Subject: Physical Assessment, Former Chapel Hill Town Hall, 100 West Rosemary Street
Summary:
This purpose of this study is to review the planning, architectural, and structural issues related to the
Old Town Hall in Chapel Hill. A web site at www.OldTownHalINC.Wordpress.com has been created as
an extension of this study.
On June 2, 2015, Dave Uhland, RE of LHC Structural Engineers and Statler Gilfillen, an Architect
working directly for Orange County,',visited the site. Structural findings have been incorporated into this
report with his letter attached to this study. Mr. Gilfillen managed the assessment and provided this
summary information.
The structure is located at the corner of Rosemary Street and Columbia St. at 100 Rosemary Street in
Chapel Hill. The Old Town Hall in Chapel Hill was built in 1938, altered in 1963, and renovated into a
Men's Shelter in 1989 . A major asbestos remediation occurred prior to this renovation. The building
is on .41 acres and has 9,195.27 gross square feet on three levels. The building is on the National
Register of Historic Places; however the facility has no historic landmark protection. A recommended
process for historic review has been provided.
The building is structurally sound and is in reasonably good condition. Additional structural support
would be needed on the first and second floors to meet any new use and anticipated occupancy loads
for future use. The building envelope is largely intact and watertight; however building eaves in certain
areas are damaged and in immediate need of maintenance The mechanical system was originally
installed in 1989 and will need to be replaced in the next 2-4 years. There are other non-critical
maintenance issues that need immediate action detailed in this report.
The building had accessibility improvements installed standards in 1989 with an elevator and a ramp to
the basement. Consideration should be given to making the front entry accessible. Staff is currently
evaluating the accessibility of the facility according to the current ADA accessibility code standards.
With regard to the current energy code, the building had major energy improvements in 1989 with
upgrades including insulation and high efficiency, insulated exterior windows.
P.O. Box 8181 * 131 West Margaret Lane-3rd Floor* Hillsborough, North Carolina 27278
Telephone:Area Code 919 245-2625
Fax:644-3001
E-mail:jethompson @orangecountync.gov
2
Physical Assessment, page 2
General Information
Floor Area
1938 building 8,787.07 gross square feet
1963 stair tower at rear 415.20 gross square feet
Total gross square footage is 9,195.27 gross square feet. The following are the total gross square feet
on each level:
Basement: 2,699.01
First Floor: 3,248.13
Second Floor 3,248.13
Notes
1. The basement has 549.12 less square feet, because the 1989 renovations leveled the first floor
by approximately 4 feet leaving the 1938 equipment room (fire station) floor with a head height
of approximately 4 feet in an inaccessible space.
2. The Town of Chapel Hill lists the building as having 9,255 square feet which is 59.73 more than
these calculations.
Land
PIN(s): 9788371539 and 9783370577
Area: 150' x 114.5' = 17,175 square feet, or .39 acres
Assessed Value
Based on the Chapel Hill estimated value of $1,700,000, the cost per gross square foot would be
$184.87 ($1,700,000 /9,195.27 gross square feet)
Floor Heights
According to the 1989 Architect's drawings:
Basement
Front portion: from top of slab to finished first floor is 12'-0"
Back portion: from top of slab to finished first floor is 9'-0"
First Floor: from finished first floor to finished second floor is 12'-0"
Second Floor: from finished second floor to finished ceiling is 12'-0"
Additional Structural Support Need
To meet any new use and anticipated occupancy loads, approximately 30 percent of the first floor and
90 percent of the second floor will need to be upgraded.
The rear and the southeast portions of the first floor that were part of the 1989 renovations can safely
support 100 PSF live load. This confirms the design live load indicated on sheet S-2 of the 1989
structural drawings. The original framing in the southwest portion of the first floor can safely only
support a live load of 50 PSF.
3
Physical Assessment, page 3
The second floor framing, which consists of original 1938 framing, except for the area adjacent to the
elevator that was added in 1989, can safely support a live load of 45 PSF at the area to the rear of the
building and a live load of 50 PSF at the southwest and southeast areas.
Based on the current North Carolina State Building Code, the areas with live load capacity of 45 PSF
would be limited to uses such hotel, multifamily private rooms (Homeless Center) and school
classrooms. The areas with at least 50 PSF live load capacities would be limited to the uses such as
offices and the uses stated above.
The current live load capacities are based on a total dead load of 35 PSF, which includes 25 PSF for
the concrete slab and 10 PSF for ceilings, mechanical, electrical, plumbing, and partitions. Needing to
keep the weight of the partitions within the 10 PSF dead load, will greatly limit flexibility in planning for
use of the current space and in any potential modifications. Anticipated uses of the building would likely
require a higher live load.
To allowing for accommodating maximum use and flexibility of the spaces, the engineer undertook to
explore options to increase the design live load capacity of the floors. The engineer's opinion is that the
most cost effective and feasible way to increase the capacity of the floors is to remove those portions of
the existing floor framing designed for 45 to 50PSF and replace them with new structure designed for
100PSF. This would be similar to what was done on the first floor as part of the 1989 renovations.
New framing will consist of open web steel joists, spaced at 2 feet on center, with 2 inch concrete slab
on 26 gage metal form deck, reinforced with 6x6 W2.1xW2.1 Welded Wire Fabric. At the southwest
corner of the first floor, the new framing could incorporate an anticipated handicap accessible ramp
which is discussed below. This would require at least one new column and foundation pad in the
basement to support the beam just to the west of the front entrance.
The attached structural engineering analysis illustrates the new framing and the approximate location of
the new column. The defined areas for the required remedy at approximately 600 square feet on the
first floor and 2200 square feet on the second floor.
For planning purposes, the engineer estimated that the cost of the construction to remove and replace
structural floor framing system to be between $110 and $150 per square foot. The amounts are rough
estimates do not include any costs associated with de-construction, removal and replacement of
architectural, mechanical, electrical, or plumbing components. Cost for that work is assumed to be part
of the overall up fit of the building.
Accessibility
In 1989, accessibility to the facility was improved with a Dover elevator and a ramp to the basement.
The accessible entry into the building is through the basement. Although this may meet the technical
requirements of the building code, an analysis of a front door accessible was undertaken.
Although there are still some issues to be detailed, it appears that a ramp from the Rosemary Street
and Columbia Street can be made to the level of the front door. The front door is 4'- 0". With
modification to the current landing and steps access into the building can be made. The platform inside
the door is 4'x8' and is 1'-6" below the first floor level. An 18' interior ramp, framed as part of the new
floor on the south west corner, can be created to meet the 18 rise necessary.
The dimensions of the existing Dover elevator would indicate that it is adequate to meet the accessible
standards. It is recommended that the existing elevator be reviewed by experts for maintenance or
replacement.
4
Physical Assessment, page 4
Energy Efficiency
The 1938 building is of V-5" brick construction. Major energy upgrades were done during the 1989
renovations which included high efficiency insulated windows and insulation, particularly in the attic.
Even though the attic was insulated in 1989, the cost of adding even more insulation in the attic may be
a more cost effective solution than furring out and adding additional insulation on the interior walls.
Additionally, any insulation provided against the interior of the brick walls must be carefully evaluated
for moisture and vapor barrier issues.
Site, Parkinq Considerations
Under the current use guidelines, no additional parking is required. Currently there are 12 to 14 parking
spaces on site. Initial review indicates that the existing drive and parking area can be reconfigured to
allow for 7 to 10 additional angled parking spaces. To confirm this, a dimensioned survey is necessary.
Historic Preservation Topics
In 1990 the "Chapel Hill Town Hall" was placed on the National Register of Historic Places. There are
only 14 structures or districts in Chapel Hill and the Chapel Hill Vicinity listed on the National Register.
The Chapel Hill Town Council is considering granting a preservation easement to provide more
protection for the building.
Although the exterior of the building retains its historic significance and should be preserved, the 1963
Alterations and 1989 Renovations stripped away the original detailing, except the entry stair to the
second level. During any potential de-construction process, additional detailing may be found and this
historic detailing may be considered for incorporation into the new interior design. Essentially the
interior is a "clean slate" for the designers to meet any future need.
"..........North Carolina law (G.S. 121-12a) provides for consideration of National Register properties in
undertakings funded or licensed by the state. Where a state undertaking is in conflict with the
preservation of a National Register property, the North Carolina Historical Commission is given the
opportunity to review the case and make recommendations to the state agency responsible for the
undertaking. The commission's recommendations to the state agency are advisory."
(http://www.hpo.ncdcr.gov/whatis.htm) This requirement applies specifically to the State of North
Carolina and not to county and local governments.
Without a resolution in place protecting the Old Town Hall, it is recommended that a similar review
process utilizing the Orange County and Chapel officials and boards so they are "given the
opportunity to review the case and make recommendations to the [appropriate] agency responsible
for the undertaking."
The Secretary of the Interior's Standards for Rehabilitation should be followed in all exterior work on
the Old Town Hall. Specific reference to their preservation bulletins is made under the maintenance
section and on the web site.
5
Physical Assessment, page 5
The historic document file from Preservation Chapel Hill was copied and has been included on the
web site. The contact is Cassandra Bennett (919.942.7818; Cassandra @preservationChapelHill.org)
Eric Field is the Town of Chapel Hill Community Sustainability Planner II who is responsible for
coordination of historic issues (919-969-5077; efeld @townof chapel hill.org).
Peter Sandbeck is the Orange County Cultural Resources Supervisor and secretary to the Orange
County Historic Board (919-245-2517; psandbeck @orangecountync.gov).
Needed Maintenance
There are specific maintenance issues that need further study or attention:
Moisture Damage. Moisture damage is evident at the roof line. This damage appears more evident at
the locations where the gutters and downspouts meet. Determination of the specific cause of this
moisture should be undertaken immediately.
Once moisture damage is noted, the damage typically increases and an increasing rate. Failure to
correct this problem in the very near future could leave the entire structure vulnerable to serious
damage and structural damage. Although the slate roof appears to be in excellent condition, failure to
repair the moisture problem could lead to a very expensive need to repair and/or replace sections of the
slate roof.
First the exact cause of the moisture needs to be determined and repaired. Once that is done, the brick
mortar and wood trim should be repaired.
The 1938 design called for copper lined boxed gutters. Traditionally, even the best designed and
constructed boxed gutters, can cause long term maintenance and repair issues. Once they begin to fail
they continue to fails at an increasing rate. At several locations, the mortar has deteriorated due to
exposure to moisture. The wood fascia and detailing at the eaves shows some substantial ongoing
wood rot and damage with holes in the eaves and pieces of the wood trim that have fallen off. On the
south east, second floor room, the interior plaster wall shows substantial damage from moisture.
Reference is made to the Technical Preservation Briefs, National Park Service, U.S. Department of
Interior Brief no. 2: Repointina Mortar Joints in Historic Masonry Buildings by Robert C. Mack, FAIA,
and John P. Speweik (httg://www.nps, ov/tps/how-to-preserve/briefs/2-repoint-mortar-ioints.htm); Brief
no. 47: Maintainina the Exterior of Small and Medium Size Historic Buildings by Sharon C. Park, FAIA
(http://www.nps.gov/tps/how-to-preserve/briefs/47-maintaining-exteriors.htm).
Cupola. The drawings would indicate that the cupola has been replaced three times since 1938. The
architectural drawings call for replacing the cupola in 1963 and again in 1989. The documents show
that the cupola was replaced in 1990.
6
Physical Assessment, page 6
Currently, sections of the base flashing are sloped so that the rain water is trapped next to the cupola
instead of flushing the water away. Serious deterioration of the wood fascia and moisture damage was
noted. Our review would indicate that this should be repaired in the near future.
Steel Lintels. Although generally the steel window lintels are in good condition, some rusting was
noted. All lintels should be carefully inspected, cleaned and finished. All lintels should be protected
before repointing any masonry.
Basement Moisture. In the rear of the basement in the mechanical room, moisture and minor damage
was noted at the brick along the floor. It was also noted that the AC condensate line going to the floor
drain has a consistent flow of water from the pipe to the drain. Along the basement wall at the back of
the original equipment room, the paint on the brick wall has bubbled and separated from the masonry.
No determination could be made as to how old this damage to the paint is. The bottom of the elevator
shaft is the lowest elevation of the building. Visual inspection indicated that there has been some water
seepage and damage.
Plantings. From the roof, it was noted that the trees on the Rosemary elevation are overgrown and
protrude onto the roof. Proper plant trimming and maintenance needs to be done.
7
m��u VIII L C S N, K- II p II["A]....
June 9, 2015
Orange County Asset Management Services
131 West Margaret Lane
Hillsborough, NC 27278
Attn: Mr. Jeff Thompson
RE: CHAPEL HILL OLD TOWN HALL - STRUCTURAL ASSESSMENT
Dear Mr. Thompson:
On June 2, 2015, LHC Structural Engineers accompanied Statler Gilfillen, Architect, of your
office, to conduct a condition survey of the referenced building located at 100 West Rosemary
Street in Chapel Hill, North Carolina. The purpose of the survey from our standpoint was to
assess the overall structural condition of the building to aid Orange County in their decision of
whether or not to purchase the building. After our site visit, we also reviewed construction
documents that were provided to us for the original design and two later renovations of the
building (described in more detail below), in order to determine the safe live load capacity of the
first and second floors.
Executive summary:
It is our opinion that the overall structural condition of the original1938 building including the
renovations made in 1963 and 1989, is very good. We observed very few structural concerns.
There was no visible evidence of any foundation settlement, such as cracking of either the load
bearing masonry walls or interior partition walls.
Based on our review of the available drawings, the southwest quadrant of the first floor and a
large portion of the second floor have live load capacities of 50 pounds per square feet or less,
limiting the potential use of the building. (See more detailed discussion later in this report.)
To allow for greater flexibility in the use of the space, it may be desired to increase the capacity
of the floors to a design live load of 100 PSF. One method to accomplish this includes removal
and replacement of the affected sections of the floor. We estimate the cost to replace one
section of the first floor to be between $110 and $150 per square for the areas replaced. These
amounts are rough estimates for planning purposes only and do not include any costs
associated with removal and replacement of architectural, mechanical, electrical, or plumbing
components.
lr bf,i° 1 .II rb °:sir,.A 1"1 . 1lerlarw11 I Steverson, 111 .
1 ',3 1 ',Rjn ,iy Di,vr, Si °r 121 III oIghi, IVY )I fiO 1 9 0 9.8 1 a M(37 n 11rc D I 9 8,3 s927 I f nnim
8
Chapel Hill Old Town Hall Structural Assessment
Page 2
Background and Description
The original building, built in 1938, is a two story building with a basement and consists of
exterior multi-wythe load-bearing brick walls. The typical floor framing consists of a two inch
thick concrete slab on lathe supported by open web steel joists at 16 inches on center that
frame either to masonry walls or steel beams and columns. The roof framing consists of slate
shingles on gypsum planks on sloping open web steel joists, supported by steel beams and
columns. There is a wood framed cupola near the south end of the roof that is anchored to the
steel framing with 3/a inch diameter rods.
The original building had a split-level basement and first floor, with the rear of areas
approximately four feet lower than the front areas. The second floor was at a consistent
elevation.
The following is a brief list of some of the significant structural work done in the 1963
renovations:
1. A mezzanine was added between the lower first floor and the second floor.
2. A new stair was also added to the rear of the building.
3. The original cupola was replaced with a similar cupola.
The following is a brief list of some of the significant structural work done in the 1989
renovations:
1. The mezzanine that was added in 1963 was removed.
2. New first floor framing was added at the rear of the building to eliminate the split-level
floor and create a first floor at a consistent elevation.
3. A portion of the first floor framing at the southeast corner was removed and replaced
with new floor slab on metal form deck, steel joists, steel beams, and two columns with
footings below the basement slab. (According to the structural drawings, the design live
load for in this area is 100 PSF.)
Observations:
At some locations the mortar has deteriorated due to exposure to moisture. See photos below.
■
■
LL _
r®
Area below catch basin on west side. Deteriorated mortar below area in left photo.
9
Chapel Hill Old Town Hall Structural Assessment
Page 3
We recommend that deteriorated mortar joints be repointed by an experience mason. The
cause of the water leaking must be identified and corrected to prevent further damage. Other
locations may also require repointing, such as at a steel lintel where the mortar had become
loose due to minor rusting of the steel. At that location, the lintel should be cleaned and
protected before repointing.
We also observed damage to the trim of the cupola caused by exposure to water. From within
the cupola, the wood framing shows evidence of exposure to moisture, but we observed no
significant structural damage. Once the moisture problems have been corrected, the trim can be
replaced.
Water damage to trim of cupola. Evidence of moisture at interior of cupola.
Structural damage not yet significant.
Below the lower portion of the cupola, some of the anchoring threaded rods were visibly loose.
We recommend that these be tightened:
i
P
View of loose threaded rod inside the cupola.
In summary, it is our opinion that the overall structural condition of the building is very good.
Other than the items noted above associated with moisture, we observed no visible evidence of
distress to the structure.
,`1 LHC STRUCTURAL ENGINEERS
10
Chapel Hill Old Town Hall Structural Assessment
Page 4
Load capacity review
Since the capacity of the floor may affect the potential occupancy or use of the building, we also
reviewed the construction documents for the building to determine the uniform live loads that the
floor framing can adequately support. From our review, we conclude the following:
1. The rear and the southeast portions of the first floor that were built as part of the 1989
renovations can safely support 100 PSF live load. This confirms the design live load
indicated on sheet S-2 of the 1989 structural drawings. The original framing in the
southwest portion of the first floor can safely support a live load of 50 PSF.
2. The second floor framing, which consists of original framing except for the area adjacent
to the elevator that was added in 1989, can safely support a live load of 45 PSF at the
area to the rear of the building and a live load of 50 PSF at the southwest and southeast
areas.
The attached reduced plans (Figures 1 and 2) from the 1989 structural drawings provide the
above information graphically.
Based on the current North Carolina State Building Code, the area with live load capacity of 45
PSF would be limited to uses such hotel and multifamily private rooms and school classrooms.
The areas with at least 50 PSF live load capacity would be limited to the uses such as offices
and the uses stated above.
We have based the live load capacities on a total dead load of 35 PSF, which includes 25 PSF
for the concrete slab and 10 PSF for ceilings, mechanical, electrical, plumbing, and partitions.
To keep the weight of the partitions within the 10 PSF dead load will greatly limit flexibility in
planning the current space and in any potential modifications to the space. Due to this fact and
that the anticipated use of the building would likely require a higher live load, at your request, we
have explored options that would increase the design live load capacity of the floors.
It is our opinion that the most cost effective and feasible way to increase the capacity of the
floors is to remove portions of the existing floor framing and replace it with new structure that
has the required capacity. This would be similar to what was done on the first floor as part of the
1989 renovations. We recommend that the design live load for the new framing be 100 PSF,
allowing for maximum flexibility in planning the space.
Recommendations for new framing and cost estimate:
The new framing will consist of open web steel joists spaced at 2 feet on center, with 2 inch
concrete slab on 26 gage metal form deck, reinforced with 6x6 W2.1 xW2.1 Welded Wire Fabric.
It is our understanding from the architect that, to provide accessibility at the front entrance, a
ramp may be required at the southwest corner of the first floor. The new framing could
incorporate this ramp by adding at least one new column and footing to support the beam just to
the west of the front entrance so that the end can be removed, allowing the framing to be
lowered for the ramp.
The attached plans (Figures 3 and 4) show the new framing and the approximate location of the
new column.
For planning purposes, we estimate the construction cost to remove the existing framing and
replace it to be between $110 and $150 per square for the areas replaced. The amounts are
LHC
11
Chapel Hill Old Town Hall Structural Assessment
Page 5
rough estimates for planning purposes only and do not include any costs associated with
removal and replacement of architectural, mechanical, electrical, or plumbing components. Cost
for that work is assumed to be part of the overall upfit of the building.
Thank you for this opportunity to assist you with this project. Please contact us if you have any
questions or concerns regarding our evaluation.
Sincerely,
LHC Structural Engineers, P.C.
o'
020096 _
David L. Uhland, P.E.
Senior Project Engineer
Attachments: Figures 1 through 4
1911 LHC STRUCTURAL ENGINEERS
12
-ERR--
T
z n
a 3 pd.
'FI�sTCi�Z I�I" E
25 14 1 14 KG � y
1100 PSF '
cr
I
x
V�k-llb sw —
W✓r Id�,/ .µ ft.1 I I 1
}�
AK--F L'I'MY Q'QN` _ IA].1VC...°.:`vV
"AM a
[ - `7 - i d =k '-�.1F CeriC.i'�:7. 14
yHaFT - ' i; -r-?-Qd e-l a
_. 47 V
R t, �.
Tr
FOM
-rurd
�Irlpvaxry �t �i,ro�n.��srs.
{F,KTI�ff P•9YI*lgrJ Yt - —
T 14 -Z
i'i' ll °L il.S n f
L Er - Py f3" �}-'} R'-
50 PS I tFJ, E K-�i' {- --- -
LL
k r 1
I � lit 7•
S•s�_e.,and opndleinna shown for --- CURRENT LIVE LOAD
s shown on eheae dray ingi are based --- CAPACITY y
el plans suppiled by the owns[.
ndltlona may vary from lhaM shown
ram one end field measure exini g
�Iahrlca teon of sleet and 3hlll be
` FIRST FLOOR
FIGURE 1 d
45 PSF
is
h
s
sil
L
I 41 r1+k.x'� la"xil rnP�1 I1 -7
WUATF. fil I =t l h F L r_JI r:�R lat
-r,,i. xi%,"x Jw' -2'1,4 100 PSF -
� _..-�''� � FYk9T�}Ida tJAfSTg
L,p-Afio.l A:, TNr.
F—.4 'T
I�'t fl.U,'rNRT r9tlhT —
�IV , ❑F- � � v- rq< ,Qc tiJ 10,2
A71R. -
�. (s C•�'• CAT LQrn
2 T.a.4.+1k'-lie KISflAlq �J kG.
�YE2IFYJ '
T0.4.+III-7�
�` 50 PSF
50 PSF �
�KthTl�! Srrkl.5 � ��iE
�f r vFY? — !VE 1F 7 (VE ;FY)
r4 . F t !2_oil
d
S IL
3
s D
- —
S JJ
CURRENT LIVE LOAD
I SECOND FLOOR CAPACITY
NOTE: Dimensions,sixes,and conditions shown for _
existing struAures shown on these drawings are based rj- y;; LL-
on various original plans supplied by the owner. FIGURE 2
Aclusl existing conditions may vary from those shown.
14
T
"1 n
� = u ^w aL G�IG���r�uG9TEp
i-r:PMS a-SryAF1Nr p lT!'>�1
'FtiKSTCi�Z I�la 23 tJ 14 kG ��,
• — Rvw 49gri m ea4p 414
cr
111 i k
V t�k b sw —
I' 'A�.a*i �� W✓r Ids .Iq R�1 I I I
H iwr-.F Ga — ., 1?'QV?V w AS-WA ?..ter/
"AM a
k-
-•r-,ti @}- •- -- - ��_.- it-µd i '- '''�x°?-@"•erj _+
" - z
vr
�I=16 VR7'•Fy
F, FaL y tten.��5Y$.
Ivrl Jc� —
_+ I -Z
I'I` 2" CONCRETE SLAB ON 26
NIGAGE METAL FORM DECK,
REINFORCED WITH 6x6 -- -- -
W2.1xW2.1 WWF ON
12K3 JOISTS @ 2'-0" O.C.
u
N 3 % L
% T —
UP
POTENTIAL RAMP -- L----and' awn for -.— --- REPLACEMENT
a rhown pn[heae drawings are based . -.- .... .�_
'I PISAI suPyl,cd by lh*owner. FRAMING FOR 100 y
ndnlona may vary from ibos9 shown PSF LIVE LOAD
ramona and field mea"ure eziaiing
Iabrlcateon of 3,*el and Shall be
FIRST FLOOR
IFIGURE 3 d
f
1
2" CONCRETE SLAB ON 26 Ca
GAGE METAL FORM DECK,
REINFORCED WITH 6x6
W2.1xW2.1 WWF ON s
14K6 JOISTS @ 2'-0" O.C.
N
x'a'k;'0 li Elh'7i1�. a ESC. . t1L.
GG511e J
ar FYI9T�}�a �f�15Tg
r 01 `i
F Ku.'r.`.J IQ.7, v' t
sl✓ K ,❑v&,❑V�]W1 -- -
A7Vr ❑F- fail ACV- �<�i wk tiJ 10,?_
n�r1R. yt1A�• �� L,a C'� CAT Lnn
.3 Ta.5.+1k'-7 " Kk5Tl�7q �.J kL,�
�YEfZIF�']_
2" CONCRETE SLAB ON 26
GAGE METAL METAL FORM DECK, 2" CONCRETE SLAB ON 26 A`,
iGAGE•REINFORCED WITH 6x6 METAL FORM DECK,
W2.1xW2.1 WWF ON REINFORCED WITH 6x6
12K3 JOISTS @ 2'-0" O.C. W2.1xW2.1 WWF ON
.� 12K3 JOISTS @ 2'-0" O.C.
FK�`�Tf�G Sfri1.5
i fh t 12_Qu
d
V
S
3
s D
-Z —
S JJ
REPLACEMENT
I SECQND FLOOR FRAMING FOR 100 PSF
NOTE: Dimensions,sixes.and conditions shown for _
esislirig struAures shown on these drawings are based rj- y;; L4
on various original plans supplied by the owner. FIGURE 4
Actual existing conditions may vary from those shown.