ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: November 5, 2007
Action Agenda
Item No. '7 - q
SUBJECT: Potential Artificial Soccer Surface Report
DEPARTMENT: Recreation and Parks PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Project Information Sheet
Site Plan
INFORMATION CONTACT:
Lori Taft, 245-2660
PURPOSE: To provide a report to the Board to determine if there is continued interest in this
project; and if so, to consider the next steps.
BACKGROUND: Members of the Board may recall that in the late 90's, during the planning of
Smith Middle School the Town of Carrboro, through the Mayor's office, formally requested
Orange County's assistance in providing an additional field at this location for use by the
community. A Memorandum of Understanding (MOU) was developed, with Chapel Hill-
Carrboro City Schools (CHCCS), Carrboro and Orange County as partners. Carrboro and
Orange County each contributed $75,000 to the project. In 2005, Orange County provided an
additional $133,561 in 2001 voter approved bond funding for the installation of athletic field
lighting at the two fields.
During discussions with soccer leaders last spring, the idea of installing artificial surfaces on a
soccer field was discussed. The soccer leaders identified Smith Community Field as an ideal
site. Interest by the Board members present led the Manager to direct staff to pursue the idea.
The general consensus among field management professionals and in the player community is
that artificial surfaces are excellent. These surfaces extend playing time and reduce operating
costs. The products available have improved in the last 30 years, reducing injury concerns.
Partners in the 2001 MOU for the Smith fields have agreed that the project would be beneficial
(Carrboro and CHCCS). However neither party had discretionary funding to contribute to the
project. The partners have agreed to MOU amendments to allow for additional community use
of Field 3a (school field), with the specific details to be determined.
a
Orange County staff has met with Carrboro Planning and Development staff, and those
discussions have been encouraging. Indications are that this project would be considered a
"minor modification" to the existing Conditional Use Permit (CUP) for the soccer fields, and
therefore not subject to the 12 month or more process required for new applications. Carrboro
staff and the town's engineer have stated that the project is likely to be viable contingent upon
receipt of engineering drawings and water runoff quality studies.
Two contractors have provided information and price estimates at $8-8.50 per square foot. The
two-field area is approximately 201,450 square foot (one field equals roughly 100,725 square
foot). The price for both fields together is approximately $1,624,400, or for one field -
$856,000. Design, engineering and permitting fees and requirements are not included in this
cost estimate.
Each of the major independent soccer leagues have been invited to fact finding meetings and
have been involved in the initial process for this potential project. Triangle United Soccer
Association, Triangle Futbol Club and CHAC Soccer have each offered to contribute funds in
support of this project.
Planning and engineering for the project as well as the bid and contract approval process
could be completed within six to nine months. The project would take three months from the
notice to proceed until completion. The project would have to be completed during the off-
season for CHCCS sports teams. Construction would occur preferably during the winter and
possibly during summer months.
FINANCIAL IMPACT: There is currently no available funding dedicated to resurfacing the
fields at Smith Middle School. However, should the Board agree that moving forward with this
project is a higher priority than other currently funded Parks projects, staff could propose
funding options that would allow the Smith project to move forward in lieu of an earlier start on
other projects.
RECOMMENDATION(S): The Manager recommends that the Board accept the report and
provide further direction.
0
Potential Artificial Surfacing Project
Smith Middle School and Community Soccer Fields
INFORMATION SHEET
• The two subject fields are on UNC property leased to CHCCS.
• An MOU between CHCCS, the Town of Carrboro and Orange County stipulates, among other
things: CHCCS is responsible for maintenance of both fields.
Carrboro manages the playing schedule for the "community" field 3b, and CHCCS
manages the schedule for field 3a.
• Orange County installed athletic field lighting on both fields in 2005.
• The lights have allowed extended play, but field conditions have deteriorated.
• Soccer leaders, Town and County Board members expressed interestrn artificial surfaces for
these fields.
• The County Manager has directed staff to explore the feasibility of this project.
• Both CHCCS and Carrboro would like to see the project proceed.
• Neither have funds to contribute
• Orange County has rio funding identified for this project
• Amendments to the MOU would have to be made.
• Initial meetings with Carrboro Planning have been positive with regard to permitting.
• Soccer groups have proposed to contribute to the project. Available funds up to $600,000 have
been offered.
• Two contractors have provided information and price estimates at ~$8-8.50/sf.
• The two- field area is about 201,450 sf (one field is 100,725 sf)
• The price estimate for both fields together is approximately $1,624,400, or for one field -
$856,000
• Most of the products, carry an 8-year warranty.
• The estimated prices do not include design, engineering, permits or environmental studies of
any kind.
• The project would take three months from the notice to proceed until completion.
• If the County were to approve this project, the earliest opportunity for construction to take
place would likely be during the winter of 2008-2009.
0
iDTi'icATES ~ ~ ~ ~~
~ XISTING
/ ---_"__`_' ~ \ \ ,. PARKING
~ ~ LOT
/, BASEBALLf50FTBALL s,; '
i._ P ACES
F :LD
PRC n-n ~ },
Doa.D ,l}.>l
/ / ~'~_
_ DUFFER~'b~
/\~ / m.,.~ BV mot' 3 . 1 C~///~~/// ~~~~ \
RDAD eU~\ J Y~.'~ / i _/ 1 ~ DATA D 2I FR~DD PLAN F
_.-~."'IEASE . _.. /14; .. -~ ~ 1 10.00'
~/
~t~.
OWASA AND DUKE POW£R EASEAIFIlT
uults DF
coNSmucnoN
~ P~s:~,ClC>" 'EE~_D ~ PR`''.T."-;~ `~_Ls I/ ~ ~ -
FUNRE .1 Y'
3D• PCP p
NRE F.EG~\r .....__. ..._.__.. .1..Lt ...... _ . .............. _. ............ .
W7~ENERS '\£ ,,
\ r RF
r I.
s.. '~.
j I s n N ,-.., 9az a ~ t1.__ 9oz.. ~ • -tD.DD'
i
F ~/ ••• ~ ~_A~ 8 iV.U01 ~D7 t~-~T • •~~ •-~~ ~ - "~'a1APd NILLICARRROItO PIANNINC BgINOAI
tS ~°°:~- .r ~,~gyzs-t AFr~~s,. ~vzs~ ~ _
.......yCQS ~ ~'~`
"ENNIS:;OUFT= 8 ( ~~~- -aoo
-- -- ~ ` f~~ _.
vD.ln'-- - ~ ~ ~~.
---- ARiO~, ,,.....
,
P05510LE ?0 -• •••~.' 400S1•••~ •••~ ~ 0 ~ `~\\`
'~'~~ FUTURE ~' '- '~ '~~ ~'~- '., ~ Nl' D'WASA MiD DUNE POWER EA9EUENT
CENTERLINE OF ~~'-
_.__._
({':` NEW ROAD , AlITS CF hL"~
7?'~ RETAINING BW p~Y CON57RUCnON
WALL .~•
°~ SEE DETAI A o'
D.W. 959.0 ~ ® ® \..
~57REA41 DUFFER i
~ ~ PRDPERN UNE
Smith Artificial Surface Project
a~r~-.
Carrboro, North Carolina 9t~g~ ~ ~°~~"'n
.,:_, ,~ ~ iT ~ i2
Change County
ReaeatiaT&Pa1F5 ~ •,O"rh t.aTU"c~
October 2, 207 Marab°ih Curt