Loading...
HomeMy WebLinkAboutAgenda - 11-19-2007-3ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 19, 2007 Action Agenda Item No.j SUBJECT: Economic Development Districts Orange County Zoning Ordinance Section 6.29 DEPARTMENT: Planning and Inspection PUBLIC HEARING: (Y/N) No De artment p ATTACHMENT(S): INFORMATION CONTACT: 1) PowerPoint Craig Benedict, Planning Director, 245-2592 Willie Best, Interim Economic Development Director, 245-2308 PURPOSE: To discuss possible amendments to the Economic Development District Manual and add performance criteria for retail establishments and other uses, including an amended review and approval process. In addition, a new threshold categorization classification of low- intensity non-residential use is possible. BACKGROUND: Economic Development District (EDD) land use designations were created in 1994. Subsequently, Orange County amended the Zoning Ordinance Article 6.29 to include `The Orange County Economic Development Districts Design Manual'. This document sets forth the description and intent of three economic development zones; ^ I-85 Buckhorn Road, ^ I-40/Old NC 86 (now known as the Hillsborough Area EDD) and the ^ I-85/US Hwy 70 (now known as Eno Township EDD) SMALL AREA PLAN AND INFRASTRUCTURE ACTIVITY These areas are in varying degree of planning and infrastructure research, analysis and Small Area Plan Implementation. Portions of these areas have received or are in the process of receiving water and sewer infrastructure and therefore additional planning is underway to ensure compatible uses and a pattern of development that will support existing uses as well as future uses. Other planning efforts regarding these areas are the Efland-Mebane Small Area Plan Implementation Focus Group, Waterstone Area Planned Development and Eno EDD Task Force. REEVALUATION OF PERMITTED USES, PROCESSES, AND STANDARDS The manual and table employs different sets of approval processes, i.e. administrative, Class A or B Special Use Permit (SUP) or Planned Development (PD) rezoning. Although, this is a classic zoning mechanism that can be effective, other methods can be used to promote compatibility. In fact, the two other EDD zones used other methods such as placing compatible uses in a prescriptive large zone (either Primary or Secondary EDD) so the potentially conflicting land uses of retail and light industrial or residential would not occur. 2 Another method uses heightened performance standards such as is noted in the Design Manual to create better access, appropriate buffers and landscaping, and master planning to manage the patterns of development. Also, the scale and/or employment impact of a project can be considered. The ranges of uses are still generally allowed, but the process type promotes a certain generalized use category located in a particular zone. Since these different EDD zone types are being suggested to be intermixed, there is a different and higher level of performance standards and procedural scrutiny that is involved. A PowerPoint presentation will be provided at the meeting. FINANCIAL IMPACT: Existing planning staff will support the writing and implementation of the proposed ordinance. RECOMMENDATION(S): The Manager recommends that the Board: 1) Receive the presentation and provide comments and direction to staff; 2) Refer to Economic Development Commission and Planning Board for their participation in ordinance development; and 3) Direct staff to prepare amendments for the February 25, 2008 Quarterly Public Hearing. ---. - _ Economic Development Districts (EDD) Possible Amendments to Zoning Code Section 6.29 EDD Design Manual I. EDD Intent - (By Area Zone) II. Development Approval System III. Permitted Use Table (Future Work) and Associated Approval Processes I. Design and Application Standards Outline of Discussion Page I. Strategic Development Area Focus-EDD Intent 4 A. Retail - OfFce -Service 1. Descdptlon 5 2. Intensity Level Categories 6&7 B. Industrial -Manufacturing -Wholesaling- Distribution 1. Descdption 8 2. Intensity Levels 9 C. Mixed Use 10 II. Development Approval System 11&12 ill. Specific Permitted Use Table and Approval Processes n/a IV. Design and Application Standards 13&14 3 Retail-Office-Service ~ More Cars, Less Trucks ® More Internal Traffic Capture ® Support for Nearby Job Centers ~ Better Transition to Lower Density a Higher value office is invested in an area where there is less potential of industrial. ® Peak and Non-Peak Traffic - - - __. _. Strategic Development Area Focus- EDD Intent ® Focus certain development uses in areas best matched for its type attributes. ® Focus means make process easier for a use in one area over another but allow in both if conditioned appropriately. ® Target Preferred Businesses and Industries. °~ Examples: a Industrial near rail and high power transmission lines. o Retail/Office near good customer and employee access and as a transition to lower intensity use. 4 ;~ .. Primary ED Zoning Retail, Office, Service Category Systems (INTENSITY LEVEL THRESHOLDS) PRIMARY LEVEL SQUARE FOOTAGE ® ED 1 < 5,000 sf ® ED 2 5,000 - 20,000 sf ® ED 3 > 20,000 sf 1 BUILDING TYPES ® Freestanding Building a Enclosed Mall ® Drive-thru Restrictions .,.~._ ,:-. Industrial, Manufacturing, Wholesaling, Distribution Intensity Levels PRIMARY LEVEL SQUARE FOOTAGE TOTAL ^ ED 5 < 50,000 sf ® ED 6 50,000 -100,000 sf s ED 7 > 100,000 sf __ _ Development Approval System Process X -Multi-Departmental EDD Staff Advisory Committee Employing Elements of Central Permitting System i.e. Permitted by Right stag B - Class B Special Use Permit (SUP) eon A - Class A Special Use Permit (SUP) aeieocc J - _ .,. ._ Industrial/Manufacturing/ Wholesale Transportation/Utilities ® High truck traffic ® Rail Access ® High Power Transmission Lines m Better access to US Hwy 70 Corridor or Interstate ® Non-Peak Activity Traffic ® Large Building Footprint Mixed Use PRIMARY/SECONDARY LEVEL s ED 4 1. New Topic -More Discussion Necessary 2. Placeholder 3. Could include medium-high density residential and low-medium non- residential. (Co-mingled in structure or separate development parcels) Development Approval System Process PD -Step 9...Planned Development / Peieocc Conditional District Zoning (CDZ) Leg(slative Rezoning (Article 7B) Ste Z...S ecial Use Permit Class A p P QuasWudlcial Concurrent CUD -Conditional Use District Rezoning Peieocc Site & Use Specific Plan (Article 7A) Legislative Conditional Use Permit stag tz 2 Design and Application Standards A. Smart Growth Site Design Attributes B. Master Planned Program (Similar to Planned Development) 1. Roadway System 2. Infrastructure 3. Environmental 4. Flexibility (Removes need for stringent Building/Site/Landscape Volume Ratios) Design and Application Standards C. Architectural Design •Common Element D. Laridscape Design •Xeriscaping, Buffering E. Circulation and parking •Shared Parking Systems F. Service and Storage •Access and Screening G. Signs and Lighting •Economically Competitive 14 3