ACTION AGENDA ITEM ABSTRACT
Meeting Date: November 15, 2007
Action Agenda
Item No. ~_~
SUBJECT: Process to Determine Alternate Sites for a Solid Waste Transfer Station
DEPARTMENT: County Manager, Solid Waste
Management
ATTACHMENT(S):
1. Siting Criteria Summary
2. Revised Site Search Timeline
3. Estimated Remaining Landfill
Capacity
4. March 27, 2007 BOCC Adopted
Resolution on the Waste Transfer
Station Siting
PUBLIC HEARING: (Y/N) No
INFORMATION CONTACT:
Laura Blackmon, County Manager, 245-
. 2300
Gayle Wilson, Solid Waste Director,
968-2885
PURPOSE: To provide background information and a proposed strategy to assist the BOCC in
a process for identifying and evaluating alternate sites for locating a County solid waste transfer
station.
BACKGROUND: On March 27, 2007, the BOCC adopted a "Resolution on the Waste Transfer
Station Siting" that directed staff to begin planning a solid waste transfer station for the Eubanks
Road site and the creation of the Historic Rogers Road Neighborhood Task Force to continue
discussion of a community development program.for neighborhood enhancement. Since that
time, Solid Waste staff has worked with its engineering consultants to prepare plans and
documents for a Zoning Atlas Amendment Application before the Town of Chapel Hill during
spring 2008.
The BOCC created and approved the Historic Rogers Road Community Enhancement Plan
Development and Monitoring Task Force on April 24, 2007. The purpose of the Task Force is
to meet with residents of the Historic Rogers Road community as needed to determine issues
they deem important for improving the quality of life in their community in order to address the
concerns related to long term presence of the solid waste facilities located in their community.
The Task Force has made considerable progress toward identifying key neighborhood
enhancement issues in their 7 meetings to date. The work of the Task Force is continuing.
At its meeting on November 5, 2007, the BOCC directed the County Manager to schedule for
November 15 an item for discussion of a process for reviewing criteria and outlining next steps
in placement of the transfer station. Within the discussion on November 5 was the concern that
the work of the Task Force not be "pre-empted" as they were charged with "bringing forward
recommendations to mitigate impacts".
Attachments 1, 2, and 3 are background materials relative to the siting criteria under
previous use, extracted from EPA guidance materials, a revised siting project timeline,
and a copy of the June 12, 2007 memo estimating remaining landfill capacity for BOCC
consideration.
Issues the BOCC may wish to address as it resumes discussion of Eubanks Road and
reopening a search for alternate transfer station sites include, but are not limited to, the
following:
• Implications for the Historic Rogers Road Neighborhood Task Force in progress
• Implications for Eubank Road in a formal decision by the BOCC to reopen a site search;
i.e., would the BOCC temporarily suspend or permanently exclude Eubank Roads from
further consideration? Should County staff continue the course of the March 27 directive
of obtaining a permit for a transfer station at Eubanks Road?
• .What criteria or factors might the BOCC wish to adopt, taking into account those
previously employed by the Solid Waste Advisory Board, contained in EPA transfer
station guidance manuals, or generated by the BOCC?
® How might the BOCC seek to include and involve the community or general citizenry in a
reopened site search given the complexity and likelihood of revived controversy? Would
the BOCC choose to serve as its own "search committee of the whole"?
• In order to expedite the business at hand, will the BOCC schedule special meetings or
work sessions to conduct the business of the search process?
• To what degree should ancillary services, if any, be considered for co-location along the
transfer station?
• Concern and consideration for the critical timelines involved in project implementation
and expectant costs in a reopened site search. The BOCC is reminded that current
predictions are that the landfill will reach capacity sometime in April-May 2011.
County Management and Solid Waste, in follow up to the BOCC discussion that began on
November 5, are prepared to utilize one of two qualified and capable professional consulting
firms currently under contract with Orange County for a variety of solid waste environmental
monitoring, regulatory compliance and engineering services. Neither of these two firms have
been involved in the local search for a transfer station site, although Olver, Inc. has been
performing design and permitting work relative to the previous Eubanks Road transfer station
site.
Either firm could perform the site search work in an objective and unbiased manner and could
be available to begin working with the BOCC immediately. Alternatively, staff is also prepared
to retain the services of an outside professional consulting firm that would also bring the
requisite technical skills and expert objectivity to assist and support the BOCC. Staff is
prepared to immediately initiate a Request for Proposal (RFP) process to obtain these services
should the BOCC wish to pursue this option. It is estimated that the RFP process could take
approximately 3 months. Staff recommends that the consultant chosen by the BOCC would
work directly with the BOCC in redefining site criteria and be responsible for conducting an
extensive land-based search and analysis for suitable sites for presentation to the BOCC.
FINANCIAL IMPACT: There is no direct financial impact associated with the BOCC discussion
of a reopened site search. Staff proposes to return in January, should the BOCC desire, with
an estimated cost for outside professional/technical services.
RECOMMENDATION(S): The Manager recommends that the Board discuss the background
materials, issues and implications, and consider the following actions or some modification
thereof:
1. Agree to begin a new process for identifying and evaluating alternate locations for an
Orange County Transfer Station;
2. Review the siting criteria as attached and provide any comment or feedback as may be
desired; and
3. Authorize staff to either utilize one of the existing contracted professional consulting firms
OR pursue a new consulting firm to establish and implement with the BOCC a new
process for identifying and evaluating alternate locations.
Siting Criteria for Transfer Station
November 15, 2007
This information originated in part from an EPA Office of Solid Waste 2002 publication
"Waste Transfer Stations: A Manual for Decision Making. Exclusionary criteria were
obtained from Orange County Planning and the State Division of Waste Management.
Exclusionary Siting Criteria
These criteria are "fatal flaw" type criteria that would prohibit siting by law, regulation,
or that requires extraordinary design and construction techniques.
• County Regulations
0
• North Carolina Regulations
0
Technical Siting Criteria
Technical siting criteria affect technical, environmental and economic operations and can
be considered "operational" in nature. These criteria provide guidance on specific
engineering, operation, and transportation conditions that should be considered.
• Central location to individual collection routes (proximity to the center of waste
generation)
• Access to major transportation routes (proximity to I-40/85)
• Site size (size of site varies from a minimum of 5-6 ideally situated acres for
transfer station only to a larger site if other ancillary facilities to be included, such
as convenience center, scrap tire/white goods/metal recycling, mulch/com post
sales, storm debris management, queuing space, recyclables processing, collection
vehicle parking, etc. and future expandability)
• Traffic Impacts (increased impact on surrounding community, safety, road
conditions, bridge weight limits, etc.)
• Ability to integrate with other solid waste- operations
• Buffer space (maximizing space between operations and surrounding
uses/neighborhoods)
• Topography (gently sloping preferred with minimal rock, surface water features
and substantial groundwater depth)
• Proximity of public water and sewer (for facility wash down)
• Zoning (ability to obtain local pernutting)
Community-specific Siting Criteria
These criteria are community specific in nature and vary according to community
priorities, values and interests. These may include:
• Environmental justice considerations
• Impacts on air quality
• Impacts on local infrastructure
• Compatibility with adjacent land uses
• Prevailing winds
• Proximity to sensitive receptors, such as schools, churches, recreation sites and
residences
• Number of residences impacted
• Presence of natural buffers
• Impacts on existing businesses
• Expansion capability
• Development and operational costs
• Buffer zones and screening measures
• Traffic compatibility
• Impact on historic or cultural features
• Impact on neighborhood character
According to current generally accepted formal solid waste facility siting practice, to
maintain objectivity in the siting process the siting criteria are agreed upon before
potential sites are known. While the consultant is applying the criteria to screen the
county for satisfactory/suitable sites (according to these previously agreed upon screening
criteria) the siting committee (the Board of Commissioners in this instance) prioritizes
(assigns values) to each of the criteria to assist in ranking the candidate sites that are
identified in the initial screening. Again, to maintain the objectivity in the process the
criteria are prioritized (weighted) before the potential sites are known. Based on the
ra~ciking/scoring the BOCC may wish to apply a more rigorous analysis of the top 2-4
sites. It is likely that every site identified will have shortcomings.
2
m
~ - - - ---
~ ~
_
~
~ j
_ I
`
i ~
~ ,
~
~ i
~ I
I ~
, ~
i
i
~
~ i
.
; I I ! i ! ~i i.
~ ; , ~ ~ ~~.
m L I ~ ~ _ i
~ i
~
.
`
~
I
;
'
~
I. ~
.
~
i.
~
..
. I
~
..
. .
I I I
,.
i
j
i ..... i
I
~, ~
..
~
..
I
~
~ ~ . .
i
t~' 1 I
..
_ +
I }
~ I
~ I
~
I ~ t
!. I i4- ~ !.
. I 1 ~.
M
M I
I ~
i L
I I
I
I
( 1
I
-
~
.. '
,
o I... I
± ~
~ I
'
i I i I
i ~ I I
i i
a
a ~
N
O
`
I
.-~
-
' f
I
~ ~
I
I
~ ~
~ I 4
.
I.
E
N N
N ~
i I
1 j.
! ; ~
; ~
~ i ~
W-
L.. N ..
N +
I
' v,. ,
` . ~ ~ ~ ,
I i.
I I
I_ i.
I i
~ ~ j
~
I .. ~
~ i
I ~. ~..
~
N
.
.. ~
. .. _
i
I
~
I
i
~
f I
I
C
V N
.. (
I. ,
'~
'
~
..
j
I. .
.. '
i
I
i I.
i
i ~ ;
~ I
i I
I
y I
w
~
~
~~ ~ ~
~ I ~. ~ I
~ I I i. I
I i i i i I
i a
~~ r ~ I I L I i
a
u. a ~
o ..
~
~
I
.-~.
~
~
(. ..
I
...
L
~
_
~
'
I ~
I
I I
~
~
~ I
I
~
~
~
,
I
.
'
~
w
a
N.
of
;.
I_ I
~
I
I
~
(. ..
~
l
i f
~
I
' I
i ~
~~
~
~
D
!
~ I '
ili
( j
~ ' ~
I
1
i i
~-
~ I
,
.
i j (. ~ i I I
I i ~.
1 ,.
i
m
~
... ,
, I i i I, i i I
i I
I .~ I ~. ~ ~ I I ~ I ~ I
~
I~
I 1 ~ ~
I i I
I i i I ! I i
_ ~ I. I ; I.
I~ I 1
N I
I: l i i~ I ', ~ I i
~ ~ I. I I I I i i I I ~ i. I i i. `
I
~
~
y
'~
N
7
.I. ,
. , , ,
._.
. J .j . ..~.~ _..~.._._._.S_._.~' C
p
N
N L N c W
. d c] O N C
U to c w ~
C w w W ~ ~ ~ c ,;
w
C
p
m
to
i9 ~ ~
m O W N 'p C Q N C O w O w O. O
C C O ftl b N € pl 2 V D. C
~ d vi ~ `° .v o ro `~ w v ~ u N c v 2 0 °- ~ °1
N
t-
p ~ V7 'c° p N ~ d `m aci v ~ ~. m o ~ m m .d da~pp o m °' ~ ~ ~
~ Y4 N rJ O .. ~ w O C N ~ C w w U p~ ~. O V p N U Y U 'L C ~
E
N
c
~
U
w
~
Z c ~
y N n ~ o
" :~ ;~ ~ W
~ m ~y v ~ w
~ m a ~~ s Z
w o 'wGi a } c ~ $ a' g c' Lo w ~ ~ c c m v w '~ p ~ p m o c ~ ~ ~
m v w v w i,. eX <`n w w ~ o m a ii. ~ ~ m ~ 'm c.> N ~ u. ~ ~ o i-' ~- w`a
~'rn
m r
N
H k ~ .~ ~ rN¢~_ b U (L
- N 0. Q m
1
t0 N F! V' N ~ ~"" ~ Q1 IN
fQ'')
N IN ~N N IN N N N O t~L
v
w ci
~ ~
G` ~
r N F! 'C th tp h 07 ~
IN
1i ao
Y~• -
t.~'
Memorandum
To: Laura Blackmon, County Manager
From: Gayle ~VaTilson, Solid Waste Director
Subject: Estimated Remaining Landfill Capacity
Date: June 12, 2007
The aerial survey of the Orange County Landfill performed on Apri15, 2007 indicates
that approximately 4.7 years remain. If the incoming tonnage remains relatively
constant, which it has for the past 3-4 years, it would appear that the landfill would reach
capacity sometime in April-May 2011, or just under one year beyond our previous
estimate.
The reasons for this extended capacity include:
• Continued attention to'improving compaction of wastes
• Close enforcement of state and local waste bans '
• Subsidence of previously placed waste due to the highly putrescible nature of
local wastes
• .Rebuilding of the outer landfill slopes (due to subsidence) to reclaim previously
. filled airspace
At the. June 1 1, 2007 Chapel Hill Town Council meeting Orange County's request for
expedited review of the transfer station permitting process was not granted, which will
extend the permitting process through most of the additional time and significantly
'reduce yr eliminate any opportunity to preserve landfill capacity following opening of the
new transfer station. Staff remains confident that the transfer station will be, ready for use
prior to reaching landfill capacity, absent any extraordinary delays in bidding and
construction. Had the Town granted expedited review it would have been possible that
eight to ten months of landfill capacity would have remained following the transfer.
station's opening. Our consultant is proceeding deliberately with design and permitting.
of the new transfer station.
Staff is available to answer questions or provide additional information as necessary.
ADOPTED March 27, 2007
ORANGE COUNTY BOARD OF COMMISSIONERS `='
RESOLUTION ON THE WASTE TRANSFER STATION SITING
Whereas, the Eubanks Road site is close to the population/waste generation
center of Orange County thus minimizing cost, pollution and green house gas
emissions, and
Whereas, the Eubanks Road site has excellent access to points outside Orange
County because of the nearness to I-40 and other major highways, and
Whereas, -this site is near a railroad, thereby offering flexibility in transportation
alternatives, and
Whereas, the Eubanks Road site is in an area appropriately zoned for the
proposed use and will add minimal traffic to an existing road, and
Whereas, the time for obtaining approvals, designing, and constructing a transfer
station is tight since the landfill is expected to reach capacity in 2010, and
Whereas, the Solid Waste Advisory Board has strongly recommended that the
Eubanks Road site be the location for the waste transfer station (and an
explanation of the Solid Waste Advisory Board's rationale for its recommendation
can be found in the attached March 19, 2007 Memorandum on Waste Transfer
Station Siting).
Now, Therefore Be It Resolved, that the Orange County Board of County
Commissioners finds that the solid waste transfer station on Eubanks Road
should be sited on Eubanks Rd, that it should be designed with care, that it must
be aesthetically pleasing, and that the fagade should be made of brick, stone or
other attractive material, and
Be It Further Resolved, that the buffer between the roadway and the facility
should exceed the minimum buffer required and be as wide as is practically
possible, and
Be It Further Resolved, that the Board will enter into discussion with the historic
Rogers Road neighborhood to determine a community development program
that enhances the neighborhood, including but not limited to the following items
identified by the neighborhood at the January 18, 2007 meeting;
a. Seek reduction of speed limit along Rogers and Eubanks Roads
b. Pave driveway surface in and out of new facility
c. Ban public and private waste hauling vehicles from using Rogers Road
as they travel to/from the transfer station
ADOPTED March 27, 2007
d. Seek the installation of a sidewalk alon Ro ers Road
g g
e. Install the sewer line to the leachate pond in a timely manner
f. Work with our transit partners to secure a bus route that serves the
Rogers Road neighborhood
Be It Further Resolved, that the Board agrees to pursue the following additional
actions that were identified in the January 18, 2007 meeting with the historic
Rogers Road neighborhood:
a. Place large numbers on the side of solid waste vehicles so they can be
easily spotted and reported if caught speeding
b. Amend contracts with haulers to ensure that tarps cover all loads
traveling to and from the transfer station
c. Any spilled liquids at the transfer station site will be filtered and
diverted to the sewer system
d. Modify waste hauling agreements to include a requirement to maintain
all factory installed collection vehicle body plugs and seals in an
operable condition to avoid leaking.
Be It Further Resolved, that the Board agrees to continue to discuss a
community development program with the historic Rogers Road neighborhood in
order to solicit further ideas and feedback, and
Be It Further Resolved, to develop a plan with law enforcement to enforce
speed limits and requirements for covered loads."
Be It Further Resolved, that the Orange County Board of Commissioners
directs staff to begin planning a solid waste transfer station for the Eubanks Road
site.
16
MEMORANDUM
TO: ,Gayle Wilson, Orange County Solid Waste Director
FROM: Jan Sassaman, Chair, Orange County Solid Waste Advisory Board
SUBJECT: Waste Transfer Station Siting
DATE March 19, 2007
CC: Members, Orange County Solid Waste Advisory Board
At the March 13, 2007 Orange County Board of Commissioners (BOCC) meeting, there was
some confusion and lack of detail and context regarding the Orange County Solid Waste
Advisory Board's (SWAB) resolution of March 2007 recommending that the proposed
Waste Transfer Station (WTS) "be developed on existing landfill property north of Eubanks
Road." With that in mind, I would like to provide some additional information regarding the
context and detail associated with our deliberations and recommendation.
Context
The context in which we performed that evaluation included the following.
• That we must proceed with development of a WTS as expeditiously as possible in as
much as the current landfill will be full by 2010 and that some residual capacity
would be desired for contingencies. This continues to be the SWAB's understanding.
• That the Eubanks Road landfill site will remain an active waste handling and disposal
facility for many years to come -for disposal of construction and demolition (C and
D) material, for staging of recycling operations, as a county-wide convenience waste
drop off center, for disposal of household hazardous waste, as the site of the waste
operations center, and potentially as the locus for a landfill gas collection facility.
However, the current MSW landfill cell will be capped, significantly reducing
generation of odors and attraction for vermin and pests.
• That the proposed WTS will be operated in accordance with state and federal
guidelines, that odors, vermin, and other noxious elements will be controlled or
eliminated, that MSW will be removed to the receiving landfill at the end of each
day's operations, and that the building will be constructed and operated in a manner
to reduce to the maximum extent feasible any adverse impacts on surrounding areas.
• That the net impacts, if the WTS were sited at the Eubanks Facility, would be less
than for present operations, since the MSW landfill would no longer be operational.
Thus, impacts of the added approximately 10 to 15 (average about 12) large long-
haul truck round-trips from Route 86 to the WTS would be offset by reduced or
even eliminated landfill odor, vermin, noise, etc. Furthermore, we are talking about a
relatively small facility, enclosed within a structure, screened from casual public view,
located as part of an ongoing solid waste operation.
Memo to Gayle Wilson
March 19, 2007
Page 2
• That despite the proximity of the Eubanks Road facilities, many nearby citizens have
benefited from extension of OWASA water lines through the community paid for by
Solid Waste Enterprise funds (these costs are normally borne by the homeowner,
either directly or indirectly through a developer) and where appropriate, low- intexest
loans to actually connect dwellings to the OWASA mains.
Siting Criteria
The SWAB Members are certainly not unaware of facility siting criteria. The present SWAB
collectively has more than 100 years of professional experience evaluating and siting
hazardous and nonhazard waste facilities, chemical facilities, energy production and
transport facilities, and other such facilities with potential adverse effects on human health
and the environment. Our goal, and the charge we were given by the BOCC, was to evaluate
and address the suitability of the Eubanks Road location fox a WTS.
To that end, we evaluated the suitability of the Eubanks Road site as a location of a WTS
against a number of criteria, mostly technical, but also against "community based" criteria.
Some of these criteria were outlined in the SWAB recommendation to you last March.
The US EPA Office of Solid Waste has published adecision-making manual for Waste
Transfer Stations that addresses primarily design and operation, but does devote several
pages to siting criteria (LT.S. Environmental Protection Agency, 2002. i~aste Transfer Stations:
A Manual for Decision Making, EPA530-R-02-002, June 2002, Office of Solid Waste and
Emergency Response). For the most part, the SWAB considered all of the criteria and issues
outlined in this document. It should be rioted that this is a draft guidance document, not a
set of regulations. Indeed, WTSs are typically regulated at the state level, and North Carolina
regulations do not include siting requirements for Waste Transfer Stations, per se. A review of
the US EPA recommendations dealing with WTS siting referenced above, and our approach,
is appropriate.
The document provides guidance on determining the need for a transfer station. The SWAB
operated under an a priori assumption that, given the size and nature of our communities,
and the fact that other options such as an in-county landfill were not on the table, there was
a need for a WTS.
The document suggests, at pages 11 and 12, public cornrnittee participation and informing
the public. The SWAB is a broad-based public committee, appointed by the various
signatories to the inter-local agreement that governs waste management in Orange County.
As such, it represents most of the involved stakeholders, including residents close to the
Eubanks Road facility. All of the SWAB members participated fully and were heard during
our deliberations. The issue of the WTS has been discussed at length for more than a year in
public meetings and in the press.
i~
The document addresses three types of siting criteria, exclusionary, technical, and
community, and their application, on pages 14 though 18. The following are presented in the
order in which they axe presented in the US EPA guidance document.
Memo to Gayle Wilson
March 19, 2007
Page 3
Exclusionary Criteria axe those criteria that would prohibit siting by laws or
regulation, or that would require special engineering or construction techniques. The
SWAB remains unaware of any exclusionary siting criteria applicable to the existing
Eubanks Road Site.
Technical Siting Criteria are those parameters that affect technical, environmental,
and economic operations of the WTS facility. They can be viewed as "operational
consideration," and include the following:
Central location to collection xoutes. The SWAB was particularly concerned
with the importance of keeping to a minimum the distances traveled by
collection vehicles to reduce driving times, gas consumption, air emissions,
and truck wear and tear. The Eubanks Road site is presently the locus of
delivery of solid waste from all over the county, and county and municipal
collection routes are presently optimized to deliver waste there.
• Access to major transportation routes. The Eubanks Road location is close
to I-40 for access to long-haul trucks, and to major delivery routes for
collection vehicles, minimizing the distance these larger vehicles would need
to be on secondary roads in the county.
• Site size requirements. The SWAB reviewed and concurred with a siting
study by Olver Associates indicating that there was sufficient area for the
WTS at the Eubanks Road facility.
• Sufficient space for onsite roadways, queuing, and parking. The siting study
by Olver Associates indicated that there was sufficient area for associated
infrastructure for the WTS at the Eubanks Road facility.
• Truck and traffic compatibility. The SWAB was concerned that there would
be the additional large truck traffic on Eubanks Road, but concluded that an
estimated increase of approximately 10 to 15 (average about 12) large-truck
round trips per day as a result of siting the WTS at the Eubanks Road facility
would not constitute a significant increase in overall vehicular traffic along
Eubanks Road. In addition, the SWAB understands that development of the
WTS on Eubanks Road would also include additional shoulder and turn
space for the large trucks entering the facility.
• Ability for expansion. The SWAB understands that the WTS as planned
would be constructed larger than necessary at this time in order to
accommodate future needs, and our recommendation was based on that
understanding.
~a
• Space for recycling, composting, and public education. These activities are
presently carried out on the site and would not be adversely affected by the
Memo to Gayle Wilson ~ 3
March 19, 2007
Page 4
WTS. Indeed, the Solid Waste Operations Center recently approved by the
commissioners will include a meeting space available for the public, as well as
facilities for public education to support the Solid Waste Department's award
winning education program.
• Buffer space. The SWAB has on several occasions over the past six years
reviewed elements of the site master plan and noted that present operations
require buffer space. In addition, we have discussed ongoing efforts by the
Solid Waste Department to acquire additional land for buffer space
whenever possible. With that in mind, there is sufficient space available for
buffers.
• Gently sloping topography. The siting study indicated that the Eubanks Road
site topography was suitable for WTS operational considerations.
Furthermore, the presence of capped landfill mounds north and south of the
WTS will provide buffering and visual shielding in many directions.
• Access to utilities. Utilities are available on the site for current operations.
Zoning designations and requirements. The site is currently used for land fill
operations, and will continue to be so for many years.
Community-specific Siting Criteria are those associated with potential impacts that the
facility might have on surrounding communities. Examples of community-specific criteria
that the guidance document identified are:
• Environmental justice considerations
• Impacts on air quality
• Impact on local infrastructure
• Adjacent land uses
• Proximity to sensitive receptors, such as schools, churches, recreations sites,
and residences.
• Prevailing winds
• Number of residences impacted
• Presence of natural buffers
• Impacts on existing businesses
• Expansion capability
• Buffer zones and screening measures
• Traffic compatibility
• Impact on historic or cultural features
• Impact on neighborhood character.
In addition to these community-specific criteria identified by the guidance document, the
SWAB was concerned with the community-wide need for a timely solution to our looming
waste disposal needs and that all of the citizens of Orange County need to be prepared for
Memo to Gayle Wilson
March 19, 2007
Page S
MSW landfill closure in 2010.
While the SWAB discussed many of these community-based issues noted above, since the
site was already being used for solid waste operations, and will be so used for many years to
come whether or not the WTS is sited there, the SWAB focused on two issues -the
potential impact of the WTS as an additional burden on the Historic Rogers Road
Community balanced against the imminent need for the WTS and the operational benefits to
all of the County's citizens associated with its siting at Eubanks Road. As part of our
discussion, we noted the benefits that have been directly granted to the Rogers Road
community to mitigate the proximity of the landfill, and that should the WTS be sited at the
Eubanks Road site, additional mitigation measures might be appropriate.
Conclusion
Some of these criteria are mutually exclusive, for instance location close to the point of
MSW generation is usually associated with location close to population, traffic, schools, etc.
In addition, and no matter where a facility is sited, there will be strong opposition. The
SWAB felt compelled to make a recommendation to the BOCC that was in the best interest
of all of the citizens of Orange County.
Given that the Eubanks Road site was a very clearly optimal site from an operational and an
economic standpoint and was available and owned by the county, and given that the SWAB
(and staff) are very familiar with the Eubanks Road site, we recommended to the BOCC that
the WTS be sited on Eubanks Road. We did not consider that acounty-wide site search and
ranking exercise would yield any better site that would significantly better operationally,
more readily available, and more publicly acceptable than the Eubanks Road site.
Locationally, from an operational standpoint, the optimal site would be very close to I-40 in
the general vicinity of the Eubanks Road Solid Waste facility, and thus would raise the same
community-based issues as the Eubanks Road site, and possibly not have the same level of
operational benefits.
Finally, it is important to return to the US EPA Guidance for help here, and note that at
page 18, the guidance document makes the observation that "... despite the best efforts,
every site has some shortcomings that will need to be addressed" and that "[s]iting any type
of solid waste management facility has often been met with strong community opposition."
The guidance then goes on to discuss that "host community agreements" for both private
and publicly operated facilities might serve to mitigate community concerns. Such
agreements range from operational controls on the facility (e.g. traffic route restrictions,
operating hour restriction, or video monitoring of operations) to direct help to the local
community such as road or utility improvements, provision of an education center, or
financial support for other community-based initiatives. The potential for some form of
mitigation for the Historic Rogers Road community was indeed part of the SWAB's
discussion.
14