HomeMy WebLinkAboutAgenda - 09-20-2007-1a~~~~~~~:
C)Wi~-S,A ORANGE WATER AND SEti~VER AUTI-€ORITY
Quality Service Since 1977
September 7, 2007
Ms. Laura Blackmon
Orange County Manager
Post Office Box 8181
Hillsborough, North Carolina 27278
SUBJECT: BRIEF REVIEW OF PAST DISCUSSIONS WITH CHATHAM
COUNTY REGARDING POTENTiAT, JOINT USE OF THE
JORDAN LAKE WATER SUPPLY
Background
During the August 14, 2007 meeting that Orange County arranged with officials from
Carrboro, Chapel Hill, and Chatham County, OWASA was asked to provide a summary
of past discussions that have taken place about our possible joint use with Chatham
County of the Jordan Lake water supply. This memorandiun provides a brief review of
those discussions along with OWASA's current expectations regarding the Jordan Lalce
water supply. We understand that this information will be presented at the September 20,
2007 Orange County Asseimbly of Governments meeting and perhaps at a follow-up
meeting with Chatham County scheduled for October 30.
Previous Discussions
The t"irst round of Jordan Lake water supply storage allocations by the NC
Enviromnental Management Commission occurred in 1988. Orange County,
Hillsborough, Orange-Alamance Water System, Inc., Chatham County, and.
OWASA jointl~pplied for individual allocations at that time. OWASA
coordinated this joint effort with the other entities, all of whom subsequently
received storage allocations.
Also in 1988, OWASA and Chatham County initiated negotiations to share treated
drinking water through a wholesale transfer agreement, but these efforts were never
finalized.
• OWASA participated in joint staff discussions during the late 1990s about the
potential for interlocal collaboration in developing a western water supply intake
and potential treatment facilities at Jordan Lake. Other participants included staff
40o Jones Ferry Road Equal Opportunity Employer Voice (919) 968-4421
Pd Box 366 Printed on Recycled Paper FAX (919) 968-4464
Carrboro, NC 27510-0366 www.owasa.org
Joint Use of Jordan Lake Water Supply
September 7, 2007
Page 2
from Chatham County, Durham, and the NC Division of Water Resources. UNC
Institute of Government and Triangle J Council of Governments staff helped.
facilitate those discussions, which included the possibility of establishing a Jordan
Lake water authority as the lead agency for developing additional water supply
facilities. Neither the discussions nor the proposal to create a special authority were
pursued.
In 2001 the Towns of Carrboro, Chapel Hill, Hillsborough, Orange County, and
OWASA entered into a Water and Sewer Management, Planning and Boundary
Agreement, which includes a requirement that any non-emergency water transfers
from OWASA to locations outside of its designated "long-term interest area" (e.g.,
to Chatham County) must first be approved by the elected boards of Carrboro,
Chapel Hill, and Orange County.
4WASA-Owned Property at Jordan Lake and Expected Use of Storage Allocation
OWASA awns approximately 125 acres of land adjacent to US Army Corps of Engineers
property south of Highway G4 on the western side of Jordan Lake in the Pea Ridge -
Seaforth Roads vicinity (please see attached map). The property is close to the preferred
site of a western water supply intake recommended in a 1991 OWASA-commissioned
engineering report. The Corps of Engineers has indicated that this would. likely be the
only other intake site allowed at Jordan Lake in addition to the Town of Ca1y's existing
site north of Highway 64 (also shown on map). Although OWASA owns property near
the lake, neither we nor any other entity own or have a claim to the intake location within
the lake itself.
OWASA pays an annual fee to reserve a Level II allocation for 5 percent of Jordan
Lake's water supply storage capacity. This is expected to yield an average of 5 million
gallons of water per day. Because we regard our allocation as insurance against
unforeseen problems with our existing supply sources, it is unlikely that OWASA would
commit to snaking its allocation available to another utility on anon-interruptible basis.
Jordan Lake represents a secondary supply option that could supplement oiu- long-term
needs if current plans for water conservation and reuse do not provide the expected
savings and future demand reductions. It is unlikely that OWASA will develop any
Jordan Lake facilities on our own, due to the high capital costs (more than $40 million for
a water intake, pumping, and transmission pipeline) and the relatively short duration (~15
years) for which we currently anticipate a potential need for additional water. Our use of
Jordan Lake will likely be snore feasible by collaborating with other entities, such as
Chatham County, Durham, and/or Cary, in a joint venture or partnership of some kind.
A number of treated water interconnections (pipelines) currently exist among the water
utilities in our vicinity. In most cases, treated water can be moved in either direction
between these systems, although the actual transfer capacity depends on pipe and pump
Joint Use of Jordan Lake Water Supply
September 7, 2007
Page 3
sizes, topographic elevation, and other factors. Water quality considerations, especially
the type of disinfection process used by different entities (chloramines vs. free chlorine),
may preclude the ability to transfer water between certain systems. Finished. water
pipeline interconnections exist between the following drinking water systems:
v OWASA-Chatham County
~ OWASA-Hillsborough
r OWASA-Durham
- Chatham County-Durham
~ Chatham County-Pittsboro
v Durham-Hillsborough
Durham-Cary
A special study is underway at L7NC to examine the extent to which water transfers
through these existing or upgraded facilities may be less costly than building additional
supply capacity to meet the projected needs of OWASA, Cary, and Durham. This
project, which is jointly fimded by those three entities and the NC Urban Water
Consortium, will also consider how Jordan Lake may be most effectively used among
thase three interconnected water providers and possibly by others, such as Chatham
County.
Consistent with the principles of the Water and Sewer Management, Planning arzd
Boundary Agreement noted above, OWASA recognizes that the eventual use (and
protection) of Jordan Lake will have planning and growth management implications
beyond our local boundaries. We understand that decisions regarding if, when, and how
OWASA eventually uses Jordan Lake will be determined as part of a larger interlocal
discussion and consensus.
We look forward to discussing these issues further at the September 20, 2007 Assembly
of Governments meeting.
Very truly yours,
Ed Kerwin
Executive Director
Attachment
c: Mr. Roger Stancil, Chapel Hill Town Manager (w/attaclnnents)
Mr. Steven Stuart, Carrboro Town Manager (w/attachments)
OWASA Board of Directors (w/attachments)
Mason Crum, OWASA Director of Engineering and Planning (w/attachments)
~~ Selected Water Supply Facilities in the Jordan Lake Vicinity ~v
~ r i
s ,
-----._.._ ~f ~ r `...-. f ~ t
ORANGE DURHAM ~ r
r~ ,.-'` ~ --,~`.= ~i CHATHAM
~.J ~ ,.l y
~ ,~ ~,~ ~,
r,~ ~~ ~ ~ f.~.
i '~
r ~ C.I ~,•
-, ~ `.' .
C
~ -.,._.
.~'
..
r ' 'l
~` {4 ..~ .
/ ~~ ~'~ E~
~s._~ --•~----,~
1 ~. {
1~ / }
' 501 -~ ~ ~ I L./,~ _~.
~,, ,
y-' ,,_.
..
•. /
~,` _ ~ `
_.
`.~"
~-- .._._-~' ~-- ~~`-~---~ Arm Cor s of
` _ .____ Y p ~: ~`~
•~ r., ~ ~:
` r: .
~`~'' ~- -- ~ -~ ,j' Engineers Land ~ ~ o° ~_
rte.
Pittsboro WTI' `-~`~ ~`'~ - ~""~~
_ A -~ ~;'.
'~- ~-.-- ' ~;~ r- _ __.- ,.
,:.~` ~~
~~ 1--~--''fy :Cary Water Intake
~~ / .
'. ,:
~ ~ ` ~~`~~~~~~~~ ~ Chatham Gou y
~ ~ , .:.. .
1
~ WTP ~_
~~, ,-, it ~.• JO.~'C~dI2 ,..
~.
Pittsboro ~ ~,~ ~ ~ ~. ~ ~..
~~,~~ Lake . ~ ; _ ~
:::
. ,.
., ~ ,
~,~~~` ..''~,~,~-- OWASA Property .
_ ~~~•
~. ~ -..r
~~...~~ - Recommended Western
,..•
'''...
.,,.. ~ Intake Location
15 ~.~;,~.,~~:.:;
.,:;
501
. ,. _ ,: ~ -
... ,
{ ~ ~,
ra n e Wate r a n d .~,r. ~~ ::r~ ~~~~~~~~~:::.
::...
Sealer Auth®rity N
.. . _A
~ ~ ~ ~~
.: :..
0 1 '~~ _
..; .
...
.:.
:.. •:
Miles Date: 8/10/2007 _~- J ,/
...,..
.•. f