HomeMy WebLinkAboutAgenda - 10-09-2007-4mORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 9, 2007 Action Agenda Item No. ~ - tYl SUBJECT: West Ten Soccer Center Change Order Requests DEPARTMENT: Purchasing PUBLIC HEARING: (Y/N) No Recreation and Parks ATTACHMENT(S): Proposal INFORMATION CONTACT: Pam Jones, 245-2650 Lori Taft, 245-2660 PURPOSE: To consider approving a change order that includes installation of a water storage tank; use of a temporary generator; winter cover crop seeding; and spring field prep for the West Ten Soccer Center. In addition, the change order includes a credit due to the Hunter Industries irrigation products provided by the County and not the contractor as a result of the US Soccer Foundation grant award. BACKGROUND: In June of 2007, the Board awarded a contract in the amount of $530,463 to Carolina Green Corporation, for field development and irrigation at the soccer complex. The Board is being asked to approve a $118,552 change order that will cover the following items: • $105, 582 is added to the contract to provide and install a 25,000 gallon fiberglass underground storage tank (UST) that will be used to provide irrigation for the fields. The UST was not part of the original bid since the capacity of the wells that would be used to provide water for irrigation was unclear as was the location of the wells -both of these factors are key in the determination of the price and sizing of the UST. Following installation of the UST and associated piping (8-10 week lead time for delivery of tank), the County will be able to reduce the expense of water used for irrigation, since the City of Mebane water connection would only be used for irrigation if the wells became non- functional • $13,430 is added to the contract to seed two fields with winter rye, remove it in the spring and prepare the fields for sprigging with Bermuda grass. Per previous discussion with the Board, two fields were not ready for Bermuda sprigs by the deadline far their application. Rather than install sod at substantial additional cost ($97,000+/-), a cover crop will be planted for erosion control over the winter and then removed in the spring when it is appropriate to plant the Bermuda sprigs. • $620 is added to the contract to cover the cost of a generator, used for less than one week, to operate the irrigation controller during the critical period between sprigging and a the provision of permanent power to the site. The sprigs required the immediate application of water when they were initially installed. • $1,080 is deducted from the contract. The Hunter Industries products provided as part of the $50,000 US Soccer Foundation grant in addition to items included in the contract were in the amount of $1,080. FINANCIAL IMPACT: This change order falls within funding allocated by the Board in the spring of 2007 and projected for this use. No additional funding is requested. RECOMMENDATION(S): The Manager recommends that the Board approve a change order in the amount of $118,552 for the work specified; and authorize the Manager to sign and report this and other change orders that may occur within the project up to the amount of budgeted funds. 3. ._ ~~,~ Gootra~t Admr~nistration ~~_ ~~ G701 Change Order (instructions on the reverse silo) PRUJECT .(Name a?d.address): CHANGE ORDER N 1 iBESt: GC-~. ~ie.1cl Cons trcuc.ton anri tr~cigarr ion S.zrtpravcm~nrs West Tin Socr-er C~nt~r, Clrarlge Co„, L~{.; DATE: 9IZ~T~C~7 TO CDtdTRACTOR'(Name and address): ~ ARCHITECT`S PAO Il ~T NUMBER: CaTCO~]Lt1~ ~Cru',"..tl C.,OiCQ. CONTRACT bAT~: fl~3 1~. Zf~t~7 't G11 nR Tnrl i an TraT 1-Fai YtTi_P_5,7 ~O~ y Oistributi n 'st: Owner Architec _ Contractor Field _.~ Other .I'*?,~