1. Does any Board member desire to modify this agenda?
2. Does an� member of the audience desire to speak about:
A. Items on this agenda?
B. Items not on this agenda?
3. The County's CETA Director will review the current public service
employment situation. Does the Board wish to take action on this matter?
4. Report of bid results:
A. Dental Equipment:
(1� Thompson $60,232.91
(2) Healthco $55,777.14
5. The Ma ager recommends:
A. The Board authorize execution of a contract with Healthco
for acquisition of dental equipment.
B. X- ay equipment be rebid.
C. Th Board authorize filing of a Section 8 application requesting
1 0 units of Moderately Rehabilitated Housing.
6. The C airman will name two members of the County Planning Board to a
commi tee that will develop a joint planning proposal for the Chapel
Hill area.
7. The Panning Director will review a proposed letter to the Department
of Transportation dealing with the widening of I-85.
8. The Board will meet jointly with the Orange County
Industrial
Facilities and Pollution Control Financing Authority.
I
ORANGE-DURHAM
CNIPLOYMENT&T RAiN3NG
O DURHAM CO.OFFI CE
RANGE CO.OFFICE
CENTRAL OFFICE - 300 E.MAIN N.C.
115 N.CH U RTON 5T. MUL 01CA DWE CENTER DURHAM,N.G.
610 CALDWELL EXT. 682-1553 OR
HILL5BOROUGH,N.C. CHAPEL HILL,N.C. 688-7331;EXT.287
732-8925 942-8788
s
MEMORANDUM
TO: Mary Lou Bouley
FROM: Stewart L. RogersTA Director
SUBJECT: CETA Position Terminating Due to 18 month Limitation
DATE: September 26, 1979
The following positions will be terminated on September 30, 1979
due to the 18 month limit. They are :listed below:
Chapel Hill Housing Authority 2 Carpenter
Town of Hillsborough 2 Pi.pelayers
1 Carpenter
Orange County 1 Maintenance Worker
1 Plumber
1 Coordinator, Commission Ori
Women
JOCCA 1 Carpenter, Crew Supervisor
1 Mason
Durham County General Services 1 Maintenance Mechanic
an equal opportunity/full potential employer
ORANGE COUNTY CO,
Room NO. 12
106 EAST MARGASIT LANE
IIILLSBOP.OUGH,N. C.
27278
RICHARD WEITtED,CF,:i,maro
NO?I•IAN CCIALKER
NMMAN Gv STAVESW;
DONALD WILL.LIOIT
ANNE BARNES
September 13; 1.979
Mr. T. L. Waters, Manager
Planning and Research Branch
Division of Highways
Department of Transportation
Raleigh, MC 27611
Dear Mr. Waters:
Thank you for your letter of August 2, 1979 wherein you
requested that Orange County advise your department of any environ-
mentally sensitive areas which might be affected by the proposed
six-laning of I-85 from Greensboro to Efland. Subsequent to that
letter, it was learned that the scope of the project had been
expanded to include six-laning of I-85 in all of Orange County. 41e
understand that this project will require no new acquisition of land
in Orange County except in the immediate vicinity of interchanges
which are to be redesigned.
Any highway project of this magnitude always has positive and
negative impacts on the social , economic and natural environment of
an area. The categories of impacts that need to be addressed for such
projects are well known by this time and we feel that they need to be
analyzed in an environmental impact statement for this particular project.
Aside from the general categories of impacts that need consideration, we
have two specific areas of concern regarding the impact of the proposed
project on Orange County.
(1) Lake Ben Johnson - Seven Mile Creek Watershed: A substantial section
of the project from Orange-Alamance County line to Efland is in the
watershed of Lake Ben Johnson, the water supply reservoir for Hillsborough.
This section of the project also drains into Seven Mile Creek, one of
the two prime potential reservoir sites in water-short Orange County.
Lake Ben Johnson currently supplies water to some 6,000 regular
customers and is projected to have 7,400 customers by the year 1985.
Mr. T. L. Waters, Manager
September 18,1979
Page 2
This reservoir also serves as a back-up supply for Carrboro-Chapel Hill
via a pipeline that was constructed in 1978. This past summer, Lake
Ben Johnson supplied a million gallons of water a day to Carrboro-Chapel
Hill to supplement their system.
We are concerned that the quality of water flowing to this important
Crater resource during the construction phase of this project: will be
decreased. Construction of the road will result in increased activity
in the watershed. Of particular concernis the potential for increased
erosion due to the absence of vegetative cover. An increase in
erosion and the movement of sediment to the stream system and ultimate-
ly to the reservoir could have a number of impacts. These include (a)
a negative impact on the plant and animal life in the affected
streams; (b) increased sediment loads delivered to Lake Ben Johnson
which could reduce its volume and therefore its effective life time
as a reservoir for Hillsborough; (c) increased sediment reaching the
water treatment plant intake which might result in greater treatment
costs to meet State turbidity standards for water delivered by public
water suppliers; (d) a decrease in other water quality parameters
since sediment is the agent by which many toxic materials are carried
into the surface water system. These toxic substances can affect the
well being of water consumers.
Due to the potential negative impacts of increased erosion and sedimenta-
tion on Hillsborough's water supply, we hope that there will be careful
planning by DOT so that these impacts can be kept to a minimum during
the construction phase of this proposed project.
Our second concern regarding the watershed has to do with the potential
for accidential spills of hazardous materials that increasing traffic
on I-85 will bring. Release of these materials into Lake Ben Johnson
and Seven Mile Creek reservior when it is constructed could have
disasterous results. The proposed changes to I-85 provide an oppor-
tunity to incorporate design features into the drainage system in the
vicinity of the highway which could serve to contain any spills of
hazardous materials long enough to allow them to be cleaned up before
they could reach the stream system in significant amounts. For example,
provision of retention areas along sections of highway which are in
close proximity to streams flowing to these existing and potential
reservoirs is one obvious design measure which might be used. We are
sure that the engineers responsible for this project can devise and
incorporate many other more sophisticated design features which would
greatly reduce the threat to the Hillsborough water supply.
(2) Miles Community: A. preliminary sketch,of the proposed redesign of the
Buckhorn Road interchange sent to us by Mr. Tom Hepler of your depart-
ment shows a new alignment of SR 1374 (GE Service Road) at its intersec-
tion with Buckhorn Road. Unfortunately this proposed realignment places
the new section of SR 1374 squarely through the Miles community, the
long time home of a number of Orange County residents. The presence of
such a road will serve to divide the neighborhood physically and in more
Y
Mr. T. L. Waters, Manager
September 18,1979
Page 3
subtle ways, and may threaten its viability as a corrunity.
Aerial photographs of the area reveal that alternative alignments
may be possible for SR 1374 either paralleling the new west bound on
ramp or on the northwestern periphery ,of this neighborhood. We
feel these alternative routes should be given careful consideration
since they would avoid a, "direct hit" and lessen the impact of the
proposed project on the Miles Community.
It was your request that Grange County advise you of any environ-
mentally sensitive areas affected by 1-85aprore:ct. Having done this we
would like to take this opportunity to
about the need for construction and improvement of the Interstate highway
system.
Policy early 0s construction
interstate
was made in the early
and resources as they were perceived at that time. In the subsequent thirty
years, a number of the factors which underlay this policy decision have
changed so drastically that we feel a re-evaluation of transportation problems
and solutions is needed.
The realities of the 180s include a realization that a number of
resources are in short supply and should be expended carefully and wisely.
The energy position of the United States today, for example, calls into
solutions problems that eie de earlier J
abund ant" t am The contructionofhghspeeInterstatehighwaysserving
the individual automobile is one problem-solution set which needs re-evalua-
tion. Certainly there are other alternatives which can provide safe, effi-
cient transportation for Americans.
Federal and State transportation policy makers do seem to be responding—
somewhat slowly in our opinion-to these new realities. The Federal Aid Highway
Act of 1973 provides that if Federal , State and local officials agree, pror
approval for an urban portion of an Interstate highway may be withdrawn and
a local area may substitute instead a non-highway mass transit project which
will be funded at the same level as the Interstate highway p j
like to know if innovative alternatives such as this were investigated when
it was realized that the capacity of the I-85 transportation corridor would
need to be increased in the future. Certainly, consideration should be
given to such alternatives before the point is reached where we are locked
into a particular alternative.
Another energy-related concern v:e have is the 70 mile-per-hour (MPH)
design speed of the project. As we understand it this means that the sweep
of curves, sight distances over the crest of hills, lengths of off-ramps for
deceleration, etc. will be designed so that automobiles can travel safety on
the highway at 70 MPH. In light of the energy savings that can be realized tha
by automobiles traveling at slwer speds and Presi
the speed on Interstate highways be posted
Mr. T. L. Waters, Manager
September 18, 1979
Page 4
for a design that provides for much higher speed travel. Designing the
highway so that people can travel safely at 55 MPH may negate the need for
redesign of many of the interchanges which are being proposed. !Designing
the highway for this lower speed may reduce considerably the estimated 130
million dollar cost of this project.
Thank you,
Richard E. Whitted, Chairman
Orange County Board of Commissioners
REW/mb
cc Secretary Neal Goldschmidt
400 7th Street
Washington, DC 20590