HomeMy WebLinkAboutAgenda - 05-17-2016 - 8-a - North-South Corridor Study Update – Locally Preferred Alternative (LPA) 1
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 17, 2016
Action Agenda
Item No. 8-a
SUBJECT: North-South Corridor Study Update — Locally Preferred Alternative (LPA)
DEPARTMENT: Planning and Inspections
ATTACHMENT(S): INFORMATION CONTACT:
1. LPA Recommendation Max Bushell, Transportation Planner,
2. LPA Powerpoint Orange County, 919-245-2582
Mila Vega, Transit Service Planner,
Chapel Hill Transit, 919-969-4916
PURPOSE: To receive an update on the North-South Corridor Study and provide comment as
appropriate.
BACKGROUND: The study corridor runs along Martin Luther King, Jr. Boulevard (Historic
Airport Road/NC Hwy 86), South Columbia Street (including the portion of Pittsboro Street along
the one-way pairing in this corridor through the UNC campus), and US 15-501 South. This
corridor, which is approximately 7.3 miles long, has its northern terminus at Eubanks Road and
Martin Luther King, Jr. Boulevard and its southern terminus at US 15-501 near the Southern
Village mixed-use development.
The North-South Corridor study, funded through a combination of federal (Federal Transit
Administration [FTA]) and local funds, identifies and evaluates a series of transit investment
alternatives for implementation within the study corridor. It is managed by Chapel Hill Transit
and guided by a Policy Committee, Technical Committee, Transit Partners Committee and a
substantial public involvement process. The Technical Committee includes a representative
from Orange County Planning.
The study expands on previous planning work to identify a locally-preferred transit investment
alternative that facilitates safe, efficient and expanded levels of mobility within the increasingly
busy study corridor, and to improve connectivity between the corridor and the Research Triangle
region. Additional reasons for this study include improving connections with other local and
regional transit routes (including the planned Durham-Orange Light Rail line), supporting future
development within the corridor, and increasing transit mode share and ridership to the UNC
campus/hospital. The Orange County Bus Rail Investment Plan (OCBRIP) has this project
identified in its adopted 2012 plan, including some assumed local funding from the mobility tax.
The study process was guided by strategic and comprehensive public involvement process that
included three rounds of public meetings that were well attended. The process also included
2
web-based outreach via project website (www.nscstudy.org), Facebook, Twitter and email. The
project website provides valuable resources such as study documents, materials from all public
meetings, presentations and a visualization video showing a range of potential improvements for
the corridor.
Following a multi-phased alternative development and evaluation process, a Locally Preferred
Alternative (LPA) recommendation, consisting of three (3) variations (i.e. Alternatives 6-1, 6-2,
and 6-3), was developed by the Study Technical and Policy Committee and the Transit Partners
Committee to be carried forward for more study (LPA recommendation is provided in
Attachment 1). The LPA is the transit investment alternative that best meets the purpose and
need for the project and is potentially competitive for funding through the FTA's New
Starts/Small Starts capital funding program. The LPA developed for this corridor comprises Bus
Rapid Transit (BRT) service. A draft report on the alternatives is available on the project
website: http://nscstudy.orq/wp-content/uploads/Chapel-Hill-Detailed-Evaluation-of-Alternatives-
v3-DRAFT-2016-04-report-on ly.pdf.
The Chapel Hill Town Council adopted the LPA on April 27th and authorized staff to submit the
LPA to the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) for
adoption and integration into the 2040 Metropolitan Transportation Plan. Chapel Hill Transit
Planner Mila Vega will provide more detail at the meeting using a powerpoint presentation
(Attachment 2) and will respond to any questions the BOCC may have.
FINANCIAL IMPACT: There is no financial impact associated with receiving this update. The
North-South Corridor Project will be financed in part by 1/2 cent sales tax revenues from Orange
County. Initial estimates of the project costs vary from the conceptual project costs and extents
within the OCBRIP and, if the LPA is approved, financial modification to the OCBRIP is required
to be approved by the BOCC.
SOCIAL JUSTICE IMPACT: The following Social Justice Goals are applicable to this item:
• GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND
INEQUITY
The fair treatment and meaningful involvement of all people regardless of race or
color; religious or philosophical beliefs; sex, gender or sexual orientation; national
origin or ethnic background; age; military service; disability; and familial, residential or
economic status.
• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding
necessary for residents to provide shelter, food, clothing and medical care for
themselves and their dependents.
• GOAL: CREATE A SAFE COMMUNITY
The reduction of risks from vehicle/traffic accidents, childhood and senior injuries,
gang activity, substance abuse and domestic violence.
RECOMMENDATION(S): The Manager recommends that the Board:
1. Receive the update; and
2. Provide comment as appropriate.
Attachment 1: Bus Rapid Transit (BRT) Alternatives
The Recommended Locally Preferred Alternative I March 2016 3
IMixed Traffic I Dedicated Curb I Dedicated Center I Dedicated Curb
with TSP Lane-Construct Lane-Construct Lane-Convert
Alternative 6-1 Alternative 6-2 Alternative 6-3
Eubanks P+R Eubanks P+R Eubanks P+R
A
Weaver Dairy Road Weaver Dairy Road Weaver Dairy Road
New Parkside New Parkside New Parkside
Homestead
Northfield Northfield Northfield
B
Piney Mountain Piney Mountain Piney Mountain
Estes
•Estes Estes Estes
c
Hillsborough Hillsborough Hillsborough
North
Franklin Franklin Franklin
c c c
2= Cameron a°= Cameron a° Dn
= Cameron
E-S Carrington Hall a S Carrington Hall a S Carrington Hall
0 0 0 Manning
Manning/East Manning/East Manning/East
Jackson Circle/ Jackson Circle/ Jackson Circle/
Mason Farm Mason Farm Mason Farm Ds
Purefoy Purefoy Purefoy
NC 54
Culbreth ICulbreth Culbreth E
Southern Village P+R Southern Village P+R Southern Village P+R
45/2/2016
Attachment 2
North-South Corridor Study
Update
Date: May 17, 2016
Board of County Commissioners
Orange County
Agenda
• Welcome and Introductions
• Project Status and Schedule
• The Need for Transit Investment
• The Alternatives
• Public Engagement Activities and Results
• The Recommended Locally-Preferred
Alternative
• Next Steps
IR?Ds1t
1
6 5/2/2016
Federal Project Implementation
Process
WE
ARE
HERE
FTA Project
North-South Development/ Engineering Construction
Corridor Study Environmental
Review
Indicates required
FTA approval
CIt el Hill
transit
LOCALLY
PREFERRED
ALTERNATIVE SPRIN 2016
LPA) 2016 Study Process
FINAL
EVALUATION
WINTER/
Z SPRING
2015/
2016
DETAILED
EVALUATION SPRING/
UJ WINTER PAN...,,.•.„
2015
• WINTER
2015 W°
CONCEPTUAL
-J 3RD RLIOU D EETING
SCREENING O SUMMER/ y
FALL
> 2014
Z
2ND ROUND �`w•`•,�,,,,,•'°p°°„,,"r°°a
ALTERNATIVES
DEVELOPMENT SPRING
2014
Col 1ST ROUND co.e wro.�
watic
pr sdpe�se.
- �[tpGS Cwmw•M1 vqN
ASSESS EXISTING CONDITIONS J
AND DEFINE PROJECT CO
PURPOSE AND NEED.
I Ransil
3
75/2/2016
Decision-Making Process
Dt
Process guided by:
Town of•
Adopts the LPA The Technical Committee
•Review of the technical analysis
GET Partners
Recommends the IPA)
The Policy Committee
•k`tM' t •Review of milestone deliverables
PM,Piann ng,and Pubbc l
InvoMernent f •Provide policy guidance
MEM Committees
Members of the public
•Provide input and feedback
Provide I throughout the study process
Input VIII if12�♦II��
ff( Slf
STUDY CORRIDOR
40
•
r
F�nar�ca.d:.a
Na.tn Ixres�am ..
lJ�� ffr^(II,S Chapel Hdl - t
Town of
Carrbdro'- Jy,y�
•UNC-CH
8 l
UNC Hos pitala
7 J
Mai, v,II OI
v Soulfnrn Villanee
I Milt
4
85/2/2016
Purpose and Needs Identified by
Study Committees & the Public
✓ Make transit more efficient and attractive
✓ Improve connectivity along the corridor
✓ Improve connectivity of the corridor to the region
✓ Support planned land uses
✓ Contribute to regional equity, sustainability, and
quality of life
✓ Develop a community-supported project
trdii"sit
Alternatives: Transit Modes
L
No Build-PASS , BRT Low-PASS BRT High-PASS 1171:11016.,. ... ;11011071
'
Streetcar-DEFER LRT-DEFER Commuter Rail-DEFER.
0111
5
95/2/2016
Dedicated Center Lane - Convert a Lane
UK-
,44. ,,..400.... - -
_ __ _ ___.,.. - . lerr..,, \
_ ,,,_,,,,,„ --44111111P. '-' -
r ////
'rt sip' - .
5 �
•
ttonsh
Dedicated Center Lane - Construct a Lane
-"-. _
/:
_.
i ` '.2 .
II I
6
105/2/2016
Dedicated Curb Lane - Convert a Lane
... � =. p'�= / - � sue, - T�
_ ;� 7" '-'-- -- - 4
_ _....,
1�T - ♦.. / `— J-
1 '"�,lj////
trthisit
Dedicated Curb Lane - Construct a Lane
.
� �\• � a •.
/ .' ... ' -
7.
Crtol el Hill
7
115/2/2016
The Detailed Alternatives
5551.*5 iUl•. 5 N1rr11..• .Ibr•a.• 511.rn•1hs5 •Y.......
�. rem .•__.•
•
Mr... . "NNW rgrNY81 ream ream
ier •••• M.
1r■4 .....°"a ..i....p �1.T 1N+.nP my C MOO
A 185•105 h 14=— • ..—.r 11 er•N•- I e aF1Y• -
Mm4
.1.•./•r ary/•r 11115158/5851
M �. / /
a� w IbN1555 05
5558 34 .RN MON Medd Cu RN
.ern. Dana err. ■
Sr........ —".n.• .rrr•._N. Nr.•.rp••• rrrl••••• w•••.•rn•
it
Public Input
If ily F The public input is the foundation of the process.
The public outreach is comprehensive and strategic.
I In-person-three rounds of meetings:
� - - • March 2014
• October 2014
• January 2016
Web-based
k Project website www.nscstudy.org(presentations,reports,
w.a
meeting materials)
er
• Facebook
• Twitter
• Email
Locally Preferred Alternative
fray"slit
8
. .,
The Recommended Locally Preferred Alternative I April 2016 125/2/2016
,
-----,---,
A.......11rAr it=I
r - .... -- ........ ---
..
■ A
me Dory b. v....7.... .../..0.1..0
Dedicated Curb Lane-Construct a New Lane ...1.1.16 W.Panale• Mew Parlaide
Mambo/
N.M. 11.1.11.1 illedell.
-.......17.••■•-. .' • OW. CY Estm ....
........
i2••-..^.-"." 11,........... 110-'-'"•"" ......
, .....,,,... • Mama./E.
,• gr./
Idama nom Color OW
Ds
Dedicated Center Lane-Construct a New Lane
MC It■ NC MI
NC•V
. ••
-or
"mg PI" E
,--'
_ ......,_ ■-::.- - 1,- -'
...own 1/4.0 NR IMMIwge.11.01. 11....•Map..
Dedicated Curb Lane-Convert Lane from Existing Use
--- era
LPA Summary
6-1 6-2 6-3
Capital Cost $96.8 M $105.9 M $ 105.4 M
Federal $77.4 M $84.7M $84.3 M
Non-Federal $19.4 M $21.2M $21.1 M
O&M Cost $3.4 M
Travel Time 33:10
_._
Travel Times Savings 03:51
Draft Ridership-subject to change 8,575
Average Peak-Hour Traffic Delay 02:28 00:23 00:49
5:00 am-11:00 pm during the week
Hours of operation
8:00 am-11:00 pm on the weekend
-
Days of operation 7 days a week
Every 7.5 minutes during the day
Frequency of service
Every 10-20 minutes early morning and at night
e 1 ?Alt
9
135/2/2016
Next Phase - Project Development
The LPA is refined during environmental
documentation and engineering:
• Refine ridership
• Refine costs
• Refine impacts
• Identify community preference
CM el Hill
trdosit
Potential Outcomes of BRT Investment
Local capital investment: $19 M - $22 M
Leverage federal funds: $77 M - $85 M
Annual operating investment: $3.4 M
Increase corridor
ridership:
up to 50%
Minimize traffic
delays:
< 3 minutes
Init
10
145/2/2016
Benefits of North-South Corridor BRT
Provides regional connections
•
Improves reliability of the whole L�
system . 11.41
existing routes can also use the
lanes,improving system-wide
reliability and efficiency
Reduces CHT fleet age Asa
provides access to capital funds for buses currently not available
Funds bike/pedestrian investments T i
provides non-Town resources to build bike lanes and improve pedestrian ,_
access 4 +1.)
Designed for expansion
may be the first investment in a future BRT network
trdnS11
Without BRT Investment in the
North-South Corridor...
• Transit trips will take up to 9 minutes longer - and
will likely get worse as congestion increases
• Traffic congestion will increase - driving through the
corridor will take longer
• Buses will become more crowded and less reliable as
they're stuck in traffic
• Additional parking spaces will be necessary
throughout the corridor
• Development patterns will be less transit-supportive
Milt
11
155/2/2016
Chapel Hill Town Council Action
• On April 27th, 2016 the Council adopted the
North-South Corridor Study Locally Preferred
Alternative (LPA) as recommended by the
Chapel Hill Transit Public Transit Committee
and the Study's Technical and Policy
Committees, and authorized staff to submit
the LPA to the Durham - Chapel Hill -
Carrboro Metropolitan Planning Organization
(DCHC).
trdii"sit
Questions, Comments, Discussion
M I LA VEGA
Transit Service Planner
Chapel Hill Transit
6900 Millhouse Road
Chapel Hill, NC 27516-8175
(919) 969-4916 Phone
mvega @townofchapelhill.org
www.nscstudy.org
tfiit
12