Loading...
HomeMy WebLinkAboutAgenda - 09-15-2015 - 6f 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 15, 2015 Action Agenda Item No. 6-f SUBJECT: North Buckhorn Sewer— Transfer of Ownership to City of Mebane DEPARTMENT: Planning, Manager's Office, PUBLIC HEARING: (Y/N) No Attorney's Office ATTACHMENT(S): INFORMATION CONTACT: 1) System Map Craig Benedict, Planning, (919) 245- 2) Utility Dedication Form 2592 3) Letter from EPA Grant Administration Bonnie Hammersley, County Manager, Office (919) 245-2300 4) Successor in Interest Agreement from John Roberts, Attorney's Office, (919) EPA 245-2318 Kevin Lindley, Planning, (919) 245-2583 PURPOSE: To consider transferring ownership of the North Buckhorn sewer utility infrastructure to the City of Mebane. BACKGROUND: The County has a Utility Service Agreement (signed in 2004, expanded in 2012) with Mebane for provision of water and sewer utility service in the area east of the city and along the interstate and Highway 70 corridor. In the agreement, Orange County agrees to turn over ownership and operation of any utility infrastructure built in the agreement's designated service area to the City of Mebane. In this sense, the County is acting as a developer of this designated growth area, building a framework of water and sewer infrastructure from which future development can grow. The North Buckhorn Sewer project was completed in Spring of 2013 as part of a larger construction project which included the expansion of the Efland Sewer System. A map of the North Buckhorn portion of the project is shown in Attachment 1. Though the North Buckhorn and Efland Sewer expansions were geographically separated, they were bid as a single project to capitalize on economies of scale for the construction contractor. The project was partially funded by two EPA grants, which is the reason the transfer of ownership has taken so long after completion to come before the BOCC. As part of the application for the grants, the County agreed to several assurances related to the long term maintenance and operation of the sewer system. In order to transfer the system to the City of Mebane, Orange County had to request permission from the EPA Grant Administration staff. When County staff approached EPA staff about the transfer, the EPA staff had never encountered this situation before. EPA had no objections to the transfer, but had to develop a document that transferred the responsibility for the operation and maintenance of the North Buckhorn sewer system to the new owner. The form the EPA developed is called a 2 "Successor in Interest" agreement (Attachment 4). This form has to be signed by both Orange County and the City of Mebane, and then returned to the EPA Grant Administration Office in Atlanta for their review and signature. In addition, the EPA needs documentation of the ownership transfer of the infrastructure to the City of Mebane. The water and sewer infrastructure installed by the County as part of this project and the associated easements are the property of the County. This transfer of property needs to be approved by the BOCC. Staff has developed a utility infrastructure dedication form for this transfer (Attachment 2). Once the ownership transfer has been approved, staff will forward the Successors in Interest form and the Utility Dedication form to the City of Mebane for signature. The City will then forward the signed documents to the EPA. Once EPA reviews and signs the documents, the County and the City of Mebane will receive signed copies back for each jurisdictions' records. FINANCIAL IMPACT: There is no financial impact associated with approving the transfer of utility infrastructure ownership to the City of Mebane. SOCIAL JUSTICE IMPACT: There is no Orange County Social Justice Goal impact associated with this item. RECOMMENDATION(S): The Manager recommends that the Board: 1. Authorize the Manager to sign the Successor in Interest agreement on behalf of the County; 2. Approve the transfer of ownership of the utility infrastructure and easements to the City of Mebane and authorize the Chair to sign the Dedication Form (Attachment 2); and 3. Authorize staff to pursue any further action necessary to complete the transfer of ownership to the City of Mebane, per the 2012 Mebane-Orange County Utility Service Agreement. Northern Buckhorn Sewer Extension Project 3 Attachment 1 c ;r- #15 # O #16 #03 9834295681 9834296682 #17 #01 #02 9834295428 9834393400 9834396240 E WASHINGTON ST 185 S 140 W �98 34296426 9834298424 9834398472 185N140E 9834295368 9834296371 983439i134 8834397450 / /9834395473 9834493127 9834297179 98343905 9834284926 1 /9834399027 #0 9834387749/ 9834288117 /9", n 9834481931 / 9834385767 9834384788. _ 9834283783 9834484761 9834288117 _ 9834386683 9834481752 /v i 9834287573 9834285600 9834288420 /9834380583 8834381529 9834387506 0408 }9834289404'983438�/� /I��Y�— 9834386462 9834480414 9834287311 9834288229 9834380460 - 834289346 9834388314 9834381324 9834382913 9834288229 f i n/ 9834289283 /9834287311 9834389610 9834286104 9834275917 #02 #03 185S140W 185S140W 185N140E T157 Legend 0 100 200 300 400 500 600 Disclaimer: The sewer lines and manholes as shown Feet on this map are meant to show generally where they will be installed. For more detailed information please Orange County Planning and Inspections Department visit the Orange County Planning Office,located at 0 Manholes North Buckhorn parcels GIS Map Prepared by Miriam Coleman,February 11,2011 131 W. Margaret Ln.,to view the actual proposed construction drawings. Projection: North Carolina State Plane(feet) Sewer lines Service Connections (stubouts) Datum: NorthAmerican 1983 4 Attachment 2 Water and Sewer Utility Dedication Form City of Mebane City of Mebane 106 E. Washington St. Mebane, NC 27302 Re: North Buckhorn Sewer Utilities Dear Sirs: Orange County, North Carolina, the current owner of the public sanitary sewer line, does hereby dedicate and convey unto the City of Mebane, its successors and assigns, all of its rights, title, easements and interest in and to the water and sewer lines constructed in accordance with plans titled "Buckhorn Sanitary Sewer Improvements North of I-85" prepared by Coulter Jewell Thames and certified by McGill Associates, dated July 15, 2013. IN WITNESS WHEREOF, this letter is executed by the duly authorized officers of Orange County, North Carolina and its corporate seal to be hereunto affixed, on the day, month of in the year ATTEST: BY: Donna S. Baker Earl McKee Clerk to the Board of County Chair, Board of County Commissioners Commissioners NORTH CAROLINA ORANGE COUNTY I, a Notary Public, hereby certify that personally appeared before me this day and acknowledged that she is the Clerk to the Board of County Commissioners for Orange County, NC, a government entity, and that by authority duly given as the act of the Board of County Commissioners, the foregoing instrument was signed in its name by its Chair, sealed with its corporate seal, and attested as its Clerk. Signature of Notary Public My Commission Expires: lAttachment 3 � 5 ip;G UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 '0 Us 0 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, 1 3 03038960 JUN 0 3 2m Ms. Bonnie Hammersley 200 South Cameron Street P.O. Box 8181 Hillsborough, North Carolina 27278 SUBJECT: Transfer of Grant Funded Real Property Dear Ms. Hammersley. Enclosed are three copies of the Successor in Interest Agreement required in the transfer of ownership of facilities funded under the EPA grant agreement XP95456411 from Orange County(County) to the City of Mebane. Please have all three copies executed by your authorized representative and forward all three copies to the City of Mebane (City). Please request that the authorized contact for the City execute the forms and return the to the Grants and Infrastructure Section, U.S. Environmental Protection Agency, 61 Forsyth Street SW, Atlanta, Georgia 30303. Also, enclosed are assurances and certifications that need to be completed by the director of the new owner and returned to the EPA, The County should also provide a copy of the deed of transfer(i.e., quitclaim deed or other) noting that the EPA has an interest in the property and the property is thus encumbered. The Successor in Interest Agreements will be executed by the Grants Management Officer, who also serves as the Award Official. This office will return copies of the executed agreement for your files. Please remember that the City is bound by the grant agreement to notify the EPA when the property will no longer be used for grant purposes, or should it transfer the property to another entity. If you have any questions, please contact me at (404) 562-9392. Sincerely, Stacey Bouma Chief Grants and Infrastructure Section Enclosures hernet Address(01L)-httpWwww-epa goe RecyckkMecyclaWa-FINnIed wfth Vegetable 09 Based Inks on Rmycled Flaper(MWrnuirn 3011"',Past.consumer) 6 Attachment 4 SUCCESSOR IN INTEREST AGREEMENT BETWEEN ORANGE COUNTY AND THE CITY OF MEBANE This agreement is between Orange County(hereafter County), North Carolina and the City of Mebane (hereafter City), North Carolina, as the result of the County's request to transfer ownership of a portion of EPA-funded infrastructure to the City. The Environmental Protection Agency(EPA), represented by its grant award official, Ms. Dorothy ayfield, awarded a grant agreement, XP-95456411, on 1216/2010 to the County. The performance and payment have been completed and the County has remaining duties and obligations to fulfill. The County assigns, conveys, and transfers to the City the North Buckhom portion of the grant award, including all activities now in the possession of the County. By virtue of this agreement, conveyance and transfer, the City will assume the duties, obligations, and liabilities of the County under this grant that relate to the portion of assets and activities being transferred. The City is in a position to fully perform the duties and obligations as they exist under the grant, and it is consistent with EPA's interest to recognize the City as the successor party to the grant. In consideration of the work completed, the parties agree as follows: 1. The County releases and discharges EPA from all claims, demands, and rights which it may now or may hereafter have in connection with the grant referenced above. 2. The County remains responsible for its grant obligations including recordkeepin , reporting and providing supporting cost documentation where necessary. The City may assume some or all of these responsibilities, however, nothing in this agreement discharges the County from its obligations under the grant or the applicable laws and regulations. . The City assumes responsibility for and will be bound by the terms and conditions of the grant and all laws and regulations applicable to the grant. 4. The City has the managerial and legal capability to assume all responsibilities associated with the ownership of the grant. 5. The City agrees that it is not entitled to any grant funds or other benefits paid to the County from the grant, and the County will have no rights nor make any claims against the City or EPA for grant funds paid to the County prior to this agreement. 7 6. EPA recognizes the City as the County's successor in interest for the North Buckhorn activities under the grant and hold the City responsible for satisfactory completion as though the City were the original party tote grant. For the North Buckhorn portion oft e grant activities, the to "grantee" as used in the grant is deemed to refer tote it rather than the County. The execution oft is Agreement signifies the parties' acceptance oft a terms of this Agreement ENVIRONMENTAL PROTECTION AGENCY By: ....... Title: Award Offi ciaFG rants Manapement Officer ORIGINAL GRANTEE NAME By: ........... Title: .............. NEW OWNER/GRANTEE NAME By: Title-,