Loading...
HomeMy WebLinkAboutAgenda - 02-16-2016-13-2 - Information Item - Memorandum - Hollow Rock Nature Park Update INFORMATION ITEM 1 -u+„ Department of Environment, Agriculture, Parks &Recreation MEMORANDUM To: Bonnie Hammersley, County Manager From: David Stancil, DEAPR Director Date: February 16, 2016 Re: Hollow Rock Nature Park Update Construction of the Hollow Rock Nature Park (formerly Hollow Rock Access Area) continues this winter. Despite several major rainfall events and one ice event that has slowed and complicated the work, the project is generally on schedule and plans are underway for an opening of Phase I later this spring. Hollow Rock Nature Park is a 75-acre site comprised of multiple land parcels owned separately by Orange County, Durham County, and the Town of Chapel Hill. The site straddles the Orange-Durham county line and New Hope Creek forms the western boundary. Portions of the site are protected with conservation easements held by the State of NC. Plans for a nature preserve styled park date back to the early 1990's, when Orange County, Chapel Hill, Durham County and the City of Durham adopted the New Hope Creek Corridor Master Plan, which called for preservation of lands along the New Hope Creek corridor, from central Orange County to Jordan Lake. The master plan envisioned a public trail network with a number of "access areas" at strategic locations, including the "Hollow Rock Access Area" at the intersection of Erwin Road and Pickett Road. A Master Plan for the 75-acre Hollow Rock site was developed by an interjurisdictional master plan committee and adopted in 2010. Orange County and Durham County, under an interlocal agreement signed in 2015 (with the Town of Chapel Hill as an additional signatory), will jointly manage and operate the park, with Durham County managing the area east of Pickett Road, and Orange County the portion west of Pickett Road. Construction of the initial public amenities outlined in Phase 1a (Exhibit B) for the Hollow Rock site is well underway and with anticipated opening mid spring of Orange County Department of Environment, Agriculture, Parks &Recreation (DEAPR) PO Box 8181, Hillsborough, NC 27278 Phone: (919) 245-2510; Fax: (919) 644-3351 2 2016 (date TBA). These amenities are being constructed with help from a $200,000 North Carolina Recreational Trails Program (RTP) grant awarded to Durham County in collaboration with Orange County. Orange County's share of this Phase 1 a construction is $50,000 appropriated in FY 2014-15 and FY 2015- 16. These amenities include a gravel 15-car parking area and turn around, overflow parking area, natural surface trails, four pedestrian bridges, information kiosks, a park entrance sign, and a cleared area for the "old" Hollow Rock Store, which is planned to be relocated to this site by a non-profit organization working with the Friends of Hollow Rock Store. Despite the weather delays, construction is well underway and within budget. Orange County staff is currently working with the NC Department of Transportation in providing addition wayfinding and safety signage. DEAPR is also developing a pre-application for a potential 2017 RTP grant to help fund Phase 1 b construction. A phasing plan for development of Phase 1 b of the site is provided as Exhibit B. The adopted CIP identifies additional funds from both Orange and Durham counties for Phase 1 b construction in 2016-17. We hope to be in touch with plans for an opening event in the spring, possibly late-April or early-May. Attachments Copies: Travis Myren, Deputy County Manager Marabeth Carr, Landscape Architect Dan Derby, Parks Superintendent Orange County Department of Environment, Agriculture, Parks &Recreation (DEAPR) PO Box 8181, Hillsborough, NC 27278 Phone: (919) 245-2510; Fax: (919) 644-3351 Exhibit A o faa V ■ Proposed Master Plan o _ i r IN Hollow Rock Access Area VI/ � - a at �, -- V n New Hope Preserve -Kiosk end ' Bike Possible Locaati Kios Racks /Crossing Loc tlon� // / } Option 1 - Pickett Road Opened /, , r�� � Option 2 - Pickett Road Closed :/ ,' f *� / /2 \ / PTrall r `� n i I -ZI MiIBI le' - ckeKROatl P --`-' J Phase l-Pickett Rd Open-NO Drkngtps hownttl III Y 1 Phase3-PkkNI Rtl Cbutl-90°Pargn9ushown to be P'A"r,.-�� I El g Q Entrance Closed 4","..la's Klock a.Bike Racks look y/ �a N 0 0 Gress Overflow Nature Vlev log // el 7,4 Pa sic ciOVerio lk \ P / _ . / Rlocatatl Hollyw \\ �, osslbiecurare - 1 1 Rock$tore \ Pavatl elks Lane / -�I III^11J L!', b IADA LOaP Trail `\�\ _ // C� X . / 0 7 (tl3 Mlle) , wFisher P pert; C E o Future N.\\\ , A Existing Trails Meadow �InterPrative Signage f �\ along Trail ■ nM Existing TLC BarNBhetl / N Patenlal Educational / \ Outdoor Class z N ,, 111 ..,,,z,„100 50 U, 100 "' ,�* O 3/04/20119 Possible Trail connecton to • Rev Trails 10/1V012 the PAM Site and Duke Trolls / N O LEGEND A Hanging ,-information Kiosk �.� v\\v * POSSIBLE ACCESS POINT Rock r'e \ O. * EXISTING BENCH LOCATIONS \ v 0 i',:1-� it PROPOSED BENCH LOCATIONS / \ (TO BE FIELD LOCATED) / \ • PROPOSED BIRD WATCHING PLATFORM ,\ \\ I u❑ EL!(TO BE FIELD LOCATED) Al r UQ \\\ — STREAM CENTERLINE `,v(� IJ'�� \ g \ ❑ 1J STREAM BUFFER LIMA N' r _ (n} Cil I J EXISTING TRAIL ■ PROPOSED TRAIL(TO BE FIELD LOCATED) ° a ——PROPOSED ADA SLOPE ACCESSIBLE ' TRAIL(TO BE FIELD LOCATED) !1 0 i t00t0 Trails to the Booth ii . ° o 4 Exhibit B Phasing Plan for Hollow Rock Nature Park Phase 1a- Infrastructure, amenities, and site work already completed or allowable under RTP Grant. • Additional Survey work- Cultural &Archaeological (Completed) • Land Acquisition (TLC Parcel in Orange County) (Completed) • Bridge Engineering Design Work for Pedestrian Bridges (4) (Completed) • Preliminary Design Work for Parking Lot(Site Plan, Engineering,Approvals, Topo Survey) (Completed) • Entrance Driveway and Parking(Gravel/HC Paved/Wheel Stops) (Underway) • Entrance and Directional Signage (Underway) • Pedestrian Bridges (4)for nature trails on east side of Pickett Road (Completed) • Information kiosks and trail maps (Completed) • Site clearing for future Hollow Rock Store (Completed) Phase 1 b -Additional Amenities • Site Amenities- Picnic Tables, Waste/Recycling Receptacles, and Dog Waste Receptacles • Interpretative Signage • Restroom (vault type) and engineering • Platform Overlooks for nature observation • Nature Trail Bridges (2) on west side of Pickett Road • Barn Renovation for Educational Use • Accessible trail loop Phase 2 (Timeframe TBD) • Additional Survey work- Cultural &Archaeological and/or Topographic • Hollow Rock Store relocation (by Friends of Hollow Rock Store) If Pickett Road were ever closed: • Entrance Gates • Parking (Gravel/HC paved/Wheel Stops) • Top-dress gravel - Pickett Road • New Entrance Sign/Directional Signage 5 Hollow Rock Nature Park — Under Development Exhibit C , , q; S w. „ r" 5- ,.y '^ ;''' kr . ,I., 1. ..., f; I jl . I :a i , •YY99 , • '� a ,;,..4,, "4� , 1 11t� G ',l .i N` 8J 1114 r ,' t ,� 4.c ai a miff 1' I I . b; 4. 'e' _ it. Parking area and turn around under construction _ Air !/ � R:. A. 4 ;4."..' i iii, Stone mason's working on the entrance sign in the snow! u % r , .. s • f - `/ n '--414-----..,,, ✓, - a 'S, 1 Jr e a '.Apes' 'a '.1 't�J Bridge and Kiosk at trail head