HomeMy WebLinkAboutAgenda - 05-05-2016 - 5-g - Resolution to Endorse Orange County’s Priority Transportation Project Lists for the DCHC MPO, TARPO, and B-G MPO 1 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 5, 2016 Action Agenda Item No. 5-g SUBJECT: Resolution to Endorse Orange County's Priority Transportation Project Lists for the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization, the Triangle Area Rural Planning Organization, and the Burlington-Graham Metropolitan Planning Organization DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. Resolution Prioritizing Order of Max Bushell, Transportation Planner, 919-245-2582 Projects for DCHC MPO, TARPO, Abigaile Pittman, Transportation/Land Use Planner, and B-G MPO Priority List 919-245-2567 2. OUTBoard Draft Minutes Tom Altieri, Comprehensive Planning Supervisor, 3. DCHC MPO, TARPO, and B-G 919-245-2575 MPO Project Priority Craig Benedict, Planning and Inspections Director, Recommendations 919-245-2585 4. DCHC MPO Project List Map 5. TARPO Project List Map 6. B-G MPO Project List Map PURPOSE: To consider a resolution (Attachment 1) endorsing three (3) priority lists of transportation projects that are considered for inclusion in the 2018-2027 Statewide Transportation Improvement Program (STIP) within: • the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO), • the Triangle Area Rural Planning Organization (TARPO), and • the Burlington-Graham Metropolitan Planning Organization (B-G MPO) planning areas, respectively. Seven (7) DCHC MPO projects and three (3) TARPO projects that were initially endorsed by the BOCC at the June 2, 2015 meeting are not carried forward/included in the attached proposed resolution (All B-G MPO projects are included in the resolution.). BACKGROUND: The Board of County Commissioners previously approved an overall list of projects - the goal of this agenda item is to approve a priority ranking of a subset of these projects for funding through the MPO/RPO process to North Carolina Department of Transportation (NCDOT). Priority rankings are listed by NCDOT scores from highest to lowest with a few notable exceptions and were approved by the OUTBoard for submittal to the respective MPO/RPO organizations to engage in their internal prioritization processes. The OUTBoard discussion is detailed in Attachment 2. More information about the MPO/RPO and Orange County prioritization process is presented below. The projects are summarized in Attachment 3. 2 At the BOCC's June 2, 2015 meeting, the BOCC considered and approved three (3) lists of transportation projects incorporating all modes to submit to the DCHC MPO, TARPO, and B-G MPO transportation planning organizations for the portion of Orange County within those organizations' respective planning areas as part of the development of the 2018-2027 STIP. Those lists were subsequently submitted to each transportation planning organization for inclusion in each organization's submission of projects to the State for scoring under the Strategic Planning Office of Transportation (SPOT) P4.0 prioritization process. This process funds projects at three levels — the Statewide level, the Regional Impact level, and the Division Needs level. NCDOT scores projects at the Statewide funding level using a 100% data driven process. Only one project, the interchange improvements at 1-85 and Old NC 86 (SR-1009 — South Churton Street), was approved for funding at the Statewide funding level in SPOT P4.0. It was determined at the June 2, 2015 meeting by the BOCC that the transportation lists for the DCHC MPO, TARPO, and B-G MPO should be revisited upon receipt of the Statewide scores to create a prioritized list of projects for each transportation planning organization for submittal at other funding levels. More general information about the Strategic Transportation Investments law and the Strategic Planning Office of Transportation, such as information about different funding levels, scoring, and the Strategic Mobility Formula, can be found here: http://www.ncdot.qov/strategictransportationinvestments/ For more detailed information about the steps and timeline for the P4.0 process, see this document: http://www.ncdot.gov/download/strategictransportation investments/P4 Fact Sheet.pdf OUTBoard Prioritization Discussion Based on input from the OUTBoard at a special called OUTBoard meeting on April 4, 2016, a ranking of projects by priority was developed in order from highest NCDOT score to lowest by transportation planning staff. Despite the fact that transportation planning staff had not received NCDOT scores for Orange County projects, the OUTBoard discussed the projects in detail for each of the transportation planning organizations and ultimately decided to prioritize the projects in order of NCDOT ranking from highest to lowest score to maximize the likelihood of receiving funding for high scoring projects. However, the OUTBoard did conclude that the 1-40 widening projects in the DCHC MPO planning area were not ideal for funding at the Regional Impact level and that the NC 54 widening projects in the TARPO/DCHC MPO planning area were not desirable projects at all. As such, these projects were designated as the lowest priorities on the DCHC MPO and TARPO priority project lists, respectively. A summary of the OUTBoard's discussion is provided (Attachment 2). Transportation planning staff and the OUTBoard have provided the list of prioritized projects to the BOCC for review in tabular form (Attachment 3). This list includes both the original score and the new prioritized score. Once the BOCC approves these priority project lists, the lists will 3 be submitted to the respective MPO/RPO to conduct their internal prioritization process and will then be submitted back to NCDOT for funding consideration. MPO/RPO Prioritization Process The procedure for prioritizing projects using local input at the MPO/RPO level is different for each of the three MPO/RPO organizations in Orange County. However, each organization takes the likelihood of receiving funding into account (consideration of historic funding levels, amount of current funding available, etc.) and includes some measure of local goals and priorities. Additionally, coordination with the NCDOT Division Engineers is paramount in determining that projects are broadly supported by both the public and the Division. This will help ensure that projects have the highest likelihood of receiving funding. Staff Project Ranking Process History The starting point for staff in generating these lists at the beginning of the SPOT P4.0 process in Spring 2015 was to carry forward those projects submitted as the County's project priorities to all three transportation planning organizations in the 2013 iteration of the SPOT Prioritization process (P3.0) and add new projects based on public input. For the DCHC MPO, a total of nine (9) highway projects and eight (8) bicycle and pedestrian projects were submitted to DCHC for consideration, as recommended by the OUTBoard and BOCC in May and June of 2015. DCHC, in taking the County, municipality, and division input into account, ultimately submitted 14 projects to SPOT P4.0 that fall within the Orange County jurisdiction of the MPO, of which six (6) are related to interstate improvements. Seven (7) of the projects that were endorsed by the BOCC at the June 2, 2015 meeting were not carried forward due primarily to the need for a 20 percent local match, but also for their low scores in the prioritization tool and the large number of other eligible pedestrian and bicycle projects in the DCHC MPO jurisdiction. These projects are listed below. 1) Eubanks Road bike lane installation 2) Mt. Carmel Church Road Bike/Pedestrian Improvements 3) Orange High School Road/Harold Latta Road Sidewalk Improvements 4) Orange Grove Road/I-40 Pedestrian Bridge and Supporting Sidewalk Improvements 5) Dairyland Road paved shoulders 6) Trail Connection from English Hill Lane to Buttonwood Drive 7) Trail Connection from Patriots Pointe to Timbers Drive For TARPO, the OUTBoard and BOCC approved nine (9) projects in all modes in the TARPO jurisdiction of Orange County for ranking and submission to the SPOT P4.0 process. Following the internal TARPO process, the list was reduced to eight (8) projects, with the deletion of the Buckhorn Road (SR 1114) Widening project. That project is included with the B-G MPO list. Segments of NC 54 account for four (4) of the projects. It is important to note that NC 54 was split into multiple projects and submitted to the SPOT P4.0 process as both a widening project as well as an operational improvement project. This was the result of extensive discussions between Orange County, NCDOT Division 7, TARPO, and the Town of Carrboro and allows for the evaluation of the scoring of both potential options by TARPO staff. The projects that were not carried forward in the TARPO process are listed below. 1) Orange Grove Road Paved Shoulders (From NC 54 to Arthur Minnis Road) 4 2) Dairy land Road Paved Shoulders 3) Orange Grove Road/Dodsons Crossroads Paved Shoulders Within the B-G MPO area of Orange County, three projects were approved for submittal to the MPO for prioritization by the OUTBoard and the BOCC. Of these three, all were carried forward through the B-G MPO process. The OUTBoard-approved and modified priority project lists to be carried forward to the Regional Impact prioritization category in the DCHC MPO, TARPO, and the B-G MPO areas of Orange County are described in Attachment 3 and presented in graphic form in Attachment 4, Attachment 5, and Attachment 6, respectively. This ranking strategy intends to optimize scoring output and corresponding funding probability. Considering the state scoring rubric, funding tier eligibility, and projects' need for local input points, these rankings are designed to maximize the competitiveness of Orange County projects in the SPOT P4.0 process, while taking local project desirability into account. FINANCIAL IMPACT: There is no immediate financial impact associated with this item except that projects specifically categorized as bicycle and pedestrian projects will require a 20 percent local match from the County and will require the County to expend any costs related to right-of- way acquisition and project management and administration. All bike and pedestrian projects require a resolution or letter of commitment from Orange County indicating the County will provide the local match if the projects are selected for funding. SOCIAL JUSTICE IMPACT: The following Social Justice Goal(s) are related to this item: GOAL: CREATE A SAFE COMMUNITY The reduction of risks from vehicle/traffic accidents, childhood and senior injuries, gang activity, substance abuse and domestic violence. GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. RECOMMENDATION(S): The Manager recommends that the Board approve/endorse the resolution (Attachment 1) to reconfigure the lists of priority transportation projects submitted to the DCHC MPO, TARPO, and the B-G MPO, respectively. Attachment 1: Resolution Endorsing a Prioritized List of Transportation Projects for 5 Resubmission for State Funding RES-2016-036 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION ENDORSING ORANGE COUNTY'S PRIORITIZED LIST OF TRANSPORTATION PROJECTS FOR CONSIDERATION FOR FUNDING AT THE REGIONAL IMPACTS LEVEL OF THE 2018—2027 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM THE BURLINGTON-GRAHAM AND DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATIONS (BGMPO AND DCHC MPO)AND THE TRIANGLE AREA RURAL PLANNING ORGANIZATION (TARPO) WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide Transportation Improvement Program (STIP) that identifies transportation projects to be implemented over the next ten years with State and Federal funding; and WHEREAS, the North Carolina BOT solicits input from the public for prioritizing transportation projects of local and regional importance to be funded at the Regional Impacts level in the FY 2018-2027 STIP; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; and WHEREAS, Orange County has outlined its transportation priorities within the BGMPO, TARPO and DCHC MPO planning areas in attachments to this resolution; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board endorses the following prioritized list of transportation projects to be resubmitted to the MPO/RPO organizations and to the State and to ultimately be considered for funding at the Regional Impacts level in the FY 2018-2027 STIP. Durham-Chapel Hill-Carrboro MPO: 1) I-40/NC-86 Interchange Improvements: Improve interchange at 1-40 and NC 86. 2) I-85/NC 86 Interchange Improvements: Reconstruct interchange at 1-85 and NC 86. 3) NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. 4) 1-85 from Mt. Herman Church Road to Durham County Line Widening: Widen one lane in each direction. 5) NC 54 and Neville Road Intersection Improvements: Improve the intersection of NC 54 and Neville Road. Attachment 1: Resolution Endorsing a Prioritized List of Transportation Projects for 6 Resubmission for State Funding 6) 1-85 from 1-85/1-40 Split to east of the NC 86 Interchange Widening: Widen one lane in each direction. 7) Dimmocks Mill Road Rail Crossing Improvement and Bellvue Street Closure: Improve current Dimmocks Mill Road grade separation (#735154S) and close Bellvue Street (#735152D). 8) U.S. 70 East/I-85/I-40 Connector: Modify the 1-85/1-40 Connector (SR 1239) interchange at U.S. 70 to provide access from all directions. 9) Extend SR-1006 (Orange Grove Road) from SR-1006 (Orange Grove Road) to US70A: Construct Orange Grove Road Extension (Orange Grove Road to US 70A) with sidewalks and bicycle lanes. Construct a grade separation at intersection of Orange Grove Road Extension and NCRR. 10)South Churton Street (Old NC 86) Improvements: Widen South Churton Street (SR 1009) from 1-40 to U.S. 70 Business to multiple lanes with congestion management, limited access, bicycle and pedestrian, and aesthetic improvements. 11)Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) and make safety improvements. 12)Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor where they do not exist. 13)1-40 Widening from 1-40/1-85 interchange to NC 86: Widen 1-40 from four (4) lanes to six (6) lanes from the 1-40/1-85 interchange to NC 86. 14)1-40 Widening from NC 86 to U.S. 15-501: Widen 1-40 from four (4) lanes to six (6) lanes from NC 86 to U.S. 15-501/Durham County line. Triangle Area RPO: 1) NC 54 Operational Improvements (Orange Grove Road to Old Fayetteville Road): Implement operational improvements along the corridor to address congestion, safety, intersecting street turning movement delays, and the lack of gaps in traffic for side street access to the facility as an alternative to widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side streets along the facility etc. 2) NC 54 and Orange Grove Road Intersection Improvements: Improve the intersection at NC 54 and Orange Grove Road to improve operations along the NC 54 corridor. 3) Old Greensboro Road Paved Shoulders: Widen Old Greensboro Road (SR 1005) from Carrboro's extra-territorial jurisdiction (ETJ) to the Orange/Alamance County line to include four (4)-foot paved shoulders. 4) Efland-Cedar Grove Road Improvements: Widen Efland-Cedar Grove Road (SR 1004) from Highland Farm Road (SR 1332) to the northern property line of the U.S. Post Office north of Carr Store Road (SR 1352) from a two (2)-lane, 20-foot cross section to a 24-foot cross section with straightening of the roadway where needed, improvements to turn lanes, and the incorporation of bicycle facilities. Attachment 1: Resolution Endorsing a Prioritized List of Transportation Projects for 7 Resubmission for State Funding 5) Orange Grove Road/Buckhorn Road Paved Shoulders: Widen Orange Grove Road (SR 1006) from Dairy land Road (SR 1177) to Buckhorn Road (SR 1114) and Buckhorn Road (SR 1114) from Orange Grove Road (SR 1006) to West Ten Road (SR 1144) to include four (4)-foot paved shoulders. 6) NC 54 Widening from Orange Grove Road to Old Fayetteville Road: Widen NC 54 from a two- lane undivided cross-section to a four-lane boulevard cross-section to mitigate anticipated congestion issues. 7) NC 54 Widening from NC 119 in Alamance County to Orange Grove Road: Widen NC 54 from a two-lane undivided cross-section to a four-lane boulevard cross-section to mitigate anticipated congestion issues. Burlington-Graham MPO: 1) Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities. 2) Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 and close the existing railroad crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. 3) Mattress Factory Road Interchange: Construct a new interchange at the existing grade- separated crossing of Mattress Factory Road and 1-85/1-40. Upon motion of Commissioner , seconded by Commissioner , the foregoing resolution was adopted this the 5th day of May, 2016. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on May 5, 2016, as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of , 2016. Clerk to the Board of Commissioners 8 Attachment 2: OUTBoard Draft Minutes 1 DRAFT MINUTES(Excerpt) —Agenda Item 4a 2 Orange Unified Transportation Board 3 April 4, 2016 4 5 MEMBERS PRESENT: Alex Castro, Bingham Township Representative; Heidi Perry,At-Large Representative; 6 David Laudicina,At-Large Representative;Amy Cole,At-Large Representative; Jeff Charles,At-Large 7 Representative; Ed Vaughn, Cedar Grove Township Representative;Art Menius,At-Large Representative; John 8 Rubin,At-Large Representative; Erie Smith, Chapel Hill Township Representative; Gary Saunders,At-Large 9 Representative; 10 11 MEMBERS ABSENT: Brantley Wells, Hillsborough Township Representative; Ted Triebel, Little River Township 12 Representative 13 14 STAFF PRESENT: Abigaile Pittman, Transportation/Land Use Planner; Max Bushell, Transportation Planner; 15 Meredith Pucci Administrative Assistant 16 17 OTHERS PRESENT: Matt Day, Principal Planner, Triangle Area Rural Planning Organization (TARPO) 18 19 AGENDA ITEM 4a: North Carolina Department of Transportation(NCDOT) Strategic Planning Office of 20 Transportation (SPOT 4.0) Metropolitan Planning Organization (MPO)and Rural 21 Planning Organization (RPO) Project Priority Lists and Scores(Max Bushell) 22 23 OUTBoard Action: Make a recommendation to the BOCC. 24 25 Max Bushell delivered his presentation. 26 27 Matt Day stated that NCDOT has no idea when the scores will be released. 28 29 Heidi Perry asked if there was a possibility they would be ready for our next meeting. 30 31 Max Bushell said that he hopes so and that there is a BOCC meeting on April 19,where we are hoping to present the 32 scores. 33 34 Matt Day stated the RPO association is already working on a letter to send to the Secretary requesting they release 35 the scores. 36 37 Max Bushell explained to the Board that map ID 4 actually cannot be funded at the Regional Impact funding level 38 because it is a secondary route and is not eligible for funding, except at the Division Needs funding level. 39 40 Heidi Perry asked about improvements for bicycle and pedestrian traffic. 41 42 Matt Day explained that there are two pots of funding.There is a regional pot and a division pot. The bike and 43 pedestrian is only eligible in the division pot.Alex Castro asked,whether multi lane with pedestrian and bicycle 44 facilities is just modernization? 45 46 Matt Day explained that multi lane means that they are adding extra lanes so they are saying to make it a 4 lane 47 road. 48 49 Jeff Charles said that,while they are doing that, they wanted to go ahead and put the bicycle lanes in.As it is in the 50 MPO jurisdiction, it can potentially get funded. 9 51 52 Max Bushell explained that highway projects can get funded in any of the three categories. 53 54 Matt Day said that you're allowed to add bicycle as an incidental piece of a highway project. 55 56 Max Bushell said that NCDOT does not build roads anymore without two foot shoulders. That is the new standard 57 58 Matt Day added to Max's comment that the new standard applies only to a new road. Road repaving projects, Matt 59 continues, do not have to include the addition of two foot shoulders. 60 61 Jeff Charles said that Orange County is not going to get a lot of new roads. Everything is about resurfacing and 62 making things bicycle friendly. 63 64 Max Bushell suggested that ultimately what we really need to decide here is the top three projects in each category, 65 as those are the projects likely to receive funding. 66 67 Heidi Perry asked if this is the list they had already come up with earlier in the year? 68 69 Max Bushell said that no, it is not. It is the list he put together based on his assessment and the prioritization process 70 used in the last round of prioritization. Ultimately, at this level, the projects that will likely get funded are mostly 71 interchanges or highway projects. 72 73 Art Menius asked about the necessity of improvement on i Hwy 54. 74 75 Abigaile Pittman explained that the corridor study that they are doing has been designed to answer the question as to 76 what is really needed on Hwy 54. 77 78 Matt Day explained that what the Board needs to think about with these rankings is what they believe is the most 79 important should be ranked high. He continued by stating that since they don't have the scores, it may be advisable 80 for the group to identify the projects they don't like, and then just accept the NCDOT rankings from highest score to 81 least for the remainder of the projects, then place the projects they don't like at the bottom of the list. He stated that 82 this is what Chatham County did. 83 84 David Laudicina explained that he travels Hwy 54 often and in the morning it is pretty congested and that people who 85 work in Chapel Hill often times cannot afford to live there, so they are commuting and taking Hwy 54 in to work. 86 87 Heidi Perry asked if it is congested from the lack of another lane or because there isn't smooth traffic flow. 88 89 David Laudicina thinks that it is a traffic flow issue and that signal improvements may be able to help. 90 91 Alex Castro agrees with Heidi that signalization could improve Hwy 54 more than adding lanes would. 92 93 Jeff Charles said that signalization causes a lot of potential problems and that it is not a simple fix. 94 95 Max Bushell explained that he needs to break number two under TARPO into two projects. 96 97 Matt Day explained that DOT required they leave the widening project in there. 98 99 Max Bushell said that from what he is hearing, the operational improvement project should be a top priority. 100 101 Matt Day agreed with Max Bushell. 2 10 102 103 Jeff Charles asked how many of the projects on the list have a chance of getting funded. 104 105 Max Bushell said that for DCHC not very many of these are likely to get funded, based on the level of competition 106 between projects across the funding region. For TARPO however they do need a complete prioritized list. 107 108 Amy Cole asked if they are talking about construction with the on-ramp and off-ramp or are they talking about the 109 actual overpasses on 1-85 and Hwy 86. 110 111 Matt Day said that generally with an interchange project you're replacing the bridge and the ramps all at the same 112 time. 113 114 Amy Cole asked if the bridge will be widened and accessible for bicycles and pedestrians. 115 116 Matt Day said typically yes. 117 118 Jeff Charles asked if they can wait on voting until they see the scores from NCDOT. 119 120 Heidi Perry explained that if they waited they wouldn't be able to give input. 121 122 Matt Day said that the TARPO meeting when they will actually vote on it is May 19th so if the Board meets before that 123 day you can submit comments then. 124 125 Max Bushell said that he thinks the top three or four will be funded. 126 127 Matt Day said that from his experience interchange projects, interstate widening projects, and intersection projects 128 scored well. 129 130 Max Bushell explained that since they have spent an hour on this already he suggested they move the two 1-40 131 projects to the bottom of the list as the group did not think those should be funded at the Regional Impact level and 132 then they should go with the NCDOT scores in order from most to least for the remainder of the projects, because 133 this is one small part of a larger public process and this will maximize the funding to Orange County. 134 135 Alex Castro asked if someone could restate the motion. 136 137 Max Bushell said the motion is to accept the NCDOT scoring as is in the DCHC MPO, but with the two 1-40 projects 138 at the bottom and to otherwise rank the projects based on NCDOT scoring. For the TARPO, he said we rank the 139 projects based on NCDOT scoring but the NC 54 widening projects will go to the bottom. The Burlington-Graham 140 MPO projects will remain as prioritized. 141 142 MOTION made by Jeff Charles; Seconded by Alex Castro 143 VOTE: Unanimous 144 3 11 Attachment 3: DCHC MPO,TARPO,and B-G MPO Project Priority Recommendations Current Project Project Priority Submitted Project Project Description Priority(April 2016) (June 2015) DCHC MPO Projects 1-40 and NC 86 1 4 Interchange Improve interchange at 1-40 and NC 86. Improvements 1-85/NC 86 2 6 Interchange Reconstruct interchange at 1-85 and NC 86 to accommodate Improvements increased traffic. NC 86 3 7 Improvements Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four (4) North of lanes with intersection improvements at U.S.70 Bypass and NC 57. Hillsborough 1-85 from Mt. Herman Church to 4 N/A Durham County Widen one lane in each direction Line Widening NC 54 and Neville 5 N/A Road Intersection Improve the intersection of NC 54 and Neville Road. Improvements 1-85 from 1-85/1-40 Split to east of the 6 N/A NC 86 Interchange Widen one lane in each direction and improve interchanges Widening Dimmock's Mill Improve current Dimmocks Mill Rd (#735154S) grade separation Road Rail Crossing and close Bellvue St(#735152D)Cost information does not exist at 7 N/A Improvement and Bellvue Street this time and a placeholder value of $1 was used in the cost Closure estimating screen 8 9 U.S.70 East/1-85/1- Modify the 1-85/1-40 Connector(SR 1239)interchange at U.S.70 to 40 Connector provide access from all directions. Extend SR-1006 (Orange Grove Orange Grove Road Extension(Orange Grove Road to US 70)with 9 N/A Road)from SR-1006 Sidewalks and Bicycle Lanes. Construct grade separation at (Orange Grove intersection of Orange Grove Road Extension and NCRR. Road)to US 70A South Churton Street(Old NC 86) Widen South Churton Street (SR 1009) from 1-40 to Eno River to 10 1 from 1-40 to Eno multiple lanes with congestion management, limited access, River bicycle and pedestrian,and aesthetic improvements. Improvements Eno Mountain Realign the intersection of Eno Mountain Road (SR 1148) and 11 8 Road/Mayo Street Mayo Street (SR 1192) with Orange Grove Road (SR 1006) and at Orange Grove Road make safety improvements. Homestead Road Improve Homestead Road(SR 1777)from Old NC 86(SR 1009)to 12 10 Bike Lanes and NC 86 to include bicycle lanes and sidewalks in sections of the Sidewalks corridor where they do not exist. 1-40 Widening from 13 2 1-40/1-85 Widen 1-40 from four(4) lanes to six(6) lanes from the 1-40/1-85 interchange to NC interchange to NC 86. 86 1-40 Widening from Widen 1-40 from four(4) lanes to six(6) lanes from NC 86 to U.S. 14 3 NC 86 to U.S.15- 501 15-501/Durham County line. 12 Attachment 3: DCHC MPO,TARPO,and B-G MPO Project Priority Recommendations Current Project Project Priority Submitted Project Project Description Priority(April 2016) (June 2015) 1-85/Old NC 86(SR- 1009-South Funded 5 Churton Street) Reconstruct interchange at 1-85 and Old NC 86. Interchange Improvements N/A 11 Eubanks Road Bike Construct bicycle lanes on Eubanks Road(SR 1727)from Old NC 86 Lanes (SR 1009)to NC 86. Mt.Carmel Church Construct bike lanes and sidewalks from US 15-501 to Bennett N/A 12 Road Road and bike lanes from Bennett Road to the Chatham County Bike/Pedestrian Improvements line. Construct a sidewalk along the west side of Orange High School Orange High School Road from Harold Latta Road to U.S.70,construct a sidewalk along Road/Harold Latta the south side of Harold Latta Road from Cloverfield Drive to N/A 13 Orange Grove Road, install high visibility crosswalks and in-road Road Sidewalk signage at school entrances and exits on Orange Grove Road,and Improvements construct a sidewalk along entrance roads to CW Stanford Middle School. Construct a pedestrian bridge over 1-40 alongside Orange Grove Road (SR 1006), construct a sidewalk along the north side of Orange Grove Orange Grove Road (SR 1006) from the pedestrian bridge to N/A 14 Road/1-40 Timbers Drive,construct sidewalks along both sides of New Grady Pedestrian Bridge Brown School Road with a midblock crossing, and construct a sidewalk along one side of Oakdale Drive from Cheshire Drive to Orange Grove Road. Dairyland Road Widen Dairyland Road (SR 1004/1113/1177) from Union Grove N/A 15 Paved Shoulders Church Road(SR 1111)to Orange Grove Road(SR 1006)to include four(4)-foot paved shoulders. Trail Connection N/A 16 from English Hill Construct a multi-use path connecting English Hill Lane to Lane to Buttonwood Drive. Buttonwood Drive Trail Connection Construct a multi-use path connecting the southwest corner of from Patriot's N/A 17 Pointe to Timbers Patriots Pointe to Timbers Drive to shorten walking distances for Drive pedestrians. 13 Attachment 3: DCHC MPO,TARPO,and B-G MPO Project Priority Recommendations Current Project Project Priority Submitted Project Project Description Priority(April 2016) (June 2015) TARPO Projects NC 54 Operational Improvements (Orange Grove Operational improvements along the corridor with bicycle and 1 1 Road-originally pedestrian accommodations. Dodsons Crossroads-to Old Fayetteville Road) NC 54 and Orange 2 N/A Grove Road Improve intersection at NC 54 and Orange Grove Road Intersection Improvements Old Greensboro Widen Old Greensboro Road(SR 1005)from Carrboro's extra- 3 4 Road Paved territorial jurisdiction([Ti)to the Orange/Alamance County line to Shoulders include four(4)-foot paved shoulders. Widen Efland-Cedar Grove Road(SR 1004)from Highland Farm Efland-Cedar Grove Road(SR 1332)to the northern property line of the U.S.Post 4 5 Road Office north of Carr Store Road(SR 1352)from a two(2)-lane,20- foot cross section to a 24-foot cross section with straightening of Improvements: the roadway where needed,improvements to turn lanes,and the incorporation of bicycle facilities. Orange Grove Widen Orange Grove Road(SR 1006)from Dairyland Road(SR 5 6 Road/Buckhorn 1177)to Buckhorn Road(SR 1114)and Buckhorn Road(SR 1114) Road Paved from Orange Grove Road(SR 1006)to West Ten Road(SR 1144)to Shoulders include four(4)-foot paved shoulders. NC 54 Widening 6 2 (Orange Grove Widen NC 54 to a four-lane boulevard cross-section to mitigate Road to Old anticipated congestion issues. Fayetteville Road) NC 54 Widening (NC 119 in Widen roadway from a two-lane undivided cross-section to a four- 7 N/A Alamance County lane divided boulevard to mitigate anticipated congestion issues. to Orange Grove Road) Included as part of Buckhorn Road(SR Widen Buckhorn Road from U.S.70 to West Ten Road(SR1144)to B-G MPO Project List 1114)Widening: multiple lanes with bicycle and pedestrian facilities. Orange Grove Road Paved Shoulders Widen Orange Grove Road(SR 1006)from NC 54 to Arthur Minnis N/A 7 (From NC 54 to Road to include four(4)-foot paved shoulders. Arthur Minnis Road) Dairyland Road Widen Dairyland Road(SR 1004/1113/1177)from Union Grove N/A 8 Paved Shoulders Church Road(SR 1111)to Orange Grove Road(SR 1006)to include four(4)-foot paved shoulders. Orange Grove Widen Orange Grove Road(SR 1006)from 1-40 to Dodsons N/A 9 Road/Dodsons Crossroads(SR 1102)and Dodsons Crossroads(SR 1102)from Crossroads Orange Grove Road(SR 1006)to Dairyland Road(SR 1177)to include four(4)-foot paved shoulders. 14 Attachment 3: DCHC MPO,TARPO,and B-G MPO Project Priority Recommendations Current Project Project Priority Submitted Project Project Description Priority(April 2016) (June 2015) B-G MPO Projects 1 3 Buckhorn Road(SR Widen Buckhorn Road from U.S.70 to West Ten Road(SR1144)to 1114)Widening multiple lanes with bicycle and pedestrian facilities. Extend Mattress Factory Road northward across East Washington Mattress Factory Street and the NCRR/Norfolk Southern railroad right-of-way to 2 2 Road Extension to intersect U.S.70 and close the existing railroad crossover road U.S.70 connecting East Washington Street and U.S.70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. 3 1 Mattress Factory Construct a new interchange at the existing grade-separated Road Interchange crossing of Mattress Factory Road and 1-85/1-40. Attachment 4: DCHC MPO Project List Map 15 Caswell Co. y % flWSTETRYONST _z---- Person Co.NE - - ---------- - --------- ----- ------ -------- DIMS° to.„, lialk,,, / i 0 �tiq„ 1., ® II N, pc,c,.,A, 1.1#O = r, \G eP l o D )/ # An.lir i, it OR ,vOAKDALE �1 i £lLA\ i it 1 N A a j �� I 85 , �� �� `..,........_ See Inset,�� �` i Alamance Co. /r■Ak �� 8s aDurham Co. ip il ill I"II" I 1 40 � I 0.0."- p k I% ii--.‘.. a 11.,....,. (, gpAIL Arm Atimlif Ilkmattir„ ,. „LA.,..v 4,4 or ,.. ,4 40.0„,,, itip , i ,.___ _ , --,______ ___ , ______ ----_ Chatham Co. -------------- — - ------ - -� ---------------- 1 -- N 1 in=3 miles Y) rt 0 �^ Miles B-G MPO DCHC MPO Orange County Planning and Inspections Max Bushell(4/18/2016) ' r Attachment 5: TARPO Project List Map 16 Caswell i /" Person - - - ---- - ------- 41104 ----------- -- 1 i I U I ti0 2`� LAWS sTORF RioG� I . I ' w Vii o � 9 I J2G,,,i,', `nlO Z SPoM\LL R; i I m 1 D SC l ) 0 °O I �FR ti m I ° o .o 1 f s y' e � I 1 ti y�O o c y A <40 KENION RD O PRO�o i C k ° 9 E� HALLS MALL KO I O MPRVS RD f i i I tb. egall ,85 40 �� a I\yfi wEST,„„,. - �2 1 ��i 2 , O zo- j R°N i ��e ,..\NGRO ,,ARO 85 a I la Alamance Z Mj� m t c5i O ct w ar� ; Durham �N 50 D �O o P2 ' 9O ,� 0 ,_,c,, ©GAa2P 1 O gORlANO RD ARTHUR M//yNIS.0 gali, D Z " y Z ^ gRP ,, o 1114}2 7 D G Oo �C O Z N p TEERRj p �RD ri. O 1 RO� © Iliodial ■ MORROW�\� O O NW ° 1 1���liWINW p A �s OLD GREENSgORO RO 2 ' �� �� R0 dir y I 1,\ a o�o � e``<-�� I Chatham - - t ,in=Smiles 0 , , Miles B-G MPO DCHC MPO Orange County Planning and Inspections Brian Carson(4/15/2016) Attachment 6: Burlington-Graham MPO Project List Map 17 / .1-"--- Ai/0 c> st-P� QO LU G'q- C J 1 O \ Q � OANIE�S T o co 7 CC Q 'XI CC . ) — — / g 'XI Cr 4 Q O � la`Z 1 Q II Oa , LEBANON RD l I- tn 1 h hM■W 0 ` . T t Z'` PAYI ORS , ct • W. ` N Q AI LL RED G MCGOIVgN ©� \ \TE RD_ oo CREEKRO z I� 7 q S./-//„, v I City of m G TO,� r �T N Mebane 0 ST m I- � \ � O -4 O W< k J cr O"141)) Q O OO ST OAW O INDUSTRIAL DR O 85 40 C ,Al... ---------S U T R • I 1:i 'se‹. B` O I SD `A P O f �� WEST TEN RO li \-----\ 1 m 0 T N o�MPN RD a)N g G 0 0 Z = Z = o C. v-/ 70- rn r Z ■ , N 1 in=3,000 feet t B-G MPO Boundary Mebane City Limits RO o .-.-------\ mFeet ,s. y Orange County Planning and Inspections Buckhorn EDD(PLUM) Mebane ETJ Brian Carson(4/18/2016) I