Meeting Date: August 21, 2007
Action Agenda
Item No. _ ~' r ,
SUBJECT: Approval of Orange County's School Construction Standards
DEPARTMENT: Budget PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Attachment 1. April 30, 2007 School
Construction Standards
Attachment 2. Minutes April 30, 2007
Joint Meeting of County
Commissioners, Chapel
Hill Carrboro City Schools
Board of Education and
Orange County Schools
Board of Education
INFORMATION CONTACT:
Donna Coffey, (919) 245-2151
PURPOSE: To approve Orange County's School Construction Standards.
BACKGROUND: Orange County's current elementary and middle school construction
standards have been in place since 1996, and its high school standards since 1999. While these
standards have served as a model for many schools constructed in both the Chapel Hill-
Carrboro City and the Orange County Schools, it has become increasingly difficult to adhere to
the standards due to economic factors such as rising construction costs as well as educational
reforms such as changes in state mandated class sizes for grades kindergarten through third. In
addition, land use regulations and environmental considerations that incorporate sustainable
building components and smart growth elements are becoming more prevalent in the
construction industry. Two separate School Facilities Task Forces, convened in 2000 and 2002,
identified a number of standards that required clarification and/or updating (e.g. baseline
estimates for per square foot cost, an appropriate inflation factor, percentage of project budget
that should be set aside for contingency, etc.). To that end, the Boards of County
Commissioners and Education recognized the need to update and refine Orange County's
current School Construction Standards, and last year requested that the School/County
Collaboration Work Group review existing School Construction Standards with the intent of
bringing them more in line with today's practices, regulations, and construction market.
At the time that Orange Commissioners adopted the County's existing School Construction
Standards, the North Carolina Department of Public Instruction (NCDPI) had Facilities
Standards in place that established minimum construction criteria for individual school districts
to adhere to when they constructed new facilities or renovated older ones. Since that time, the
State has moved away from the "standards concept" and now has "Facilities Guidelines" in
place.
During the first half of 2006, the Collaboration Work Group met four times to focus on revisions
that should be made to existing Orange County school construction standards. Those meetings
involved primarily information gathering regarding school construction practices and guidelines,
sustainability considerations, and opportunities for community use of school facilities,
particularly with regard to County and municipal recreation programming. Since September
2006, the Work Group has met three additional times to review and refine successive drafts of
updated School Construction Standards. All three governing boards received and reviewed an
early draft of the revised standards at the September 2006 joint work session. Of particular note
in the Work Group's proposal is the recognition of the need to consider "non-traditional schools"
as well as more traditional models, in furtherance of evolving educational priorities and smart
growth initiatives, and in light of the harsh realities of spiraling costs in the construction industry.
At the April 30, 2007 joint work session between Commissioners and both Boards of Education
there was consensus that the draft presented (Attachment 1 of this agenda abstract) reflected
construction standards that were fair and reflected values that were important to all parties.
While the intent of the Guidelines remains consistent with the previously enacted State
Standards - to ensure that school systems provide adequate space for instructional classes and
activities -the Guidelines now allow for flexibility and allow for more consideration of local
situations such as availability of land or other limitations that school districts may face.
Both Chapel Hill Carrboro City and Orange County Schools Boards of Education have adopted
the Standards.
FINANCIAL IMPACT: There are no immediate financial impacts associated with approval of this
version of the Standards since, based on the November 15, 2006 certified student membership
projections for both school districts, the need for new school construction falls beyond fiscal year
2007-08. In accordance with the draft Standards a School Capital Review Team consisting of
County staff and representatives from each school district, would meet annually, in November,
to review construction and land related costs for actual school projects that have occurred within
the past year. Based on actual expenditures related to school construction, the Review Team
would recommend updated school construction standard costs, which include all of the project
components, for the respective School Boards to review and for the Board of County
Commissioners to approve. In addition to school construction costs, the Review Team would
also review the ten year Capital Investment Plan (CIP) process and pay-as-you-go funding
allocations for the upcoming long-range capital plan. The Review Team would take the
Construction Price Index (CPI) and benchmarks set by national education facilities planners into
consideration in recommending updated construction standards.
RECOMMENDATION (S): The Manager recommends that the Board of County Commissioners
approve the attached School Construction Standards.
3
School Construction Standards
Apri 1200? Update
As Proposed by the School/County
Collaboration Work Group
Table of Contents
Introduction 3
School and County Collaboration Work Group Proposal
Traditional and Non-Traditional Models 4
Class Size and School Capacity 5
Square Footage 6
School Site and Minimum Acreage 6
Interior Building Space Allocations
Non-Specialized Classrooms 7
Specialized Classrooms 8
Site Considerations 11
Best Management Practices and. Development Standards 12
Cost Considerations 15
Other Considerations 17
Appendices
Appendix 1. Elementary School Space Profile and Square Footage
Standards
Appendix 2. Middle School Space Profile and Square Footage Standards
Appendix 3. High School Space Profile and Square Footage Standards
(1,000 Student Capacity)
Appendix 4. High School Space Profile and Square Footage Standards
(1,500 Student Capacity)
Appendix 5. School Project Cost Calculation Template
2
5
Appendix 6. School Construction Project Components
School Construction Standards
County/School Collaboration Work Group Apri12007 Update
Orange County's current elementary and middle school construction standards have
been in place since 1996, and its high school standards since 1999. While these
standards have served as a model for many schools constructed in both the Chapel Hill-
Carrboro City and the Orange County Schools, it has become increasingly difficult to
adhere to the standards due to economic factors such as rising construction costs as
well as educational reforms such as changes in state mandated class sizes for grades
kindergarten through third. In addition, land use regulations and environmental
considerations that incorporate sustainable building components and smart growth
elements are becoming more prevalent in the construction industry. Two separate
School Facilities Task Forces, convened in 2000 and 2002, identified a number of
standards that required clarification and/or updating (e.g. baseline estimates for per
square foot cost, an appropriate inflation factor, percentage of project budget that
should be set aside for contingency, etc.). To that end, the Boards of County
Commissioners and Education recognized the need to update and refine Orange
County's current School Construction Standards, and last year requested that the
School/County Collaboration Work Group review existing School Construction
Standards with the intent of bringing them more in line with today's practices,
regulations, and construction market.
At the time that Orange Commissioners adopted the County's existing School
Construction Standards, the North Carolina Department of Public Instruction (NCDPI)
had Facilities Standards in place that established minimum construction criteria for
individual school districts to adhere to when they constructed new facilities or renovated
older ones. Since that time, the State has moved away from the "standards concept"
and now has "Facilities Guidelines" in place.
While the intent of the Guidelines remains consistent with the previously enacted State
Standards - to ensure that school systems provide adequate space for instructional
classes and activities -the Guidelines now allow for flexibility and allow for more
consideration of local situations such as availability of land or other limitations that
school districts may face.
The report that follows offers the Work Group's proposal.
4
School/County Collaboration Work Group Proposal
Traditional and Non-Traditional Models
The Collaboration Work Group recommends that the Standards make a distinction at all
levels -elementary, middle and high -between "traditional" school models and "non-
traditional" ones.
Traditional Model -The planning model for a traditional school is set out
in these standards. Capacity of a traditional school would be 585 for
elementary schools, 700 for middle schools and would range from 1,000
to 1,500 for high schools. For the most part, a traditional model would
consist of a site that would have sufficient acreage to allow for future
building expansion, outdoor play areas, full complement of athletic
facilities and on-site parking for faculty, students and buses.
Non-Traditional Model - Anon-traditional model would be one that
deviates in some way from the traditional model and would be defined on
a project-by-project basis. This model would offer flexibility and
accommodate various local conditions, including the availability, or lack
thereof, of land in addition to a school district's needs.
This report, outlines the Traditional Model at all levels and provides examples of Non-
Traditional Models. The Work Group foresees the need for Non-Traditional Models
becoming more prevalent in the future. Furthermore, the Work Group encourages
School Boards and County Commissioners to consider non-traditional models as they
plan new schools.
5
S
Space Considerations
1) Class Size and School Capacity
The Collaboration Work Group recommends that traditional school capacity be in
accordance with State class size/teaching station requirements as outlined in
North Carolina General Statute 115C-301.
Elementary School -For school year 2006-07, elementary class size/teaching
station requirements are:
• Average of 21 students per class in grades kindergarten through three
• Average of 26 students per class in grades four and five
• 10 students per class in special needs classrooms
Based on the average class sizes outlined above the capacity of a traditional
elementary school totals 585 students - a reduction of 15 students from the
previous County standards of 600 students.
Middle School -Middle school includes grades six through eight. For school
year 2006-07, middle school State class size requirements are:
• Average of 26 students per class in grades six through eight
• 10 students per class in special needs classrooms
Based on the average class sizes outlined above, for school year 2006-07, the
capacity of a traditional middle school averages 700 students.
High School -High school includes grades nine through twelve. For school
year 2006-07, high school class sizes allow for:
• Regular classrooms with a minimum, capacity 20 students per
class/teaching station
• Vocational Education class rooms with a capacity ranging from 15 to 20
students per class/teaching station
• All other classrooms range from 15 to 25 students per class/teaching
station
o For example a theater arts class room may have upper range
capacity while exceptional education class rooms would be on the
lower end of the spectrum
For school year 2006-07, the capacity of a traditional high school ranges
between 1,000 and 1,500 students.
The Work Group further recommends that should the General Assembly amend
class sizes at any level, the County's School Construction Standards should be
amended within some reasonable timeframe that would allow for consideration of
6
funding and adequate timing of new schools. While the Collaboration Group
does not recommend going above the state mandated class size at any level,
there might be examples in the future where total school capacity may vary from
the Standards. For example, a smaller than traditional school site may create the
need to construct a smaller school or a multi-story one. Other examples include
a non-traditional school that may allow for smaller than mandated class sizes or
may include additional classroom space for pre-kindergarten students.
The chart below compares existing standards with those proposed by the
Collaboration Work Group:
Gapacity -Traditional Model
School Level Existing Standards April 2007 Proposal from School
Collaboration Work Group
Elementa 600 585
Middle 700 700
Hi h School Ran e 1 000 1 500 1 000 1 500
2) Square Footage
In calculating total square footage of new schools, the Collaboration Work Group
concluded that the prior standards for square footage per student are sufficient.
Given the Work Group's proposed change in elementary class size and total
elementary capacity, as outlined earlier in this report, the proposed elementary
square footage is reduced from the previous standards of 95,235 square feet to
92,840. Statutory class sizes for middle and high school levels remain
unchanged from the previous Standards; therefore, the Work Group
recommends no changes in existing standards for total square footage of middle
and high schools. The chart below compares existing standards with those
proposed by the Collaboration Work Group:
Square Footage -Traditional Model
School Level Existing Standards Apri12007 Proposal from School
Collaboration Work Group
Elementa 95,235 92,840
Middle 132,192 132,192
Hi h School Ran a 151,049 251,345 151,049 251,345
Square footage of anon-traditional school may be higher or lower than those
outlined by the School Collaboration Work Group. Examples of factors
7
io
considered as non-traditional include community recreational facilities such as a
gymnasium or smaller schools constructed on smaller than traditional sites.
3) Interior Building Space Allocations
a) Non-Specialized Capacity Generating Classrooms/Teaching Stations
Elementary - A traditional elementary school contains 25 non-specialized
classrooms. As stated earlier in this report, the Work Group recommends that
non-specialized classroom sizes for a traditional elementary school be in
accordance with State class size requirements as outlined in North Carolina
General Statute 115C-301. The Statute currently states that kindergarten
through third grade classrooms have capacity for 21 students per class with third
through fifth grade teaching stations having capacity for 26 students per class.
Appendix 1 of this report outlines, by grade level, the capacity and square
footage guidelines for a traditional elementary school.
Middle A traditional middle school contains 21 regular classrooms with an
individual class size of 26 students plus 6 science classrooms. As outlined in
Appendix 2 square footage for regular traditional middle school classrooms plus
storage total 1,014 square feet and science classrooms including lab storage
space, total 1,200 square feet.
High A traditional 1,000-student high school contains 24 academic classrooms
allowing for a minimum of 20 students per class in grades nine through twelve. A
traditional 1,500-student high school contains 40 regular classrooms allowing for
26 students per class in grade nine and 29 students per class in grades ten
through twelve.
Square footage for traditional academic high school classrooms allows for in-
room student use computers and ranges from 850 to 950 square feet per
classroom and square footage for science classrooms, including lab storage
space, range from 1,200 to 1,500 square feet.
Appendix 3 of this report outlines capacity and square footage guidelines for
a traditional 1,000 student high school and Appendix 4 provides similar
information for a traditional 1,500 student high school.
b) Specialized Classrooms
Specific functions of each specialized classroom determine the total square
footage needed for each. The narratives below provide overviews of the function
of each specialized classroom while Appendices 1 through 4 provide detailed
space profiles including square footage information for each specialized area.
The Work Group recommends that the existing standards for specialized rooms
remain unchanged for traditional model schools.
8
i) Pre-School Area (Elementary Level)
NC Public Schools Facilities Guidelines recommend 1,200 to 1,400 square
feet for pre-kindergarten classrooms. Orange County Standards allow for
one classroom for pre-kindergarten children ages three and four at 1,700
square feet.
ii) Special Needs Classrooms (All Levels)
Programs for exceptional children vary greatly, depending on age of children
and local factors. Additional support spaces may be necessary for
exceptional education purposes depending on the program. Specialized
spaces, such as cooking areas, toilets, bath/shower rooms, laundries,
observation rooms, and special equipment to accommodate certain
disabilities may be required.
iii) Remediation and Resource Labs (All Levels) -School plans should
include one or more small group classrooms for remediation, conferences,
guidance and testing for groups. Smaller group activities may require
additional smaller rooms.
iv) Instrumental and Vocal Classrooms (High School Level) -Student
participation for these programs is often high - it is not unusual for the
number of students in these classrooms to range between 40 and 80.
Orange County Standards provide for a range of 2,800 to 6,600 square feet
for these two classrooms (not including storage).
v) Dance Classroom (High School Level) -Dressing rooms and access to
showers for dance students are desirable in high schools. If located adjacent
to the gymnasium locker rooms, this space can be combined. Orange County
Standards for this function range from 1,800 to 2,000 square feet.
vi) Workforce Development (Middle and High School Levels) -Facilities for
high school, workforce development programs are often large, extensively
equipped and more expensive than regular classrooms because of their
similarity to industry. Square footage included in Appendices 1 B and 1 C
parallels the State Guidelines. In accordance with State statutes, a basic high
school vocational education program must offer at least three of the workforce
development programs. Many high schools offer all seven programs
including agricultural, health occupations, business, family and consumer
sciences, marketing, technology, and trade and industrial. The number and
types of laboratories depend on local factors. More than one laboratory for a
program such as family and consumer sciences education may be necessary
in larger schools. Another factor to consider is the co-use of the darkroom of
a school. Alarger-than-standard darkroom with additional storage could
serve art and science programs as well as workforce development programs.
Existing County high school standards allow for offering all seven programs
9
~a
with allocated space for each program ranging from 10,750 to 16,100 square
feet.
c) Media Center Standards (All Levels) -The capacity for the media center of the
school should be ten percent of the average daily membership of the school.
State guidelines recommend that the media center be located on the ground
floor, be single story and convenient to all learning areas of the school. Minimum
support areas include offices, work/production rooms, conference rooms,
periodical storage, audiovisual equipment storage, and spaces for professional
collections.
State guidelines recommend that the media center's location should not preclude
future expansion of the facility.
When appropriate, school media centers allow for joint use and public access.
Additional technology and security measures are required in order to allow for
public access. During facility planning, the respective School Board, along with
the Board of County Commissioners, would invite local municipalities to
participate, financially and programmatically, in possible joint use opportunities.
d) Physical Education and Gymnasium Standards (All Levels) -The State
square footage guidelines for physical education facilities vary by school level.
Gymnasiums for traditional middle and high school levels should include dressing
and shower areas large enough to accommodate physical education and athletic
programs, offices and storage. Orange County Standards for a traditional middle
school includes locker rooms and weight rooms. Both elementary and middle
school levels allow additional space that would allow after school use including a
multipurpose room. In addition, Orange County Standards for a traditional high
school provide for an auxiliary gym at the 1,000-student profile compared to the
current standards of allowing for an auxiliary gym at the 1,500-student profile.
During initial facility planning and programming states, the respective School
Board, along with the Board of County Commissioners, would invite local
municipalities to contribute to funding a community use gymnasium or other
athletic facilities such as soccer fields.
e) Administration Standards -The size of the Central Office will vary according to
school level and staffing at each school. Partition construction should allow for
flexibility of space.
f) Student Support Area Standards -This general area includes counseling
rooms, guidance rooms and health services, social workers, psychologists or
other health professionals.
g) Staff Support Areas Standards - In accordance with State Guidelines, Orange
County Standards allow for shared office and workspace areas for teachers. In
10
13
addition, the existing standards provide work areas for instructional, lab and
teacher assistants along with at least one centralized workroom for copy
machines and other specialized equipment and supplies that are not typically
located in teacher offices/workspaces.
h) Child Nutrition (Cafeteria/Food Service) Standards -Existing Orange County
Standards for all levels provides for a full service kitchen and seating to
accommodate the entire student body in no fewer than three shifts.
i) Dining areas allow for 12 to 14 square feet per pupil dining. The formula for
calculating dining area size is capacity / number of seatings x square foot per
pupil.
ii) State Guidelines calculate kitchen area square footage based on the number
of meals served per day. The chart below outlines the State's Guidelines for
kitchen areas:
Lunches
Served Square
Footage
100 -~~~~~ 856
250 1,261
500 1,518
750 1,938
1,000 2,208
1,250 2,566
1,500 2,880
A non-traditional model may provide a smaller dining area if the district allows for
open lunch (i.e. traveling away from school for the lunch period).
i) Commons/Circulation/Entries/Building Support Standards - This area
includes miscellaneous space such as corridors, stairs, additional storage, book
storage, entries, mechanical areas, and commons areas. In addition, this areas
includes additional restroom facilities, academic house centrums and activities
areas.
11
i~-
Site Considerations
1) School Site and Minimum Acreage
Traditionally, minimum acreage refers to usable, or developable, acreage.
"Usable" or "developable" acreage refers to those portions of the site where a
school district can construct something -examples include parking, playfields,
buildings, retention ponds, and septic systems. Examples of areas that are not
"usable" or "developable" might include mandated buffers, setbacks, slopes too
steep to be effectively developed, rock outcroppings, wetlands or environmentally
sensitive areas.
School site sizes for non-traditional schools may be higher or lower than those
outlined in the State Guidelines -for example, acreage may deviate from State
Guidelines in order to
• Accommodate community use of the facility and multiuse recreational
facilities such as soccer and softball fields.
• Account for areas that cannot be built upon, such as steep slopes,
wetlands, rights-of--way, easements, setbacks, buffers or poor soils
• Meet requirement imposed by local ordinances - i.e. restrictions governing
the ratio of land that can be disturbed within a development and the
permitted amount of impervious service will affect the ultimate size of the
site
• Allow for on-site or off-site parking for staff, students, buses and visitors
• Accommodate the expanding number of middle and high school athletic
teams either on-site or off-site - i.e. an additional ten acres or more of
land may be necessary to allow for an athletic stadium and associated
spectator parking.
However, other areas to consider in siting a new school include areas of
population density, public transportation availability and walkability, natural
geographic enhancements or barriers, road patterns, and existing or non-existing
infrastructure such as water, sewer and roadways. School systems should
actively pursue partnering agreements with the Towns and County Parks and
Recreation Departments, private developers, and businesses in an effort to
maximize joint use of facilities. Future projects should also include:
^ Xeriscaping and regulatory buffers
Use of synthetic turf for athletic fields or installation of irrigation
systems.
12
i5
The chart below compares existing standards with those proposed by the
Collaboration Work Group:
School Site Acreage -Existing Standards -Traditional Model
September 2006 Proposal from
School Level Existing Standards School Collaboration Work
Group
Elementary (10 developable
acres plus one developable 16.0 16.0
acre for each 100 students
Middle (15 developable acres
plus 1 additional developable 22.0 22.0
acre for every 100 students)
High School (Range) (30 40 to 50 fora 45 to 60 fora 40 to 50 fora 45 to 60 for a
developable acres plus 1 1,000 student 1,500 student 1,000 student 1,500 student
additional developable acre for high school high school high school high school
ever 100 students
The Work Group recommends that the acreage standard for a traditional school
model remain unchanged.
With all of the above-mentioned factors considered, the availability of suitable
land and adequate infrastructure may create the need to construct a non-
traditional school on a smaller site.
As the availability of land becomes less and less due to development and land-
use regulations, the Work Group also recommends that the County, both school
districts, Towns, and possibly the University of North Carolina, partner to identify
suitable, available future school sites throughout the County. The partners would
meet periodically to update the database and report the findings to elected
officials on an annual basis.
Best Management Practices and Development Standards
The Board of County Commissioners and both Boards of Education want to be good
fiscal stewards of taxpayer monies. In order to meet this objective, the Work Group
recommends utilizing tools and best management practices that allow for improved
contract negotiations thereby resulting in the best pricing and outcomes possible.
With this objective in mind, the Collaboration Work Group recommends that the
following best management practices serve as guidelines during facility planning.
a) Innovative Development Tools
In North Carolina, school districts have a variety of options for constructing
schools:
13
1(0
^ General Statute 143-128 (a1) includes (1) Separate Prime Bidding,
(2) Single Prime Bidding, and (3) Dual Bidding
^ General Statute 143-64.31 provides for Construction Management
at Risk
^ General Statute 143-135.26(9) provides for alternative contracting
methods
^ Senate Bill 2009 (Senate Law 2006-232) provides for capital leases
of school buildings and school facilities
Both the Construction Manager at Risk and the capital lease options allow
school districts flexibility in setting actual project cost. Examples of
potential benefits associated with these options include:
Contract Negotiation -School Boards and staffs become integral
partners within the design build teams that includes the architect
and the contractor. This team develops a maximum project cost, in
a transparent manner, throughout all areas of the design and
development process thereby controlling these costs within the
design phase.
Flexibility -While school systems had the statutory authority to
lease facilities in the past, with the ratification of Senate Bill 2009 in
2006, through public-private partnerships between Boards of
Education and contractors, school districts now have opportunities
for to enter into "build-to-suit" contracts. School districts have
opportunities to identify where the district needs schools, and to
provide design, programming and construction specifications to the
developer.
^ Future Maintenance of Facility - In accordance with Senate Bill
2009, as part of contract negotiation, responsibility for future facility
maintenance/repairs and energy usage guarantees can be
assigned to the developer and not the school system.
Ownership -Per Senate Bill 2009, transfer of ownership of the
leased property may occur at the end of the lease term or
ownership may stay with the developer.
Time Savings -Contract negotiations offered through public-private
partnerships can potentially be conducted more quickly than more
traditional public methods. While entities may not realize major
cost savings in building costs, there may be savings attributed to
beating inflation.
14
~~
Based on County staff discussions with Local Government Commission
(LGC) staff over the last few months, it is important to note, that the LGC
considers capital leases as outstanding debt for County governments.
b) "Large Developer" Status
For the most part, local communities view school systems and
governmental agencies as "large developers". While this situation offers
purchasing advantages on some fronts, it is also a situation that staffs
must manage effectively. Being viewed as a "large developer" often sets
"higher than normal" pricing standards in the construction market. As an
example, past practice has been that local governments and school
districts make construction project budgets known before the bid process
beginning. An unintended consequence of this practice has been that
development and construction markets tend to "re-adjust" their standards
upwardly, and bids more than likely come in at the "pre approved" level or
higher rather than coming in at less than the "pre-approved" level.
c) Value Transference to Stakeholders
"Value Transference" is defined as the value that an external entity or
stakeholder receives when schools and governmental entities such as
counties or towns invest in particular communities. Individuals,
businesses, and other public as well private entities benefit from school
and other governmental capital investments into a community. The impact
of such investments should be recognized in development practices and
principles relative to the potential revenues from the private sector that this
value transference creates. For example, schools and co-located
recreational facilities inure to the retail value of residential building lots and
existing homes. This value transference to the owner and/or developer of
this real estate may be recouped in the form of impact fees, transfer taxes
or other reasonable proffers.
d) Financial Strength
Strong financial conditions of Orange County and both the Chapel Hill
Carrboro and Orange County school districts should allow for negotiating
positions and purchasing power within land use design, development and
operations.
All of the practices outlined above offer guidelines to consider as each district
proposes new school construction projects.
15
i~
Cost Considerations
As a starting point for this update, in setting the budget for future school construction
it is important that the building cost per square foot reflect historical costs of
constructing new schools (both locally and statewide) as well as consider the current
construction market. A School Capital Review Team consisting of County staff and
representatives from each school district, would meet annually, in November, to
review construction and land related costs for actual school projects that have
occurred within the past year. Based on actual expenditures related to school
construction, the Review Team would recommend updated school construction
standard costs, which include all of the project components, for the respective
School Boards to review and for the Board of County Commissioners to approve. In
addition to school construction costs, the Review Team would also review the ten-
year Capital Investment Plan (CIP) process and pay-as-you-go funding allocations
for the upcoming long-range capital plan. The Review Team would take the
Construction Price Index (CPI) and benchmarks set by national education facilities
planners into consideration in recommending updated construction standards.
With historical practices, construction project budgets were established and
broadcast at the onset of project planning thereby "pre-setting" the budget for the
market to react to with the ultimate result of the construction community matching or
exceeding the budget. However, with future projects, the approach would vary
somewhat by not "pre-setting" the budget ahead of the bidding process. Amore
conservative approach would be for the School Capital Review Team to create a tool
that analyzes historical costs of like projects (elementary to elementary, middle to
middle, etc.) across all project components. Appendix 5 offers an example of the
template that would serve as an analytical tool for developing construction project
__
budgets. Note to readers -Appendix 5 is pending finalization by County and. School
__.
staffs to include. most recent school construction costs related to Chapel Hill
Carrboro City Schools Elementary_ #10 __as _approved_ by Board of County
Commissioners on March, 13, 2007. This tool allows for a comparable cost analysis
.. ~.
without establishing any advantages or expectations to the marketplace.
The following section defines individual construction project components, and
Appendix 6 provides the information in a chart format. Staff plans to develop
construction project budgets and track actual expenditures in accordance with the
project components outlined in the chart. At the end of the project, staff will prepare
a final reconciliation and budget variance analysis for Commissioners and School
Boards to review.
a) Site Acquisition
Site acquisition costs include costs associated with acquiring a site. Examples of
these costs include the actual purchase price of the properly along with costs of
property survey, appraisals and deed recordings, testing to include soils, cultural,
16
~~
archeological, environmental, suitability, and legal fees associated with purchase
and recording the property.
For purposes of this update, it is recommended that the per acre price be
consistent with the fair market value of land at the time of purchase. The School
Capital Review Team would review market value of land each year during the
process outlined earlier in this report.
b) Site Development
Site development should be broken out into two sub-categories:
i) Hard Construction - Site ~ Vertical Tasks
Costs included in this category cover the "usual" costs of all construction
activities associated with preparing a school site for construction (both
"horizontal" [dirt] and "vertical" [building] construction). Examples of items to
budget in this category include pre-grading and final grading of the site to
include playing fields and playgrounds, installation of storm water run-off
drainage, testing for soil suitability (rock), extension and/or installation of
utilities, building structure and systems (includes General Contractor and all
Sub-Contractors; satisfying municipal requirements such as storm water run-
offdrainage; and landscaping to include, when feasible, xeriscaping.
ii) Hard Construction -Off-Site
This category includes construction activities for the surrounding area (costs
of "horizontal" construction). It does not include hard construction costs
associated directly with the building and direct site (see Section 2 a above).
Historically, these costs have been high in cost and are unique to individual
projects. Examples of off-site development costs include water and sewer
installations/extensions to the site, off-site road intersection improvements
including, roundabouts, turn lanes and traffic signals or other traffic control
devices, sidewalks, off-site environmental mitigation, construction of trails
and/or greenway systems and other municipal or state requirements. All
design work associated with these costs outlined in this section would be
considered "Hard Construction -Off-Site" costs.
c) Moveable Equipment
Examples of readily moveable equipment include office furniture (desks, chairs,
files, bookcases), cafeteria equipment (tables, seating, ovens, stoves,
dishwashers), conference room furniture, gymnasium bleachers and athletic field
bleachers.
d) One-Time Startup Costs
Examples of one-time start up costs may include media center collections,
classroom textbooks and & supplies, musical instruments, science lab materials,
art materials, playground equipment, cafeteria utensils and trays, athletic
17
~o
supplies and equipment (wrestling mats, basketball goals, scoreboards), athletic
and band uniforms, custodial cleaning equipment, lawn maintenance equipment,
recycling and trash containers, postage machines, specialized equipment such
as pianos, and signage.
2) Other Considerations
a) High Performance Buildings
During the planning process, school districts should give special attention to
incorporating fiscally sound energy efficiencies and sustainable green building
standards that use renewable/recyclable materials, improve the environment and
air quality, and reduce energy usage. Ways to achieve this include:
^ Choosing efficient lighting systems and energy management controls
^ Incorporating solar orientation, earth integration, and xeriscaping
(landscaping with slow-growing, drought tolerant plants to conserve water
and reduce trimmings)
^ Selecting energy efficient heating, ventilation and air conditioning systems
^ Adopting energy alternatives and other conservation measures such as
day lighting, water reclamation and reuse systems, water free urinals,
photovoltaics, and xeriscaping
School systems should analyze life cycle costs of high performance systems to
determine their efficiency and sustainability.
b) Materials
Construction contractors and School district staff should select construction
materials based on low maintenance and high durability. The presumed life
cycle of new schools is fifty or more years.
c) Generator Ready Schools
Construction plans for all future schools should include the facility being
"generator ready" so that they can serve as emergency shelters as needed.
d) Other Considerations
Other site considerations might include:
i) Types of landscaping and buffers at all school sites
ii) Installing synthetic playing fields or equipping athletic fields with irrigation
systems
18
~~
iii) Installing covered walkways at student drop-off areas, main entrances and
bus loading areas
iv) Reducing student drop-off lanes
It is also important to note that the cost of the regulatory process has historically
been high and require from 12 to 24 months before the construction project can
begin.
19
o~~ q
Apri12007
Capacity Generating Spaces:
Kindergarten classrooms
Footage Per
Number of Capacity per Classroom/T
Classrooms/ Classroom/ eaching
Teaching Teaching Total K-5 Station or Total Square
Stations Station Capacity Function Footage
4 21 84 1.240 4,9E
Third Grade Classrooms 4 21 84 1,240 4,960
Fourth Grade Classrooms 4 26 104 1,240 4,960
Fifth rade classrooms 4 26 104 1,240 4,960
Flex Class Room S ace 1 21 21 1,240 1,240
Special/Exceptional Rooms/Speech Language 7 varies 20 807 5.649
32
585
Square
Footage Per
Number of Capacity per Classroom/T
Classrooms/ Classroom/ eaching
Teaching Teaching Total K-5 Station or Total Square
Stations Station Capacity Function Footage.
Non-Capacity Spaces
Pre-K classrooms 1 1,700
1,700
Administration 1 1,950 1,950
Art and Music 1 2,850 2,850
Book Stora e 1 800 800
Cafeteria/Child Nutrition 1 4,700 4,700
Custodial Stora e 1 500 500
Ph sical Education 1 5,250 5,250
Media Center 1 4,200 4 200
Science Pro ect Room 1 1,200 1,200
Small Grou Resource Rooms 3 450 1,350
Small Pro'ect Room 2 200 400
Staff Support Area -Teacher Offices & Work
Rooms
1 4,600
4,600
Staff Su ort Area -Conference Rooms 2 250 500
Staff Su ort Area -General Conference Room 1 200 200
Staff Support Area -Speech/Language Conference
Room
2 200
400
Staff Su ort -Teacher Loun e & Work Area 1 1,000 1,000
Staff Su ort -Itinerant Su ort 3 100 300
Student Commons 1 1,000 1,000
Student Su ort Area -Health 1 300 300
Student Su ort Area - Counselin 1 900 900
Circulation (Including Additional Toilets) 1 22,091 22,091
Total Elementary School Square Footage (Capacity Generatino and
as
April 2D07
Total Elementary Square Foot Per
~~
~~i zoo7
Footage Per
Number of Capacity per Classroom/T
Classrooms/ Classroom/ eaching Total
Teaching Teaching Total 6-8 Station or Square
Stations Station Capacity Function FootagE
Sixth -Eighth Grade Classrooms (Language Arts,
Social Studies, Math) 21 26 546 1 014 21 294
Sixth - Ei hth Grade Science Classrooms 6 26 156 1,200 7 200
Total Caoacitv Generating Teaching Stations 27 702 28,494
Number of
Classrooms/
Teaching
Stations
Capacity per
Classroom/
Teaching
Station
ota16-8
Capacity Square
Footage Per
Classroom/T
eaching
Station or
Function
otal
Square
Footage
Non-Ca aci S aces
Academic House Centrums 3 1 000 3 000
Activities Lobb 1 500 500
Administration 1 1,850 1,850
Art Education and Music (Cultural Arts 1 10 730 10 730
Book Stora a/Central Su 1 Stora e 1 1 800 1 800
Cafeteria/Child Nutrition 1 5 240 5 240
Ex )oratories
Forei n Language Classrooms 2 1,000 2,000
Career Ex )orations Lab & Resource Room 1 1 000 1000
lied Technolo Lab & Resource Room 1 3 500 3 500
Consumer Education Lab & Resource Room 1 1 500 1 500
Com uter Lab & Resource Room 1 1 000 1 000
Video Production Room 1 1 000 1 000
Ph sisal Education 1 13 700 13 700
Media Center 1 5,700 5,700
Parerrt/Communit Room 1 400 400
Receivin Area 1 200 200
SpeciaUExceptional Rooms/Speech
Lan ua a/Resource Rooms
5
660
3 300
Staff Support Area -Conference Rooms (one per
rade level
3
250
750
Staff Su ort -Teacher Lounge & Work Area 1 450 450
Staff Su ort -Teacher Offices & Workrooms 1 4 600 4 600
Student Commons 1 1 500 1 500
Student Pro'ect Room 3 750 2 250
Student Su ort Area -Health 1 700 700
Student Suooort Area -Counseling 1 1.750 1.750
I Total Middle Sauare Foot Per Student) 18s.s1
~.'
April 2007
Number of
Capac'dy per Square Footage (Range)
Per Teaching Station or
Function
Total S uare Foota e
Capacity Generating Spaces Classrooms/
Teaching
Stations Classroom/
Teaching
station Total 9-12
Capacity
From
To
From
To
Academic Classrooms (English, Foreign Language,
Social Studies Math
25
20
500
850
950
21 250
23 750
Science Labs, Pre & Stora e
Ph sicai Science 2 20 40 1 200 1 200 2 400 2 400
Biol 2 20 40 1 200 1 200 2 400 2 400
Ph sits 2 20 40 1 200 1 200 2 400 2 400
Earth Science 1 20 20 1 400 1 400 1 400 1 400
Chemist 1 20 20 1500 1500 1500 1500
S ecial/Exce tional Children Self-Contained 3 15 45 800 1 200 2 400 3 600
Instrumental Classroom with Lockers 1 20 20 1 800 2100 1 800 2100
Vocal Classroom 1 20 20 1 000 1 500 1 000 1 500
Visual Arts Classroom 1 20 20 1 200 1 500 1 200 1 500
Theater Arts Classroom 1 20 20 1 800 2 000 1 800 2 000
Dance Classroom inciudin Stora e 1 20 20 1 800 2 000 1 800 2 000
Workforce Development (includes Agricultural,
Business, Family & Consumer Sciences, Health
Occupations, Marketing including a store,
Technoi Trade & Industrial
ranges from
11 15 to 20 145
depending on type of
classroom, ranges from
850 to 3000
0,750
6100
G nasium-IAuxilia i 25 0 fi 00 6200
G nasium -Main 1 50 50 6,200 6 200 6 200 6 200
Total Ca aci Generatin Teachin Stations 54 1,000 30,150 58,300 68,850
Square Footage (Range)
Number of Capacity per Per Teaching Station or
Classrooms/ Classroom/ Function Total S uare Foota e
Teaching Teaching Total9-12
Non-Ca ac' S aces Stations Station Capacity From To From To
Adminstration 1 1,900 1,9110 1,900 1 900
Arts Education
Instrument Stora a Room 1 400 600 400 600
Music Libra 7 200 200 200 200
Instrument Re air 1 150 150 150 150
Office 1 150 150 150 150
Uniform Stora e 1 400 600 400 600
Practice Room 1 55 60 55 60
Ensemble Practice Room 1 150 200 150 200
KiINCIa Stora e 1 40 60 40 60
Art Material Stora e 1 80 150 80 150
Theater Arts Auditorium (8' per seat; capacity
ran es from 1/3 to 1/2 of total school ca aci
1 2 667
4 000
2 667
4 ODO
Sta a Stora e & Dressin Rooms 1 3 000 5 000 3 000 5 000
Li ht Lock Vestibui Lobb Consessions 1 800 2 OOD 800 2 000
Cafeteria/Child Nutrition 1 8 480 11 214 8480 11 214
Exce tional Education Resource Room 1 450 450 450 450
Media Center
Main Room 5 s uare feet r total school ca ac' 1 5,000 5 000 5,000 5,000
5u rt Areas 1 2,000 2,000 2,000 2,000
Video Studio 1 400 400 400 400
ControUEdftin 1 260 260 260 260
E ui ment Stora e 1 80 80 80 80
as
Apri12007
Square Footage (Range)
Number of Capacity per Per Teaching Station or
Classrooms/ Classroom/ Function Total
Teaching Teaching Tota19-12
Stations Station Capacity From To Fra
Ph sicai Education
Spectator Seating (ranges from 400' to 500' per 100
Special Assistant/Itinerant Teacher Office/Work
Workroom
Student
Rooms
560
450
Total Hi h School S ware Foota a Ca acit Generatin and Non-Ca ac' 157,049 1a2,71o
Total Hiah Sauare Foot Per Student 151.0 182.7
a6
Apri12007
Number of
Capacity per Square Footage (Range)
Per Teaching Station or
Function
Total S uare Foota e
Capacity Generating Spaces Classrooms/
Teaching
Stations Classroom/
Teaching
Station Tota19.12
Capacity
From
To
From
To
Academic Classrooms (English, Foreign Language,
Social Studies Math
40
20
800
850
950
34 000
38 000
Science Labs, Pre & 5tora e
Ph sisal Science 3 20 60 1 200 1 200 3 600 3 600
Biol 4 20 80 1 200 1 200 4 800 4 800
Ph sits 2 20 40 1 200 1 200 2 400 2 400
Earth Science 2 20 40 1 400 1 400 2 800 2 800
Chemist 3 20 60 1 500 1 500 4 500 4 500
S cial/Exce tional Children Self-Contained 3 15 45 800 1 200 2 400 3 600
Instrumental Classroom with Lockers 1 20 20 1 800 2100 1 800 2100
Vocal Classroom 1 20 20 1 000 1 500 1 000 1 500
Visual Arts Classroom 2 20 40 1 200 1 500 2 400 3 000
Theater Arts Classroom 1 20 20 1 800 2 ODO 1 800 2 000
Dance Classroom includin Stora e 2 20 40 1 800 2 000 3 600 4 000
Workforce Development (includes Agricultural,
Business, Family & Consumer Sciences, Health
Occupations, Marketing including a store,
Technolo Trade & Industrial
ranges from
13 15 to 20 160
depending on type of
classroom, ranges from
850 to 3000
0 750
6100
G nasium - Auxilia 1 25 25 6 200 6 200 10 750 16100
G nasium -Main 1 50 50 6,200 6 200 6 200 6 200
Total Ca aci Generatin Teachin Stations 79 1,500 30,150 92,800 110,700
Square Footage (Range)
Number of Capacity per Per Teaching Station or
Classrooms/ Classroom/ Function Total S uare Foota e
Teaching Teaching Total9-12
Non-Ca acit S aces Stations Station Capacity From To From To
Adminstration 1 1,900 1,900 1,900 1 900
Arts Education
Instrument Stora a Room 1 400 600 400 600
Music Libra 1 200 200 200 200
Instrument Re air 1 150 150 150 150
Office 1 150 150 150 150
Uniform Stora e 1 400 600 400 600
Practice Room 1 55 60 55 60
Ensemble Practice Room 1 150 200 150 200
Ki1NCla Stora e 1 40 60 40 60
Art Material Stora e 1 80 150 80 150
Theater Arts Auditorium (8' per seat; capacity
ran es from 1/3 to 1/2 of total school ca ac'
1 4 ODD
6 000
4 000
6 ODO
Sta a Stora e & Dressin Rooms 1 3 000 5 000 3 000 5 000
Li ht Lock Vestibul Lobb Consessions 1 800 2 000 800 2 ODO
Cafeteria/Child Nutrition 1 8 480 11 214 8480 11 214
Exce tional Education Resource Room 1 450 450 450 450
Media Center
Main Room 5 s uare feet r total school ca aci 1 7,500 7,500 7 500 7,500
Su rt Areas 1 2,000 2,000 2,000 2,000
Video Studio 1 400 400 400 400
Control/Editin 1 260 260 260 260
E ui ment Stora e 1 80 80 80 80
a7
Apri12007
Number of Capacity per
Classrooms/ Classroom/
Teaching Teaching Tota19-12
Stations Station Caaacity
Square Footage (Range)
Per Teaching Station or
Function Total
To ( From
Ph sisal Education
Spectator Seating (ranges from 400' to 500' per 100
1
45
Special Assistant/Itinerant Teacher Office/Work
S ace
7 80
10D
560
700
Workroom 1 300 800 300 800
Loun e 1 300 1,333 300 1,333
Stora e/Pre Rooms Biolo Chemist Ph sics 2 500 500 1 000 1 000
Student Su ort Areas
Guidance 1 300 300 300 300
Rece tioNCareer Center 1 400 400 400 400
Counselor Office 3 150 150 450 450
Other Student Services 1 200 200 200 200
Health Room 1 200 200 200 200
CirculatioNCommons/Entries/Building Su ort (45%) 1 46,877 56,703 65,634 77,788
Total Hi h School S uare Foota a Ca ac' Generatin and Non-Ca ac' 211,a87 251,345
Total Hiah Sauare Foot Per Student 141.D 167.s
as
Appendix 6. School Construction Project Components
• Purchase and contracted pricing of property
• Survey
Site Acquisition -Tasks and . Deed recording
costs associated with acquiring
Appraisals
a site
• Soils, environmental, suitability testing
• Le al fees associated with urchase and recordin
• Pre-grading
• Grading to include playing fields and playgrounds
• Installation of storm water run-off drainage
Hard Construction -Site & Soil suitability testing (rock)
Vertical Tasks and costs of
"
"
"
" Utility extension/installation
horizontal
and
vertical Sidewalks
construction: all construction
activities for the actual site • Turn lanes
and building • Building Structure and Systems (includes General
Contractor and all Sub-Contractors
• Municipal Requirements
• Landsca in
Hard Construction - Off-
Site Off-site Traffic Improvements
Tasks and costs of Water and Sewer Service to the Site
"horizontal" construction: all . Off-Site Environmental Mitigation
construction activities for the . Trails and Greenway System
surrounding area, not • Related Design
including the building and
direct site
• Prime Construction Contracts (includes general
Construction Costs - contractor, electrical contractor, HVAC contractor,
Costs of constructing a new plumbing contractor)
facility or renovating an Other construction related work
existing one Sprinkler
• Ex anded Water Flows
a~
Appendix 6. School Construction Project Components
• Architectural/Engineering/CM services (examples:
educational specifications and programming,
schematics and design development, bidding,
construction documents, construction administration,
reimbursables, furniture selection) for Site and Building
• On-site engineering control inspections
Fees -All non-construction Materials testing
costs ("soft costs") related to Survey, Topographic and boundary studies
the direct site and building • Local government applications and permit fees
(examples: special use permits, conditional use permits,
zoning permits, building permits, NCDENR, NCDOT
fees)
• Specialized consultants (examples: traffic engineer,
environmental specialist, project scheduler/expeditor)
• Connect fees to utilities
• Technology infrastructure (examples: wiring or fiber
optics)
Computer equipment (examples: computers, printers,
Technology scanners, servers routers, switchers, CD-ROM drives,
laser disc players)
• Fire/Security alarm systems
• Televisions, video recorders & cameras, satellite dishes
• Telephone system
• Technolo consultin services
• Office furniture (examples: desks, chairs, files,
bookcases)
Moveable Equipment - Cafeteria equipment (examples: tables, seating, ovens,
Readily moveable equipment stoves, dishwashers)
• Conference room furniture
• Gymnasium bleachers
• Athletic field bleachers
• Media center collections
• Classroom textbooks & supplies (including musical
instruments, science lab materials, art materials, etc)
• Playground equipment
• Cafeteria small wares (examples: utensils, trays)
One-Time Start up Athletic supplies and equipment (examples: wrestling
Costs mats, basketball goals, scoreboards, etc.)
• Athletic and band uniforms
• Custodial cleaning equipment
• Lawn maintenance equipment
• Recycling & trash containers
• Postage machines
• Specialized equipment such as pianos
• S ecialized si na e
30
APPROVED 6/26/2007
MINUTES
WORK SESSION
Orange County Commissioners
Orange County Board Of Education
Chapel Hill-Carrboro Board of Education
April 30, 2007
7:30 p.m.
The Orange County Board of Commissioners met for a joint session with the Chapel Hill-
Carrboro Board of Education and the Orange County Board of Education on Monday, April 30,
2007 at 7:30 p.m. at the Southern Human Services Center in Chapel Hill, North Carolina.
COUNTY COMMISSIONERS PRESENT: Chair Moses Carey, Jr., and Commissioners
Valerie P. Foushee, Alice M. Gordon, Barry Jacobs, and Mike Nelson
COUNTY ATTORNEY PRESENT: Geoffrey Gledhill
COUNTY STAFF PRESENT: County Manager Laura Blackmon, Assistant County
Manager Gwen Harvey, and Clerk to the Board Donna S. Baker (All other staff members will be
identified appropriately below)
ORANGE COUNTY BOARD OF EDUCATION MEMBERS PRESENT: Chair Dennis
Whitling, Vice-Chair Ted Triebel, and Board Members Elizabeth Brown, Debbie Piscitelli, Anne
Medenbleck, AI Hartkopf, and Susan Hallman. Superintendent Shirley Carraway was also
present.
ORANGE COUNTY BOARD OF EDUCATION MEMBERS ABSENT:
CHAPEL HILL-CARRBORO CITY SCHOOL BOARD OF EDUCATION MEMBERS
PRESENT: Chair Jamezetta Bedford, Vice Chair Pam Hemminger, and Board Members Jean
Hamilton, Lisa Stuckey, Annetta Streater, and Mike Kelley. Superintendent Neil Pedersen was
also present.
CHAPEL HILL-CARRBORO CITY SCHOOL BOARD OF EDUCATION MEMBERS
ABSENT: Elizabeth Carter
Chair Carey made reference to the handout on school collaboration efforts.
CHCCS Board Chair Jamezetta Bedford said that this is a very lengthy agenda, and she
hopes that each item will be given a time limit so that everything can be done.
Dennis Whitling said that they have some full and frank discussions at the school
collaboration meetings and he appreciated the Board of County Commissioners listening to
them.
Chair Carey said that this meeting is generally not designed for decision-making, except
for talking about the next steps on a particular item.
Chair Carey said that Commissioner Gordon may be here later and Jamezetta Bedford
said that Liz Carter might be here later also.
1. County/OCS/CHCCS Matters
a. School Construction Standards Policy
Laura Blackmon said that the collaboration group is working to update these standards.
All three boards have seen an early draft in September 2006. The current draft is the 4th one,
and there have not been any changes from the initial one. She said that there are three things
that are relatively new that have to do with non-traditional schools, Smart Growth initiatives, and
trying to deal with the increasing costs of school construction. Also, there are some issues
~i
about capital funding, and the standards will play an important part on how to develop the
capital investment plan for the next ten years. There will also be an update on the impact fee,
and there is a contract in the works with a consultant.
Commissioner Gordon arrived at 7:44 PM.
Debbie Piscitelli asked about start up costs and if a school is expanding or adding on,
would the start up costs be incorporated.
Budget Director Donna Coffey said that they did not discuss expansion of facilities, but
more construction of new schools. She said that the collaboration group could discuss this at a
future meeting.
Debbie Piscitelli said that from the OCS standpoint, they are looking at building new
schools versus expansion and she would like to know where the start up costs come in. Donna
Coffey said that non-personnel start up costs have always been a part of construction
standards.
Dennis Whitling said that it looks like the numbers have changed. Donna Coffey said that
appendices 1-4 are the numbers from the State DPI model.
Jameszetta Bedford made reference to page 17 and said that the language has changed
about the generators. It used to say "might include," and now it says, "all will include." She was
not at the last collaboration meeting, and she does not know if this was a deliberate decision.
Donna Coffey said that this was a topic of discussion at the last meeting, and that is the wording
that the group decided on. She said that though they may make new schools generator-ready,
it would depend on the Red Cross as to which schools would be shelters.
Commissioner Gordon said that she appreciated the staff getting her a draft of the
information. She made reference to the traditional versus non-traditional and said that the
traditional has not changed much. She asked about the definition of anon-traditional school.
She asked if it was acase-by-case basis and all agreed.
Commissioner Gordon made reference to page 13 and the last bulletin the middle of the
page, "Accommodate the expanding number of middle and high school athletic teams either on-
site oroff-site." She said that with Cedar Ridge and Carrboro High Schools, they were started
with core facilities and a core amount of students and then expanded to build the bigger facility.
Commissioner Gordon made reference to page 15 and "Future Maintenance of
Facility.responsibility for future facility maintenance/repairs and energy usage guarantees can
be assigned to the developer and not the school system." She asked if this was completely in
the bill and Donna Coffey said that it was.
Commissioner Gordon asked about page 17 and the possibility of a School Capital Review
Team consisting of County staff and representatives from each school district. She asked about
the County staff. Laura Blackmon said that this is what was talked about with Jeff Thompson.
Commissioner Jacobs said that this is a definite improvement and the non-traditional is on
a case by case basis. He made one edit on page 12. Instead of "As the availability of land
becomes less and less," he suggested "decreases." Regarding possibilities, he would like to
include co-location of a library every time a school is built.
Commissioner Gordon said that there is a memorandum of understanding about co-
locating facilities, and this mechanism is already in place.
Chair Carey said that the next step is for all is to take this document back to the boards to
adopt as presented.
b. Landbanking History and Goals
Laura Blackmon said that this is an outgrowth of school construction standards and siting
schools in the future.
Chair Carey said that the intent was to step up the engagement of the towns and the
County in working with the staff and the two school systems to make sure that school sites are
3~
identified and preserved. The collaboration work group asked that a letter be sent to the towns
to this effect. There has been a response from Carrboro only.
Dennis Whitling said that the OCS Board met with the Town of Hillsborough and discussed
this topic, and the two boards were on the same page. He said that OCS is moving forward with
the Town of Hillsborough on some ideas.
Chair Carey asked about a proposed meeting with the Town of Mebane and Dennis
Whitling said that there are plans to do this.
Superintendent Pedersen asked about next steps after they get responses and contacts
and who would take the lead in this process.
Chair Carey said that the Board has not discussed this yet. He said that once contacts
have been identified then Orange County staff could facilitate the first meeting with all the
entities.
Commissioner Gordon made reference to a handout she distributed at the County
Commissioners' meeting on March 27~'. She said that the general idea of these groups getting
together was implemented by the Schools and Land Use Council years ago. The SLUC
initiated the Schools Adequate Public Facilities Ordinance. She said that she supports this
general idea of land banking. She said that there was aschool/parks reserve fund at one time,
where the County Commissioners had set aside one cent on the property tax for land-banking,
but the Commissioners eventually stopped allocating money to it. She said that if this group
meets, there should be discussion about how the sites will be purchased.
Commissioner Jacobs suggested that OCS get with the Planning Department, who did a
fiscal analysis of the Collins property. The developer has not committed to any commercial
density, which may convert to more residential density and would have more of an adverse
impact on the school system.
Chair Carey asked the Manager and Planning Director to share this document with the
school boards.
c. Capital Funding Policy, Including Lottery Proceeds
Laura Blackmon said that on April 24th the Board of County Commissioners approved the
capital funding policy, which included the updated position on the lottery proceeds. The Board
decided to come back in the fall and do the ten-year capital improvement plan. The Board
approved budgeting the lottery proceeds in arrears for renovation projects or debt service.
Chair Carey said that this policy, as it relates to the lottery proceeds, has been discussed
in the school collaboration work group at least twice.
Ted Triebel said that he did not see before now that the N.C. Department of Public
Instruction (page two) has said that the County could request lottery funds before actually
spending them as long as the County anticipates making the expenditure within the fiscal year.
He said that he understands this to say that they are going to get funds and bank them for a
year, and then expend them. He asked for clarification on this.
Donna Coffey said that by statute the lottery commission is to make four deposits into the
account in any format that they want -not necessarily every quarter. She said that the County
can request as much money as it wants, but it will not get it until the money is in the account.
The funds need to be expended within the year. She clarified that the funds do draw interest at
the state level.
Several school board members asked clarifying questions, which were answered by
Donna Coffey and Laura Blackmon.
Jamezetta Bedford thanked the Board of County Commissioners for giving the school
boards the flexibility on how to use the funds. She made reference to page seven and the
construction management function. She asked if there was a fairer way to allocate funds rather
than the number of students. Dennis Whitling agreed.
33
Chair Carey said that this document has already been adopted, but the Board can amend
it later.
d. Fund Balance Policy
Laura Blackmon said that since 1986 the school systems have maintained a fund balance.
The CHCCS has maintained 5.5% and OCS has maintained 2.7%. She said that there have
been no changes implemented in the policy since 1986. This is on the agenda for discussion to
see if changes need to be made to this.
Dennis Whitling said that this may be something the school collaboration group can look at
for review and/or updating.
Superintendent Pedersen said that CHCCS is using $500,000 from fund balance for
Elementary School #10 and $500,000 for startup costs for Carrboro High School. He said that
there has been a struggle with the budget for Carrboro High School, and they have identified
$500,000 for one-time purchases for startup programs for the new school.
Chair Carey thanked Superintendent Pedersen for making the Board aware of this for the
first time. He thinks that the County Commissioners would like to think this over.
Superintendent Pedersen said that there is a need for cash reserves to cover payroll when
the school system is not collecting any district taxes. He said that CHCCS has looked to the
Board of County Commissioners for assistance in the past when this has happened. He said
that he is comfortable with the 5.5% fund balance.
Commissioner Gordan said that if either school board has anything to mention about their
fund balances, then please let the County Commissioners know, such as if the targets are not
right, what to use it for, etc. She said that there has been a lot of misunderstanding about this
issue.
Dennis Whitling said that in OCS, the creation of a fund balance is a savings from year to
year that accumulates. He said that he understands the concept of using fund balance for non-
recurring items. He said that when their operation budget is not fully funded, then money must
be taken from the fund balance. It is also a judgment that the school board has to make about
funding programs or waiting.
Debbie Piscitelli said that when spending occurs between now and the end of the fiscal
year, this can make people upset, and this should be addressed.
Commissioner Jacobs said that the larger the County's fund balance, the better the bond
rating, and they want to build back their fund balance to increase the bond rating. He said that
when schools need money, the County takes it out of its own fund balance. He said that as long
as the County has a good fund balance, everyone has a good fund balance.
Ted Triebel asked about a target goal for the County and Donna Coffey said that the Local
Government Commission recommends 8%. The County's internal target is 15%, but it has not
been this large in a long time.
Jean Hamilton asked about the County's bond rating and it was answered Triple A. Chair
Carey said that the bond rating agencies do not tell entities what they need to boost or lower the
bond rating.
Laura Blackmon said that bond raters are looking for consistency.
Chair Carey said that the school collaboration work group will discuss this topic.
e. Fair Funding/Equity
Laura Blackmon said that the joint boards had looked at this topic last year. Attachments
E-1, E-2, and E-3 were the minutes from the Fair Funding Work Group meeting in May 2006,
the recommendations, and the goal statement with regards to the recommendation of the Fair
Funding Work Group.
Commissioner Gordon said that the school collaboration work group should take this topic
up.
3~
Dennis Whitling said that, on the capital side, OCS has done what is listed, such as the
lottery proceeds. He said that the operating side is stickier. He said that he thought he saw a
memo about the 48.1 % target, and this is integral to the recommendation.
Chair Carey said that it is important to keep the issue of fair funding on the agenda. He
suggested having the school collaboration work group discuss it again.
Liz Brown said that the OCS Board has talked about this, and she thinks That with the talk
of no tax increase, that the work on the fair funding was pointless. She said that getting more
equity is different from getting more funding for the schools. She said that it seems that this
year is a year that the County Commissioners should look at giving more money to the OCS
children.
Chair Carey said that the County Commissioners have said that they want to target the tax
increase at the level required to cover the debt service from all of the capital projects that the
schools and the County have. He said that the Board will go through the process of adopting
the budget as always, and will do the best it can for both school systems.
Liz Brown said that she differs with the subjects that are discussed in the school
collaboration work group because it seems that they have spent a lot of time discussing
buildings and tax increases for buildings, which will not be for OCS. She said that OCS needs
more money for programs. She would like to see the whole County work together at discussing
that issue. She said that they have spent four years dancing around this issue of fair funding.
Chair Carey said that the recommendation from the work group came forth in May and the
Board of County Commissioners raised the tax rate six cents to try and accommodate the
needs. He does not think that the Board can raise the tax rate another six cents this year.
Jamezetta Bedford said that the CHCCS is presenting a budget to the Board of County
Commissioners that meets their schools' needs. This budget has been cut from the budget that
was presented to the school board at their February Board retreat. She said that it is millions
more than the Board of County Commissioners is planning to cover. She asked about the
realities here.
Chair Carey said that the budget drivers included the $800,000 and that would not be at
risk.
Dennis Whitling said that what is driving OCS next year is the construction costs and debt
service. He made reference to the budget public hearing on May 31St and said that OCS has
offered the use of one of the school auditoriums.
Ted Triebel said that there are serious concerns about the OCS operating budget and CIP.
He said that they are trying to look after their youth in the long range.
Mike Kelly asked for an explanation about the payment of debt service and said that he
would like to look to avoid this in the future. He said that he would like to understand how they
came to this point - to not increase taxes past paying for debt service. He said that this is a
transient problem and debt service is supposedly going to go down.
Commissioner Jacobs said that the cost increase between Gravelly Hill, Carrboro High,
and Elementary School #10 caused a bump of $10 million beyond what was anticipated. Also,
the Governor raised State teachers' salaries. He said that the County gets indirectly penalized
for this and they still raised taxes 12 '/2 cents over the last two years. He said that the County
Commissioners are trying to address County needs. He said that this was a confluence of
circumstances that were not within the County Commissioners' control.
Liz Brown said that she does not think the fair funding discussion should be in the school
collaboration group because it is a waste of CHCCS's time. She would like to see a separate
meeting of the Board of County Commissioners and the OCS, without the CHCCS.
Chair Carey said that anytime you talk about funding, decisions affect all of the groups,
and he does not see a conflict with the school collaboration group discussing it.
Ted Triebel said that they would be discussing this in a partial vacuum if they did it
between the County and OCS only.
35
Dennis Whitling agreed with Ted Triebel that this is a global issue and all boards should
discuss this.
Chair Carey said that with these discussions, transparency is important.
Superintendent Pedersen said that this is going to be an unusual year budget wise, and
he wants the Board of County Commissioners to understand the CHCCS's concerns. He said
that the total request is $7 million, and $5 million is for salary increases, opening Carrboro High
School, and utilities. He said that he is not sure how not to do these things. He said that they
are having some serious meetings about how to reduce the budget, but they are looking at cuts
in the millions, if they take what the County Commissioners say seriously.
Superintendent Carraway said that OCS's situation is similar and half of their requests
are mandates. She said that they would be listing things that they will have to cut, and the
majority of that will be people. She said that this is the first time since she has been here that
there has not been increases in the per pupil.
Jamezetta Bedford said that CHCCS did not offer contracts to their employees as of yet,
and they are taking this very seriously.
Chair Carey said that the County Commissioners understand this and the school
systems are wise to have discussions about the various scenarios. He said that the County
Commissioners will always do the best they can for the schools. He said that he hopes that the
schools are asking their legislative liaisons to work with the legislature to pass the Medicaid
relief and Real Estate Transfer Tax for counties. This would relieve a lot of pressure.
f. School Health/Day Clinics Proposals
Chair Carey said that this is informational.
Superintendent Carraway gave some highlights of this PowerPoint presentation.
Working Together to
Improve the Health ~ Academic Success of
Orange County School District Students
Shirley Carraway, EdD
Superintendent, Orange County School District
Rosemary L. Summers, MPH, DrPH
Director, Orange County Health Department
Why?
® There is a direct link between students'
- physical health
- mental health
- academic success
• Compared to students experiencing physical or psychological health problems,
healthy students
- have better school attendance
- are better learners
- are more academically successful
- Have a better chance of graduating
- have a better chance of making a smooth transition to a healthy, happy, and productive
young adulthood
What are we currently doing?
School Health Advisory Council
• School Board Representative
• School Staff and Administrators
~~
• Health Dept. Staff and Administrators
• Local Physician
• County Agencies
• Community Members
• Parents
CDC Coordinated School Health Program
For example, we now have....
• Nurses in every school
• Social Workers in every school
• PE teachers in every school
• School Improvement Plans for every school
• Healthy Active Children Policy for every school
• District school nutritionist
• District safety coordinator
• Health education programs
• Staff health promotion
® Family-focused after-school programs
What do we want to consider next?
What about health services?
We know our students have unmet health needs.....
From Orange County Schools' 2005-2006 School Nurses End of Year Report
Kindergarten through High School Screenings
® Dental - 1826 students screened (Of the 191 students referred for outside care only 36%
followed through.)
® Hearing - 860 students reached (Of the 24 students referred for follow up care only 38% of
them completed the referral process.)
We know our students have unmet health needs.....
The Healthy Carolinians and Advocates far
Adolescents Committee Assessment on
Mental Health Needs of Adolescents in
Orange County, October 2006
^ Children and adolescents need more education about mental illness and mental health.
^ Children and adolescents need more knowledge of when and how to seek mental
health services.
3~
We know our students have unmet health needs.....
From OCS Spring 2006 Communities That Care Survey
• 17.78% of 6"' graders (450 students surveyed), 18.63 % of 8~' graders (408 students
surveyed), and 19.47% of 10~' graders (457 students surveyed) reported having their first
beer before the age of 11.
• 2.44% of 6th graders, 5.39% of 8~' graders, and 5.69% of 10~' graders always threaten to hurt
people.
From Spring 2005 Youth Risk Behavior Survey
• 27% of OCS 8"' graders seriously considered suicide in the previous year.
• 35% of OCS 8~' graders reported that they had felt so sad or hopeless for 2+ weeks in a row
that they stopped doing their usual activities in the last 12 months.
School-Based Health Centers?
(SBHC)
We propose aone-year exploratory process to determine whether it is desirable and feasible to
develop aSchool-Based Health Center (SBHC) at CW Stanford Middle School ...
as a first step in a system-wide strategy
to address unmet health needs of students in the OCSD.
Propose a Steering Committee
Leader: OCSD Superintendent
Co-Leader: OCSD Health Dept. Director
Members:
Director, OCSD Student Services
Director, OCSD Healthful Living
Director, OCSD Adolescents in Need
Director, School Exceptional Children Program
Leader, OCSD School Health Advisory Council
Steering Committee Members (Continued)
County Commissioner Chair, or designee
Health Dept Board Member
OCSD Board Member
DSS Board Member
Local Physician
Director, Piedmont Health Services
UNC Adolescent Medicine Physician
OCSD Nursing Supervisor
OPC Mental Health Consultant
Juvenile Justice representation
CW Stanford Middle School Principal
Many Questions for Steering Committee to Address...
• Is SBHC desirable?
• Is SBHC feasible?
• Which students and which services?
3~
- Students without medical homes?
- Urgent care so kids can stay in school?
- Helping medical home serve students with chronic care needs?
- Synergist coordinated services around high-need students?
- Convenient, centralized, coordinated, comprehensive services?
- Safety-net services?
- Mental health/substance use services?
How to Best Use SBHC to Improve Important Outcomes.....
• Better school attendance
• Better academic achievement
• Lower drop out rates
• Better access to high quality health care
• Better health
We are enthusiastic about moving forward!
• ASCD Health Schools Community Grant awarded!
• Would like to convene Steering Committee summer of 2007!
She said that the next step is to convene a steering committee (including a County
Commissioner representative) to begin to discuss and evaluate the potential for such a center at
C. W. Stanford Middle School. They would like the support of the Board of County
Commissioners before moving forward.
Commissioner Gordon asked how this fits in the grim budget situation.
Shirley Carraway said that this steering committee will look at funding and the possible
sources. She said that they visited one in Wayne County, and some of it is funded through
reimbursable dollars and private insurance dollars.
Lisa Stuckey said that she attended a conference and the speaker from South Carolina
spoke about how this could be self-funding.
Commissioner Foushee said that she heard this presentation and she would like to refer
this to staff to bring back a formal proposal in concept for Board approval.
Chair Carey said that he is familiar with school based health centers throughout the state
and they serve a great need. He said that it is naive to think that we can depend on
reimbursements to cover the costs. He said that OCS is not asking the Board to commit to
funding, but to a concept. He asked how this relates to what is being done now.
Betty Compton said that this is the next natural step in services for children. She said
that she has worked in the OCS for a long time. She said that they have not finished the job,
which is getting these children the help they need when they need it.
Anne Medenbleck suggested that the steering committee tap Duke or UNC for grants.
,g: Middle College High School Update
Superintendent Neil Pedersen said that this is an update and is a collaborative effort
between the two school systems and the Durham Public Schools also. This is the second year
and there are 14 students from OCS and 10 students from CHCCS. He said that the program
could have as many as 50 students each, so they are under enrolled. He made reference to the
overview in the packet. The program is for juniors and seniors. The Durham Tech courses are
offered free of charge to the students and the credits are transferable. He said that this is not
for students who are involved in athletics or for students who are reluctant to leave their social
groups.
~~
Superintendent Carraway said that as students continue to participate, they are going to
be the best advertisement for this program. There will be three students graduating from this
program in May.
Commissioner Nelson asked the OCS about the proposed merger of Hillsborough
Elementary and Central Elementary. He has been getting emails from citizens who are
concerned about this.
Dennis Whitling said that there was amini-session in February and then it was
discussed later at another meeting, and he appointed athree-person committee of the board to
come up with a process of exploring this issue. This process was discussed at the last OCS
Board meeting about a week ago. He said that they are in the process of scheduling a meeting
(four-hour retreat) to be facilitated by Andy Sachs of the Dispute Settlement Center to discuss
this process. The timeline has been discussed, but there have been no decisions. He said that
all meetings would be open to the public. There will be a public hearing down the line and
possibly a panel discussion with some experts to talk about the socioeconomic issue. He said
that the issue is that there is a year-round school of choice with 14% having free and reduced
lunches versus another districted school a block away with 70% having free or reduced lunches.
He said that the proposal is to have 100 students to move from Central to Hillsborough
Elementary. He said that the school board is committed to exploring this.
Commissioner Nelson said that this process sounds fair and open. He said that there
was a group of people that came to the Human Relations Commission meeting about this.
There were some issues raised about race and class.
Chair Carey said that AI Hartkopf left a message that he had other commitments tonight.
Chair Carey made reference to the list of bills that the school boards are asking the
legislative member to support. He asked both school boards to write the legislative delegation
supporting Medicaid relief and the Real Estate Transfer Tax.
Commissioner Jacobs said that the Real Estate Transfer Tax can generate $10 million
for Orange County if approved. He said that, having been through a merger discussion, he
would like to commend the OCS for taking on this issue of merging two schools and for the
process.
Ted Triebel made reference to the letter about the bills and said that it was also sent to
three or four other legislative representatives. He suggested that joint letters to the legislative
representatives (two school boards and the BOCC) would have much more "throw" weight.
The boards agreed to do a joint letter.
With no further issues to address, the meeting was adjourned at 9:44 PM.