Loading...
HomeMy WebLinkAboutAgenda - 12-03-2007-6dORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 3, 2007 Action Agenda Item No. (p SUBJECT: Amendment -Additional Services - to Professional Services Agreement for Design of Northern Human Services Center to Include Work on Septic System DEPARTMENT: County Manager PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Proposal from Coulter Jewel Thames Paul Thames., 919-245-2303 Pam Jones, 919-245-2650 PURPOSE: To consider authorizing a change order for the design work associated with the Northern Park to include completion of the design of the septic system that will support the Park and the adjacent Northern Human Services Center. BACKGROUND: The septic system project at the Northern Human Services Center has been in process for several years, pending property acquisition to expand the system, regulatory approvals from the State and County and completion of the design. Although the County Engineer has prepared a conceptual and process design for the Northern Human Services Center septic system, oversight of the construction of the recently completed Buckhorn sewer and the work toward planning construction of the system that will serve the downtown Efland area have prevented the completion of the specifications and drawings for the Northern Human Services Center system in a timely manner. Since the septic system will support both the Northern Park (the beginning of construction is imminent), as well as expanded usages of the Northern Human Services Center, the need to complete the design construction documents, final permitting and construction of the septic system is critical. Coulter Jewell Thames (no relation to the County Engineer Paul Thames) is designer for the Northern Park Project. The.design work being proposed is consistent with work the firm would normally perform on the park project and it is therefore recommended that the design of the septic system be added as a change order to the existing contract for park design. The specific work that would be included in the change order, as detailed on the attached proposal, is summarized as follows: • Design of Grinder Lift Station • Design of the Effluent Lift Station • Drafting assistance to support the County's design efforts for the remaining portions of the project. a ® Prepare final site plan Assist in the preparation of the project operation & Maintenance manual for the system Coulter Jewell Thames estimated completion time needed for the drafting/design work and submittal for final permit approval is four months, for permit approval is two months, and for bidding and construction is six months. The County will require Coulter Jewell Thames to provide bi-monthly updates regarding the status of this project in order to stay abreast of the progress and to place the County in a position to provide assistance should the project be delayed during the permitting process. FINANCIAL IMPACT: The Board is asked to approve a change order for this work not to exceed $74,500. Approximately $27,000 of that amount is attributable to work on the site plan and the project Operation & Maintenance manual, both of which may be accommodated through the County Engineer's office with assistance from the Environmental Health Division of the Orange County Health Department. The consultant will provide an updated construction cost as part of the work. Project funds from the County's 2004 Net Debt Reduction Bonds fund the construction of the system. Although the work would be accomplished via a change order to the Northern Park Project design contract with Coulter Jewell Thames, the design and construction costs for the system would be charged to the septic system project account. RECOMMENDATION(S): The Manager recommends that the Board approve a change order for additional services in the amount not to exceed $74,500 for the Northern Park design project to include the drafting/design of the new wastewater treatment system as outlined above; and authorize the Chair to sign on behalf of the Board. Cou4ter Jewell Thames. ~~~. .: t 'J '- l.E"{`1'ER OF .aC;REE1~ll/\'T made this 9"' day ol'November. 2007 l"o "Che C?~1:\L'{2 ,GNU LE:1U UES{GNE12 C)ran~e County PQ (30~ 81 fi 1 i-{illsborou<.th. NC 27274 Bv'{'hc E1G{tiEER1NG CONS{.!L"C,~lti'i' Coulter Jewel{ Thames. P..a. 1 I 1 }~Vesf iv4ain Street Durham. North Carolina 2770 For Cir•il Engineering Consulting Serrices To assist Orange County with the design of an on-site sanitary seta-er treatment system to sense die Northern Human Services Center located north of Nilisborou~h nn 1\:C SCi. Ucscription This praposal is fir Civil Engineering sen~ices related to the design and drafting of various components a!''a sanitary server treatment system to serve the Narthern 1-luman Services Ce.nter.yOran~e County has developed a conceptual and process design for the septic system. The major components of the new sewer s}•ste+n includes a grinder sewage lift station and force main to pump sewage co the new treatment. Iacility to be located on the east. side of NC 4h, a sewer treatment facility, an effluent lift statian, and riitrificatian. fields This proposal is for Coulter Jewel( Thames to design specific pumping and piping components of the overall s_ystean and to provide drafting and other assistance for other portions of the project performed by Orange County. Design work performed by Coulter Jewell Thames P.A. will include engineering drawings and technical specifiratians for assembly by Orange County into the Contract Documents. Coulter Jewell Thames will assemble or assist with assembly of the. b'td package and contract documen s as directed by Oran~~e County. tt is understood that this "Agreement" holds harmless Coultec Jewell Thames, P.,a. of any responsibility relative to the process and treatment of water-water being performed by the on-sste sanitary sewer treatment faciiit;~ that ta~ill serve the l~torthern Husnan Services Center. Process design and associated kinetics and the quality oftreatment of the tt~astewater for the Northe+-n Hutrian Services Center will he the sole responsibility of Orange County. SCOPE OF BAS{C SERV{CES: t. Grimier Lift Station i.01 Design of a ne"~ grinder lift station in the rear of the Northern Human Services Center to pump sewa~~e to the east. side of NC 86. It'space does not allo~a~ construction of a new lift. station. design will include caiversion of the existin;~ eflluettt pump tank to the new ~:trindcr lift statian. !.0? {)esign of a new force main to cross l~'C 8G and that will discharge at Che head ol'thr treattent tiuility on the east side at NC' Sti. 1.U3 Desi~~n of yard piping to connect the ne++r,rinder liR station to the existin~~ collection lines and grease. traps that alloys fix t+vo e~isring septic tanks to he converted to grease traps. 1.04 Elecu•ical design for po++'er feed to new lift station and design of thr lift station instrumentation and central systems. \o provisions will he made for emer_ency hack-up poser supply per direction from Orvr~'e ~Otln[y. ?. Effluent Lift Station _'.O1 Design of a new effluent lift station to be. located on the east side al' \C S6 to pump effluent from the end of the treatment facility to the nitrification fields. The effluent lift station will be a triples station with each pump delivering to a separate field. The wet +yell +a~ill he a precast concrete vault. 03 Design of force mains to the nitrification tields.- 3.03 Design of sputter boles at the head of each nitrification field. 2.04 Electrical design Cor power feed to new lift station and design of the lift station instrumentation and control systems. \n provisions will be made for back-up poser supply per direction from Orange County. 3. Drafting Assistance for Other Portions of Project 3.01 Provide drafting assistance to Orange County to support their design efforts for the remaining portions of the Project. Drafting and assistance will be provided to Orange County as directed by the Orange County Engineer. 4 4. .Site Plans 4.01 Prepare site plan drawings and applications for improvements on the east and y+~est sides of ~C 86 for review and approval by the Orange County Planning Department as directed by the Orange County Ertgineer. 4.03 Meet with the Orange County Planning Department as required for review and approval of the site plans. 4.03 Make revisions as required to the site plan drawings. S. Project i1'tanuat 5.01 Assist the Orange County Engineer with the preparation of a project manual by developeing contract documents and assembling bid packages as directed. 6. Additional Services not included in Basic Scope of Services, which can he performed at the direction of the Owner 6.D I Permitting of the septic system. All permitting will be done by the Owner. G.0? Bidding phase services 6.03 Construction obsen~ation, as-boil! dra++~ings, or construction administration. 6.04 Re-designs authorized by the O~yner after plans have Been accepted by the O+cncr. G.OS Re-designs due to unkno+vn or unanticipated field problems including. but not limited to unsuitable soil and undiscorered utilities. (i.06 Lahoratory testin~~ of materials, borings. and specialized geolcr,_*ical studies 6.07 Assistance in negotiating I'or land and eascanent rights. 6.OS Construction stake-out of any site features or details 5 6.09 Permit Application Fzes. Site Plan Pees, Re-review l=ees 6.10 Environmental assessments other thfln 11'etlands Delineation 6.11 \1'etlandsiStream Disturbance Permitting 6.1_' Surveyin<~ The L=ngineerin~z Consultant +vill not be responsible for or have. control or charge of construction means. methods. techniques sequences or procedures or for safety precautions and programs in connection +cith the work. and +vill not be responsible for the contractors failure to cam out the +vork in accordance +vith the contract documents. The Engineering Consultant +vill not. be responsible fir or have control or charge over the acts or omissions of the contractor, subcontractors or any other agents or employees or any other persons performing any of the ++°ork. It~++~ill be the responsibility of the contractor to verif}' the depth and location of all underground utilities prior to starting construction. Should any underground utility not be located as shown on the dra+vings. the contractor will notifi~ the Engineering Consultant immediately before starting any construction for a resolution of the discrepancy. The Engineering Consultant will be saved harmless from any damaged utility during construction +vith the cost tilt repairing any underground utility borne by the contractor. V O~YNER RESPONSIBILITIES: The Qwner+vill appoint a representative through which all communications with the Engineering Consultant +vil) take place. The Engineering Consultant will be allowed access to the site at all times. The Owner ~+•ill . be responsible far payment ol'any and all permit and application fees. The O++~ner will keep the Engineering Consultant apprised of all relevant information that could affect the work. The O+vner will also be responsible for any fees charged by utility locating services. "11te Owner shall also provide the Engineering Consultant with a sealed professional survey of the sites. The Owner will be responsible for providing the Engineering Consultant wvith flo+.v requirements for both pump station sites. The Owner will be responsible for designing all .aspects of the sewer system not outlined to be desi_ned by the Engineering Consultant. The O++-net will be responsible for permitting the sever system through Orange. County Environmental Health and the State. The Owner will be responsible for all bidding, construction administration. and construction observation. All design parameters will be provided by Orange County. COM PENSAT(ON: Compensation for basic services as outlined in the above scope of work will be provided fiir the stipulated sums listed below plus reimbursable expenses as listed in the attached schedule. Additional Services will be perforated as requested according to the hourly rate schedule. 1. Grinder Lift Station -------------------------------------------------- S 15,000.00 2. Bff7uettt Lift Station ------------------------------------------------- $ 17,500.00 3. Drafting Assistance ------------------------------ Hourly, estimate $ 15,000.00 4. Site Plans ------------------------------------------ I-(ourly estimate $ 15,0'00.00 5. Project Manual ----------------------------------- Hourly estimate $ 12.000.00 Total Estimated Cost ----------____________._______________________ $ 74,.100.00 (Includes estimate for hourly services for Items 3, 4, and 5) Standard Hourly Rates Licensed Professional Engineer ...............:................................................................ S 120AU/hour l.iccnscd Professional Landscape Architeci ............................................................. ~ 1?U.00/hour Licensed I'rolessional Consultant ............................................................................. $ 12U.OOlhour Sur+~ev 1=field Crc+v .................................................................................................... $ 120.QUlhour Engineer-in-•Crarniitg ................................................................................................. $ 8.00/hour \utoCAU'1"cchnician ............................................................................................... $ 7U.OO/hour 5ecretm•ial ................................................................................................................. $ ±U.QO/hour Standard Reimbursable Expenses 131uc(trints ~ 1.jO;'sheet >4ylar Sepias 'ti 1 Q.OOrsheet hhl ittlC(thlC`~ tit).It)'pacc I'kttun:! ti l t).OI)-shcct e. ICSI)fCSS l`Ial~ ('nSla L' en\[ _ , 1.tlilf? (~ISTii IICC 1'hllnc ta11t Film and Phtnn Prnce~sing cnsl 131LLING :1ND PA1'~1ENT: shall bill the Owner nutnihly for the perccatta;~e of each chase completed since the previous billing period Rtaltccifulh~ tcndcroJ this t)°i Jay of?lo~cmhcr. ?111'17 For The Consultant COULTER JE~~'ELL TtIA~•1E5, P.A. Daniel ~. Jewell. R[.A. ASLA President Dat for The Owner ORANGE COUNTY Chair Orange County Commissioners .4'I•'1'EST Steven P. [3ailey, PG Vice President Date: .4TT~ST Donna S. Baker. Clerk Date: Daie: