Capital Investment Plan
FY 2008-18
CAPITAL IMPROVEMENT PLAN PROJECTS (2007-2017) DRAFT2
TOTAL CIP PROJECTS
$29,640,600
9/19/2007 TOTALS Page 1
YEAR 1 CAPITAL PROJECTS DRAFT 2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
CWSMS Air handler re lacement 20 EA. $500,000
CWSMS Li htin u rades $70,000
CWSMS Ceilin the re lacement $40,000
CPES G m HVAC re lacement $100,000
CPES Bathroom refurbishment $35,000
CWSMS Bathroom renovations $25,000
OHS Bathroom renovations $239,000
HES Fire alarm u rade 200 Buildin $35,000
CPES As halt resurfacin la areas, arkin lot and track $100,000
GABES Classroom ortable wall re lacement $75,000
GABES Re alce win doors and locks $30,000
CRHS Securit li htin Student arkin lot & stadium entrance $15,000
OHS Install moisture barrier on walls with windows & repaint $75,000
TRANS Re lace Under round fuel tanks w/Above Ground Tanks $275,000
DISTRICT Technolo U rades $650,000
. _
ALSMS Baseball field safet nettin ~ $15,000
OHS Renovate tennis courts (cost sharing w/OC Parks & Rec) $150,000
OHS Track renovation (includes bleachers & drainage) $550,000
GHMS Electrical Service Outdoor scoreboards $70,000
TOTAL $3,049,000
9/19/2007 2007-2008 Page 2
YEAR 2 CAPITAL PROJECTS DRAFT2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
CPES HVAC duct cleanin $26,500
CES Media Center window re lacement $30,000
CES Ex and arkin lot $50,000
CES Coolin tower re lacement $150,000
CES Air handler re lacement $65,000
CES HVAC duct cleanin $26,500
ECES Coolin tower re lacement $150,000
ECES HVAC for kitchen $30,000
ECES HVAC duct cleanin $26,500
GAGES Concrete re airs ~ $20,000
HES Dishwasher re lacement $30,000
HES Boiler re lacement Cafeteria $45,000
HES Re lace exterior doors $25,000
HES Environmental controls $150,000
HES Asbestos removal G m hot water i es $22,000
HES Handica accesibilit 300 bld $30,000
NHES Fire alarm u rade $190,000
NHES Re lace m floor rubberized surface $100,000
PES Fire Alarm u rade $4,500
PES Cabinet re lacement Room 507 $3,200
ALSMS Su ort column reinforcement $25,000
ALSMS Re lace fencin Athletic fields $18,000
ALSMS Fire alarm u rade $185,000
ALSMS HVAC Chilled-water line insulation $23,000
ALSMS Science lab renovations $82,000
ALSMS Mechanical room ventilation u rade $12,000
CWSMS Re lace intercoms stem $65,000
CWSMS Interior aintin entire facilit $85,000
CWSMS Cafeteria doors re lacement $5,000
CWSMS Science lab renovations $50,000
OHS Chemical stockroom renovation $75,000
OHS Heating/cooling valve replacement $150,000
OHS Boiler replacement $75,000
OHS Boiler pump replacement (2 EA) $40,000
OHS Replace baseball/softball field lighting $250,000
OHS Replace boiler condensation tank $20,000
DISTRICT Technolo U rades $650,000
TOTAL $2,984,200
9/19!2007 2008-2009 Page 3
YEAR 3 CAPITAL PROJECTS DRAFT2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
CPES Stora a containers $15,000
CPES Streetsca a renovation $100,000
CPES Roof Re lacement Sections K & L $80,000
CES. Re-ke in and electronic securit door locks $35,000
CES Track and arkin lot resufacin $50,000
CES Casework re lacement K-1 classrooms $100,000
CES ~ Refurbish the in classroom bathrooms $25,000
CES Roof re lacement Section G $30,000
CES Re air ceilin overhan Media Center $10,000
ECES Casework re lacement K-1 classrooms $100,000
ECES Re-ke buildin $15,000
HES HVAC Chilled-water line insulation $10,000
HES Electronic securit door locks $40,000
ALSMS G m floor reconditionin $5,000
CWSMS Roof re lacement Sections 36 & 1A $300,000
CWSMS Kitchen doors re lacement $8,000
CWSMS G m floor reconditionin $5,000
OHS Mini-blind re lacement ~ $20,000
OHS Concrete re airs and sidewalk extensions $10,000
OHS Electrical u rades $30,000
OHS Replace ceiling tiles in Gym area $5,000
OHS Securit li htin Cam us-wide $30,000
OHS Replace lockers (Main Gym) $18,000
OHS Renovate third-wing basement $10,000
OHS Roof replacement (Sections fourth wing) $150,000
OHS G m floor reconditionin $5,000
PAAS Building expansion (Phase 2) $250,000
PAAS Flagpole (25') $2,000
DISTRICT Vehicle Re lacement #7007 $30,000
DISTRICT Vehicle Re lacement # 7017 $27,000
DISTRICT Vehicle Re lacement #7016 $25,000
DISTRICT Technolo U rades $650,000
TOTAL $2,190,000
9/19/2007 2009-2010 Page 4
YEAR 4 CAPITAL PROJECTS DRAFT2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
HES Basketball oats re laced $30,000
HES Renovate m floor $50,000
NHES Sidewalk re lacement $15,000
NHES Celin renovation $20,000
PES Perimeter fencin $30,000
ALSMS Track resurfacin $15,000
CWSMS Parkin lot and drivewa resurfacin $40,000
GHMS Additional security cameras $16,000
GHMS Fencing around sediment ponds $10,000
GHMS 8th Grade athletic program equipment $50,000
GHMS Storage building $10,000
GHMS Locker room benches $1,500
GHMS Track upgrades ~ $4,000
CRHS Dust Removals stem Wood Sho $15,000
CRHS Rubberized track surface $60,000
CRHS G m floor reconditionin $5,000
DISTRICT Pla round E ui ment $15,000
DISTRIGT IAQ Monitor $4,000
DISTRICT Mold Monitor $6,000
DISTRICT Vehicle Safet Partitions 10 EA $5,000
DISTRIGT Re-Ke Central Office Buildin $7,500
DISTRICT Emer enc Electrical Hooku for Central Office $3,000
DISTRICT Technolo U rades $650,000
DISTRICT Central Office $2,500,000
TOTAL $3,562,000
9/19/2007 2010-2011 Page 5
YEAR 5 CAPITAL PROJECTS DRAFT 2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
CPES Facilit aintin $10,000
CPES Kitchen air conditionin $15,000
HES Roof Re lacement Section 6A $130,000
CWSMS Roof re lacement Section 3A $225,000
CWSMS Roof re lacement Sections 1 B & 1 C $375,000
CRHS Auxilia mnasium $1,500,000
TRANS Activit buses 4 EA $308,000
DISTRICT Technolo U rades $650,000
TOTAL $3,21.3,000
9/19/2007 2011-2012 Page 6
YEAR 6 CAPITAL PROJECTS DRAFT2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
CES Re lace all mini-blinds $25,000
GAGES Re lace sinks/cabinets Art Room $6,000
GAGES Install bounds fence on la round $20,000
GHMS Concession stand $15,000
CRHS Landsca in and erosion control $10,000
CRHS Locker room aintin $3,000
CRHS Tennis courts refurbishment $10,000
OHS Re lace fencin at FB ractice field $20,000
OHS Resurface all arkin areas and roads $100,000
OHS Replace fencing near FB stadium entrance $10,000
OHS Roof replacement (Sections E, I, & G) $150,000
OHS Soccer field press box $20,000
OHS Replace lockers in Field House $10,000
OHS Replace track hurdles $1.2,000
TRANS Re lace erimeter fencin $20,000
TRANS Re rade/level bus arkin lot $25,000
DISTRICT Asbestos abatement e ui ment $1.,000
DISTRICT TurF maintenance a ui ment ~ $25,000
DISTRICT Duct cleanin $80,000
DISTRICT D -write board re lacement $10,000
DISTRICT Fire Extin uishers $8,000
DISTRICT Emer enc Li hts $10,000
DISTRICT Weed Control S stem $40,000
DISTRICT Directional Si ns $24,500
DISTRICT Door Locks $23,700
DISTRICT Furniture $117,000
DISTRICT Confined S ace Detector $5,500
DISTRICT Sound Level Monitor $1,200
DISTRICT HVAC Com uters $10,000
DISTRICT Tools / E ui ment $10,000
DISTRICT Emer enc Mobile Stora e Unit $10,000
DISTRICT Emer enc radios PES, GHMS, PAAS, Trans $21,000
DISTRICT Technolo U rodds $650,000
TOTAL $1,502,900
9/19/2007 2012-2013 Page 7
YEAR 7 CAPITAL PROJECTS DRAFT2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
CPES Chilled water i e insulation $15,000
CPES Door re lacement G m & hallwa s $20,000
ECES Re lace doors Kitchen & Cafeteria $20,000
PES H draulic lift $12,000
ALSMS H draulic lift $12,000
CRHS Install hallwa securit ates $10,000
TRANS Renovate sho $225,000
DISTRICT Vacuum Cleaners 15 EA $12;000
DISTRICT Handheld Radios $3,000
DISTRICT Technolo U rades $650,000
TOTAL $979,000
9/19/2007 2013-2014 Page 8
YEAR 8 CAPITAL PROJECTS DRAFT2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
CPES Lower la round shelter $15,000
CES Drains a im rovements $10,000
GABES Walkwa Between GAGES and CRHS $16,000
ALSMS G m bleachers motorization $25,000
ALSMS Football field irri ation s stem $20,000
ALSMS Erosion control $15,000
CWSMS H draulic lift $12,000
GHMS Hydraulic lift $12,000
GHMS Ticket booth $500
GHMS Flag poles (Athletic fields) $3,000
CRHS Hydraulic lift $12,000
CRHS Soccer and lacrosse field $200,000
CRHS Field House $500,000
OHS Replace cafeteria doors $12,000
OHS Hydraulic lift $12,000
OHS Softball field irrigation system $5,000
OHS Wrestling mat $8,000
DISTRICT H draulic Lift $13,000
DISTRICT Technolo U rades $650,000
TOTAL $1,540,500
9/19/2007 2014-2015 Page 9
YEAR 9 CAPITAL PROJECTS DRAFT 2
LOCATION PROJECT DESCRIPTION ESTIMATED COST
CPES Buildin Renovations $800,000
CRHS Buildin Renovations $500,000
CES Buildin Renovations $800,000
CWS Buildin Renovations $85,000
ECES Buildin Renovations $800,000
GABES Buildin Renovations $800,000
OHS Buildin Renovations ~ $890,000
DISTRICT Athletic Facilit U rades $500,000
DISTRICT Technolo U rades $650,000
TOTAL $5,825,000
9/19/2007 2015-2016 Page 10