HomeMy WebLinkAboutAgenda - 09-19-1978 AGENDA
ORANGE COUNTY BOARD OF COMMISSIONERS
COMMISSIONERS ROOM, COUNTY COURTHOUSE
HILLSBOROUGH, NORTH CAROLINA
TUESDAY, SEPTEMBER 19, 1-978
7 :30 P.M.
1. Does any Board member desire to add addi
agenda? tional items to this
2. The Erasion Control Office will report a violation of the
County l s Erosion Control Ordinance and recommend action against
the property owner.
3. The Mara
ger recommends the Board approve a change order for
additi al work at the Northside
(Agenda Attachment 1) Mental Health project.
4. The Man ger and Attorney will review legislation
enacted requiring the County ecently
nty to name a Nursing Home Advisory
Committee.
..
5. Joe Bradshaw will review current CET.A activities.
6 - The Energy Conservation Officer, will review a proposal to
implement certain energy conservation recommendations made b
Intex'g.r ted Energy Systems, Inc. Y
7. The Tax Supervisor recommends the Board approve the tax refunds
hereina ter listed:
A_
E.Iiz�beth F. Gervais
B. Eugene A. Conti $ 15.47
Jennifer Wingard
C. Bi.11.y B. Sparrow $ 86.00
D. Ralph F. Whitfield, Jr. $162.49
E_ Edward Thomas Rice $ 4.25
F. Chapel Hill Communities, Inc. $ 6.21
$ 60.21
8- Two Property owners desire the Board to hear their a
of tax assessments: appeals
A. Austin Watts
B. Percy H. Quinlan and Carol
Quinlan
ATTACHMENT I
Northside Chan e Orders
Two change orders are necessary at the Northsi.de Mental
Health project.
A. The Board hould forscertainuplasteringe atawil.l, not accept
be done.
credit of $320
B. The Board should authorize a change order f ri 2protectiox
to cover' installation of some 40 dampers
devices designed to place barriers within the duct work of the
heating/air conditioning system at points where this duct work
opens into the main building structure.
ent
The Division of Facility Services of the State Depaartmtructur�
of Administration has design approval authority over
constructed using State funds. Some two years ago that agency
approved the plans and sPeicstn � en �veslHealth
At a prefinal inspection in August, of --+-hat agenc
decided ceilings in the structuretheyewou fireproof
of their previous plan appr oval ,
for final occupancy Until fire dampers were
that carry air throughout the building, one damper
Negotiations with that
outlet into the body of the building.
agency have proven fruitless. tie must install ravalefordhe ebuildix
our expense, prior' to their giving final. app
occupancy.
In this years Public Works budget$ the Board provided funds
for certain outside improvements at this sate (mainly parking) -
Money to cover this change order can be taken from that source the Board so desires .