HomeMy WebLinkAboutAgenda - 12-03-2007-4gORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: December 3, 2007
Action Agenda
Item No. _ ~~__~
SUBJECT: Bid Award: Connect "Gateway Campus" to County Computer Network
DEPARTMENT: Information Technology PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
INFORMATION CONTACT:
Todd Jones, 245-2285
David Cannell, 245-2651
PURPOSE: To consider approving a contract with Intellicom, Inc. of Durham, North Carolina to
install data networking fiber between the new "Gateway Campus" and the Orange County
computer network.
BACKGROUND: In 2001 the County installed a fiber network in the downtown area connecting
the County's server room with;
• The Link Center
• Government Services Annex
• Sheriff
• New Court House
• Old Court House
• Court Street Annex
• Clerk Of Court Annex
The County fiber network allows County computers and servers to interconnect, providing staff
access to email, file servers, application servers, the Internet, municipal partners and other
computing resources. With the construction of the three new buildings for the "Gateway
Campus" (the Gateway building, the office building and the Library), the Information
Technologies department needs to provide a networking connection so staff at those facilities
can connect with the County network.
The Purchasing and the Information Technologies Department solicited bids from qualified
vendors to perform the interconnection work. The requirements for this work include:
• All easement and right of way negotiations with the North Carolina Department of
Transportation (NCDOT) private and public utilities
• Installation of an NCDOT approved 4" metal conduit pipe underneath Churton Street,
County properties and other roadways for the full length of the interconnection.
• Furnishing and installation of 72 strands of fiber optic cabling to accommodate current
and future data connectivity needs between the Purchasing Building and the Gateway
Center
• Termination of fiber optic strands in the Gateway building and the current Courthouse,
which in turn connects with the County data center. (Conduit has been placed by
Telesis on the west side of Churton Street)
When the network was originally installed in 2001, extra conduit was run to each building with a
"pull-string" running through the conduit, to allow future fiber strands and/or wiring to be installed
in the conduit with minimal cost. This project will utilize the spare conduit that runs to the New
Courthouse. Two firms submitted bids. Intellicom Inc. of Durham North Carolina submitted the
lowest bid at a cost of $40,780.
• Intellicom, Inc. -- $40,780
• Integrated Communication Services, Inc. -- $46,175
As the County's network has grown in speed and complexity, Information Technologies has
arrived at a model for cost effectively managing network expansion. In this model, the County
invests Capital funds to install, own and manage short distance interconnections (less than a
quarter mile) between facilities, using buried fiber optic cables. For longer distances, the County
leases fiber optic cable from private providers. This hybrid model ensures that the County can
achieve connectivity through capital investment in the shorter interconnections and operating
budget expenditures for longer connections. This proposed fiber installation is consistent with
that model
If the County were to lease fiber circuits to achieve this same connectivity, the costs would be
$18,000 a year for the additional circuit needed to achieve this, thus yielding a payback of some
28 months for the contract option. Additionally, if the County proceeds with its plan to relocate
the County data center to the office building, the leased fiber alternative would require two
additional circuits at $36,000 a year, yielding a payback of some 14 months for the contract
option.
The Information Technologies Advisory Committee discussed this proposal at its October
meeting and unanimously endorsed the plan of engaging a contractor to perform the work, as
specified.
FINANCIAL IMPACT: Total cost for this action, if approved by the Board, would be $40,780.
Sufficient funds were included in the 2007-2008 CIP.
RECOMMENDATION (S): The Manager recommends that the Board authorize the Purchasing
Director to issue a purchase order to Intellicom, Inc. in the amount of $40,780.