DATE: November 13, 2007
TO: Laura Blackmon, County Manager
FROM: Wilbert McAdoo, Public Works Director
RE: 10/23/2007 BOCC Meeting Follow-Up Action
On October 23, 2007 the following information request were made regarding
Whiffed Human Services Center Renovations.
10/23/2007 Provide a memo to the Manager on problem that have
occurred at the Whiffed Complex after its renovation
was completed in 2002. Include information on the
Following items:
A. The Library's meeting room's insufficient weight capacity
Response:
Bilger Engineering conducted a structural analysis of the A and B building. A
number of corrections were made to the building structures. Building A the
analysis revealed first floor offices and library conference room existing structure
beams were too small for modern day office loads or crowded conference rooms.
Management made the decision to delay making structural improvements due to
available funding. Bilger Engineering, stated it is ok to continue to use the
conference room but limit the occupancy to 20 people. Additionally Bilger states it
is ok to use the offices as long as file cabinets and bookcases are placed along
the perimeter. Orange County Inspections has posted the occupancy level of the
Library conference room at 20-person occupancy. Once a decision is made on
future use of the facility it would be prudent to consider improving the structural
integrity of the building. There is no imminent danger of the structure failing.
B. Chiller noise irritating nearby residents
Response:
Following installation of the new chiller neighbors surrounding the REWHS
building neighbors complained about the noise. Orange County staff meet with
neighbors and took corrective action to include installation on sound attenuation
blankets on the compressors and sound blankets on two walls of the chiller
enclosure. E.Inc. conducted five Industrial Hygiene Noise Samplings from
November 2003 to June 2005 around the Whitted building. All five samplings
results indicated that the chiller noise at no time during the testing emitted noise
above the Orange County Noise Ordinance beyond the property border. While
we have and can take additional measures to reduce the chiller noise we will not
be able to eliminate the noise entirely. We have not received complaints from the
neighbors since late 2005.
C. Leaking doorways
Response: The assumption is that leaking doorways refer to the front entrance
doors to A building. The front landing area experienced deterioration and allowed
water infiltration in the wall and doors. The replacement of the Library landing
corrected this problem.
Although some caulking and sealing work was performed when the historic wood
door surround at the entrance to the Library was painted during the HVAC
system replacement project, all sources of water infiltration were not discovered
at this time. Years of hidden water infiltration between the slab and the building
resulted in corrosion of structural steel components of the landing, requiring
rebuilding of the landing in 2005/06, once the extent of damage became known.
D. Crumbling vestibules
Response: The assumption again is that reference is to the front landing
entrance to the Library.
The above response to C addresses the issue of replacement of the Library
landing.
E. Elevator malfunction
During the past two months the elevator in the connecting corridor at Whiffed
began to experience frequent failure. Upon investigation it was determined that a
relay in the control board had failed. The elevator has been in service since the
replacement of the relay.
The refurbishment /modernization of the elevator approved by the Board at their
October 23, 2007 meeting primarily will include replacement'of operating controls
and components of the elevator, which will increase reliability. These controls
include relays that tell the car when to slow down, when to open and close doors,
etc. Some additional accessibility improvements are also included as part of the
work to be completed. The car, hoist way, etc. are still considered to be in good
operating condition and are not in need of replacement at this time.
F. In addition, provide information on the contractors that
performed the work and whether under funding of the
renovations might have caused some of these problems.
Response:
Environmental Air Systems of Greensboro N.C. was the lead contractor for the
Whiffed Renovation project and used sub-contractors for the different trade work
as required.
The contractors who performed work during and following the HVAC system
replacement were professional and completed the work for which they were
contracted in a professional manner. The project began as a HVAC system
replacement and evolved into a major renovation project, to address building
code, life safety issues, structural issues and other hidden conditions. The
primary challenge faced during this project was due to hidden conditions that
came to light once acoustic file ceilings, light fixtures and ductwork were
removed. The biggest challenges we faced with the renovation related to the
age of the building, prior renovations and modifications that created structural
issues and the issue of trying to bring a 70-year-old building into compliance with
current codes.
The board approved additional funding of $475,000 for the Whined Human
Services Renovation project on October 1, 2003 to address substantial change
orders required to address the issues of building code, life safety, structural
repairs, fire alarm system installation, bat guano eradication and asbestos
abatement.
Funding was a consideration and choices had to be made about which
improvements to include and which improvements could be delayed.
Should you have questions or need additional information, please contact me.
Wilbert McAdoo.