Loading...
HomeMy WebLinkAboutAgenda - 12-07-2015-13 (5) - Information Item - Memo Regarding Mebane Comprehensive Transportation Plan Project Including the Mattress Factory Road Interchange INFORMATION ITEM 1 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration ,. 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 Jima— MEMORANDUM TO: Board of County Commissioners Bonnie B. Hammersley, County Manager FROM: Abigaile Pittman, Transportation/Land Use Planner Craig Benedict, Planning Director CC: OUTBoard DATE: November 18, 2015 SUBJECT: INFORMATION ITEM – Mebane Comprehensive Transportation Plan Project Including the Mattress Factory Road Interchange On November 5t" the City of Mebane released a Request for Proposals (RFP) to engage a qualified private engineering and design firm or team for transportation planning services for a Comprehensive Transportation Plan (CTP). The project scope of services includes developing a comprehensive program of transportation improvements over a 10 to 20 period, including facilities, recommendations, and alternatives for the Mebane transportation system. Included in the scope of the project is the Mattress Factory Road interchange, located both in Orange County's and Mebane's jurisdictions. In November 2012 an Interchange Analysis and Corridor Study was completed for Mattress Factory Road. The report was a preliminary feasibility study to determine the effects of a potential interchange on the roadway network immediately surrounding the interchange. The scope of the study provided a conceptual interchange design, which included roadway configuration and potential right-of-way needs. Orange County staff has had concerns about the impact of the conceptual connections to the County's economic development area to the east, and has been suggesting that this design be re-visited. Inclusion of the Mattress Factory Road interchange in this current project evolved in part from joint discussions earlier this year. In June, Planning staff met with City of Mebane staff to review Orange County's interest in working with Mebane to identify and protect future interchange access from Mattress Factory Road. The County has been 2 examining revisions to its access management plan for our nearby economic development area that will make connections via service roads to the Mattress Factory Road interchange. As development proposals come forward in this area in and around the `future' Mattress Factory Interchange, the two jurisdictions should cooperate to develop a plan for a mutually agreeable alignment of the future feeder road system. NCDOT can find money easier when right-of-way and conceptual design has been accomplished. The Burlington-Graham Metropolitan Planning Organization (BGMPO) has prioritized this project to develop recommendations for better integration of transportation modes in existing and future transportation corridors in Mebane. Funding sources for the planning effort include the Federal Highway Administration (FHWA) ($20,000) and the City of Mebane ($30,000). The estimated completion date for the project is June 30, 2016. No funds are being requested from Orange County; however, staff will be consulted during the course of project development. Staff will keep the Manager and Commissioners informed regarding progress on this project and plans for the Mattress Factory Road interchange. US 70 at y 3rd Street t • t US 70 at 2nd Street 70 A..i, �' i� US 70 al 5th Street ►h ;'• fiI `l. y, Uuckhorn Road at _� c 140 WD Ram s 5th Street at }� r Mebane Oaks Road ' Mebane Oaks Road at 11 j '� 1-40 Wl3 Rams `;♦ �; Mattress Factory Road at �• � ( Industrial Drive 13uckhorn Road at 1-40 E13 Ramps Y } Mebane Oaks Road at y 1-40 E13 Ram s Mattress Factory Road `Future' Interchange