls before walls are constructed in order that walls may be constructed around pipes or ducts. This Contractor shall furnish and install all sleeves in floor,beams,walls,etc.,for such penetration as needed for installing his work and installation by General Contractor. Unless otherwise noted,the General Contractor will provide openings and lintels as new construction progresses,but this Contractor shall fully designate his requirements prior to construction. Failure to furnish his requirements prior to building construction shall make this Contractor responsible for removing, replacing and painting building construction as required for installation of his work. N. CLEANING AND PAINTING: This Contractor shall at all times keep the Owner's premises,the adjoining premises,driveways and streets clean of rubbish caused by this Contractor's operations and at the completion of the work shall remove all the rubbish from and about the premises,all his tools,equipment temporary work,surplus material and shall leave the work clean and ready for use. This Contractor shall be required to perform touch-up painting on all factory finished equipment installed under this contract where necessary to repair abraded or scarred areas and make a clean and neat installation at the direction of the Designer. All metal exposed to weather shall be properly painted. 15H-5 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 After the facility is ready for operation,clean all dirt from all machinery and equipment,fans,grilles, ducts, controls, etc. Replace(disposable type)or clean and recoat(permanent type)all filters that have been used during construction at time of final acceptance. O. SUPERVISION: This Contractor shall have in charge of the work at all times during construction a thoroughly competent foreman with extensive experience in the work to be performed under this contract. Any one deemed not capable by the Designer shall be replaced immediately upon request, and after satisfactory foreman has been assigned,he shall not be withdrawn without the written consent of the Designer. P. GUARANTEE: This Contractor shall guarantee all materials,equipment,workmanship and each and every piece of apparatus which he furnished and which he installs under this contract against defects and failures of any nature for a period of two years from date on which the system is accepted. Apparatus furnished by this Contractor shall be guaranteed to be satisfactory when operated under rated conditions in accordance with manufacturer's instructions and to be of function, size, and capacity specified on drawings or in the specifications. Upon notice from the Designer or Owner, he shall immediately check system, make necessary repairs or adjustments as required; due to faulty workmanship, materials, stoppages, operation or equipment, without cost to the Owner, and instruct Owner in proper operation, adjustment and care of systems. Contractor to send Designer a copy of each service call work order stating problem(s),findings,corrective actions taken and any items pending or unresolved; giving anticipated scheduled date for completing. All refrigeration compressors to have five year warranty by manufacturer. The initial two year warranty shall include periodic inspections and filter changing. A report of each inspection shall be sent to the Designer. A minimum of three inspections will be made during the each year after acceptance. The Owner's maintenance personnel shall be instructed regarding routine operation and maintenance of the equipment during each inspection. Upon expiration of the initial 24 month warranty/service period, this Contractor shall offer a continuing service program to the Owner, with a copy to the Designer. The program offered shall vary in content from a minimum service policy to a maximum full coverage policy. The Owner shall have the option to elect to use either policy or none on an annual basis for a nominal fee or none. Q. INTERFERENCES: 15H-6 ,ll DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 This Contractor shall cooperate with all Contractors on the building and shall confer with all Contractors installing mechanical work and equipment which may effect or come in contact with this work. He shall make necessary visits to site and examination of other trades to verify dimensions, installation conditions and conflicts,storage facilities,etc.;he shall examine approved shop drawings of all trades and arrange his work in proper relationship to other work and apparatus and with the architectural finish in an approved manner. All equipment shall be installed to provide convenient access for service. Service access shall be as required by equipment manufacturer, whether or not specifically detailed on drawings. When equipment is not accessible from the ground; catwalks, service platforms,etc. shall be provided as required to allow access to equipment for maintenance. It is the intent that piping, air ducts and light fixtures are laid out to clear each other; it shall be the responsibility of this Contractor to coordinate his work with that of other trades to avoid any such conflicts.Any conflicts that occur after work of one trade is installed and was not prior coordinated, shall be relocated or rearranged at total expense of this Contractor, as directed by Designer. The conflicts that cannot be corrected in field by location or elevation changes shall be reported to the Designer in writing prior to an installation. R. IDENTIFICATION: All equipment shall be identified and properly marked. All marking must meet Designer approval. All markers shall be of appropriate size. Minimum letter height 3/16". Each panel,starter,control, valve,and other pieces of equipment shall be identified as to their service,including each component and adjustment in control panels and equipment. Numbered tags shall be attached to each valve and referenced in operating instructions where applicable. Seaton style 2070 tags or approved equal to be utilized. Where equipment requiring adjustment, servicing or checking is located above lay-in ceiling panels, each ceiling panel is to be identified with a coded marker signifying that it provides access to that particular equipment such as control devices, adjustment dampers,fire dampers, induction boxes, fans,heaters, etc. Ductwork: All ductwork shall be identified as to the service of the duct and the direction of flow. The letters shall be at least two inches high and the flow arrow shall be at least six inches long. The letters and flow arrow shall be made by precut stencils and black oil base paint with aerosol can. Concealed ducts need not be identified. Piping: All piping shall be identified as to the service of the pipe and the normal direction of flow. The letters shall be one inch high on small pipe sizes and two inches high on large pipe sizes and the flow arrows shall be at least six inches long. The letters and flow arrows shall be made by precut stencils and black oil base paint with aerosol can. Concealed pipes need not be identified. Equipment: All equipment,except in finished rooms,shall be identified by stenciling the title of the 15H-7 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 equipment as taken from the plans in a position that is clearly visible from the floor. The letters shall be made with black paint and shall be not less that two inches high. The titles shall be short and concise and abbreviations maybe used as long as the meaning is clear. In finished rooms,equipment shall be identified by engraved nameplates as specified. S. MAINTENANCE AND OPERATION INSTRUCTIONS: Operating and Maintenance Instructions on all equipment shall be provided: Owner's manuals: Organize owner's operation,maintenance,and installation instructions into sets of manageable size. Bind in individual heavy-duty 3-ring vinyl-covered binders of appropriate size, with pocket folders for folded sheet information. Mark identification on front and spine of each binder. Submit four(4)complete copies to the Engineer for review prior to final inspection. Include the following information, with tabs to separate information for each piece of equipment: Submittal data Spare parts lists Manufacturer's operating, installation, and maintenance instructions Copies of warranties Wiring diagrams Preventive maintenance procedures and frequencies Test and balance reports As-Built Test&Balance Drawings As-built control drawings Report of factory start-ups, or contractor's check-out data Valve tag lists Names and addresses of manufacturer's or subcontractors and suppliers. Provide rack in each equipment room for owner's manual storage. Provide a plastic envelope on the wall of each equipment room with inspection certificates, control diagrams, elementary wiring diagrams,piping schematics, valve lists, etc. Prior to Application for Final Payment of the contract,this Contractor shall be responsible to train owner's personnel. Owner training: Train owner's personnel in system and equipment operation and maintenance, including normal and emergency operation, start-up and shut-down, troubleshooting procedures, repair procedures,routine preventive maintenance procedures and frequencies,nouual adjustments, safety precaution, warranty terms and procedures, and assistance available from manufacturer's authorized service representatives. Training is to include review of owner's manual information described above. Where required elsewhere in these specifications,training is to be conducted by manufacturer's authorized service representative or factory representative as part of equipment start- up specified. Upon completion of training,the organization conducting training shall submit on its letterhead to the Engineer a letter stating what training was conducted, date of training, names of 15H-8 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 owner's personnel trained, and name of person conducting training. Upon acceptance of this letter, and final inspection and approval of this project, the one year warranty period on all equipment and systems installed by this Contractor shall start,from that date. T. ELECTRICAL WORK: This Contractor shall furnish, and install all electrical starters, disconnect switches, thermostats, controls,and safety devices required for the proper installation and operation of equipment installed under this contract. Switches,thermostats and controls shall be located for convenient access if not specifically located on drawings. Contractor shall install conduit, power and control wire and outlet boxes for thermostats and interlocks,and wiring to equipment. This Contractor will pull control wiring and furnish all items of control equipment. Work shall be installed in accordance with the most current edition of the National Electrical Code, and as specified in Section 16 of these specifications. U. SHOP DRAWINGS: Upon award of the contract, this Contractor shall submit to the Designer within ten (10) days, for approval, a list of all proposed sub-contractors and materials he proposes (within the three listed manufacturers as equivalent)to utilize for approval by Designer, Contractor to include a submittal schedule/status log listing all items of submittal and shop drawings on AIA Form G712 or similar form, and within 4 weeks of approval, supply eight(8)sets of shop drawings consisting of detailed drawings or manufacturer's cuts of all manufactured equipment he proposes to use on the job. The drawings or cuts shall show details of construction and arrangement and all pertinent data pertaining to equipment proposed to be furnished. The approval of the Designer shall be obtained before equipment is ordered for delivery. Approval of the Designer shall be for general fitness and design only and final approval of substituted equipment is contingent upon its satisfactory performance. It will be the duty of this Contractor to verify quantities, dimensions, capacity, and details, and determine suitability of equipment for installation in space provided. Approval of shop drawings by the Designer does not relieve this Contractor of the responsibility for coordination, dimensions, quantities, capacity, features, or details. If submittal shows variations from the contract requirements, the Contractor shall note on submittal and shall describe all differences (i.e., increased amperage, horsepower, physical size, capacity, flow, etc.) in writing (on letter of transmittal) separate from notations on submittal shop drawings. This Contractor shall check and approve shop drawings making such notations and corrections as may be appropriate or necessary to comply with specifications before submission to the Designer. 15H-9 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Submittals with variations and/or substitutions as equivalent by the listed manufacturers as specified or by those approved as equivalent 10 days prior to bid (see Materials Section) shall also contain a statement that this Contractor has coordinated same with other Contractors and Designers affected and list any changes required, refer to Materials Section. Shop drawings and/or submittal data shall be submitted on items listed as follows: Insulation Materials & Insulation Methods Condensing Units Duct-Mounted, Cased DX Coils Multi Split-System Fan Coil Units Automatic Controls Grilles, Diffusers &Air Handling Accessories Ceiling System (Grid, Ceiling Panels, etc..) Roof Supports, Pipe Curb Assemblies Starters,Magnetic/Manual Disconnect Switches V. TEMPORARY UTILITIES: All necessary utilities such as water and electricity shall be furnished by this Contractor, from Owner's facilities (where practical) during construction. Refer to General Conditions of the Specifications. W. EXISTING FACILITIES: Every precaution shall be taken to prevent damage to existing underground lines and structures and public utilities. Damage to existing water and sewer lines, culverts, service connections, underground cables, and similar surface and sub-surface structures shall be at the risk of this Contractor, whether or not locations thereof are show on plans, and the repairing of such damage shall be by and at the expense of this Contractor,which shall be completed without delay. The locations of any existing underground utilities that are shown are in an approximate way only and have not been independently verified by the Owner or its representative. The Contractor shall determine the exact location of all existing utilities before commencing work,and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. X. ADAPTATION OF WORK TO EXISTING CONDITIONS: It is reasonably implied that this Contractor is to furnish all labor and materials to provide Owner with a new and satisfactory system in these facilities. Contractor is to include necessary work for adaptation of equipment to conditions that may be found to produce conflicts during construction. 15H-10 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 When any such conditions are encountered, Contractor is to consult with Designer and then modify installation as directed without additional costs, and to include any incidental materials required. Y. STORAGE AND PROTECTION OF MATERIALS AND EQUIPMENT: The Mechanical Contractor shall be responsible for furnishing suitable shelter and protection of all materials and equipment stored on the job. Equipment shall be protected from damage from any source both during storage and after installation until completion of the job. No damaged equipment will be accepted. Z. CLEAN UP: The Mechanical Contractor shall be responsible for keeping work areas clean and free of trash and debris resulting from his operations. When work is conducted in occupied areas,clean up shall be accomplished daily and work areas left clean at end of day's work. When all equipment and systems have been set and ready for use,they shall be thoroughly cleaned, removing all labels,plaster,rust and stains, checked for leaks, and left in perfect working order. AA. DELIVERY AND HANDLING OF EQUIPMENT FURNISHED BY OTHERS: All mechanical equipment furnished by Owner and others which is to be installed and connected by the Mechanical Contractor as hereinafter specified will be delivered and turned over to this Contractor. Storing and protection of such equipment shall be done by this Contractor and the furnishing of all applicable accessories and miscellaneous fittings to make complete shall be provided by this Contractor. BB. RESTORATION OF PROPERTY: This Contractor shall carefully restore all property defaced by operations or acts of any of his agents or employees. Such restoration shall include seeding, sodding,and transplanting of lawns,hedges, ornamental planting, and the repair or replacement of driveways, walks, fences, steps, or other facilities in such a manner as to meet with the approval of the Designer and to be at least equal in quality to the original undisturbed work. CC. RENOVATIONS/ALTERATIONS: Survey: Before any work is started in existing building, Mechanical Contractor shall make a thorough survey with Designer and a representative of the Owner of building in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three to 15H-11 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Designer. This report shall list by rooms and spaces: 1. Existing condition and types of resilient flooring, doors,windows,walls and other surfaces not required to be altered throughout and affected areas of building. 2. Existence and condition and operation of items such as thermostats, EMS devices and accessories,HVAC equipment, etc.,required by drawings to be either reused or relocated, or both. 3. Shall note any discrepancies between drawings and existing conditions at site. 4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and Designer. Any items required by drawings to be either reused or relocated or both,found during this survey to be nonexistent, or in opinion of Designer and Owner's representative,to be in such condition that their use is impossible or impractical, shall be removed and a proposal submitted by Contractor to replace with new items in accordance with specifications which will be furnished by Designer. Re-Survey: Fifteen days before expected partial or final inspection date, Contractor, Designer, Owner's representative,together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing,mechanical devices and accessories,HVA/C equipment, etc., as compared with conditions of same as noted in first condition survey report. Telephone system shall be checked out and any damage caused by construction repaired to the satisfaction of this designer and owner. 1. Re-survey report shall also list any damage caused by this Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of this Contractor to restore damage caused by Contractor's workmen in executing work of this Contract. DD. PROJECT CLOSEOUT When this Contractor considers that his work is complete in all respects,per plans and specifications, he shall conduct an inspection of project with office and field supervision personnel and prepare a punchlist of outstanding/incomplete/deficient items of work. This inspection shall include review of all specified documentation, certificates,warranties, and close-out information. When this Contractor considers the above punchlist to be completed or corrected he shall submit to the Designer,in writing,a request for Final Inspection. The request for Final Inspection shall have as attachments the following items: --Punchlist prepared by the Contractor, indicating by check-off all completed items (each item individually checked on the list, not a cover letter stating that all items on attached list are 15H-12 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 complete); -- One copy of the Contractor's Maintenance and Operation manuals for review by the Designer; --As-built marked prints; -- Copy of the Certificate of Occupancy issued by the local authority having jurisdiction; --Contractor's certificate that he has completed all work,per plans and specifications,that he has installed all items in accordance with manufacturer's installation instructions and all applicable codes,and that all systems/equipment furnished have been tested and are in full working order; (see enclosed Certificate Form); -- Contractor's certificate that the as-built marked prints he provided are complete and accurate in all respects, and that any deviations from original design plans and/or specifications are clearly and accurately shown thereon, including all change orders; -- Control subcontractor's certificate that all control components have been calibrated and tested and are in proper working order, and that the system is operating in accordance with the specified control sequence in all modes of operation; --Report of factory start-up on chiller, boiler, etc.; --Testing and balancing reports as specified. -- Letters documenting Owner training in operation and maintenance of systems and equipment. This Contractor is advised to allow adequate time in the project schedule to complete all work, including all specified testing, check-out, inspections, certifications, etc., prior to the contract completion date listed in the Notice to Proceed or other such notification,and before it is necessary for the Owner to occupy the facility. Once the Final Inspection has been conducted,the Designer will issue to this Contractor a punch list of outstanding/deficient items. The Contractor will pursue corrective action to complete the Final Inspection punch list in an expeditious manner. Once all items on the Final Inspection punch list are complete,the Contractor is to submit to the Designer a copy of the Final Inspection punch list with all items checked off, attaching any outstanding documentation required. Additional visits by the Designer which may be required because above procedure has not been followed or accomplished; or,which are necessary to check off Final Inspection punch list items will be at the expense of the Contractor. 15H-13 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Refer to the General Conditions for the completion requirements. As a minimum, the following items must be fully complete, and proper documentation submitted to the Designer, before the Owner can be allowed to occupy any portion of the facility: -- All life safety systems must be fully operational and certified, including fire alarm, emergency power, egress lighting, intercommunications, sprinkler, etc. -- The HVAC system must be fully operational in automatic modes of operation and all control components calibrated and certified by the control system installer. -- Approval of the local authority having jurisdiction through issuance of a Certificate of Occupancy. -- Owner trained in operation and maintenance of systems and equipment. 15H-14 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 CONTRACTOR'S CERTIFICATE OF COMPLETION PROJECT: CONTRACTOR: I hereby certify the following: a. That the work on the above-referenced project has been completed in accordance with the plans and specifications, and that all equipment and materials provided have been installed in accordance with manufacturer's installation instructions and all applicable codes; b. That all items on specified contractor's inspection punch list (copy attached) are completed; and all items on designer's punchlist(s) are completed; c. That all tests and inspections and sub-contractor's certificates and reports specified in the contract documents have been properly conducted and documented as specified, and that all equipment and systems are now completed and in proper working order; d. That the as-built marked prints submitted to the Designer are complete and accurate in all respects, showing all deviations from original design plans and all other items specified; e. That the following Owner's personnel were trained in operation and maintenance of equipment and systems installed under this contract (list names of Owner's personnel and date(s) training was conducted), as specified: (Contractor) (Title) (Date) 1 5H-1 5 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 15620 MATERIALS: Materials and workmanship on all work installed under this contract shall be new and of the best quality and shall conform to the best practice for such work and be installed in accordance with manufacturer's recommendations and instructions, including all hardware and accessories recommended or appropriate. Any work or materials not specifically mentioned in these plans and specifications,but required to make this job a complete and workable system shall be furnished and installed by this Contractor. All materials, fixtures, apparatus and materials and methods of installation shall meet with approval of the Designer. Certain items of manufactured materials and equipment are cited by manufacturer's or product name and model number. This is to establish a standard of design and quality,and is not intended to be restrictive as to the use of materials and equipment of similar design and equivalent quality by other manufacturers,which may be used subject to the approval of the Designer. A.Proposed Equivalent Products:Items proposed as equivalent to those cited will be considered by the Designer up to 10 days prior to receipt of bid, and shall be subject to the approval of the Designer. After that date,no equivalent material or substitution will be considered or approved, and all items shall be as specified. Approvals to consider a proposed brand as being equivalent are for acceptable quality range and are not intended or to be construed as a detailed review of products, features, accessories, mounting hardware,compatibility with other equipment being furnished and space available.Preceding are the Contractors responsibility to insure a complete and coordinated installation of this product and must be submitted for approval and review as specified for submittal data.The approval to bid a proposed equivalent brand as a acceptable equipment design product does not relieve the contractor of this responsibility. Equivalent Products proposed for approval for equipment specified must be equal in every respect and this Contractor shall base his proposal on the quality of materials and equipment covered in these specifications and shown on the drawings, complete with all accessories,hardware, features and functions to provide the same satisfactory performance on this project as the specified item or system. If required by the Designer,this Contractor shall submit for inspection samples of both the specified and the proposed substitute items for comparison by the Designer and test data from a recognized independent testing laboratory for both pieces of equipment. Where equivalent products proposed and approved for bidding alter the design or space requirements indicated on the plans, this Contractor shall include all items of cost for the revised design and construction,including the cost of any changes or modifications in structural or architectural details, and/or electric service, and the cost of all allied trades involved resulting from use of equivalent 15H-16 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 product or equipment. This Contractor is to coordinate and bear all cost where such differences affect other Contractor's work. B. Material Deliveries: This Contractor shall provide to the Designer as soon as possible,and not later than seven(7)weeks after job is awarded,copies of factory acknowledgments of orders of all major items of material,i.e. air handlers,compressors,controls,special systems,etc. These acknowledgments should show date of factory entry and delivery dates promised by the supplier and be updated as job progresses or changes occur. Subsequent monthly applications for payment will not be processed for payment until above information is received each month. C. TESTING AGENCY APPROVAL OR LISTING: 1) All fabricated assemblies of electrically operated equipment furnished under this contract shall have approval and listing of recognized third party agencies accredited by the NCBCC to label electrical and mechanical equipment as of August 1, 1991, or other agency satisfactory to authority having jurisdiction; in every case where such approval and listing has been established for said assemblies or equipment. 2) All manufactured items of electrically operated equipment shall have approval and listing of recognized third party agencies accredited by the NCBCC to label electrical and mechanical equipment as of August 1, 1991, or other agency satisfactory to authority having jurisdiction; in every case where such approval and listing has been established for said items of equipment. 15621 SEISMIC RESTRAINTS: A. The Mechanical Contractor shall be responsible for providing restraints to resist the earthquake effects on the mechanical system. The requirements for these restraints are found in Section 1613 (and sections that follow thru 1614), entitled"Earthquake Loads-General",of the NC Building Code. B. Figures shown in the above code states that this project has effective earthquake spectral response acceleration at short periods(Ss),and earthquake spectral response acceleration at 1-second period (S1), for this project located in Orange County,North Carolina. The Professional Engineer who is utilized by the Mechanical Contractor for the Seismic Design(See Below),shall refer to this section of the Code, for appropriate values of Ss and Si. C. Section 1613 - 1614 states that parts or portions of the buildings or structure,non-structural components,and their anchorage to the main structural system shall be designed for seismic forces in accordance with the applicable equations. D. Chapter 16 of the NC Building Code defines the Seismic Occupancy Category. Sections 15H-17 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 1613-1614 define the Seismic Design Category. The Professional Engineer who is utilized by the Mechanical Contractor for the Seismic Design (See Below), shall select (and include in design submittals) the appropriate Seismic Occupancy Category and Seismic Design Category based on calculation and usage, for each building and / or for each separate building area / usage (where required). Seismic Design Engineer shall consult with Owner/Engineer where function or usage of areas are in question. E. The Mechanical Contractor shall refer to the latest edition of the "Seismic Restraint Manual Guidelines for Mechanical Systems"published by SMACNA for guidelines to determine the correct restraints for sheet metal ducts,piping, and conduit, etc. F. The anchorage of the equipment and machinery for this project shall an integral part of the design and specification of such equipment and machinery. Manufacturers of all equipment including air handling units,pumps,boilers,tanks,compressors,etc.shall provide anchorage details, isolators, seismic mounts and restraints, etc. necessary to comply with Section 1614 to the Mechanical Contractor for installation. It shall be the Mechanical Contractor's responsibility to provide and install the equipment, machinery, systems, and assemblies, etc. for this project which satisfy these requirements. G. Notes/Tables in Sections 1613-1614 lists where seismic restraints are not required. Where seismic restraints are required, the Mechanical Contractor shall provide restraints per details and instructions included in SMACNA's Seismic Restraint Manual. H. Mechanical Contractor shall include shop drawings of the specific methods of seismic restraint to be used for this project before installation of piping, ductwork, and equipment. I. The Mechanical Contractor shall retain the services of a Professional Engineer registered in the State of North Carolina to design seismic restraint elements required for this project. The engineer's computations,bearing his professional seal,shall accompany shop drawings which show Code compliance. Computations and shop drawings shall be submitted for review prior to the purchasing of materials, equipment, systems, and assemblies. J. Internal seismic restraint elements of manufactured equipment shall be certified by a professional engineer retained by the manufacturer. Such certificate applies only to internal elements of the equipment. All equipment anchorage requirements shall be coordinated with the building structure and shall be compatible thereto. All such anchorage shall be reviewed by the project's structural engineer. K. Review of the seismic design and shop drawings by the Engineer/Owner or his agent shall not relieve the Mechanical Contractor of his responsibility to comply with the seismic or any other requirements of the North Carolina State Building Code. 15H-18 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 15622 PIPE AND PIPE FITTINGS: General - Run all piping parallel or perpendicular to building lines and walls unless otherwise shown. Exposed piping arrangements shall be symmetrical straight runs,evenly spaced and graded. A. PIPING: 1. Piping For A/C Condensate Water Lines: Pipe: A/C condensate pipe shall be "Cresline"PVC, schedule 40, or approved equal, conforming to ASTM Specification D1785-13, suitable for a minimum working pressure of 150 PSI, with water temperature of 120 degrees F. Pipe shall be furnished with couplings and PVC schedule 40 pressure fittings for cement joints. Adapter fittings with screw connections shall be furnished as required for connections to equipment,valves,unions, etc. Joints to be assembled in accordance with manufacturer's recommendations and instructions. Piping shall be adequately supported with hangers spaced in accordance with manufacturer's instructions and recommendations. All pipe shall be clearly marked with class, specification designation, and pressure rating. 15688 PAD MOUNTED CONDENSING UNITS: • Furnish and install air conditioning air cooled condensing units as shown on plans. Units shall be completely assembled,piped and wired internally ready for field connections. Condenser exhaust air shall be discharged out of top of unit, and unit to have guards on coils and fans. Unit shall be matched to air handling unit to give integrated capacities indicated on plans and of same manufacturer. Unit to be as manufactured by Carrier, Trane, or approved equal. Unit shall be test operated at factory before shipment. Units shall be installed on suitable 4"concrete pad by this Contractor if shown ground mounted,and on Greenheckpre-fab equipment supports style GESR,or Pate Equipment Curbs-installed per manufacturer's instructions if shown roof mounted. All roof penetrations shall utilize Pate pipe curb assembly. All wall penetrations to be properly sleeved and sealed. Utilize Mitsubishi Line Hide System for all vertical refrigerant piping,furnished complete with all accessories,fittings,brackets,etc.for a complete system—color by owner(either factory color or field-painted as required—coordinate). The refrigerant system shall include a liquid line service valve, compressor cycle protector, high pressure switch,low pressure switch, schrader fitting,refrigerant test valve,crank case heaters, and high capacity dryer. Refrigerant piping shall be Type "L"hard copper tubing,sized and installed per manufacturer's instructions,soldered with"silver solder",purged with dry nitrogen,evacuated before charged, insulated with 3/4" Armstrong "Armaflex" or approved equal. If installed below grade between unit and building to be in 3" schedule 40 PVC conduits. Pre-charged line sets preferred where available sized per manufacturer's recommendations. Unit to include cased, dx cooling coil furnished complete with drain pan (for installation at air 15H-19 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 handling unit in supply ductwork), etc. - matched with outdoor condensing unit. Entire unit to be warranted for one year with additional four(4)years on the compressor. 15689 MULTI-SPLIT SYSTEM FAN COIL UNIT(HIGH SIDEWALL): Outdoor Units: 1.01 System Description A. Outdoor air--cooled split system compressor sections suitable for on--the--ground,rooftop, wall hung or balcony mounting. Units shall consist of a variable speed rotary compressor, an air--cooled coil,propeller--type draw--through outdoor fan, reversing valve, accumulator, electronic expansion valves, multiple service valves, and controls that allows multiple indoor units to be connected to the outdoor unit.Units shall discharge horizontally as shown on the contract drawings. Units shall function as the outdoor component of an air--to--air heat pump system. B. Units shall be used in a refrigeration circuit matched to one, two,three or four High Wall duct--free heat pump fan coil units. 1.02 Agency Listings A. Unit construction shall comply with ANSUASHRAE 15, latest revision, and with NEC.\ B. Units shall be evaluated in accordance with UL standard 1995. C. Units shall be listed in CEC directory. D. Unit cabinet shall be capable of withstanding 500-hour salt spray test per Federal Test Standard no. 141 (method 6061). E. Air-cooled condenser coils shall be leak tested at 573 prig. 1.03 Delivery, Storage,And Handling Units shall be shipped in one piece and shall be stored and handled per manufacturer's recommendations. 1.04 Warranty(For Inclusion By Specifying Engineer) PART 2—PRODUCTS 2.01 Equipment A. General: Factory assembled, single piece, air-cooled outdoor unit. Contained within the enclosure shall be all factory wiring,piping, controls, and compressor. B. Unit Cabinet: 1. Unit cabinet shall be constructed of galvanized steel, bonderized and coated with baked-enamel finish on inside 15H-20 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 and outside. 2. Unit access panel should be removable with minimal screws and shall provide full access to the compressor, fan, and control components. 3. Outdoor compartment shall be isolated and have an acoustic lining to assure quiet operation. C. Fans: 1. Outdoor fans shall be direct-drive propeller type, and shall discharge air horizontally. Fan shall draw air through the outdoor coil. 2. Outdoor fan motors shall be multi--speed,totally-enclosed, single phase motors with permanently lubricated ball bearings. Motor shall be protected by internal thermal overload protection. 3. Shaft shall have inherent corrosion resistance. 4. Outdoor fan openings shall be equipped with metal/mesh PVC coated protection grille over fan. D. Compressor 1. Compressor shall be fully heintetic variable speed rotary type. 2. Compressor shall be three phase, inverter driven. 3. Compressor shall be equipped with oil system, operating oil charge, and motor. 4.Motor shall be suitable for operation in refrigerant and oil atmosphere. 5. Compressor assembly shall be installed on rubber vibration isolators. 6. The inverter and compressor shall be protected against over temperature and over current. E. Outdoor Coil: Coil shall be constructed of Aluminum fins mechanically bonded to seamless copper tubes, which are cleaned, dehydrated and sealed. F. Refrigerant Components: Refrigerant circuit components shall include multiple brass external liquid line service valves with service gauge connection port, multiple suction line service valves with service gage connection port, accumulator,reversing valve, electronic expansion valves. G. Safeties: Operating safeties shall be factory selected, assembled, and tested. The minimum functions shall include the following: 1. Compressor discharge over temperature protection. 2. System low voltage protection. 15H-21 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 3. Compressor overload protection. 4. Compressor over current protection. 5. IPM module protection. H. Electrical Requirements: 1. Units shall operate on single-phase, 60 Hz power at 208/230 v. 2. Unit electrical power shall be a single point connection. 3.All power and control wiring must be installed per NEC and all local electrical codes. 4.Units shall have multiple terminal blocks to connect to multiple indoor units. Indoor Units: 1.01 System Description Indoor, wall-mounted, direct expansion fan coils are matched with heat pump outdoor units. 1.02 Agency Listings Unit shall be rated per AHRI Standards 210/240 and listed in the AHRI directory as a matched system. 1.03 Delivery, Storage,And Handling Units shall be shipped in one piece and shall be stored and handled per manufacturer's recommendations. 1.04 Warranty (For Inclusion By Specifying Engineer) PART 2—PRODUCTS 2.01 Equipment A. General: Indoor, direct-expansion,wall-mounted fan coil. Unit shall be complete with cooling/heating coil, fan, fan motor,piping connectors, electrical controls,microprocessor control system, and integral temperature sensing. Unit shall be furnished with integral wall mounting bracket and mounting hardware. B. Unit Cabinet: Cabinet discharge and inlet grilles shall be attractively styled, high-impact polystyrene. Cabinet shall be fully insulated for improved thermal/acoustic performance. C. Fans: 1.Fan shall be tangential direct-drive blower type with air intake at the top of the unit and discharge at the bottom front. Automatic, motor-driven vertical air sweep shall be provided standard. 2. Air sweep operation shall be useable selectable. The vertical sweep may be adjusted(using the remote control) and the horizontal air direction maybe be set manually. 15H-22 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 D. Coil: Coil shall be copper tube with aluminum fins and galvanized steel tube sheets. Fins shall be bonded to the tubes by mechanical expansion. A drip pan under the coil shall have a drain connection for hose attachment to remove condensate. Condensate pan shall have internal trap. E. Motors: Motors shall be totally enclosed,permanently lubricated ball bearing with inherent overload protection.Fan motors shall be 4--speed. F. Controls: Controls shall consist of a microprocessor-based control system which shall control space temperature, determine optimum fan speed, and run self diagnostics. The temperature control range shall be from 62_F to 84_F (16.7_C to 28.9_C). The unit shall have the following functions as a minimum: 1. Automatic restart after power failure at the same operating conditions as at failure. 2. A timer function to provide a minimum 24-hour timer cycle for system Auto Start/Stop. 3. Wireless infrared remote control to enter set points and operating conditions. 4.Automatic air sweep control to provide on or off activation of air sweep louvers. 5. Dehumidification mode shall provide increased latent removal capability by modulating system operation and set point temperature. 6.Fan-only operation to provide room air circulation when no heating/cooling is required. 7.Diagnostics shall provide continuous checks of unit operation and warn of possible malfunctions.Error messages shall be displayed at the unit. 8.Fan speed control shall be user-selectable: high, medium, low or microprocessor controlled automatic operation during all operating modes. 9. Cold blow prevention control to ensure that cold air is not blown into the occupied space after the compressor is de--energized in the heating cycle. The unit shall be protected against the following: 1. Indoor coil freeze up 2. Indoor coil high temperature protection shall be provided to detect excessive indoor discharge temperature when unit is in heat pump mode. 15H-23 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 G. Filters: Units shall have filter track with factory-supplied cleanable filters. H. Electrical Requirements: Indoor fan motor to operate at 208/230 volts.Power is supplied from the indoor unit. I. Operating Characteristics: The 40GVM system shall have a minimum listed SEER(seasonal energy efficiency ratio) of up to 16.0 SEER at AHRI conditions, and HSPF of up to 8.2. J.Refrigerant Lines: All units should have refrigerant line connections that can be oriented to connect from the left,right, or back of unit. Both refrigerant lines need to be insulated (on all systems). K. Special Features (Field Installed): 1. Condensate Pump: The condensate pump shall remove condensate from the drain pan when gravity drainage cannot be used. Pump shall be designed for quiet operation. Pump shall consist of two parts: an internal reservoir/sensor assembly, and a remote sound-shielded pump assembly. A liquid level sensor in the reservoir shall stop cooling operation if the liquid level in the reservoir is unacceptable. Furnish and install air conditioning air cooled condensing units as shown on plans. Units shall be completely assembled,piped and wired internally ready for field connections. Condenser exhaust air shall be discharged out of top of unit, and unit to have guards on coils and fans. Unit shall be matched to air handling unit to give integrated capacities indicated on plans and of same manufacturer. Unit to be as manufactured by Carrier, Trane, or approved equal. Unit shall be test operated at factory before shipment. Units shall be installed on suitable 4"concrete pad by this Contractor if shown ground mounted,and on Greenheck pre-fab equipment supports style GESR, or Portable Pipe Hanger and Support (Neoprene Padded Feet Type) Equipment Curbs - installed per manufacturer's instructions if shown roof mounted. All roof penetrations shall utilize Pate pipe curb assembly.All wall penetrations to be properly sleeved and sealed. Utilize Mitsubishi Line Hide System for all vertical refrigerant piping,furnished complete with all accessories,fittings, brackets,etc.for a complete system—color by owner(either factory color or field-painted as required —coordinate). The refrigerant system shall include a liquid line service valve, compressor cycle protector, high pressure switch,low pressure switch, Schrader fitting,refrigerant test valve,crank case heaters,and high capacity dryer. Refrigerant piping shall be Type"L"hard copper tubing,sized and installed per manufacturer's instructions,soldered with"silver solder",purged with dry nitrogen,evacuated before charged, insulated with 3/4" Armstrong "Auuaflex" or approved equal. If installed below grade between unit and building to be in 3" schedule 40 PVC conduits. Pre-charged line sets preferred 15H-24 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 where available sized per manufacturer's recommendations. Entire unit to be warranted for one year with additional four (4)years on the compressor. 15764 DUCT WORK: A. General: All ductwork must be U.L.Listed, Class 0 or Class I. However, ducts may be Class I materials when they are not used as vertical risers serving more than two stories or in systems with air temperature higher than 250°F. All duct work shall be installed in accordance with applicable requirements of NFPA Bulletin 90A, SMACNA, and ASHRAE Guide and Data Book. Duct work sizes indicated are as required for free inside area. Actual dimensions shall be determined to allow for duct liner specified herein, or if utilized in lieu of blanket insulation (if approved by Designer) and duct size increased to allow for additional friction loss. Unless otherwise specified or noted, ducts shall be made of galvanized sheet iron or steel and the finished work shall show no flaking or peeling of the coating at any point more than 1/4"from a cut edge. All duct connections to air handling units and equipment shall be made with U.L. listed flameproof flexible connectors. All medium pressure joints and joints at air handling units shall be sealed with "Hardcast" tape. All other joints shall be sealed with SMACNA duct tape with UL Listing to UL 181B. This Contractor shall furnish and install all duct work and miscellaneous metal and materials required for the proper hanging, installation, and insulation of duct work. In the design and sizing of ducts concealed in ceiling spaces, an attempt has been made to allow clearances for light fixtures,piping,structure,and suspended ceiling system. However,the HVAC contractor shall,in all cases,take field measurements before any duct is fabricated to insure that duct sizes shown will fit into available space without interference with lighting fixtures,structures,piping and ceiling systems. In case of conflict,notify Architect/Engineer before proceeding, and relocate and/or resize as required and directed without additional cost to contract. B. Metal Gauges: Thickness of sheetmetal for ducts including elbow,doors,and other details shall not be less than the following: Duct Size-Long Side U.S.S. Gauge Thickness 12" or less 26 ga. .0188" 15H-25 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 13" to 30" 24 ga. .025" 31" to 60" 22 ga. .031" 61"to 90" 20 ga. .0375" Over 90" C. Joints: Longitudinal joints in ducts not exceeding 50 inches in either dimension and in ducts exceeding 60 inches in the large dimension but not exceeding 18 inches in the smaller dimension shall be inside grooved seams, standing seams,sliding corner seams,Pittsburg lock seams, or equal. Longitudinal joints in all other ducts shall be inside standing seams. Ductmate or W.D.C.I.proprietary duct connection systems will be accepted. Duct constructed using these systems will refer to the manufacturer's guidelines for sheet gauge,intermediate reinforcement size and spacing, and joint reinforcements. All ducts shall be strongly and rigidly constructed and joints shall be mechanically tight as well as substantially air tight. Transverse joint and bracing angles shall be as follows: Duct Size-Long Size Transverse Joint Bracing Angles 18" or less S-slip & drive cap None 19"to 24" 3/4" bar slip & drive cap None 25"to 42" 1" bar or pocket slip 1"x 1" x 1/8" 43"to 90" 1-1/2" bar or pocket slip 1-1/2"x 1-1/2"x 1/8" D. Dampers & Splitters: Dampers and splitters shall be installed in ducts at all branches where shown on drawings and wherever required to permit complete adjustment of air quantities. A splitter or opposed blade dampers shall be installed in each branch duct serving four or more outlets,and wherever shown,in addition to dampers,or other means of volume control provided at the outlets. Dampers and splitters shall be located where they can be adjusted at any time after completion of work, means of adjustment and access panels being furnished as required. Dampers on main branch lines shall be manufactured opposed blade type items. Control dampers shall be equal to Ruskin type CD50- 10 CFM per square foot at 4"W.C.maximum leakage. Splitters shall be manufactured type. E. Stiffeners: 15H-26 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 All ducts larger than 24" in either dimension shall be provided with stiffeners which may be either transverse joints or angle bracing as indicated above. The center to center spacing of stiffeners shall not be over 4'-0" for ducts not exceeding 60". Bracing angles shall be galvanized iron. All rectangular ducts over 10" wide shall be cross-broken between joints. F. Turning Vanes: All square elbows shall have factory made double thickness turning vanes. Where space permits, long radius elbows may be used in lieu of square elbows with turning vanes. Inside radius of long radius elbows shall be equal to V2 duct width. Vaned turns shall be Barber-Colman "air turns" or Tuttle and Bailey "duct turns" or approved equal. G. Clearances: In the design and sizing of ducts concealed in ceiling spaces, an attempt has been made to allow clearances for light fixtures,piping,structure,and suspended ceiling system. However,the HVAC Contractor shall,in all cases,take field measurements before any duct is fabricated to insure that duct sizes shown will fit into available space without interferences with lighting fixtures, structures, piping, and ceiling systems. In case of conflict, notify Architect/Engineer before proceeding for instructions for installation and relocate and/or resize as required and directed without additional cost to contract. H. Flexible Duct Sections: All duct connections to fans and air handler units shall be made with U.L. approved flame proof flexible connectors, sewed and sealed air tight. Flexible duct for connections between diffusers and branch ducts shall be a factory fabricated assembly consisting of an inner sleeve, insulation and an outer moisture barrier. The inner sleeve shall be constructed of a continuous vinyl-coated spring steel wire helix fused to a continuous layer of vinyl-coated fiberglass mesh. A 1-1/4"thick insulating blanket of fiberglass wool shall encase the inner sleeve and be sheathed with an outer moisture barrier of a reinforced metalized mylar/neoprene laminate of low permeability,and shall be listed by the Underwriters'Laboratories. The flexible duct shall be Thermaflex II Type NIKE or approved equal and shall not exceed 6 feet in length. All connectors, and accessories shall be manufactured by duct supplier and all components suitable for use on a system of these pressures and velocities. Duct shall be installed strictly per manufacturer's instructions,with factory made fittings and accessories,spin-ins with dampers shall be used for each take-off connection. Flexible ductwork to be run as straight as possible with squashing and kinking limited so that free area is not restricted below 80%. Any turn in excess of 45°to be a metal section,or a boxed plenum at grill connection. 15H-27 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Duct system shall be supported at all turns and transitions and at not more than 3 feet on center for ducts up to 18" in maximum dimension and 4 feet on center for larger ducts. All ducts shall be supported by hangers 1" minimum width of 18 gauge galvanized strap, or rods. Upper ends of hangers shall be secured to floor or structural member above by a method which will develop the full strength of band or rod. 15766 HANGERS AND SUPPORTS: Horizontal rectangular ducts shall be supported by hangers as follows: Duct Size-Long Dim. Hanger Size &Type Maximum Spacing 60" or less 1"x 18 gauge 8'-0" 61" and over 3/8" dia. rod 8'-0" Bands shall be bent over one inch from end and turned under the corners of rectangular ducts and fastened with self-tapping screws at corners and at 6" intervals up the sides. Rod hangers shall be secured to bottom bracing angles with nuts and lock nuts. Hanger material shall be galvanized steel, 1" minimum 16 gage. Upper ends of hangers shall be secured to floor or roof construction above by a method which will develop the full strength of band or rod. Duct system shall be supported at all turns and transitions and at not more than 6 feet on center for ducts up to 24 in. maximum dimension. All round ducts shall be supported by hangers 1" minimum width of 16 gauge galvanized strap, or rods. Hangers shall be attached to ducts with self tapping sheet metal screws,pop rivets,or nuts and lock nuts. Upper ends of hangers shall be secured to floor or structural member above by a method which will develop the full strength of band or rod. This contractor shall furnish and install all miscellaneous metal required for the proper hanging of duct work. 15768 FIRE DAMPERS Furnish and install,at locations required or as shown on plans,fire dampers constructed and tested in accordance with UL Safety Standard 555. Each fire damper shall have a 1-1/2 hours fire protection rating unless noted otherwise,212 degrees F.fusible link,and shall include a UL label in accordance with established UL labeling procedures. Damper Manufacturer's literature submitted for approval prior to installation shall include comprehensive performance data developed from testing in 15H-28 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 accordance with AMCA Standard 500 and shall illustrate pressure drops for all sizes of dampers required at all anticipated air flow rates. Fire dampers shall be equipped for vertical or horizontal installation as required by the location shown. Fire dampers located in supply ducts to be Type "B" (100%free area). Fire dampers located in return and exhaust ducts to be Type "A". Fire dampers shall be installed in wall and floor openings utilizing steel sleeves, angles, other materials, and practices required to provide an installation according to NFPA 90A and equivalent to that utilized by the manufacturer when dampers were tested at UL. Installation shall be in accordance with the damper manufacturer's U.L approved instructions. During installation,personnel installing dampers shall have manufacturer's installation instructions in their possession. Fire dampers shall be as manufactured by Ruskin,Prefco, Safe Air,National Controlled Air,United Air,or Nailor,and must be U.L. labeled. Provide access doors for inspection and resetting as applicable when duct dampers are installed and/or concealed. Access doors to be by Milcor, with fire rating appropriate to the wall/floor assembly rating. Size to be as required to provide adequate access and doors to be compatible with architectural finish adjacent. 15770 GRILLES AND DIFFUSERS: Furnish and install ceiling diffusers, supply and return air and exhaust grilles and registers as noted on plans and in schedules. Provide all volume control and adjusting devices as called for in schedules,all supply diffusers shall be equipped with volume controls. Grills,registers and diffusers shall be as manufactured by Metal Aire Industries, Carnes, Titus, or EH Price, or approved equal. Round neck adapters are to be provided where required. Unit offered as substitutes to those used in the layout of the system shall show suitable air distribution and performance. Final approval will be reserved,pending satisfactory performance on job. Ceiling diffusers to be lay-in or surface mounted as ceiling type dictates. Finish to be off white baked enamel. 15810 DUCT INSULATION All supply, outside air, and return ducts to be insulated unless noted otherwise on drawings. All ductwork routed in unconditioned spaces within the building envelope shall have 2" blanket insulation; or if outside the building envelope—3"blanket insulation, as outlined below. Insulation required for conditioned air ducts shall be as listed below: A. DUCTWORK: All rectangular supply,return, and outside air ducts outside the building envelope (i.e. in the attic) shall be wrapped with 3" ductwrap,per the requirements of NC Energy Code. 15H-29 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Exhaust ductwork shall be un-insulated. B. BLANKET INSULATION: Blanket type insulation shall be 3/4 lb. density fiberglass having a vapor barrier jacket of.002 inch high aluminum foil laminated and reinforced with paper or glass fibers (minimum R= 8.0). Duct insulation, including jacketing and adhesives when used shall have a flamespread rating not to exceed 25 and a smoke developed rating not to exceed 50 when insulation assembly is tested as a composite product. Vapor barrier jacket shall be overlapped not less than 2 inches at all joints by cutting back insulation and lapping jacket to form a smooth tight joint scaled and cemented down with a suitable noncombustible adhesive. Insulation shall be secured to ducts with weld pins or metal stick clips and speed washers spaced at not over 12" o.c. each way. 15822 AUTOMATIC 'TEMPERATURE CONTROLS: Generally all equipment to be furnished with packaged controls per schedules and information on drawings. Mechanical Contractor shall be responsible for setup and programming of all controls per manufacturer's recommendations. All occupancy schedules to be coordinated with the Owner. Information below is for guidance only— refer to specific equipment/products installed and match systems and performance to the fullest extent possible. Units shall be furnished with packaged control equipment. Wire in strict accordance with Provide solid state heating-cooling auto-changeover,7-day programmable thermostats for space temperature control for gas furnaces (with split, dx cooling) and multi-mini split split systems. Therniostats to have dual setpoints (heating/cooling). Thermostats shall be equipped with switches to provide for continuous fan operation, or Auto fan operation and system Off-Heat-Cool-Auto,and be compatible with equipment furnished. Fan shall run continuously for all rtu's during"occupied"periods. Program control for designated toilet exhaust fans to be via associated zone programmable thermostat (wired—in at auxiliary contact(s)). Units shall be furnished with packaged control equipment. Wire in strict accordance with manufacturer's recommendations,providing any and all wiring and conduit required to connect the various components together. System shall meet all N.C. Energy Code and ASHRAE 90-89 requirements. Any control devices shall be located for convenient access and function if not specifically located on 15H-30 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 drawings, including all conduit and wiring required to be furnished and installed by this contractor. All theiinostat and operable controls devices shall be located not higher than 48"AFF. Furnish a complete control wiring diagram including written description and sequence of operation; train in operation and adjustment. All control wiring shall be in accordance with electrical specifications. The system shall be complete in all respects including all labor,materials, equipment and services necessary, and shall be installed by personnel regularly engaged in this type of work. The system shall include all appurtenances whether or not specifically implied or expressed herein or on the contract drawings. All electrical signal wiring together with all field control wiring whether a part of the automation system or not shall be provided for all equipment in the mechanical section as a part of the work of this section. Controls shall be installed,connected,checked out,and calibrated by this contractor,complete in all respects. 15880 ADJUSTING, BALANCING, TESTING AND INSPECTION: The testing and balancing of the heating,ventilating,and air conditioning systems shall be performed by an independent balancing agency approved by the Engineer. The balancing agency shall have a minimum of five years' specialized experience in air and hydronic system balancing, and possess calibrated instruments, qualified test-and-balance engineers, and skilled technicians to perform all required tests. The balancing agency shall be either AABC or NEBB certified. The balancing agency shall provide proof of having balanced successfully at least five projects of similar scope and size. The Mechanical Contractor shall keep a service technician on the job full time for the entire period that the test and balance technician is to coordinate work, assist in balancing and adjusting efforts, make corrections/changes indicated, and to communicate status and receive direction from the designer. The personnel and procedures utilized shall comply with all standards as set forth by a national balancing organization,shall utilize AABC or NEBB procedural standards and forms,and ASHRAE Handbook chapter on Testing,Adjusting, and Balancing. The tests shall demonstrate the specified capacities and operation of all equipment and materials comprising the systems. The balancing agency shall then make available to the Engineer such instruments and technicians as are required for spot checks of the system. 15H-31 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 The Engineer shall be notified in advance of all tests and inspections,so they may be able to witness such tests and inspections. The balancing agency shall be submitted for approval within twenty(20) days of notice of award. Within 8 weeks of approval of the balancing agency by the Engineer, the balancing agency shall submit to the Engineer via the Mechanical Contractor three copies of a complete system test plan,to include copies of foiuis to be used, with equipment designations from plans, indicated; and instrumentation list with calibration dates included. This submittal shall also indicate that the balancing agency has reviewed the Contract Documents to ensure that all necessary dampers, balancing valves, and other devices required for correct balance and adjustment of the system are provided for, and note any potential problem areas. During construction,the balancing agency shall inspect the installation of pipe systems,sheet metal work, temperature controls, HVAC equipment, and other component parts of the system. The inspection shall be performed periodically as the work progresses. A minimum of two inspections are required as follows: (1)when 60 percent of the ductwork is installed;(2)when 90 percent of the equipment is installed. The balancing agency shall submit a brief written report of each inspection to the Engineer via the Mechanical Contractor. The balancing agency shall witness start-up and tests for all major HVAC equipment. Copies of test reports, including manufacturer's start-up check lists included in manufacturer's installation instructions, shall be included in the Test-and-Balance report. System balancing and testing shall not begin until system has been completed and is in full working order. This contractor shall put all HVAC systems and equipment into full automatic operation and shall continue such operation throughout the testing and balancing period. Adequate time shall be allowed in the construction schedule for completion of all specified testing and balancing within the contract completion date, and prior to requesting final inspection. During system balancing and testing, field data in rough form shall be forwarded daily to the Engineer. The balancing agency shall coordinate and review worksheets and findings daily with the Engineer as testing and balancing progresses to obtain direction for adjustments. The balancing agency shall notify the Engineer daily of any controls found inoperative, out of calibration, or otherwise needing adjustment. Any critical deviation of equipment capabilities or performance from design and specification requirements shall be immediately reported to the Engineer for his action, and noted in the Test-and-Balance report, together with recommendations for efficient and economical correction of the deficiency. Once system balancing and testing is completed,provide a minimum of one day's training program for the Owner's designated personnel which shall stress operation of the complete control system. During this period, log all temperatures, and temperature drops/rises across equipment hourly. Allow system to stabilize; set down 5 degrees, stabilize; set up 10 degrees, stabilize; return to original setpoint,stabilize;and log at each setting. Transmit rough logs to Engineer within 24 hours of completion of this test, including names of Owner's personnel present. 15H-32 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 The balancing agency shall cooperate with the controls sub-contractor,and shall certify the following in writing to the Engineer via the Mechanical Contractor prior to requesting final inspection: (1)Certify that all system components are installed in accordance with the plans and specifications and are functional in accordance with the specified control sequence, including all electrical interlocks, damper sequences, air and water reset controls,fire and freeze stats,and all other safety and operating controls; (2) Certify that all control instruments are calibrated and set for design operating conditions; and (3) Verify the accuracy of the final settings and operation of control sequence in automatic operation by recording space temperature in a typical conditioned space for each separately controlled zone for a minimum of 48 hours of system automatic operation, and transmit chart recordings to the Engineer within 24 hours of completion. Energy Balance and Performance Test: Measure the inlet and outlet temperatures and flow rates of each fluid on each chiller, boiler, and air handler coil, and deterinine the BTU input and output. Measure volts and amps and determine KW input as applicable. Prior to Owner's occupancy of the project,train the Owner's authorized personnel on how to operate, start-up,shut-down,and service the various parts of the system,and furnish Engineer a letter stating this has been done to Owner's satisfaction and listing names of Owner's personnel so instructed. The settings of dampers,splitters,valves,pulleys and other volume adjusting devices and flow meter readings shall be permanently marked after completion of balancing and adjusting,so that they can be restored if disturbed at any time. The balancing agency shall verify that all switches, starters, control devices, relays, night and day thermostats, overcall switches, and other equipment are identified as specified with approved nameplates, and all setpoints marked. The balancing agency shall verify that the locations of all dampers,valves,etc.,located above lay-in ceilings are accurately marked by color-coded marker dots on the ceiling grid as specified. The Controls sub-contractor shall include a warranty of one year,after acceptance of system,during which time the Engineer at his discretion may request a re-check,program revisions,re-setting of any loops sequence,fine tuning, optimizing, etc., or reconfiguration. The controls sub-contractor shall provide technicians and equipment necessary to assist the Engineer in making any tests, or adjustments he may require during this period of time without additional cost. The balancing agency shall include a warranty of one year,after acceptance of test and balance work, during which time the Engineer at his discretion may request a re-check,or re-setting of any outlet, fan, pump, etc., as listed in the Test-and-Balance report. The balancing agency shall provide technicians and equipment necessary to assist the Engineer in making any tests or adjustments he may require during this period of time. The balancing agency shall perform a follow-up inspection of the HVAC system during the opposite season from that in which the initial adjustments were made,make any necessary modifications to 15H-33 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 the initial adjustments to produce optimum system operation and maintain comfort conditions. The peak design cooling and peak design heating conditions must be determined on these days for the seasons not reported in the start-up. Submit a report of this inspection,including problems noted and adjustments made, to the Engineer. The balancing agency shall notify the Engineer in advance of this inspection. AIR SYS'T'EM PROCEDURES Test and adjust fan speeds to achieve design CFM and SP requirements in all modes of operation. If a fan pulley cannot be adjusted to suit the CFM and SP required, it shall be changed. Lubricate all motor and pulley bearings. Check all belts for proper tension and alignment. Check all motors and equipment for proper rotation. Measure and record motor speed,current,and voltage,nameplate data,sheave sizes and belt sizes in all modes of operation. Perform a Pitot-tube traverse of main supply,and return ducts to obtain total CFM in each mode of operation (e.g., heating, cooling, economizer, etc.). If a Pitot-tube traverse is not practical, the summation of the outlets or inlets may be used after consultation with the Engineer. Explanation why traverse was not used is to be included on the appropriate data sheet. Test and adjust system minimum outside air by Pitot-tube traverse in each mode of operation. If a Pitot-tube traverse is not practical,the percentage of outside air may be determined by calculations from the return air, outside air, and mixed air temperatures. Make allowances for heat of compression and motor heat where applicable. Test and record system static pressures,including suction and discharge static pressure of each fan. Take wet-bulb and dry-bulb air temperatures on the entering and leaving side of each cooling coil. Dry-bulb temperature shall be taken on the entering and leaving side of each heating coil. Test and balance each diffuser, grille, and register to within 10 percent of design requirements. All adjustments are to be made at terminal boxes, trunk ducts or run-out ducts, not at volume control dampers in outlet devices. Adjust all diffusers,grilles,and registers to minimize drafts in all areas. Adjust heat recovery and exhaust systems and relief dampers to exhaust air quantities specified. Record fan nameplate data,and actual RPM,CFM,SP,and amps at each speed of operation. Verify operation of motor- or gravity-operated backdraft dampers. TEST AND BALANCE REPORT The test-and-balance report shall be complete with logs, data, and records as required herein. All logs,data,and records shall be typed and bound. The report shall be certified accurate and complete 15H-34 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 by the balancing agency's certified test-and-balance engineer. Submit three copies of the certified test-and-balance report to the Engineer. The report shall be evidence that the system has been tested, adjusted, and balanced in accordance with AABC,NEBB, or ASHRAE standards; are an accurate representation of system performance at the completion of testing and balancing;and are an accurate record of all final quantities measured,to establish normal operating values of the systems. As part of the report, submit one copy of the contract drawings marked "as-built" to the Engineer. Indicate actual CFM at each grill, static pressures, inlet and outlet water and air temperatures, pressures, GPM at each, and test point codes. Record the following items at each cooling and heating element: inlet and leaving water and air temperatures,pressure drop of each coil or bypass valve, water and air metering device readings. For each pump record operating and discharge air pressures and final 'I'MH. Record identification of all measured points to cross-reference with tabulated data. Verify as-installed locations of all dampers, balancing valves, and other control devices are accurately shown. The test-and-balance report shall be recorded on report forms conforming to recommended forms in AABC or NEBB standards and as approved by the Engineer in the test plan. As a minimum the report shall include: Preface - a general description of the system, equipment, and controls, and discussion of any abnormalities and problems encountered. Instrumentation list-The list of instruments including type,model, manufacturer, serial number, and calibration dates. System identification - Supply, return, and exhaust openings, zones, traverse points, terminal equipment such as VAV boxes,fans, air handling units,heating/cooling coils,and other equipment shall be identified to correspond to the identification used on the report data sheets. Such identification shall also correspond to the identification on the project drawings, field labels, and owner designations. Air handling equipment test report forms -Record the following for all air handling equipment in each mode of operation:manufacturer,model number,serial number; all design and manufacturer- rated data; total actual CFM by traverse or other approved method, CFM grill totals; suction and discharge static pressure of each fan; outside air and return air total CFM; actual operating current, voltage, and brake horsepower; motor and fan final RPM; fan and motor sheave manufacturer, model, size,number of grooves,and center distance;belt size and quantity;static-pressure controls final operating set points. Heating and cooling coil test forms-Record the following items for each heating or cooling coil: manufacturer;all design and manufacturer's rated data;rated and actual water pressure drop through each coil and related GPM; rated and actual static pressure drop across each coil; entering and leaving water temperatures; wet-bulb and dry-bulb temperatures of air entering and leaving each 15H-3 5 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 cooling coil; dry-bulb temperatures of air entering and leaving each heating coil. 15900 DEMOLITION: This Contractor to disconnect,remove, and dispose of at the Owner's direction all items of mechanical material/systems (piping, ductwork, etc.) designated for removal. Coordinate with General Contractor for extent of work prior to bidding. Work shall consist of performing all operations in connection with alteration,repair,removal and demolition in accordance with the drawings and as specified herein. All work shall be performed in accordance with all applicable, standards and specifications. Existing materials, accessories, fixtures and equipment shall be used in the new work as much as practicable or disposed of as directed by the Architect/Engineer or the Owner. Verify existing conditions at the site, and examine adjoining work which in any way will affect the completion of this work. Report to the Owner,in writing, any condition which will prevent the proper performance of the work.No waiver of responsibility for defective adjoining work will be considered unless notice has been filed in writing with the Owner before work begins. Protect adjacent property against damages from any cause. Repair any damage done to property by reason of required safety measures. Debris resulting from alteration and demolition work shall be removed from the site and disposed of by this Contractor. Burning of debris and rubbish on the Owner's property will not be petnritted, except by written permission of the Owner. Disconnecting, capping, sealing,relocating and reconnecting of any utility service shall be performed only by mechanics skilled in the trade involved. 15H-36 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 CONTRACTOR'S CERTIFICATE OF COMPLETION PROJECT: CONTRACTOR: I hereby certify the following: a. That the work on the above-referenced project has been completed in accordance with the plans and specifications, and that all equipment and materials provided have been installed in accordance with manufacturer's installation instructions and all applicable codes; b. That all items on specified contractor's inspection punch list (copy attached) are completed; and all items on designer's punchlist(s) are completed; c. That all tests and inspections and sub-contractor's certificates and reports specified in the contract documents have been properly conducted and documented as specified, and that all equipment and systems are now completed and in proper working order; d. That the as-built marked prints submitted to the Designer are complete and accurate in all respects, showing all deviations from original design plans and all other items specified; e. That the following Owner's personnel were trained in operation and maintenance of equipment and systems installed under this contract (list names of Owner's personnel and date(s) training was conducted), as specified: 15H-37 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 (Contractor) (Title) (Date) 15H-38 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 1 0 .I I m I o I .. 1 m I WPM ss+[1/1C-1'd cwaC to I/SW4 COMO SOU fl/P-V-o. e r- ® ., . . . ® i i i i r c i I � � ` m,Fs . I 8 8 e mA P90= `gg°;mmrgm,>m 11 Iv r� ply c 11 I 1 go go 5 5` `, at'sN1 q� F IIdIl 11 5 i!g! H o 4 0 I H EN Q i ._ — �oer� o �,y ;pct m — ga-QFf u m AIR D 2 a. Z _z a 1 2 _ CIE. o D N Eig P r P N r yon i� � E R a > > 2- 3gi 1 1 el 401 „q 8,,g A li! I1 ; so IP : 0 0 4; ihog- 11 1 il i! 11121 N a 2 04 - i o8 A LI za v 1 a , _ �L CIS € 4 kg Nie Ix 5 1 I I ' I m I c I ° I m I > 1 1 F E ___ . N z 8 ORANGE COUNTY o o SKILL DEVELOPMENT CENTER " mw q,,A, �2�2g�_ - _' 1 R ~b' = ,1 ^� DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Angel Barnes From: Ron LaPann <Ron.Lapann @warren-hay.com> Sent: Thursday, June 23, 2016 4:50 PM To: Angel Barnes Subject: RE: Skills Development HVAC Upgrade Attachments: 5.2016 Various Options Warren Hay Proposal.pdf; REVISED 7 Systems 6.2016 Controls Option Warren Hay Proposal.pdf Angel, Attached is a (REVISED) quote for ALL 7 Systems located here as discussed. I have removed the (New line sets and based this revised number on reconnecting to existing, flushing, leak check and repairing any missing insulation.) I have also removed the $2,200.00 Line item for roof work as it should not be needed. Original price for all (7) systems was $87,974.00 -$5,000.00 (New Line sets credit) -$2,200.00 (Roofing allowance) $80,774.00 for ALL Seven systems That is an increase over the original approval for (6) systems of $5,372.00. Hope this helps, let me know how to proceed, I need to secure equipment, and change permit to reflect 7 systems in lieu of 6 but other than that I don't anticpate any issues, we will reconnec to all existing as planned and new equipment should fit back as is. Keep in mind you may be required during inspeciton to install a fall protection gate/ rail where the existign access point is, depends on the inspector. I have attached both the original and revised proposal review and let me know if there are any quesitons or comments. Regards, Ron LaPann 1 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 WA ': ':EN - HAY Mechanical Contractors Inc. Heating and Air Conditioning P.O.Box 818 •Hillsborough,NC 27278 919-732-4362 May 27,2016/June 23,2016 Orange County RE: 503 W Franklin Street,Chapel Hill PROPOSAL We hereby submit specifications and estimates for: As noted: • Replace Split systems 1,2,3,4,5,6&7 with new equipment utilizing 95%gas furnaces with 14 Seer ratings. These systems will reconnect to existing ductwork,air distribution,venting,fresh air,power wiring&control wiring.All systems to be placed back as close as possible to existing location,will need to field verify exact final placement due to restrictions and service access. Any sheet metal duct,venting or electrical,off sets,extensions,needed to reach final location(close to existing)is included. • Provide labor and material to flush existing refrigerant lines,Repair and replace torn or missing insulation.(Re-use Existing line sets) • Provide&install new Stand Alone programmable thermostats. 14.0 Seer Systems w/95%Gas furnaces. $80,774.00 Add Alternate for Carrier Comfort View controls 7 systems. • Provide &install(1)IVU, (7)Premier Link controllers, (7) Sensors,communication wiring&start-up. $18,250.00 We propose hereby to furnish material and labor: As noted Above • Internet data line for controls connection(by Orange County). • Controls will be installed on existing county owned Computer. Payment due (net 30) Acceptance: Total Approved: Date: Respectfully submitted by:Ron LaPann Commercial Division ron.lapann(ciwarren-hay.com DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Kry Orange County Financial Services Department ADDENDUM #1 March 31, 2016 Bid 1716 Orange County HVAC Work at SDC To all Vendors: Modifications to bid documents for the above-named Request for Proposal are made as follows and shall be included in the proposed amount. Orange County is currently trying to identify additional funding to address issues brought up at the pre bid. Specifically the furnaces. With time being of the essence on this important project Orange County reserves the right to work with the low bidder on the project with the bid in its current form. The County, low bidder and RNM will work to address the aforementioned issues as possible. Owens Roofing installed the new roof in the first quarter of 2015 The Due date has been extended to April 7, 2016 at 2:00 pm All other terms and conditions shall remain the same By: David E. Cannel], Purchasing Agent; dicannell @co.orange no us I(919) 245-2651 Acknowledgement of receipt of this addendum shall be included with your submittal (page 1 only) Company Name: 1444, 1 MdY tc / ,4 By: q . Date Received: �1� 74 Z7 P.O. Box 8181 200 South Cameron Street Hillsborough, North Carolina 27278 Telephones: Area Code 919-245-2651 Fax: 919-636-4913 Orange County,200 S.Cameron Street, Hillsborough, North Carolina 27278 Page DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 COUNTY OF ORANGE FINANCIAL SERVICES — PURCHASING PO BOX 8181 HILLSBOROUGH, NORTH CAROLINA 27278 ORANGE COUNTY BID NO. 1716 March 16, 2016 ATTENTION: INTERESTED VENDORS Orange County requests your competitive quotation to furnish the item(s) listed below for the Orange County Asset Management Department, Hillsborough, NC. 15. A site visit is scheduled March 24, 2016 at 2:00 pm beginning at the Skills Development Center. 503 W Franklin St Chapel Hill, NC we will reconvene afterwards at WCOB to view the IT Room. This is the only scheduled time for contractors to view the site. By submitting a bid the contractor acknowledges full comprehension of the scope of this project. Please transmit this quotation via facsimile,via email dcannell rt.orangecountync:gov or deliver by hand or U.S. Mail, to the Orange County Purchasing Agent- fax # (919) 636-4913 (NEW!!) , 200 South Cameron Street, Hillsborough, NC 27278 by March 31 , 2016 at 2:00 PM ITEM QTY COMMODITIES/GOODS OR SERVICES TOTAL COST PLEASE COMPLETE ATTACHED FORM OF PROPOSAL AN INCLUDE WITH YOUR BID SUBMITTAL PLEASE SEE ATTACHED INSTRUCTIONS TO BIDDERS License 7a-/{ FIRM NA;� , :_3 ,4,0644. sr 0/4- BY ha AirMA (P oposal must be signed in writing) ADDRESS a gig FAX: 712 8' 4 11,4„,ip A/c, 2Z - EPHO : 47?"? 71.2. c{3‘.2. EMAIL: Are*.ev4rre ( 4'4a"&.4-6Y DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 • FORM OF PROPOSAL ORANGE COUNTY SKILLS CENTER CONDENSING UNIT/COIL REPLACEMENT -CHAPEL HILL,NC WEST CAMPUS IT ROOM BACKUP SYSTEM-HILLSBOROUGH The undersigned, as Bidder, hereby declares that: the only person or persons interested in this bid as principal or principals is or are named herein, and no other person than herein mentioned has any interest in this bid or in the contract to be entered into; that this bid is made without connection with any other person, company or party making a bid; this bid is in all respects fair and is made in good faith without collusion or fraud; he has examined the site of the Work and informed himself fully in regard to all conditions pertaining to the place where the Work is to be done; he has examined the Contract Documents and has read all special provisions furnished prior to the opening of bids; and he has satisfied himself relative to the Work to be performed. The Bidder proposes and agrees that if this bid is accepted,he shall forthwith contract with The County of Orange to furnish all necessary materials, equipment, machinery,tools, apparatus, means of transportation and labor necessary to fully complete the SKILLS CENTER CONDENSING UNIT/COIL REPLACEMENT and WEST CAMPUS IT ROOM BACKUP SYSTEM in complete accordance with the Contract Documents,to the full and entire satisfaction of the County of Orange, with a definite understanding that no money will be allowed for extra work except at set forth in the Contract Documents. 1.. The Bidder's Total (BASE BID- Installation of Units#2 thru #6)Contract Price is j� ix-fy 5EVE -t'`I-kt.+.t'.� (9t/1-01- 4,44 .Q rG 4 Dollars (S 4 7t g'l ' 2, The Bidder's Alternate#1 (Installation of Unit# 7) Contract Price is 11,I rg, . u04-J/ 7' kCb d 54y oe Dollars ($ 131 6 ). ADD 3, The Bidder's Total (BASE BID-Installation of West Campus IT Room Backup System Contract Price is rot 7,1 e 7/p-tl4.,,,/ ` 0 A r__AZkijspr,A17 Dollars (S yst/ I' ). • The Bidder acknowledges and agrees that the Contract Time is 90 consecutive days (including alternate(s)that may be accepted). • DocuSign Envelope ID: E8012703 ru50-48uo-9C8C'EC3r8ru8eCsD This 7/4 day of »Y 'f)/ 2O| /~ /IP V NEeu4mot 64 yl,w^4~ /Ale-- ' (Name of firm or corporation making bid) WITNESS: By: Arty k� /uw _h/ Title: ����� ' --- (Proprietorship or Partnership) ( PodncrPmo.cvYJPres.) Address: 120 SO 8/c5 License Mo, 7g// ^y/. 4 2' ~/7 _' Telephone No. 9fio 772'M2^ ATTEST: (11a corporation) Facsimile No, �/5' 73 2^g4 Z 4 y / ,�� \ / By: i " �] - ' � -� "p ~ `' , 7 ' ` ! - ( Title: ~�rY��� `�' � (Coqo.8on. nrAxn\ Snc.0n|y) (CORPORATE SEAL) Addendum received and used in computIng bid: (initial as appropriate) AddendumNu\ 1.7l /4 Addom]umNo3 Addendum No.2 Addendum No.4 . DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Angel Barnes From: Steve Kaufman <skaufman @rnm-engineers.com> Sent: Wednesday,June 01, 2016 5:13 PM To: Angel Barnes Subject: RE: Skills Development HVAC VE Attachments: 5.2016 Various Options Warren Hay Proposal.pdf Angel, Per our discussion today, the best option of those proposed by Warren Hay in my opinion would be the 14 SEER systems with 95%gas furnaces. These higher efficiency condensing furnaces have pretty much become the standard and we would not recommend the outdated 80%technology. However I do not anticipate the energy savings for improving beyond the 14 SEER outdoor units would be worth the significant extra expense. This proposal does offer the significant benefit of replacing the furnaces at this time as well as the outdoor units. The existing units are well beyond their expected life and this would have been our design approach from the beginning if adequate funds for this facility would have been available. Please let me know if any questions or you wish to discuss this further. Steve Kaufman, P.E., LEEDrAP President RN&M ENGINEERS 94 Main Street, Canton, NC 28716 828-492-0677 ext. 101 mobile 828421-7441 skaufmangrnm-engineers.com From: Ron LaPann [mai lto:Ron.Lapann@warren-hay.corn] Sent: Friday, May 27, 2016 9:43 AM To:Steve Kaufman <skaufman @rnm-engineers.com> Cc: abarnes@orangecountync.govj jethompson(�orangecountyncgov Subject: 2016-05-27 RE: Skills Development HVAC VE Ron Good morning all, My apologies for the delay in getting these options priced, I have been searching for R22 dry units that we could offer as a alternate as discussed, unfortunately they simply are not available. With that being said I priced up options for consideration with various Seer ratings so you could try to get in budget. You will also see options Carrier Controls as requested, and West Campus ductless splits. 1 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 Review and let me know if there are any questions or other options you would like to look at. On W Franklin Street we will need to (field coordinate) final locations of equipment, we can make it work however we may need to relocate some of the equipment for clearances. Have a great weekend.. Regards, Ron LaPann WARREN - HAY Mechanical Contractors Inc. Heating and Air Conditioning P.O. Box 818 Hillsborough, NC 27278 919-732-4362 Office 919-612-6850 Mobile www.warre.n-hay.com From:Angel Barnes [mailto:abarnes@orangecountync.gov] Sent:Thursday, May 12, 2016 5:10 PM To: Steve Kaufman <skaufrnan@rnm-engineers.com>; Dick Drake <ddrakeftrnm-engineers.com> Cc:Jeff Thompson <jethompson@oran:ecount nc..ov> Subject:Skills Development HVAC Good Afternoon, Thank you for the meeting last week. I was hoping to find out if you have received the updated information from Warren-Hay for the Skills Development Center? Thank you, Angel Angel Barnes I Capital Projects Manager I Orange County Asset Management Services I 131 West Margaret Lane I Hillsborou:h NC 27278 I (919) 245.2628 (direct) ! (919) 610.8182 (mobile) Iwww.orangecountync.gov 2 DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 A CCP RE, CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 6/29/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Crystal Ireland NAME: y Business Insurers of Carolinas (A/ONN Ext): (919)968-4611 (NC,No): (919)968-8991 800 Eastowne Drive, Suite 208 E-MAIL ci ADDRESS: reland @business-insurers.com PO Box 2536 INSURER(S)AFFORDING COVERAGE NAIC# Chapel Hill NC 27515-2536 INSURERA:Penn National Ins. Companies 14990 INSURED INSURER B Bridgefield Casualty Insurance 10335 Warren-Hay Mechanical Contractors Inc INSURERc:Philadelphia Insurance Comp 18058 Sheet Metal Duct Suppliers LLC INSURER D: PO Box 818 INSURER E: Hillsborough NC 27278 INSURER F: COVERAGES CERTIFICATE NUMBER:CL161514307 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUER POLICY EFF POLICY EXP LTR INSR WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED A CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $ 100,000 CX90726312 12/31/2015 12/31/2016 MED EXP(Any one person) $ 10,000 PERSONAL&ADVINJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 X PRO- POLICY JECT LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 A X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED AX90726312 12/31/2015 12/31/2016 BODILY INJURY(Per $ AUTOS AUTOS ( ) HIRED AUTOS NON-OWNED PROPERTY DAMAGE $ AUTOS (Per accident) Endorsements $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 3,000,000 A EXCESS LIAB CLAIMS-MADE AGGREGATE $ 3,000,000 DED RETENTION$ UL90726312 12/31/2015 12/31/2016 $ WORKERS COMPENSATION X PER 0TH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 500,000 OFFICER/MEMBER EXCLUDED? N N/A B (Mandatory in NH) 0196-40173 12/31/2015 12/31/2016 E.L.DISEASE-EA EMPLOYEE $ 500,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 500,000 C PHSD1108639 12/31/2015 12/31/2016 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) 1 CERTIFICATE HOLDER CANCELLATION abarnes @orangecountync.gov SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Orange County THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN PO Box 8181 ACCORDANCE WITH THE POLICY PROVISIONS. Hillsborough, NC 27278 AUTHORIZED REPRESENTATIVE / J Knauff, IV/IREL01 � �- ;` ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD 1 N S 025(9014011