Loading...
HomeMy WebLinkAboutAgenda - 04-05-2016 - 7-b - Award of Environment & Agriculture Center Professional Services Agreement 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 5, 2016 Action Agenda Item No. 7-b SUBJECT: Award of Environment & Agriculture Center Professional Services Agreement DEPARTMENT: Asset Management Services ("AMS"), Department of Environment, Agriculture, Parks & Recreation ("DEAPR"), Finance and Administrative Services ATTACHMENT(S): INFORMATION CONTACT: 1) EAC Facility Fact Sheet Jeff Thompson, 919-245-2658 2) HH Architecture Professional Services David Stancil, 919-245-2522 Proposal Gary Donaldson, 919-245-2453 David Cannel!, 919-245-2651 UNDER SEPARATE COVER— Only Available Electronically 3) Agreement Set located at: http://www.oranoecountync.00vIdep artments/purchasin_q division/eac.p df PURPOSE: To: 1) Authorize Orange County to enter into a Professional Services Agreement with HH Architecture of Raleigh, NC for design services for the Environment & Agriculture Center (EAC) capital project upon final review of the County Attorney; and 2) Authorize the Chair to execute the Agreement and any subsequent design amendments for contingent and unforeseen design requirements on behalf of the Board. BACKGROUND: On September 10, 2015 Orange County received responses to its Request for Qualifications ("RFQ") issued on August 18, 2015 for professional design services for the Environment & Agriculture Center capital project in accordance with North Carolina Procurement Law and the Federal Mini-Brooks Act governing the selection and procurement of professional services firms. The facility is contemplated to be designed from April 2016 through the fall of 2016. Staff reviewed responses from the nine (9) firms listed below. A staff panel consisting of representatives from DEAPR, Economic Development, Cooperative Extension, Farm Services, 2 Soil and Water, the Commission for the Environment, and AMS evaluated the RFQ responses and interviewed the highlighted*firms in October: Boomerang Design ESPA Architects and Planners Frank Harmon Architect HH Architecture* Hobbs Architects, PA* Innovative Design* MHA Works RND Architecture Smith Sinnett Architecture* The staff panel selected HH Architecture to enter into fee negotiations with the County based upon the firm's experience, portfolio of work, and the interview. Staff has negotiated an initial basic services fee for design services (see Attachment 2, "HH Architecture Professional Services Proposal") of $249,800, which includes significant stakeholder design input, an extensive cost-benefit study comparing a major renovation to a deconstruction/new construction process, and standard architectural and engineering design services. The estimated development timeline for this project is as follows: TASK ESTIMATED TIMEFRAME Approval of professional services agreement for Project Designer April, 2016 Project Design Stakeholder Input Spring - Summer, 2016 Schematic design review and approval Fall, 2016 Final design review and approval, bid document preparation Winter - Spring, 2017 Project Bid process, bid award Spring, 2017 Construction, Commissioning, Opening (est. 8-9 month duration) Summer, 2017-Spring, 2018 FINANCIAL IMPACT: The Board appropriated $300,000 in professional services funds within the FY2015-16 Capital Investment Plan ("CIP"). The Board is contemplating additional project funds of $3,149,500 in year two of the FY2016-21 CIP for the construction administration work of the designer, other professional services, construction, and the acquisition of furniture, fixtures and equipment to complete the project. SOCIAL JUSTICE IMPACT: The following Social Justice Goals are applicable to this agenda item: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. 3 • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. • GOAL: ENABLE FULL CIVIC PARTICIPATION Ensure that Orange County residents are able to engage government through voting and volunteering by eliminating disparities in participation and barriers to participation. RECOMMENDATION(S): The Manager recommends the Board: 1) Authorize Orange County to enter into a Professional Services Agreement with HH Architecture of Raleigh, NC for the design services for the Environment & Agriculture Center capital project upon final review of the County Attorney; and 2) Authorize the Manager to execute the initial Agreement and any subsequent design amendments for contingent and unforeseen design requirements on behalf of the Board. Attachment 1 ENVIRONMENT &AGRICULTURE CENTER 4 306 REVERE ROAD HILLSBOROUGH Ownership: Owned Year Built: 1960 Year Added: 1985 Property Total(Est.Acres):3.84* t `�h, Jim Gross Square Footage(Est.): 19,087 ,� ICI _ I ��_ r "Additional County facilities located on same parcel. ---- Building Notes Original grocery store and adjoining"green stamp"store. Complete renovation in 1987 for occupancy by County. Lighting upgrades 1998. Porch enclosed in 2000 to provide office space for then new Environment and Resource Conservation Department. Planning& Inspections and Environmental Health relocated to West Campus Office Building, November 2009. Property Information: Aerial View of Property and Building Address: _111`�' ,'ellit`: .i .' 306 REVERE ROAD " 7,4 •1-' , HILLSBOROUGH, 27278 j PIN: ,b 9864896332 ` Zoning District: , /)1441/y. :::;0MMERC1 Y II $2,525,400.00 0,•4' \ r / . ,, \.. ENVIRONMENT 8 AGRICULTURE CENTER ?•' 306 REVERE ROAD 1960(19087 sqft) Occupants/Operators: .. ; DEAPR _ 'l ..• �' Cooperative Extension ` Farm Service Agency ! ,fr_ Soil&Water Conservation �frSA , FHA Inspections . '� Records Storage • { , f; _ '' 3 81 Acres -.:r el : !IlliktiON,,,,,,.. .,...,,r,' C ... ,, Mfrit. . r I • • A;: I V i, C-47 Attachment 2 7 5l W"t¢PhIMN4yFord5C-rr4LY RALLIrh 1.1,40dIli FA 1,, 1¢kA476 1 5 lo 818 ..,3C1 HA_ 919 828 2:Sr1;:1 F/H, 190.4 Algr.E4.alOM MINE March 1, 2016 Jeffrey E. Thompson Director, Asset Management Services Orange County Government 131 West Margaret Lane, Suite 300 PO Box 8181 Hillsborough, NC 27278 Sent via email to:jethompson @orangecountync.gov Re: Orange County Environment and Agriculture Center HH Project#: 15-082 Dear Jeff, HH Architecture is pleased to present this proposal for the design of the new Orange County Environment and Agriculture Center. 1. Scope: We propose to include architectural and engineering services for the design of a new Environment and Agriculture Center(EAC)that will replace the current facility located at 306 Revere Road, Hillsborough, NC. The new facility will be located on the same site as the existing facility. The facility will include divisions of the Department of Environment, Agriculture, Parks & Recreation (DEAPR), the local Cooperative Extension Office, Soil and Water Services, the local Farm Services Agency, and the local Forestry Service operations office. The facility will also include meeting spaces, a demonstration kitchen, and outdoor demonstration areas. The existing building is currently approximately 17,000 square feet. The new facility is anticipated to become more efficient and therefore is planned to be an approximately 13,000 sf single-story building. The construction budget is set at approximately$3,047,000. For this project, the Owner intends not to pursue a Triangle J High Performance rated building, but rather utilize the Triangle J High Performance Guidelines (v1.0, 2001)as a guideline only, and shall in no way imply that actual Triangle J points or any level of Triangle J certification process are being pursued. Because no level of actual Triangle J certification is being pursued, documentation procedures are not included as a part of the consultant's work. 6 Preliminary Study Scope In this preliminary study phase, the design team will consider options to replace the existing structure with a new structure, or to use a partial adaptive re-use of the existing facility. This phase has been proposed in order to evaluate the owner provided facility assessments and to make recommendations on the feasibility of new construction versus renovation. Phased and occupied construction is being considered for either option. • Orange County will provide structural assessments, geotechnical reports, environmental and hazardous materials reports, roofing assessments, flow tests, and a site survey by early January 2016. • Design team will: o Validate and evaluate the owner provided program o Meet with stakeholders o Evaluate option of adaptive reuse versus teardown • Deliverables include: o Rough cost opinions for both adaptive reuse and teardown scenarios o Conceptual plans for both adaptive reuse and teardown scenarios Basic Design Scope At the conclusion of the preliminary study phase, the Owner will make a decision as to whether they wish to renovate the existing facility or tear it down and build new. Once that decision has been made, the Design Team will proceed with the design of the chosen option. The scope of work for each discipline is as follows: • Architectural design includes: o Overall leader of the project o Conduct meetings with Owner and stakeholders o Provide design alternatives and assist with recommendations o Provide code summary and compliance o Coordinate all disciplines of design o Present work at each of the phases listed in section 4 o Secure approvals from all AHJs o Assist with questions o Provide cost estimates at each phase o Assist with bidding o Oversee construction o Oversee closeout • Site/Civil design includes: o Contact local permitting agencies to confirm code requirements for all site development o Provide the following: • Renovation Scenario • Assumes simple phased renovation of the existing building with no increased building area • New Construction Scenario • Assumes phased construction with the ultimate building conforming to current zoning requirements for building setbacks 7 • For both scenarios: • The project will require no substantial change in parking and driveway extents or configurations, nor addition of any landscape islands • Pavement overlay or other pavement remediation will be included as needed • Impervious surface area on the site will not be increased, but a detailed accounting of impervious areas will be required • Stormwater runoff patterns will not be changed on the site • No documentation or design work will be required related to perimeter buffers, for any new plantings, fences, or screens • No tree survey or inventory of existing vegetation will be required • No substantial change to the building's sanitary sewer or potable water services, nor any new grease trap, will be required • No new solid waste management facilities will be provided • No new sidewalk will be provided along or to any public street • A fire protection sprinkler supply main will be extended to the building from the existing water main on east side of property • No NCDOT review will be required • Engineer's work will include necessary coordination and approvals to secure a Zoning Compliance Permit from the Town of Hillsborough for the project, based on staff-level administrative reviews only • Technical specifications for sitework will be included on Engineer's drawings in Engineer's standard format • Engineer will not take the lead on preparing the Solid Waste Management Plan for the project, but will assist with site-related aspects of this document as needed • Project phasing information will be indicated on a single unified set of Site Plan documents and a single unified set of Construction Drawing documents. Separate phase-by-phase documents and review processes will not be required • Stormwater analysis and design is limited to surface collection and roof drainage. Anything beyond this scope would require additional fees (i.e. treatment, management, ponds, rain gardens, easements, etc.) • Plumbing design includes: o Domestic Water System Design within and beneath the extents of the building o Sanitary waste system design within and beneath the extents of the building o Roof drainage design shall be limited to piping only(no roofing or drains) o Natural gas piping design shall be limited to piping beyond the load side of the meter o Specialty equipment(food service, lab, etc.) plumbing infrastructure design shall be based on the equipment layout and equipment consumption/use data o Renovation fee assumes full plumbing system replacement • Mechanical design includes: o Design shall include air handling and heat transfer systems in and around the building structure o HVAC controls design o Natural gas piping design shall be limited to piping beyond the load side of the meter o Specialty equipment(food service, lab, etc.) HVAC infrastructure design shall be based on equipment consumption/use data o Renovation fee assumes full mechanical system replacement 8 • Electrical design includes: o Design shall include power, lighting, and fire alarm systems for the building o Design of electrical site utilities shall be limited to site lighting and the secondary distribution beyond the service transformer o Design for special systems (audio/visual, voice reinforcement, security, etc.)shall include empty raceway system for future inclusion of cabling and equipment by the Owner. Electrical infrastructure design shall be based on equipment layout and consumption/use data o Design for telecommunications shall include passive equipment only defined as outlets and associated cabling in structured raceway/cabletray systems terminating at the patch panels within the extents of the building. Fiber(data) and copper(telephone) backbones shall be included within the extents of the building. Design for active equipment(patch cords and active electronic components) is not included. Active equipment shall be provided by the Owner o Specialty equipment(food service, lab, etc.)electrical infrastructure design shall be based on equipment layout and consumption/use data o Renovation fee assumes full electrical system replacement • Fire Sprinkler Protection design includes: o To the extent required by Code, fire sprinkler design within and beneath the extents of the building structure will consist of establishing the criteria and performance requirements. Final design will be by the Construction Contractor • Structural design includes: o Prior to the start of design, a project specific geotechnical report is needed o Assumes a seismic class D or better o Assumes shallow foundations are acceptable with a first floor concrete slab-on- grade o Assumes a relatively flat site that will not require retaining walls o For new construction scenario, assumes simple structural steel framed rectangular building with a flat/low slope rood with braced frames for lateral load resistance and exterior metal stud walls or load bearing masonry walls o For renovation scenario, assumes relatively minor structural renovations and repairs to the existing building as follows: • Small punched openings in existing exterior walls (less than 10% of total wall area for any wall) • Small skylights or sonotube type openings restricted to the wood framed roof areas and not requiring modification to the existing steel roof truss members • Removal and replacement of the existing front wall with new wall construction that would likely need to accommodate new reinforced masonry shearwalls or structural steel braced frames to resist later loads along the front of the building • Scope does not include design for rooftop mechanical equipment or any other modifications to the existing roof structure, walls, parapets, or existing building structure • Assumes that changes will not require a change in use/occupancy or structural upgrade to meet current code requirements o If needed, structural design for a 2,000 sf premanufactured metal storage building will be limited to foundation design for a slab-on-grade foundation. Engineer will review the building manufacturer's design criteria and final foundation reactions and will be considered the structural engineer of record 9 Contingency Design Scope In the event that any of the following items are requested and/or required, the corresponding fees in section 4 will be needed: • Security system component design • Interior renovation of existing storage building (does not include structural modifications) • Site lighting design • Lateral load analysis and structural code upgrades (for renovation scenario only) o Will be needed if modifications to the existing structure exceed assumptions in basic design and require our structural engineer to perform a lateral load analysis and upgrade the existing building structure to meet current code requirements • Substantial parking lot configuration (if required) • Compliance with current landscape buffer standards (if required) • Sprinkler supply connection to waterline in Revere Road rather than to the water main location on the eastern edge of the site • New sidewalk along Revere Rd. or Cedar Grove Rd. (if required) • Enhanced solid waste and recycling facilities (if required) • Stormwater analysis and design of typical stormwater treatment measures (if required) o This work should not be required as long as total site impervious area is not increased 2. Consultants For Structural Engineering, we propose: Stroud, Pence and Associates Contact: Anna Lynch, PE 4904 Professional Court, Suite 200 Raleigh, NC 27609 Phone: (919) 782-1833 For Mechanical Electrical, and Plumbing (MEP) Engineering, we propose: Stanford White Contact: William M. Smith, PE P.O. Box 19944 Raleigh, NC 27619 Phone: (919) 832-8118 For Site/Civil Engineering, we propose: Civil Consultants Contact: Tony Whitaker, PE 3708 Lyckan Parkway, Suite 201 Durham, NC 27707 Phone: (919)490-1645 10 3. Basic Design Phases Basic Design Phase 1 Schematic Design (SD): Perform preliminary code analysis. Provide written project narrative, site plan, building floor plans, and cost estimate. Attend all meetings required by Owner. Submit to Owner and AHJ and coordinate for approval. Design Development(DD): Respond to all SD comments. Continue design process in all disciplines. Provide outline specifications, code summary sheet, site plans, floor plans, and wall sections. Provide room/door schedules, engineering drawings, and cost estimate. Attend all meetings required by Owner. Submit to Owner and AHJ and coordinate for approval. Construction Documents (CD): Respond to all DD comments. Provide full working drawings and specifications. Submit to Owner and AHJ and coordinate for approval. Provide cost estimate. Attend/lead all meetings required by Owner. Bidding: Lead and administer the Bidding and Negotiation process. Basic Design Phase 2 (to begin in the Summer of 2017) Construction Administration (CA): Basic fee includes construction administration for an estimated duration of ten (10) months. Construction is assumed to be phased and occupied. Perform architectural coordination, submittal review, and related Construction Administration. Lead the pre-construction meeting. Provide bi-weeklyjobsite visits (up to 22 visits anticipated) and lead monthly construction meetings (up to 10 meetings anticipated), punch list and final inspection. Closeout(CO): Record drawings and closeout of project. 4. Fee New Construction Renovation Preliminary Study $ 35,800 $ 35,800 Subtotal Preliminary Study $ 35,800 $ 35,800 Schematic Design $ 37,100 $ 44,500 Design Development $ 55,100 $ 62,000 Construction Documents $ 87,800 $ 97,100 Bidding $ 9,400 $ 10,400 Subtotal Basic Design Phase 1 $ 189,400 $ 214,000 Construction Administration $ 75,500 $ 82,900 Closeout $ 10,700 $ 11,600 Subtotal Basic Design Phase 2 $ 86,200 $ 94,500 11 Security System Component Design $ 3,450 $ 3,450 Storage Building Interior Renovation Design $ 9,030 $ 9,030 Site Lighting Design $ 2,875 $ 2,875 Lateral Load Analysis and Code Upgrades $ - $ 11,500 Substantial Parking Lot Configuration $ 9,200 $ 9,200 Landscape Buffer Standards Compliance $ 9,200 $ 9,200 Sprinkler Supply Connection to Revere Rd. $ 5,750 $ 5,750 Sidewalk Along Revere Rd. or Cedar Grove Rd. $ 3,450 $ 3,450 Enhanced Solid Waste/Recycling Facilities $ 2,300 $ 2,300 Stormwater Analysis and Design $ 20,700 $ 20,700 Subtotal Contingency Items $ 65,955 $ 77,455 5. Excluded Services Excluded Architectural Services, to be billed as Additional Services only if required: • Project scope increase or change • Design of outdoor facilities • Design of the additional space beyond what is listed in the programming document • Additional monthly construction meetings beyond the anticipated 10 • Additional architectural CA visits beyond the anticipated 22 • Additional MEP CA visits beyond the anticipated 12 • Additional structural CA visits beyond the anticipated 5 • Additional site/civil CA visits beyond the anticipated 4 • Public meeting attendance • Renderings • Fundraising meeting attendance • Furniture, Fixtures, and Equipment(FF&E)selection and design • LEED design • Express review • Hazardous materials testing and abatement design • Existing roof modifications that require additional structural analysis and/or design • Retaining wall design • Site signage design • Adaptive re-use or augmentation of existing MEP systems for renovation • Life cycle and operating cost analysis • Energy measurement and verification plans • Computer day-lighting simulations • Design of emergency/stand-by generator system • Design of voice reinforcement wiring/equipment • Commercial kitchen design • Walk-in cooler and freezer design • Audio Visual systems design • Design for complex or large-scale bid alternates • Chapter 17 special inspections • Sanitary sewer or sanitary service extension • New driveway permit or utility encroachment permit from NCDOT • Traffic impact analysis • Geotechnical investigations • Environmental investigations 12 • Wetlands delineation/permitting • Permitting fees • Rezoning of property • Surveying • Irrigation design • Site retaining wall design • Hydraulic analysis • Water re-use or water supply well system design • Involvement in stormwater runoff management or mitigation issues that may be raised by regulatory agencies beyond typical requirements, due to site-specific characteristics or concerns • Unusual site work associated with conditions discovered during construction or geotechnical exploration (i.e. underground storage tanks/hazardous materials, unusually large quantities of rock or unsuitable material, on-site disposal area/landfills, etc.) • Off-site utility design • Any other service not listed in scope Please let me know if you need additional information. We are very excited to begin this project! Sincerely, Kristen Hess, AIA, LEED AP Principal