HomeMy WebLinkAboutAgenda - 08-22-1994 - C-4 (c) ORANGE COUNTY 077
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: August 22, 1994
Action Agenda
Item # C4c
SUBJECT: PROPOSED SUBDIVISION REGULATION TEXT AMENDMENTS
Private Road Standards (curve radius)
DEPARTMENT: PLANNING PUBLIC HEARING X Yes No
ATTACHMENT(S) : INFORMATION CONTACT:
Mary Willis
Proposed amendments Extension 2583
TELEPHONE NUMBERS:
Hillsborough-732-8181
Durham -688-7331
Mebane -227-2031
Chapel Hill -967-9251
PURPOSE: To receive citizen comment on a proposed amendment to the
Subdivision Regulations to allow for modification of the
125-foot curve radius for subdivisions served by existing
private roads which have a lesser radius.
BACKGROUND: The Orange County Private Road Standards include
requirements pertaining to construction materials, and
design standards pertaining to road and right-of-way
width, grade, curve radius, vertical clearance, drainage,
signage, turn-arounds, vegetation and maintenance.
Application of these standards assures that the road will
provide safe access, in terms of traffic circulation and
emergency access, appropriate for the number of lots it
serves.
There is flexibility in some of the dimensional standards
to address various site-specific circumstances and
constraints. For example, the Board of Commissioners may
approve a partial-width right-of-way if the full right-of-
way width cannot be attained, and the Erosion Control
Officer may approve a grade steeper than the 12% generally
required if "exceptional circumstances" are involved.
There is also some variability allowed in the pitch of the
travelway and construction standards for ditches.
There is currently no flexibility in the requirement for a
125-foot curve radius. New roads which are created when
property is subdivided are located and designed in such a
way that this requirement can be met. Problems
occasionally arise, however, in the subdivision of lots
which are accessed by an existing road which does not meet
the curve radius. In some cases, the road and/or right-
07t
of-way can be reconfigured so that the curve radius can be
met. In other cases, the road cannot be redesigned to
comply with the radius standards due to the inability to
change the location of the right-of-way, the extent of
earthwork that may be required if there are significant
slopes or embankments, and/or the location of the right-
of-way in relation to property lines. (The subdivision
regulations do not allow a new lot to be split by a road
right-of-way) . In these cases, no additional lots may be
created on the road, even if the change is minor, and the
existing road would provide an acceptable level of safety
for general traffic and emergency vehicles.
During the past year, two minor subdivisions have been
reviewed in which this issue was encountered. One
subdivision was submitted and conditionally approved, but
the requirement for certification that the existing road
meets the curve radius requirement cannot be met, and the
subdivision cannot be released for recordation. The
second case involved a subdivision which was informally
reviewed, but not submitted due to the curve radius of the
existing road.
The proposed amendment would allow approval of a
subdivision with lots served by a road with a curve radius
of less than 125 feet if all of the following conditions
are met:
1) The road existed prior to the adoption of subdivision
regulations or was approved as part of an earlier
subdivision;
2) Reconstruction of the existing road to meet a 125 '
curve radius is not feasible due to the extent of
earthwork which would be required and/or the inability
to reconfigure the existing right-of-way location due
to ownership or the location of existing structures,
wells or septic systems;
3) Standards pertaining to road width and grade will be
met;
4) The subdivision can be approved with a Class C or
Class B private road;
5) Documentation is received from the Erosion Control
Division that the proposed curve radius would provide
for adequate vehicular access and circulation;
6) Documentation is received from the Department of
Emergency Services stating that the proposed curve
radius will provide adequate access for the largest
emergency vehicle which would use the road.
The Planning Staff met with Mike Tapp, Orange County Fire
Marshall in preparing the proposed amendment to assure
that concerns related to emergency access were addressed.
. y
RECOM ENDATION: Section VII-D-3 of the Subdivision Regulations requires 07
that proposed amendments to the text of the Subdivision
Regulations be presented at a joint public hearing
involving the Board of Commissioners and the Planning
Board. It is at that time that the Planning Department's
recommendation is presented.
Planning Department Recommendation
Provided that the Planning Board and Board of
Commissioners find in the affirmative, the Planning
Department recommends approval of the proposed text
amendment.
No decision is made on the proposed amendments by either
the Planning Board or Board of Commissioners at the public
hearing. Instead, the Planning Board has 75 days within
which to prepare and submit a recommendation to the Board
of Commissioners. Failure of the Planning Board to submit
a recommendation within the required time shall be
considered a favorable recommendation.
Administration Recommendation
The Administration recommends that the proposed amendment
be referred to the Planning Board for a recommendation to
be returned to the Board of Commissioners no sooner than
October 3, 1994.
080
081
1
PROPOSED ORDINANCE AMENDMENT
ORDINANCE: SUBDIVISION REGULATIONS
REFERENCE: Private Road Standards
ORIGIN OF AMENDMENT: _X_ Staff Planning Board
BOCC Public
Other:
STAFF PRIORITY RECOMMENDATION: High Middle _x_ Low
Comment:
PUBLIC HEARING DATE: August 22, 1994
PURPOSE OF AMENDMENT:
To allow for modification of the 125-foot curve radius for
subdivisions served by existing private roads which have a lesser
radius.
IMPACTS/ISSUES:
The Orange County Private Road Standards include requirements
pertaining to construction materials, and design standards
pertaining to road and right-of-way width, grade, curve radius,
vertical clearance, drainage, signage, turn-arounds, vegetation
and maintenance. Application of these standards assures that
the road will provide safe access, in terms of traffic
circulation and emergency access, appropriate for the number of
lots it serves.
There is flexibility in some of the dimensional standards to
address various its specific circumstances and constraints. For
example, the Board of Commissioners may approve a partial-width
right-of-way if the full right-of-way width cannot be attained,
and the Erosion Control Officer may approve a grade steeper than
the 12% generally required if "exceptional circumstances" are
involved. There is also some variability allowed in the pitch
of the travelway and construction standards for ditches.
There is currently no flexibility in the requirement for a 125-
foot curve radius. New roads which are created when property is
subdivided are located and designed in such a way that this
requirement can be met. Problems occasionally arise, however, in
the subdivision of lots which are accessed by an existing road
which does not meet the curve radius. In some cases, the road
and/or right-of-way can be reconfigured so that the curve radius
can be met. In other cases, the road cannot be redesigned to
comply with the radius standards due to the inability to change
the location of the right-of-way, the extent of earthwork than
may be required if there are significant slopes or embankments,
and/or the location of the right-of-way in relation to property
082 2
lines. (The subdivision regulations do not allow a new lot to be
split by a road right-of-way) . In these cases, no additional
lots may be created on the road, even if the change is minor, and
would provide an acceptable level of safety for general traffic
and emergency vehicles.
The proposed amendment would allow approval of a subdivision with
lots are served by a road with a curve radius of less than 125
feet if all of the following conditions are met:
1) The road existed prior to the adoption of subdivision
regulations or was approved as part of an earlier
subdivision;
2) Reconstruction of the existing road to meet a 125' curve
radius is not feasible due to the extent of earthwork which
would be required and/or the inability to reconfigure the
existing right-of-way location due to ownership or the
location of existing structures, wells or septic systems;
3) Standards pertaining to road width and grade will be met;
4) The subdivision can be approved with a Class C or Class B
private road;
5) Documentation is received from the Erosion Control Division
that the proposed curve radius would provide for adequate
vehicular access and circulation;
6) Documentation is received from the Department of Emergency
Services stating that the proposed curve radius would
provide access for the largest emergency vehicle which would
use the road.
The Planning Staff consulted with Mike Tapp, Orange County Fire
Marshall in preparing the proposed amendment to assure that
concerns related to emergency access were addressed. The
Department of Emergency Management has indicated support for the
proposed amendment.
EXISTING ORDINANCE PROVISIONS AND PROPOSED AMENDMENT:
Private Road Standards - Minimum Curve Radius
New curves shall be constructed with a minimum centerline radius
of 1251 . The right-of-way must be designed with bends that will
provide sufficient width to construct the road to this minimum
radius. For example, a 90' bend in a 50' right-of-way will not
provide enough are to construct a road 18' wide. The right-of-
way must include sufficient width for the travelway and the
necessary shoulders, ditches and slopes.
A curve radius of less than 125 feet may be approved if all of
the following conditions are met:
3 d4
1) The road existed prior to the adoption of subdivision
regulations or was approved as part of an earlier
subdivision;
2) Reconstruction of the existing road to meet a 125' curve
radius is not feasible due to the extent of earthwork which
would be required and/or the inability to reconficture the
existing right-of-way location due to ownership or the
location of existing structures. wells or septic systems;
31 Standards pertaining to road width and grade will be met;
41 The subdivision can be approved with a Class C or Class B
private road;
51 Documentation is received from the Erosion Control Division
that the proposed curve radius would provide for adequate
vehicular access and circulation;
6) Documentation is received from the Department of Emergency
Services stating that the proposed curve radius would
provide access for the largest emergency vehicle which would
use the road.
**********************************
ORDINANCE REVIEW SUBCOMMITTEE: July 11, 1994
PLANNING BOARD REVIEW:
BOCC REVIEW: