Loading...
HomeMy WebLinkAboutAgenda - 11-05-2015 - 6-e - Unified Development Ordinance Amendment Outline and Schedule – Engineering Standards for Development 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 5, 2015 Action Agenda Item No. 6-e SUBJECT: Unified Development Ordinance Amendment Outline and Schedule — Engineering Standards for Development DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Amendment Outline Form for Craig Benedict, Planning Director, Engineering Standards for 919-245-2592 Development Howard Fleming, Jr., Engineering, Erosion Control/Stormwater Supervisor, 919-245-2586 Kevin Lindley, Staff Engineer 919-245-2583 PURPOSE: To consider and approve process components and schedule for an upcoming government-initiated amendment to the Unified Development Ordinance (UDO) incorporating engineering standards for property development. BACKGROUND: The County has long had land designated for economic development on its future land use map. Until recently, these areas have not had ready access to water and sewer facilities to serve any potential development. Now that several water and sewer projects have been completed to extend primary water and sewer services into these areas, they are poised for development. The addition to the UDO of clear engineering standards governing parking surface design and design of onsite stormwater conveyance systems will ensure that all new development will be held to a consistent, uniform performance standard. The County's existing standards need to be reviewed and updated in order to ensure they are clear and consistent and to ensure all applications for development are being processed uniformly with regards to engineering design of site improvements. This would help ensure quality development with enduring infrastructure to maintain property value, safety and aesthetics. FINANCIAL IMPACT: See Financial Impact included in Section C.3 of the attached Amendment Outline form. SOCIAL JUSTICE IMPACT: The following social justice goal is applicable to this agenda item. • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES 2 The fair treatment and meaningful involvement of people of all races, cultures, incomes and educational levels with respect to the development and enforcement of environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental and commercial operations or policies. RECOMMENDATION(S): The Manager recommends the Board approve the attached Amendment Outline and direct staff to proceed accordingly. 3 COMPREHENSIVE PLAN / FUTURE LAND USE MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENT OUTLINE UDO / Zoning-2015-10 Engineering Standards for Development A. AMENDMENT TYPE Map Amendments ❑ Future Land Use Map: From: To: ❑ Zoning Map: From To: ❑ Other: Text Amendments ❑ Comprehensive Plan Text- Section(s)- ❑ UDO Text: ❑UDO General Text Changes ❑UDO Development Standards ❑UDO Development Approval Processes Section(s): 1. 6.9.10 Off-Street Parking Design Standards 2. 6.9.14 Off-Street Loading Areas 3. 6.14.6 Review Criteria [Stormwater] 4. Article 10: Definitions ❑ Other: B. RATIONALE 1. Purpose/Mission In accordance with the provisions of Section 2.8 Zoning Atlas and Unified Development Ordinance Amendments of the UDO, the Planning Director has 1 4 initiated text amendment(s) to add engineering standards for property development to provide a uniform, consistent set of development criteria for non-residential developments within the County's planning jurisdiction. 2. Analysis As required under Section 2.8.5 of the UDO, the Planning Director is required to: `cause an analysis to be made of the application and, based upon that analysis, prepare a recommendation for consideration by the Planning Board and the Board of County Commissioners'. The County has long had land designated for economic development on its future land use map. Until recently, these areas have not had ready access to water and sewer facilities to serve any potential development. Now that several water and sewer projects have been completed to extend primary water and sewer services into these areas, they are poised for development. Currently, there is limited guidance for engineering design of infrastructure in the UDO. All review of development infrastructure, such as parking lot surface improvements and stormwater systems has been on a case-by-case basis using engineering design principles. The developer must make assumptions of what will be acceptable. This can increase staff review time and the developer's costs, as appropriate development criteria are negotiated for each project. The addition of engineering standards governing parking surface design and design of onsite stormwater conveyance systems will ensure that all new development will be held to a consistent, uniform performance standard thereby reducing the `guess work' plaguing the existing process. Having these standards will also help the Department avoid any perception of capricious or arbitrary review. Our goal is to develop site design standards providing developers with clear parameters, rather than assumptions of what may be required. The County's existing standards need to be reviewed and updated in order to ensure they are clear and consistent and to ensure all applications for development are being processed uniformly with regards to engineering design of site improvements. Additional analysis may be part of the quarterly public hearing materials. 3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) Principle 2. Encouraging Sustainable Growth and Development Economic Development Overarching Goal: Viable and sustainable economic development that contributes to both property and sales tax revenues, and enhances high-quality employment opportunities for County residents. Land Use Goal 4: Land development regulations, guidelines, techniques and/or incentives that promote the integrated achievement of all Comprehensive Plan goals. Services and Community Facilities Overarching Goal: Growth consistent with the provision of adequate and sustainable County services and facilities while managing the impacts upon the environmental infrastructure and effectively protecting the County's natural and cultural resources. 2 5 Services and Community Facilities Goal 5: Efficient and effective drainage stormwater, floodplain management, and erosion control systems. 4. New Statutes and Rules N/A_ C. PROCESS 1. TIMEFRAME/MILESTONES/DEADLINES a. BOCC Authorization to Proceed November 5, 2015 b. Quarterly Public Hearing May 2016 (NOTE: the exact date will be determined when the BOCC adopts its 2016 meeting calendar) c. BOCC Updates/Checkpoints November 5, 2015 —Approval of UDO Amendment Outline Form February 2016 and March 2016(if necessary) — Planning Board Ordinance Review Committee (ORC) (BOCC receives agenda materials) May 2016 — Quarterly Public Hearing September 2016 — Receive Planning Board Recommendation d. Other N/A 2. PUBLIC INVOLVEMENT PROGRAM Mission/Scope: Public Hearing process consistent with NC State Statutes and Orange County ordinance requirements a. Planning Board Review: February 2016 and March 2016(if necessary) - Planning Board Ordinance Review Committee (ORC July 2016 — Recommendation b. Advisory Boards: Economic Development Advisory Board — March 2015 3 6 c. Local Government Review: Staff will transmit copies of the proposed text amendments to our planning partners in the JPA, the Town of Hillsborough, the City of Durham and the City of Mebane NC Department of Transportation Orange County Emergency Management Orange County Building Inspections d. Notice Requirements Legal advertisement published in accordance with the provisions of the UDO. e. Outreach: ❑ General Public: ❑ Small Area Plan Workgroup: ® Other: Local Developers and/or Industry Groups representing developers — specifics to be determined 3. FISCAL IMPACT Consideration and approval will not create the need for additional funding for the provision of County services. Costs for the required legal advertisement will be paid from FY2015-16 Departmental funds budgeted for this purpose. Existing Planning staff included in the Departmental staffing budget will accomplish the work required to process this amendment. Implementation of engineering development standards will require engineering staff plan review and subsequent field inspection of development projects, which will take additional staff time and costs. This may require an increase in review fee and/or development of an inspection fee (or re-inspection fee) in order to cover the cost of additional staff time. Additional staff may be necessary to provide adequate, timely review and field inspections for development projects. D. AMENDMENT IMPLICATIONS Engineering standards, once implemented, will have to be met by all new development. E. SPECIFIC AMENDMENT LANGUAGE Will be available as part of the quarterly public hearing meeting materials. 4 7 Primary Staff Contact: Craig Benedict Planning and Inspections 919-245-2592 cbenedict @orangecountync.gov 5