Loading...
HomeMy WebLinkAboutORD-2015-030 Ordinance Amending the Orange County Zoning Atlas PAP --d 645 Ordinance ante#:ORD-201 S 030 AN ORDINANCE AMENDING THE ORANGE COUNTY ZONING ATLAS WHEREAS, Orange County has received and processed a petition submitted by Hart's Mill LLC and Ms. Alana Ennis seeking to amend the Orange County Zoning Atlas, as established in Section 1.2 of the Orange County Unified Development Ordinance (UDO), and WHEREAS, This petition seeks to rezone a 112 acre parcel of property, further identified utilizing Orange County Parcel Identification Number (PIN) 9835-74-8573, to Master Plan Development Conditional Zoning District (MPD-CZD) for the purpose of developing the Hart's Mill Hart's Mill Village, a 34 unit residential farm community. WHEREAS, The applicant has voluntarily chosen to establish development and land use limitations on the project to ensure residential and farm activities do not conflict with one another. WHEREAS, This petition has been submitted in concert with a formal site plan in accordance with the provisions of Section 2.9.2 (C) of the UDO, and WHEREAS, the requirements of Section 2.8 and 2.9.2 of the UDO have been deemed complete, and WHEREAS, the Board has found the proposed zoning atlas amendment to be reasonably necessary to promote the public health, safety, and general welfare. BE IT ORDAINED by the Board of Commissioners of Orange County that the Orange County Zoning Atlas is hereby amended to rezone the 112 acre portion of the aforementioned parcel to Master Plan Development Conditional Zoning (MPD-CZ) and allow development of the Hart's Mill Village as detailed on the submitted site plan. BE IT FURTHER ORDAINED THAT in accordance with Section 2.9.2 (F) of the UDO the approval of this Conditional Zoning applicant is subject to the following mutually agreed to conditions: 1. The property shall be utilized only as a village oriented residential/farming community as denoted on the submitted site plan. 2. County staff shall prepare a `Declaration of Development Restrictions and Requirements' outlining all conditions and development limitations associated with this project that the applicant shall record within the Orange County Registrar of Deeds office within 180 days of approval. 3. In accordance with the submitted application and site plan, development of the project shall be limited as follows: a. Permitted residential density for project shall be limited to 1 dwelling unit for every 3 acres of property with an overall limit of 34 dwelling units constructed on the property. b. Allowable Land Uses for the project shall include: i. Farm operations (i.e. animal husbandry, forestry activities, crop production, processing, etc.) ii. Accessory farm structures including, but not limited to: a. A maximum of 4 houses b. A maximum of 4 garages/barns for farm equipment/vehicle maintenance and storage, farm product processing and storage, etc. c. Woodworking shop d. Produce processing center (washing/packing area) e. Pottery studio with kiln. iii. Single-family and two-family (i.e. duplex) residential units. iv. Community House, limited to a total square footage of 6,000 sq. ft., with common facilities including, but not limited to: laundry facilities, mail room, activity room, and community kitchen. v. Administrative office including meeting facilities for local residents. vi. Accessory uses including: a. Customary accessory uses for individual residential units b. Maximum of 2 art/hobby studios for use by local residents not to exceed a total square footage of 1,000 sq. ft. per building c. Minor home occupations shall be allowed for each residential dwelling unit. Such uses shall be reviewed and acted upon in accordance with the UDO d. Parking area/garages e. Electric car/golf cart charging stations. vii. Solar Array — Large Facility to be reviewed and acted upon in accordance with the provisions of Section(s) 2.7 and 5.9.6 of the UDO. viii. Recreational land uses — recreation uses for local residents shall be allowed including: a. Walking trails/paths b. Multi-purpose athletic fields, as shown on the approved site plan, supporting such activities. No infrastructure (i.e. outdoor field lights, buildings, etc.) shall be permitted c. Individual recreational uses for residences treated as customary accessory land uses. c.Setbacks: i. No residential structure shall be located within 100 ft. of the perimeter of the property line. ii. No farm structure housing animals shall be located within 40 ft. of the perimeter property line. iii. All residential structures shall observe the following setbacks from identified residential spaces: a. Front Yard: 5 ft b. Side Yard: 5 ft c. Rear Yard: 5 ft d. All structures shall comply with minimum spacing requirements established within NC State Building Code for separation between structures. d. Ratio standards: a. Minimum Percentage of Open Space for project: 80% or 89 acres. Farm/pasture operations, roadways and parking areas, as well as off-site septic areas shall be allowed within this open space area b. Maximum Allowable Floor Area Ratio (i.e. the cumulative amount of floor area for the project): 0.10 c. Required Recreation Space Ratio, minimum: 0.031. e. Landscaping shall be installed on every individual residential space in accordance with the following standards: i. Preferred Plant Species - For landscaping purposes in the village, the Hart's Mill Land Use Committee (hereafter 'Committee') will develop a list of preferred species that will be founded on principles of being native, drought tolerant, and well adapted to Orange County, and also support shading, screening, solar access, and aesthetic enhancement goals. It will also include edible landscaping species. This list will synthesize planting recommendations from the Cooperative Extension Service, NC Botanical Gardens, NC Native Plant Society, and other sources identified by the Committee that are consistent with the vision, missions, and goals of Hart's Mill Village. ii. Prohibited Plants - Invasive species recognized by the North Carolina Invasive Plants Council for the Piedmont shall be prohibited. iii. Location and Width of Land Use Buffers - Except at the property entrance, land use buffers shall be 20 ft. wide. The buffer at the project entrance street shall be 10 ft. in width along the northern property line on the narrow portion of the site beginning at Frazier Road and continuing approximately 1000 linear feet to the point at which the property widens. At that point, the buffer will transition to 20 ft. in width. iv. Preservation of Natural Buffers: 1. If there is existing, healthy, natural vegetation in the area of a required buffer, it must be preserved. If the vegetation is removed for any reason, other than in accordance with an approved landscape and tree preservation plan, the number of required plantings shall be increased 50%. 2. The critical root zones of trees within the buffer must be protected if the applicant seeks credit for preservation of existing trees. 3. If necessary, a natural buffer will be supplemented with additional plantings in order to meet the Constructed Buffers standards established herein. v. Constructed Buffers: 1. If existing vegetation is not sufficient to meet the buffer standards established within the conditions of approval for the project or within the LIDO, additional plantings shall be installed consistent with the Type A land use buffer standards detailed within Section 6.8.6 (F) of the UDO. vi. Fences and Walls: 1. Fences and walls shall be compatible with building architecture as determined by the Committee. 2. Fences and walls shall be setback a minimum of ten feet from any property line adjoining a road right-of-way, either public or private, to ensure adequate site visibility. 3. Fences shall not exceed 12 feet in height. 4. Chain link fencing is not permitted in areas visible from adjacent residences, parking areas, street or pedestrian walkways unless it is screened through use of evergreen shrubs or vines. vii. Credit for Other Landscaping - Plant material in project boundary buffers may be counted towards the planting requirements of this section when located to serve both functions. f. Provision of wastewater disposal services: Wastewater shall be disposed of via a shared septic area, as denoted on the approved site plan, as approved by the Orange County Health Department and the State of North Carolina. In cases where an individual septic system is required for a land use located within the farmstead portion of the project, this system shall be reviewed and approved by the Orange County Health Department. g. Water service to individual buildings shall be through a water system served by Orange Alamance Water System. Individual wells shall be limited to those developed in support of agricultural operations or for residences located within the farmstead portion of the project as denoted on the approved site plan. In the event water service cannot be provided by Orange Alamance Water System, utilizing the existing infrastructure, to meet the applicable water quality and/or pressure standards, individual wells or a community well shall be permitted if approved by the appropriate agency. h. Access: access to the project shall be through a single access point on Frazier Road. No additional vehicular access points shall be developed. i. Parking: all vehicles shall be parked in designated areas as identified on the site plan. A total of 70 parking spaces shall be provided for residents and their guests. 4. The applicant shall be required to obtain final approval for the proposed dumpster pad location from Orange County Solid Waste prior to the commencement of earth disturbing activity. 5. The applicant shall be required to obtain stormwater and erosion control permits from Orange County Erosion Control prior to the commencement of earth disturbing activity. 6. The applicant shall be required to obtain a driveway permit from the North Carolina Department of Transportation prior to the commencement of earth disturbing activity. The applicant shall provide the Orange County Planning Department with a copy of this permit. 7. The applicant shall be required to obtain final approval for the location and access of a central mail kiosk providing mail service to local residents by the Postmaster General in consultation with the North Carolina Department of Transportation and County Planning staff. The applicant shall provide the Orange County Planning Department with a copy of any documentation from the Postmaster General and/or the Department of Transportation of this approval. 8. The applicant shall be required to obtain building permits from the Orange County Inspections Department prior to the commencement of construction activity. 9. The applicant shall be required to obtain sign permits from the Orange County Planning Department in accordance with the provisions of the Orange County Unified Development Ordinance. 10.The Orange County Fire Marshal shall review and give final approval to road layout and construction methodology prior to the initiation of land disturbing activities. The Fire Marshal shall also review and approve the final location of the emergency fire access roadway and location of the proposed stand-pipe prior to installation. 11.The Orange County Fire Marshal shall review and give final approval to proposed water lines prior to the initiation of land disturbing activity. The ultimate required size of said lines serving the project shall be based on the results of the application, which shall include water flow test data for the project. 12.The applicant shall be required to maintain all required land use buffers in perpetuity in accordance with the requirements of Section 6.8 of the .Orange County Unified Development Ordinance. 13.Required landscaping for residences located within the village area of the project, as denoted on the approved site plan, shall be installed prior to the issuance of a Certificate of Occupancy for each individual residential structure or the proposed common house. 14.The applicant shall coordinate with Orange Alamance Water System, Orange County Emergency Services, and the Efland Volunteer Fire Department to hold a fire-flow test for the proposed fire hydrants. The test shall be certified by the various parties as complying with applicable State Fire Code standards with respect to necessary water flow. BE IT FURTHER ORDAINED THAT this ordinance be placed in the book of published ordinances and that this ordinance is effective upon i doption.N. Upon moti4no mmis sioner seconded by Commissioner the foregoing ordinance was adopted this -5day of , 2015. I, Donna S. Baker, Clerk to the Board of Commissioners for Orange County, DO HEREBY CERTIFY that the fore oing is a true copy of so much of the proceedings of said Board at a meeting held on , 2015 as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of the said Board. WITNESS my hand and the seal of said County, this day of , 2015. f Sz Cl Wltfte_ ard of Commissioners oaf¢ cxta���'°