Loading...
HomeMy WebLinkAboutRES-2015-032 Resolution Endorsing Transportation Projects for Submission for State Scoring I nF RES-2015-032 1p i Resolution Endorsing Transportation Projects for Submission for State Scoring ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION ENDORSING ORANGE COUNTY'S LIST OF TRANSPORTATION PROJECTS FOR THE BURLINGTON-GRAHAM AND DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATIONS (BGMPO AND DCHC MPO) AND THE TRIANGLE AREA RURAL PLANNING ORGANIZATION FOR CONSIDERATION OF INCLUSION IN THE 2018— 2027 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide Transportation Improvement Program (STIP) that identifies transportation projects to be implemented over the next ten years with State and Federal funding; and WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and regional importance to be included in the FY 2018-2027 STIP; and WHEREAS, the BGMPO and TARPO Transportation Advisory Committees and the DCHC MPO Board are charged with the development of a Metropolitan Transportation Improvement Program (MTIP) or regional priority list; and WHEREAS, Orange County is a member jurisdiction of the BGMPO, TARPO and DCHC MPO; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the County's designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; and WHEREAS, Orange County has outlined its transportation needs within the BGMPO, TARPO and DCHC MPO planning areas in attachments to this resolution; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board endorses the following list of transportation projects to be submitted for scoring by the State and to ultimately be considered for inclusion in the FY 2018-2027 STIP. Burlington-Graham MPO: 1) Mattress Factory Road Interchange: Construct a new interchange at the existing grade- separated crossing of Mattress Factory Road and 1-85/1-40. 2) Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 and close the existing railroad crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. RES-2015-032 Resolution Endorsing Transportation Projects for Submission for State Scoring 3) Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities. Triangle Area RPO: 1) NC 54 Operational Improvements (Orange Grove Road to Old Fayetteville Road): Implement operational improvements along the corridor to address congestion, safety, intersecting street turning movement delays, and the lack of gaps in traffic for side street access to the facility as an alternative to widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side streets along the facility etc. 2) NC 54 Operational Improvements (Dodsons Crossroads/Butler Road to Old Fayetteville Road): Implement operational improvements along the corridor to address congestion, safety, intersecting street turning movement delays, and the lack of usable gaps in traffic for side street access to the facility as an alternative to widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side streets along the facility etc. 3) Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities. 4) Old Greensboro Road Paved Shoulders: Widen Old Greensboro Road (SR 1005) from Carrboro's extra-territorial jurisdiction (ETJ) to the Orange/Alamance County line to include four(4)-foot paved shoulders. 5) Efland-Cedar Grove Road Improvements: Widen Efland-Cedar Grove Road (SR 1004) from Highland Farm Road (SR 1332) to the northern property line of the U.S. Post Office north of Carr Store Road (SR 1352) from a two (2)-lane, 20-foot cross section to a 24-foot cross section with straightening of the roadway where needed, improvements to turn lanes, and the incorporation of bicycle facilities. 6) Orange Grove Road/Buckhorn Road Paved Shoulders: Widen Orange Grove Road (SR 1006) from Dairyland Road (SR 1177) to Buckhorn Road (SR 1114) and Buckhorn Road (SR 1114) from Orange Grove Road (SR 1006) to West Ten Road (SR 1144) to include four (4)-foot paved shoulders. 7) Orange Grove Road Paved Shoulders (From NC 54 to Arthur Minnis Road): Widen Orange Grove Road (SR 1006) from NC 54 to Arthur Minnis Road to include four (4)-foot paved shoulders. 8) Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4)-foot paved shoulders. 9) Orange Grove Road/Dodsons Crossroads: Widen Orange Grove Road (SR 1006) from 1-40 to Dodsons Crossroads (SR 1102) and Dodsons Crossroads (SR 1102) from Orange Grove Road (SR 1006) to Dairyland Road (SR 1177) to include four(4)-foot paved shoulders. Durham-Chapel Hill-Carrboro MPO: 1) South Churton Street (Old NC 86) Improvements: Widen South Churton Street (SR 1009) from 1-40 to U.S. 70 Business to multiple lanes with congestion management, limited access, bicycle and pedestrian, and aesthetic improvements. RES-2015-032 Resolution Endorsing Transportation Projects for Submission for State Scoring 2) 1-40 Widening from 1-40/1-85 interchange to U.S. 15-501: Widen 1-40 from four (4) lanes to six (6) lanes from the 1-40/1-85 interchange to U.S. 15-501/Durham County line. 3) 1-40 Widening from Old NC 86 to U.S. 15-501: Widen 1-40 from four (4) lanes to six (6) lanes from Old NC 86 to U.S. 15-501/Durham County line. 4) 1-40 Widening from NC 86 to U.S. 15-501: Widen 1-40 from four (4) lanes to six (6) lanes from NC 86 to U.S. 15-501/Durham County line. 5) 1-85/Old NC 86 Interchange Improvements: Reconstruct interchange at 1-85 and Old NC 86. 6) 1-85/NC 86 Interchange Improvements: Reconstruct interchange at 1-85 and NC 86. 7) NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four(4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. 8) Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) and make safety improvements. 9) U.S. 70 East/1-85/1-40 Connector: Modify the 1-85/1-40 Connector (SR 1239) interchange at U.S. 70 to provide access from all directions. 10)Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor where they do not exist. 11)Eubanks Road Bike Lanes: Construct bicycle lanes on Eubanks Road (SR 1727) from Old NC 86 (SR 1009) to NC 86. 12)Mt. Carmel Church Road Bike/Pedestrian Improvements: Construct bike lanes and sidewalks from US 15-501 to Bennett Road and bike lanes from Bennett Road to the Chatham County line. 13)Orange High School Road/Harold Latta Road Sidewalk Improvements: Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in-road signage at school entrances and exits on Orange Grove Road, and construct a sidewalk along entrance roads to CW Stanford Middle School. 14)Orange Grove Road/1-40 Pedestrian Bridge: Construct a pedestrian bridge over 1-40 alongside Orange Grove Road (SR 1006), construct a sidewalk along the north side of Orange Grove Road (SR 1006) from the pedestrian bridge to Timbers Drive, construct sidewalks along both sides of New Grady Brown School Road with a midblock crossing, and construct a sidewalk along one side of Oakdale Drive from Cheshire Drive to Orange Grove Road. 15) Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4)-foot paved shoulders. 16)Trail Connection from English Hill Lane to Buttonwood Drive: Construct a multi-use path connecting English Hill Lane to Buttonwood Drive. RES-2015-032 Resolution Endorsing Transportation Projects for Submission for State Scoring 17)Trail Connection from Patriot's Pointe to Timbers Drive: Construct a multi-use path connecting the southwest corner of Patriots Pointe to Timbers Drive to shorten walking distances for pedestrians. Upon motion of Commissioner seconded by Commissioner the foregoing resolution was adopted is the 2"d day of June, 2015. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on June 2, 2015, as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of 2015. Clerk to the Board of Commissioners ® �� u sz rtfj �aca�rlp-