Loading...
HomeMy WebLinkAboutAgenda - 01-23-2007-5rORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: January 23, 2007 Action Agenda Item No. 5-r SUBJECT: Housing Rehabilitation Contract Awards DEPARTMENT: Housing/Comm. Development PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Bid Results; Work Specifications Tara L. Fikes, 245-2490 PURPOSE: To award two housing rehabilitation contracts for the Orange County CDBG Scattered Site Housing Rehabilitation Program. BACKGROUND: The Housing and Community Development Department solicited bids from qualified housing, rehabilitation contractors participating in the County's Housing Rehabilitation Program for the general repair portion of the work specifications. Bids were also solicited from lead based paint abatement contractors for items containing lead based paint as required by federal regulation. The informal bidding process is governed by the North Carolina General Statues §143-131 and does not require a minimum number of bids. Additionally, present program procedures provide that housing rehabilitation contracts be awarded to the lowest responsible bidder. Additionally, all contractors participating in the County's Rehabilitation Program are required to utilize current deconstruction and material recycling methods during the repair process. Bids were solicited on November 8 and November 22, 2006 with a bid opening on December 5, 2006 with three bids received for the Overland Passage property. For the 216 W. Union Street property, bids were solicited from participating contractors on October 11 and November 1, 2006 and with a bid opening on November 8, 2006 with two bids received for the lead abatement work at 216 W. Union Street. Bids for the housing rehabilitation portion were solicited on October 4 and November 1, 2006 with a bid opening on November 8, 2006 with a total of three bids received for the project. Bid results are attached. FINANCIAL IMPACT: Funds are provided by a CDBG Scattered Site Housing Rehabilitation grant awarded by the N.C. Department of Commerce. RECOMMENDATION(S): The Manager recommends that the Board award the following housing rehabilitation contracts: Dwelling Unit Bid Amount Contractor 2607 Overland Passage, Chapel Hill $34,750 William Long Construction Co. 216 W. Union Street, Hillsborough $ 1,500 Eastern Environmental $28,689 Harmony Homes LLC 2 RESULTS OF BID OPENING OWNER: Rosemary Williams APPLICATION NUMBER: CDBG-SS ADDRESS:-2607 Overland Passage COST ESTIMATE:-$39,870 Chapel Hill, NC 27516 PERCENTAGE OF BID OVER UNDER 13o COST ESTIMATE CHECK ONE:JOB BID X JOB NEGOTIATED COMPANY 1. 2. 3. 4. 5. 6. Harmony Homes LLC Diamond Builders William Long Construction Co. BID OPENED BY: TIME OF BID OPENING: David Saconn DATE OF BID OPENING: December 5, 2006 WITNESSED BY: Dollie Henry ****************************************************************** Lowest Acceptable Bid: $34,750.00 Negotiated Amount: N/A Contractor: William Long Construction Co. NAME 3761 Phillips Chapel Rd.; Haw River, NC 27258_ ADDRESS 336-376-0170 TELEPHONE NUMBER COMMENTS : Submitted by: Bid Approval Date _ Proceed Order Issued BID AMOUNT $39,690 $36,792 $34,750 Roxanne W. Reynolds 3:00 PM Date-12-06-06 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR ROSEMARY & ELLIOTT WILLIAMS AT 2607 OVERLAND PASSAGE PHONE: (919) 370-3552 DATE: November 8, 2006 By: David Sacom REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANUAL, AND ORANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. Name: Rosemary & Elliott Williams Address: 2607 Overland Passage City: Chapel Hill, N.C. 27516 Phone: (919) 370-3552 Date: November 8, 2006 Exterior: 1. Trim all trees limbs hanging over roof located on the right rear corner. Limbs to be cut off at the tree. 2. Install a new garage door with hand opener/lock. New door to open close and lock properly. Stain or paint door to match existing exterior finish. Apply a waterproof finish over stain to protect finish and door. NOTE: Existing hardware and track may be used. Install all necessary framing to secure track properly. 3. Replace approximately 36ft of damaged and loose wood siding. Note: All damaged siding to be replaced with new wood matching siding. Secure all loose siding with galvanized nails. Stain new siding with matching stain. 4. Prepare all windows and windows frames for matching paint/stain. Remove all loose paint, spot sand smooth and paint. Apply all necessary caulking to fill all cracks. All paint/stain to cover completely. 5. Install a new pressure treated frame for the sewage pump station located on the right rear corner. Install pressure treated framing and % inch pressure treated plywood walls. Re-install the existing shingle. top on the new frame. All nails shall be hot dipped galvanized. _ 6. Install a new door unit located on the left rear. Install a 6 panel metal door unit with keyed lock and deadbolt. New door to open, close and lock properly. Prime and paint door and frame to match existing trim as close as possible. Note: Apply all necessary caulking between brick-molding and siding. Install metal drip cap over door frame to protect water intrusion. _ 7. Install a 2x8 header for the 36" door unit in the garage. Name: Rosemary & Elliott Williams Address: 2607 Overland Passage City: Chapel Hill, N.C. 27516 Phone: (919) 370-3552 Date: November 8, 2006 Roof & Gutters: Install a new 25-year shingle roof. Remove existing shingles to the sheathing. Remove all exposed nails and prepare roof for felt paper. Install brown eve starter, 15 lb felt paper, vent boots and 25 year shingles. Note: Refer to manufacture specifications for installation. Note: Do not damage existing step flashing around chimney and at gable walls. Install all necessary flashing around both top and bottom sections of the chimney to prevent water intrusion. Page 2 2. Install a shingle type ridge vent on all ridges. Note: Refer to manufacture specifications for ridge vent installation. 3. Install continuous aluminum gutters and over-sized downspouts on all fascias. Note: All downspouts shall be connected to solid drain- tile that extends not less than ten (10) feet from the foundation wall. Note: If at ten feet from foundation wall if positive drainage do not exist, the drain tile must extend until positive drainage is met. Note: Special hangers will be required due to style of boxing. _ 4. Install metal gutters guards on all gutters. Wheelchair Ramp: Remove the steps and handrails on the rear deck. Install a ramp from the rear deck to a 5ft x 5ft landing centered over the sidewalk. ( Refer to Plan) Install a ramp from the landing toward the front of the unit. The ramp width shall be 4ft in the clear. All wood shall be pressure treated lumber. All nails and bolts shall be hot dipped galvanized. Install 2x2 pickets placed 4" apart per code. Install handrails on both sides of the ramp. All work to pass inspection with the Orange County Inspection Dept. A permit is required. _ Name: Rosemary & Elliott Williams Address: 2607 Overland Passage City: Chapel Hill, N.C. 27516 Phone: (919) 370-3552 Date: November 8, 2006 Interior: Carpet & Painting: 1. Remove all carpet from the unit. 2. Remove the wallpaper from the master bathroom walls. Prepare walls where wall paper was removed. Wash to remove all glue. Fill all damaged areas with filler and sand. Prime with a Kilz type primer. Page 3 3. Prepare all painted surfaces for paint. Clean walls and trim with a mild cleaner. Prime all bare wood and sheetrock with a construction primer. Repair all damaged areas in sheetrock with filler and sand smooth. Caulk all cracks with a latex caulk. Fill all nail holes with painters putty. Paint the walls with flat latex paint. Paint the trim with semi-gloss latex paint. NOTE: Bathroom walls & trim to be painted with semi-gloss latex paint. All paint to cover completely. _ 4. Install new carpet and pad on both floors. The CARPET to cost not less than $ 14.00 sq. yard. Install a 6 pound pad. Install metal trim at all door openings where carpet meets vinyl. Install carpet and pad in all closets. Note: All carpet to be professionally installed. Carpet to be re-installed in all locations where removed. Price to include trimming the bottom of any doors that rub the new carpet. 5. Prepare the front door unit for paint. Prime the front door with a bonding primer. Paint the front door and jamb with semi-gloss latex paint. The paint to cover completely. Kitchen: 1. Remove all existing wall and base cabinets. Remove all existing countellops. 2. Install new wall and base cabinets. Note: New cabinets to match existing layout. Install factory made cabinets with hardwood face- plates, doors and drawers. Price to include all hardware. Consult homeowner for finish. (white or stained) Name: Rosemary & Elliott Williams Page 4 Address: 2607 Overland Passage City: Chapel Hill, N.C. 27516 Phone: (919) 370-3552 Date: November 8, 2006 Kitchen: 3. Install new rolled back formica countertops. The new countertops to match cabinet layout. Note: Consult homeowner to choose color. New countertops shall be installed correctly. All joints shall be tight to prevent water intrusion. 4. Prepare the floor for lauan plywood and a new vinyl floor. Clean floor by removing all dirt and debris. Install Y4" lauan plywood and a new vinyl floor. The vinyl to cost not less than $ 14.00 sq. yd. Install a metal strip at closet door and where vinyl meets all carpet. 5. histall shoe molding at all wall and cabinet areas. Finish shoe molding to match cabinet finish. Master Bathroom: 1. Remove existing shoe molding. Install V4" lauan plywood and a new vinyl floor. The vinyl to cost not less than $ 14.00 sq. yard. Install metal trim at all door openings. Install new shoe molding at all wall and cabinet areas. Prime and paint shoe molding. Prime shoe molding with an oil primer. Paint shoe molding with semi-gloss latex paint. 2. Install a five piece accessory kit in the master bathroom. Accessory kit to include two, twenty four (24) inch towel bars, a soap dish, tumbler holder, and paper holder. Note: Homeowner to choose finish. ( Chrome, brass, wood etc.) _ 3. histall a new mirror of matching size in the master bathroom over the vanity. Install a new section of mirror trim ( mirror sits in) along top edge of vanity. Install proper fasteners at both top corners into wall. 4. Install a molded marble vanity top/sink in the master bathroom. Note: Contractor to verify correct length. Install a single lever faucet, new drain line assembly/p-trap, supply lines and cut-offs. Make all plumbing connections. Note: New faucet shall be a Delta or pre-approved equal. Name: Rosemary & Elliott Williams Address: 2607 Overland Passage City: Chapel Hill, N.C. 27516 Phone: (919) 370-3552 Date: November 8, 2006 Master Bathroom: 5. Install a center face-plate on the bathroom vanity. Match the finish as close as possible. Attach from interior of vanity. 6. Install two (2) stainless steel grab bars on both side walls around the handicap commode. Install 1x6 painted trim screwed to the side wails and attach the grab bars to solid wood trim. Note: One end of grab bar should be screwed through 1x6 and into wall studs. Consult homeowner for proper grab bar height. _ 2ND Floor Bathroom: Page 5 1. Remove the wall mirror and all wall paper from the walls. Clean the walls with a mild cleaner. Remove all wall paper glue and prepare for primer. Prime the walls with a kilz type primer. Reinstall mirror when all painting is complete. 2. Prepare the floor for new vinyl. Install %" lauan plywood and a new vinyl floor. The vinyl to cost not less than $ 14.00 sq.yard. Install metal trim at door opening. Install new shoe molding at all wall and cabinet areas. Prime new shoe molding with an oil primer. Paint shoe molding with semi-gloss latex paint. Caulk vinyl at tub using white silicone caulk. Staircase: 1. Repair loose handrail. Install all missing hardware and secure to wall. Plumbing: Install a new double bowl stainless steel sink in the kitchen. Install new strainers, drain line assembly/p-trap, supply lines and new cut-offs. Make all plumbing connections. 2. Install a new single lever faucet on the kitchen sink. Note: Faucet shall be a Delta or pre-approved equal. Make all plumbing connections. Name: Rosemary & Elliott Williams Address: 2607 Overland Passage City: Chapel Hill, N.C. 27516 Phone: (919) 370-3552 Date: November 8, 2006 Plumbing: 3. Install a new handicap commode in the master bathroom. Install new supply line, cutoff, wax seal & flange bolts. Make all plumbing connections. Check for leaks. _ 4. Install a new commode in the 2"d floor bathroom. Install new supply line, cut-off, wax seal and new flange bolts. Make all plumbing connections. 5. Install a new faucet handle on the existing tub/shower valve. Note: Install matching proper handle that fits existing valve. 6. Install proper drain fittings for dishwasher. Install proper tail piece and a new section of flexible hose. Note: Homeowner to provide new dishwasher. Electrical: Page 6 l . Install a 200 amp service breaker service panel in the laundry room. Install a new meter base. Install new service cable from exterior panel to breaker box in kitchen. NOTE: Price to include all GFI receptacles, arc-fault breakers, hard-weed smoke detectors. All work to pass Current Electric Code. An Electrical Permit is required. 2. Replace approximately 5 damaged switch and receptacle covers in the unit. Repair the circuit for the front exterior light fixture beside garage door. (wire damaged) 4. Install a new exterior light fixture at the back door. ( garage door) Light fixture allowance- $ 25.00 Consult owner for color / finish. 5. Install a motion detector light fixture located beside the garage door. (Location in overhang) Light fixture allowance $ 30.00. 10 Name: Rosemary & Elliott Williams Page 7 Address: 2607 Overland Passage City: Chapel Hill, N.C. 27516 Phone: (919) 370-3552 Date: November 8, 2006 ]Electrical: 6. Install a recessed lens cover for the closet light fixture in the master bedroom. Note: Lens cover shall properly fit recessed can light. 7. Install a new vent-less exhaust hood for the oven. Consult owner for color. The new exhaust hood to be complete with 2-speed fan and light. Make all electrical connections. Miscellaneous: 1. Repair the hole in the front overhang located beside the front porch. Remove the damaged section ( approx 12" x 24") Install all necessary framing to attach matching plywood soffit. Finish to match existing' trim. _ Termite Inspection & Treatment: 1. Provide a termite inspection and treatment. A licensed Pest Control Company must perform this work. Chemically treat the entire perimeter . of the crawlspace and exterior foundation walls. Contractor to provide owner and Rehabilitation Specialist with written proof of inspection, treatment and warranty of treatment. TOTAL 11 0 Septic Pump Begin FRONT 2607 Overland Passage Chapel Hill, NC 27516 12 BACK PORCH, KITCHEN 9' X 13' DINWG ROOM 10' X 12' MASTER BATH 12'5" X 8' r LIVING ROOM 12'x 19' FRONT PORCH MASTER BEDROOM 12'5" X 15' 2607 OVERLAND PASSAGE CHAPEL HILL, N.C. 27516 1ST FLOOR FRONT 13 LEFT REAR BEDROOM 14'x 17' OPEN TO BELOW 2607 OVERLAND PASSAGE CHAPEL HILL, N.C. 27516 5' 3 x 10' REAR RIGHT BEDROOM 10' x 12'6" RIGHT FRONT BEDROOM 10' x 12'5" 2ND FLOOR 14 RESULTS OF BID OPENING OWNER: Mozelle Chavious APPLICATION NUMBER: ADDRESS:-216 W. Union St. COST ESTIMATE:_$1,300 Hillsborough, NC 27278 CDBG-SS PERCENTAGE OF BID: OVER- 13%- UNDER COST ESTIMATE CHECK ONE: JOB BID X JOB NEGOTIATED COMPANY BID AMOUNT 1. RGO Enterprises LLC $1,500 2. Eastern Environmental $2,800 3. 4. 5 6. BID OPENED BY: David Saconn TIME OF.BID OPENING: 3:00 PM DATE OF BID OPENING: November 8, 2006 WITNESSED BY: Roxanne Reynolds ?*x??e??*???*?e??r?e?**?e*?r?e??x*?*?r*?*??r?*****x*x??r**???*??*x?r?r?e**,x*?r*? Lowest Acceptable Bid: $1,500.00 Negotiated Amount: N/A Contractor: RGO Enterprises LLC NAME 114 Allen Creek Rd. Rougemont, NC 27572. ADDRESS 919-451-7989 TELEPHONE NUMBER COMMENTS: Submitted by: David Saconn Bid Approval Date Proceed Order Issued Date 11-15-06 15 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS LEAD REMEDIATION FOR MOZELLE CHAVIOUS AT 216 W. UNION ST. PHONE: 732-3173 DATE: October 9, 2006 BY: David Saconn REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANUAL, AND ORANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. Name: Mozelle Chavious Address: 216 W. Union St. City:'Hillsborough, N.C. 27278 Phone Number: 732-3173 Date: October 9, 2006 This set of work specifications outlines work items that were found to contain lead in concentrations above acceptable levels as set in the U.S. Department of Housing and Urban Development (HUD) standards. It is recommended, that any lead hazard remediation work be conducted by workers who are certified by the state to perform lead abatement work.. Leadhazard remediation work must be preformed in compliance with the regulations issued by the Secretary of Housing and Urban Development set forth in 24 CRF Part 35, et al and all applicable rulers and any others issued there-under, and all applicable Federal, State and local rules and regulations, regarding notification, -evaluation and reduction oflead-based paint hazards. in residential structures undergoing Federally: Assisted construction or rehabilitation and require the elimination of lead:-based paint hazards. Every contractor or subcontractor, including painting, pursuant to which such Federally-assisted construction•ofrehabilitation is performed, shall include appropriate provisions complying with requirements for notification, evaluation and reduction of lead based paint hazards. The contractor shall be allowed to include in the cost of the project the allowable fee for one (1) complete clearance inspection of the xemediation work performed. The cost of any additional clearance inspections which may be necessary will be born directly by the contractor. 16 Contractor must submit a copy of training certification with their bid. 17 Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N.C. 27278 Phone Number: 732-3173 Date: - October 9, 2006 Note: Prior to conducting Lead-Based Abatement activities, all personnel associated with the project should review and fully understand the requirements of ALL applicable local, state and federal regulations that may apply to the worksite. Worksite Preparation: Ground Containment: Before construction, construct a worksite perimeter curb of 2x4 timbers, ten feet from the house exterior. Create an outer barrier of flags and/or plastic tape 3 feet on center and 20 feet from the worksite. All warning signs must remain posted until clearance is passed. ( Both exterior door frames) 2. During the period of work on the exterior door frames, attach a layer of 6-mil poly to the door opening to prevent lead dust and paint chips from migrating into the unit. Pre-Clean: Pre-clean the location ( window sill) in room # 5 ( rear right bedroom) Refer to the Risk Assessment / Lead Paint Inspection- HEPA vacuum this location to remove all lead dust. Clearance Examination: 1. After completion of all work that disturbed LBP and any other lead hazard reduction activities, a qualified person shall perform a clearance examination. Work disturbing lead-based paint is not considered complete until clearance is achieved. 18 Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N.C. 27278 Phone Number: 732-3173 Date: October 9, 2006 Exterior Door Jambs: 1. Remove storm doors from both exterior door units. 2. Remove all loose chipping / peeling paint from both exterior metal door frames. Wet sand and feather edges and prepare for a lead block primer approved for metal. Prime both door jambs with a lead block bonding primer. Paint both door frames with semi-gloss latex paint. The paint shall cover completely. _ ( NOTE ) Page 2 1. The work shall require the coordination and relocation of personal belongings away from the work area. It is the responsibility of the Lead Paint Contractor to contain all lead dust from spreading throughout the unit. 2. All lead paint debris including paint.chips and wood shall be double bagged and goose neck tied in 6-mil poly. All debris shall be properly labeled and disposed of at a Licensed Landfill. 3. A copy of the Lead Abatement Contractor's License shall be submitted to the Orange County Housing/Community Development Office. 4. All Permits and Applications shall be acquired before work is to begin. Note: A Lead Abatement Permit is required for this work at 216 W. Union St. Hillsborough, NC 27278 All work shall comply with the NC Department of Health and Human , Services- Lead-Based Paint Hazard Management Program. Total 19 RESULTS OF BID OPENING OWNER: Mozelle Chavious APPLICATION NUMBER: CDBG-SS ADDRESS:-216 W. Union St. COST ESTIMATE:-$30,855 Hillsborough, NC 27278 PERCENTAGE OF BID OVER UNDER 7o COST ESTIMATE CHECK ONE:JOB BID X JOB NEGOTIATED 1. 2. 3. 4. 5. 6. COMPANY Harmony Homes LLC Triple J Construction Lewis & Son General Construction BID OPENED BY: David Saconn $28,689 $31,375 $46,761 TIME OF BID OPENING: 3:00 PM DATE OF BID OPENING: November 8, 2006 WITNESSED BY: Roxanna Reynolds ****************************************************************** Lowest Acceptable Bid: $28,689.00 Negotiated Amount: N/A Contractor: Harmony Homes, LLC NAME 2202 Schley Road, Hurdle Mills, NC ADDRESS 919-451-1282 TELEPHONE NUMBER COMMENTS : Submitted by: Bid Approval Date _ Proceed Order Issued David Saconn Date-12-06-06 27541 20 ORANGE COUNTY . HOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR MOZELLE CHAVIOUS FOR 216 W. UNION ST. PHONE: 732-3173 DATE: August 7, 2006 BY: David Saconn REHAB SPECIALIST NOTE TO CONTRACTOR. CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANUAL, AND ORANGE COUNTY M)NEVIU M HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRrM UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. 21'" Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N.C. 27278 Phone: 732-3173 Date: August 7, 2006 Exterior: 1. Replace five (S) damaged vents. Install manual foundation vents. New vents shall be secure and to open and close properly. 2. Install four (4) large vent wells on the vent close to ground level. 3. Prepare the exterior block for paint. Clean and fill all damaged areas. Caulk all cracks with tube type mortar and latex caulk. Prime block work-with an approved primer for masonry. NOTE: Contractor and Rehab. Specialist to approve block primer before exterior is primed. Paint exterior with an approved paint for block work. All paint shall cover completely. Color-'SW 6249' Storm Cloud 4. Install continuous aluminum gutters and downspouts on all fascias. Install over-sized downspouts on the four corners. Note: Gutters shall be properly installed and sloped. Install solid drain tile below grade to both rear downspouts. The drain tile shall terminate with positive drainage away from the unit. Install splash blocks on both front downspouts. Color shall be white. S. Install pressure treated railings and handrails on the front porch. Install handrails on both sides of the front steps. Install 2x2 pickets placed 4" apart per code. All nails and bolts shall be hot dipped galvanized. New railing to be secure and able to withstand 200 lbs of pressure per code. A permit is required and must pass inspection. Note: Refer to plan for handrails. Prime and paint all new treated wood with an oil based primer. Paint posts and handrails with semi-gloss latex paint. All paint to cover completely. 6. Install a new 9 lite 36 inch exterior door at the side porch. Note: Contractor to cut door to fit opening properly. Install a keyed lockset and double cylinder deadbolt keyed alike. Re-install existing hinges. Install a door sweep, weather-stripping and strike plate for a metal door jamb. 22 Name: Mozelle Chavious Address: 216 W. Union St. City. Hillsborough, N.C. 27278 Phone: 7323173 Date: August 7, 2006 Exterior: 6. Install a new vinyl-clad self storing storm door on the side porch Storm door shall be complete with lock, door sweep and closure. The new storm door to be of Larson quality or pre-approved equal. Storm door to open, close and lock properly. 7. Trim lock side of door to give an even reveal down entire length of door. Gap to be approximately 3/16 inch. Install a new aluminum threshold with rubber insert. Trim bottom of door to properly seal at threshold. Install self-adhering weather-stripping to jamb. _ Windows: 1. Cover the exposed plywood around the window air units with white aluminum coil stock. Caulk the exposed edges with white silicone caulk. Interior Ceilings: Page 2 1. Remove the bed molding, ceiling tiles, sheetrock and lx4 stripping to the ceiling joists in all rooms except living room.. Prepare the ceiling joists for %Z" sheetrock. Remove all existing nails and install %a" sheetrock on all ceilings and finish smooth. Prime the new sheetrock with a new sheetrock construction primer. Paint the ceilings with bright white latex ceiling paint. All paint shall cover completely. 2. Repair the damaged ceiling texture on the living room ceiling. Remove the damaged texture and prime bare sheetrock with a kilz type primer. Spray using repair texture. Spray paint the entire ceiling with bright white ceiling paint. NOTE: Paint must be sprayed not rolled. 23 Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N.C. 27278 Phone: 732-3173 Date: August 7, 2006 Interior Ceilings: 3. Install 3 inch crown molding in all rooms except living room. Prime the new molding with an oil based primer. Paint the crown molding with semi-gloss latex paint. The paint shall cover completely. _ Living Room: Page 3 1. Prepare the sheetrock walls, block walls and trim for paint. Fill all holes, caulk all cracks and repair all damaged areas before painting. Note: Contractor to prepare all surfaces for paint. Clean and prime with a Kilz type primer. Paint the sheetrock using flat latex paint. Paint the block walls with an approved paint for masonry. Paint the trim with semi-gloss latex paint. All paint shall cover completely. 2. Remove the flue and patch sheetrock. Note: Chimney is still being used to vent furnace. Flue must be capped off with a fire proof material to prevent fumes from entering unit. Install all necessary framing and sheetrock and finish smooth. Rehabilitation Specialist to inspect flue before covering with sheetrock. Bathroom: Remove the commode, sinklvariity and tub. Remove the wall covering to the framing. 2. Remove the door unit, sub-floor and floor joists. Note: Floor joists maybe doubled in areas where unable to remove. Install # 2 pressure treated matching 2x8 framing. New framing to span from foundation wall to center girder. Install all necessary blocking around tub and commode flange. Install % inch sub-floor and 518. inch under-layment. A permit is required for floor framing. _ 3. Install wall blocking for grab bars in the tub/shower area. Consult homeowner for correct height and location. Note: Rehabilitation Specialist to inspect blocking- before covering is installed. 24 Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N.C. 27278 Phone: 732-3173 Date: August 7, 2006 Bathroom: Page 4 4. Reframe bathroom door opening to receive a 36" door unit. Install new header and filler studs. Install a 36 inch 6 panel pre-hung interior door unit. Door unit shall be complete with privacy lock and door bumper. New door to open, close and lock properly. 5. Install %2" MR sheetrock on the walls and ceiling. Finish the sheetrock smooth. Prime the sheetrock with a new sheetrock primer. 6. Install a tub/shower surround. Install a water tight seal where surround meets tub. Glue surround to sheetrock and block wall using proper adhesive. Install proper water proof trim where tub/shower surround meets the window. Caulk surround at tub using 100% tub/shower silicone caulk. 7. Install two grab bars in the shower area. Install a 36 inch and a 24 inch grab bar. Note install proper fasteners to support grab bars. Install 3 V4" molded baseboard in the bathroom. Prime the new baseboard with an oil based primer. 9. Install a new vinyl floor in the bathroom. The vinyl to cost not less than $ 14.00 sq. yd. Install new shoe molding and metal trim. Prime shoe molding with an oil based primer. Caulk vinyl at tub area. _ 10. Install a five piece accessory kit in the bathroom. Kit to include two, twenty four inch towel bars, a soap dish, tumbler holder and paper holder. 11. Install a surface mount medicine cabinet. 12. Prepare all surfaces for paint. Paint the walls, ceiling, doors and trim with semi-gloss latex paint. All paint shall cover completely. 25 Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N.C. 27278 Phone: 732-3173 Date: August 7, 2006 Left Rear Bedroom: 1. Install a new pre-hung 6-panel interior door unit with privacy lockset and door bumper. Prime new door unit with an oil based primer. _ 2. Remove the flooring and floor joists. Note: Floor joists maybe doubled in areas where unable to remove. Install matching 2x8 # 2 pressure treated floor joists. New framing shall span from foundation wall to center girder. Install all necessary blocking for new sub-floor. Install % inch plywood sub-floor and 5/8 inch under-layment. All framing to be approved by Orange County Inspection Dept. Page 5 3. Remove existing baseboard and shoe molding. Install 4'K inch molded baseboard. Prime new baseboard with an oil based primer. 4. Prepare walls, trim and doors for paint. Repair all damaged areas of sheetrock with filler and tape. Fill all holes and caulk all cracks. Sand new filler smooth and prepare for primer. Clean walls and trim and prime with a Kilz type bonding primer. Paint the sheetrock walls with flat latex paint. Paint the block walls with an approved paint for masonry. Paint the trim and doors with semi-gloss latex paint. All paint to cover completely. _ 5. Install new carpet and pad. The carpet to cost not less than $ 14 sq. yd. Install a minimum 6 pound pad. Install metal trim at door opening. Carpet to be properly installed. Color to be approved by homeowner. Note: Trim doors as necessary to clear carpet. Right Rear Bedroom: I. Install a 6-panel interior door unit with privacy lockset. New door to open. close and lock properly. Prime new door unit with an oil based primer. 2. Prepare the walls, trim and doors for paint. Repair all damaged areas of sheetrock with filler and tape and corner bead. Fill all holes and caulk all cracks. Sand new filler smooth and prepare for paint. Paint the walls with flat latex paint. Paint the block work with an approved paint for masonry. Paint the doors and trim with semi-gloss latex paint. 26 Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N.C. 27278 Phone: 732-3173 Date: August 7, 2006 Kitchen: 1. Remove all cabinets, sink, water heater and sheetrock from both interior walls. Remove the door casing. 2. Repair approximately 64 sq. ft of damaged sub-floor located ' near washing machine and sink. Replace with matching plywood. Note: New plywood shall be even with existing finish* floor. Page 6 3. Install 15 lb felt paper and 3/8 inch BC plywood over the kitchen floor and prepare floor for vinyl. Install a new vinyl floor. The vinyl to cost not less than $ 14.00 sq.yard. Install metal trim at hall door opening. Install new painted shoe molding at all wall and cabinet areas. 4. Install a dropped soffit-for the wall cabinets.. Frame with 2x4 and 2x21umber. Soffit shall extend approximately 1 inch from wall cabinets. Install %2" sheetrock and finish smooth. Prime soffit sheetrock with a new sheetrock primer. 5. Install new %2" sheetrock and door casing on both interior walls. Finish sheetrock smooth. Prime new sheetrock with a new sheetrock primer. Prime the new casing with an oil based primer. Install corner trim where sheetrock meets block wall. Prime new corner trim with an oil primer. Prepare the walls and trim for paint. Paint the walls and trim with semi-gloss latex paint. Paint the block work with an approved paint for masonry.. Clean as necessary before painting. 6. Install new 4'/a" molded baseboard in the kitchen. Prime new baseboard with an oil based primer. 7. Install approximately nine (9) linear feet of wall cabinet and six (6) feet of base cabinet. Homeowner to choose stained of painted finish. New cabinets to have a factory finish, hardwood fronts and hardware. All cabinet doors and drawers to open and close properly. 27 Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N.C. 27278 Phone: 732-3173 Date: August 7, 2006 Kitchen: Page 7 8. Install approximately 6 feet of molded countertop. New countertop to fit wall properly. Install finish end against washing machine. Homeowner to choose color. Use silicone caulk to adhere to base cabinet. Plumbing: 1. Remove all existing supply and drain lines from unit. Re-plumb unit to new plumbing code. All fixtures to be plumbed to current plumbing code. Install cut-off within Meet of crawlspace door opening. Install V pex water lines and PVC schedule 40 drain lines. Install new supply lines, cut-offs and drains to all fixtures. Note: All vents through roof may remain. Install a water spigot located on the left side towards the front of the unit. All plumbing to meet current code and must pass inspection. 2. Install a new one-piece seamless steel tub. The tub to have a slip resistant bottom and porcelain enamel finish. Install new trip lever and drain line assembly. 3. Install single lever, washerless faucets on the kitchen sink, bathroom sink and a combination tub/shower valve in the tub/ shower. New faucets shall be Delta or pre-approved equal. 4. Install .a handicap commode in the bathroom. Commode to have a elongated bowl. 5. Install a pedestal sink in the bathroom. 6. Install a double bowl, 7 inch deep, stainless steel sink with sprayer in the kitchen. Install aluminum strainers, p-trap and drain line assembly. 7. Install a new 40 gallon electric water heater in the crawlspace. Make all connections to the new plumbing and electrical code. Install new water heater on a concrete or plastic/composite pad. 28 Name: Mozelle Chavious Address: 216 W. Union St. City: Hillsborough, N_ .C. 27278 Phone: 732-3173 Date: August 7, 2006 Plumbing: 8. Install a handheld shower with two wall clips. Electrical: 1. Rewire unit to the current electric code. Install a 200 amp service breaker panel, new mast and riser and new meter base. Install all necessary circuits, GFI receptacles and hard-wired smoke detectors. Note: Exterior walls consist of block work. If electrician is not able to pull new wire, the exterior wall circuits maybe installed in wire molding if code allows. All electric work must pass inspection to new electric Code. Install new interior and exterior light fixtures in all rooms and both exterior doors. Re-install the ceiling fan in the kitchen. Price electrical complete. All receptacles, switches and fixtures. Note: Light fixture allowance is as follows: Light fixtures to cost not less than $ 15.00- $ 20.00 per fixture. _ Termite Treatment and Inspection: 1. • Provide a termite inspection and treatment. Treat both. exterior and interior foundation walls.. All work to be done after all backfilling and landscape work is complete. Provide both homeowner and the Rehabilitation Specialist with inspection report and treatment. A licensed Pest Control Company must perform this work. Note: Price to include all slab and pier drilling. Insulation: 1. Install R-19 insulation in the crawlspace. Page 8 2. Install a 6-mil vapor barrier in the crawlspace. Remove all debris large enough to rake before poly is installed. 29 Name: Mozelle Chavious Address: 216 W. Union St. City:'Hillsborough, N.C. 27278 Phone: 732-3173 Date: August 7, 2006 Miscellaneous: 1. Install a new crawlspace door and frame. All wood to be pressure. treated lumber. Install a 2x6 treated jamb and Y4" pressure treated plywood door with 21(4 cross bracing. Install galvanized hinges and locking hasp. New jamb and door to be secure and installed properly. Install door stop on jamb. Prime and paint jamb and door with an oil based primer. Paint door and jamb to match exterior color. Page 9 2. Install a dropped girder to support floor framing at furnace. Install pressure treated lumber. Install a triple 2x8 girder (10') and adjustable post jacks. Footings for post jacks to be approved by Orange County Inspection Dept. All work to pass inspection. Jack floor up as close. as possible to original level. NOTE: Masonry blocks may need to be installed to help support furnace. TOTAL 32 FT 30 26 FT TOTAL SQ. FT - 832 31 4x4 posts 2x4 handrails 2x2 pickets NOTE: ALL RAILINGS TO BE INSTALLED BETWEEN POSTS 32