HomeMy WebLinkAboutAgenda - 10-09-2007-6gORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 9, 2007 Action Agenda Item No. _ (,~~ SUBJECT: Bid Award: Solid Waste Operations Center Construction DEPARTMENT: Purchasing PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Name, Phone Number Bid Tabulation Pam Jones 919 245-2652 Architect's Letter of Recommended Gayle Wilson 919 968-2885 Award PURPOSE: To consider awarding a bid to LeChase Construction Services, LLC, Durham, North Carolina in an amount not to exceed $2,168,090 for the construction of the Solid Waste Operations Center on Eubanks Road, Chapel Hill. BACKGROUND: The Solid Waste Operations Center, which will be located adjacent to the landfill on Eubanks road, has been under design for the last 2 years. The approximately 9,000 square foot building will include offices for all solid waste staff and amulti-purpose room with capacity of approximately 75 people. The Board approved the final design of the building in April 2006. Bids for the project were received on September 13. Of the four bidders responding, LeChase Construction Services LLC is the apparent low bidder. Five alternates that used reclaimed wood from various county projects were included in the bid specifications. The building will be constructed using the reclaimed wood as outlined in the alternates, except for that contained in Alternate #4. Alternate #4 called for use of reclaimed wood as structural members in the engineering wood room trusses. However, based on conversations with a manufacturer, it does not appear that the commercial truss makers will agree to engineer, manufacture and accept liability for roof trusses made of reclaimed wood. In collaboration among the architect, contractor and County staff, recommendation is made to accept the base bid and the other four alternates, all of which will utilize reclaimed wood in one form or another. The project is expected to be completed within 270 days of the Notice to Proceed. Assuming the contractor is able to submit bonds, insurance and other contract information in an expedient manner, the project should be completed in late-Summer 2008. As a reminder, the Board has previously approved cone-year lease for office space for the Solid Waste administrative staff from November 1, 2007 through October 31, 2008 in order to fulfill the University's requirement to vacate the current location by October 31, 2007 so the remediation of the hazardous waste dumpsite could begin. FINANCIAL IMPACT: Bids are awarded in an amount not to exceed $2,168,090. Funds in the amount of $2.2 million were included in the recent alternative financing package approved by the Commissioners. The complete project costs including design, construction and other owner responsibilities associated with construction can be met by the available funding. RECOMMENDATION(S): The Manager recommends that the Board award a contract for construction of the Solid Waste administrative offices to LeChase Construction Services, LLC, in the amount of $2,168,090; and authorize the County Manager to execute and report to the Board change orders as may be required up to the amount of the project budget. 3 ,t~~~t~iiiirrrrr~~~ ,.~ S, P.A. ~% ~• ! 4• ~ ~ ~ (J • ~~ ~ G ~ . ~ / ~~~= • .~ c+ ~C~ ~ iJ. ~ • ~~ ~ 1.[,/ = ~` : 1:.: a,. ~~ '11'' •~eo oo• /~ x~ ~~ ~ r ` ~ ~' ~,,. vo .,,,; ~ ~~N ~~ 4~ "'~ kr t tti ,~~ c7 ~~; ~• ~L QC' • '~t7d1 ~ -,~ i q '~[ ~ =~ S ~,~ S ~ pQ. ' Jam= ~• ~ ~ ti N~ i -~-• Q~ U N C O :,_.~ (II L t2 ~-+ G a~ E N cts c (t3 N ~ Z ~ ~ ~ - O p ~ ~ ~ ~ ~ _ m cll ,~ c~ cn W N ~ ~ ~ ~ ~ U m ~ ~ O 07 ~ c fi W J r t].. O ~, ~ Z ~ O '+ m cn Q 0 Z ~ cn cn cn cn W - W W W W d ~ ~ ~ ~ ~ Q ~ U O ~O O -p0 O O -p0 ~ ~ J p ~~ te ~~ t9 ~o d a itr - ~ ~ ~ ~t O ~ J = a ~~ ~ ~ ~~ a ~ Q to ~~ .~~ O ~. 0 ~ ~`~ ~~ ~ ~ N 0 ~ ~ ~ O ~ O 0 ~ O J ~ a fpN Q N 'DMA, ~`- 'D Efi} N N 'C7 69 ~ 0 ~ M 0 =p 0 ~ ° 0 0 J c O_ ~ a a ~ ~ N N N~ N ~ 0 0 0 0 0 0 0 0 ~ 0 0 o ci m o ~ o O a O o O W r- ~ N O Q N tC) ~ O CD N Ef3 N b9 N Efl N K3 W U W W W a- W Z ~ Z W W W W m m J- J- J- J- x 0 wm m m m m Q w ~ ti ~ ° ' ~ ti ~ w U ~ ~ ~ ~ 00 _ J Z Z p ~ O cn O O as w ~~ Q~ o- m J _ Z W~ ~ QO ~ C~~ m O - Z = C/) Q Z C~ O O v ~ Dixon Weinstein .. ~ F ~ ? w1s. Pc~melo K loner, Director Orange Co~rnty Purchasing rind Central Ser•~ices 129 Enst King Street Hillsborough, NC ~??78 HAND DELIVERED Dear Pam. `;ept. I ~ 2CiO' The bid opening for construction of the Orange County Solid Waste Operations Center concluded September 13. 200?, with proposals from four general contr-actor-s. We have reviewed the proposals and recommend award of the contact to the low bidder, LeChase Construction Services. LLC, as follows: Base Bid $2,227,900. Altemate I -deduct (,24.630.) Altemate 2 -deduct (35, 180.) Altemate 3 - no change 0. Alternate 5 - no change 0. :: ~ :• - •~ ~~ TOTAL $2, 168,090. _.,, _ ,. The recommended Alternates I ,2,3 and 5 .provide for various uses of wood material reclaimed from buildings Orange County has deconstructed in recent years. The only Alternate not recommended for acceptance, Alt. 4, required reclaimed wood as structural members in engineered wood roof trusses. Based on conversations with amanufacturer-, we do not believe .. ... ••~•~ commercial truss makers will agree to engineer, manufacture and accept liability for roof trusses ~_+', =~ made of reclaimed wood. ---- I have enclosed a copy of the recommended bidder's Proposal Form as well as an updated - Appendix B indicating MBE participation in the project. • "' Also enclosed is the certified bid tabulation, which indicates the next lowest bid was from •° - Harrod and Associates. Their Base Bid of X2,5 19,000 and deductions totaling $8.500 for- . Alternates I ,2.3 and 5. yielded a proposed price of X2.5 10,500. Sincerely, ~~~~~~~ Ken Friedlein. AIA Enclosures