Loading...
HomeMy WebLinkAboutAgenda - 06-02-2015 - 8aORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 2, 2015 Action Agenda Item No. 8 -a SUBJECT: Final Consultant Report Regarding Future Development of Southern Orange County Government Services Campus DEPARTMENT: Asset Management Services PUBLIC HEARING: (Y /N) No ATTACHMENT(S): (UNDER SEPARATE COVER) Report from Clarion Associates INFORMATION CONTACT: Jeff Thompson, 919 - 245 -2658 PURPOSE: To receive and discuss a report recommending development concepts and phasing for future potential facilities on the County's Southern Government Services Campus on Homestead Road in Chapel Hill, pursuant to its governing Special Use Permit that has been approved by the Town of Chapel. BACKGROUND: On June 23, 2014 the Town of Chapel Hill approved the Special Use Permit ( "SUP ") governing the Board - approved master plan for the Southern Orange County Government Services Campus. This SUP provides a 25 year vested development right for the property. Orange County has contracted with Clarion Associates to begin work on the implementation of the Master Plan. Components of the first phase of implementation included review and compilation of information, discussions with County staff, preparation of preliminary infrastructure plans and building concepts, subdivision of the site into development parcels, and preparation of an Implementation Plan for moving forward. The attached report presents this information. Work has been coordinated with other ongoing Orange County efforts, including the Space Study Work Group. Conceptual building plans have been prepared, along with a framework for providing /expanding /adjusting infrastructure on the site. The attached report suggests an initial phase of work on the site focusing on the area around the Southern Human Services building, along with internal street adjustments and proposals for expanding the existing building. The site of the proposed Veterans Memorial is in this first phase. A second phase of work would focus on the area around the Seymour Center (and proposals for expansion of that building), along with reconstructing the entrance to the site, reconstructing the stormwater management ponds on the site, and constructing a new, second entrance to the site. Following this proposed implementation plan and phasing, a subdivision of the site into three parcels is also underway, reflecting the approach and framework described in this report. 2 FINANCIAL IMPACT: None at this time. RECOMMENDATION(S): The Manager recommends that the Board receive and discuss this report, recognizing that the Manager and staff plan to use these recommendations in future Capital Investment Plan development. „»tip of SOUTHERN ORANGE COUNTY GOVERNMENT SERVICES CAMPUS R� ,A 1i Implementateion Report June 2, 2015 0 Table of Contents 1. Overview .................................................................................................................. ............................... 1 2. Background and History of Site ................................................................................. ............................... 2 3. Summary of Special Use Permit Provisions ................................................................ ............................... 4 4. Review of Development Opportunities on Site .......................................................... ............................... 5 A. Expansion of Southern Human Services Building ................................................................ ..............................6 B. Expansion of Seymour Center ............................................................................................ ..............................7 C. Site for Veterans Memorial ............................................................................................... ..............................7 D. New, Second Point of Access ............................................................................................. ..............................8 E. Repair of Stormwater Management Facilities .................................................................... ..............................9 F. Subdivision of Site into Three Parcels ................................................................................ ..............................9 5. Recommended Approach to Development .............................................................. ............................... 10 6. Preliminary Cost Estimates ...................................................................................... ............................... 14 7. Specific Ideas for Consideration .............................................................................. ............................... 14 8. Next Steps .............................................................................................................. ............................... 16 A. Estimated Timelines ......................................................................................................... .............................16 B. Detailed Drawings ............................................................................................................ .............................17 C. Permits to be Obtained .................................................................................................... .............................17 Appendices................................................................................................................. ............................... 17 1. OVERVIEW This report focuses on a 34 -acre tract of land owned by Orange County, and represents a bridge between planning and implementation regarding construction of needed government facilities. Orange County has a rich history and a strong track record of effective and efficient governance. One of the reasons that the County has been successful in providing the services and facilities needed by residents is a strong emphasis on planning ahead - - monitoring trends, preparing projections of population and demand for services, and purposeful planning for facilities that will be needed in the future. In keeping with that tradition, Orange County purchased this 34 -acre tract in Chapel Hill in 1992, anticipating the growth that would be occurring in southern parts of the County, and anticipating the need to be building government facilities to provide services in this growing area, rather than requiring that all residents needing to access county services would need to travel to the County Seat in Hillsborough. An aerial view of this property and its surroundings appears below. The 33.24 acre Southern Orange Campus lies on the south side of Homestead Road in Chapel Hill, just west of Martin Luther King, Jr. Boulevard, and abutting UNC property to the south. Existing facilities on this site include Project HomeStart operated by the Interfaith Council for Social Services, and two county buildings: a Senior Center and a multi - purpose Human Services Center. Most of the site remains undeveloped, and there is significant capacity here in this strategic location to construct additional facilities without need to purchase additional property. This report describes the process to date of planning for additional use of this property, and begins an implementation phase to get the needed facilities on the ground. Southern Orange County Government Services Campus I Implementation Report Page 1 of 2. BACKGROUND AND HISTORY OF SITE This Implementation Report has been prepared as part of a continuing series of initiatives aimed at increasing the capacity of Orange County to provide services to residents of the southern portion of the county. The report will review existing circumstances and plans, offer more specific details about development possibilities, suggest a phasing plan for development of the site, and suggest next steps for implementation. Orange County owns a 34 -acre parcel of land on the south side of Homestead Road in Chapel Hill. Located at 2551 Homestead Road, this site is the current location for the Robert and Pearl Seymour Center, the Southern Human Services Center, and Project HomeStart. There is currently a total of 61,750 square feet of floor area in buildings on the site, served by 258 parking spaces. In an effort to prepare for the public service needs of future residents in the southern portion of Orange County, the County developed a long -range Master Plan for this Southern Orange County Government Services Campus. The campus provides ample opportunities for future development of government services that can serve citizens in southern Orange County. Multiple facilities can be easily located within one convenient and cohesively designed campus. The site is served by public transportation, and is located adjacent to future centers of activity (i.e., Carolina North), creating opportunities for increasing access to public services via alternative modes of transportation — on foot and by bike. The Master Plan that was prepared and approved for this property includes a general, long -range site plan that provides guidance for development of government service facilities over a 25 year planning timeline. The intent of the Master Plan is to provide a general framework for future development that is flexible to new planning and design innovations that will arise over the course of campus development. The Master Plan consists of: (1) a map that identifies areas for future development and areas that should remain undisturbed, and (2) a set of design guidelines that will guide future development actions on this site. A copy of the Master Plan is included here as Appendix 1. Key planning objectives of the Master Plan include: • Coordinate locations of development and public services • Support non - automobile modes of travel • Protect rural lands, and promote clustered, walkable developments • Provide efficient and fiscally responsible public facilities • Protect natural resources and promote sustainable development • Foster compact communities and hubs of activity Subsequent to preparation of this Master Plan, Orange County applied to the Town of Chapel Hill for a Special Use Permit to authorize additional development of facilities on the site. A copy of the approved Special Use Permit is included here as Appendix 2. Southern Orange County Government Services Campus I Implementation Report Page 2 A sketch of existing conditions on the site appears below, followed by a copy of the main Master Plan site diagram that was prepared and adopted. The Master Plan envisions up to 300,000 square feet of new building area on the site, via expansions of the existing Seymour Center and the Southern Human Services Center, and buildings in three new areas of the site. A realignment of the entrance road is planned, along with repair of stormwater management ponds adjacent to the existing road. A new, second entrance to the site is planned along the eastern edge of the property (in an existing, unused right -of -way). An area of existing hardwood forest in the southwest portion of the site is to remain undisturbed. Bicycle and pedestrian paths will be provided, along Homestead Road and internally, including a connection to a major north -south greenway that is to be built just west of the site. Southern Orange County Government Services Campus I Implementation Report Page 3 of 3. SUMMARY OF SPECIAL USE PERMIT PROVISIONS The Chapel Hill Town Council approved a Special Use Permit for this site on June 23, 2014, based on the County's approved Master Plan. The new Special Use Permit covers the entire 34 acre site, incorporates the provisions and authorizations of previously approved permits for the site, and modifies the entitlements and restrictions for additional development. Specifically, the SUP authorizes construction of an additional 300,000 square feet of building floor area on the site, and 600 additional parking spaces The authorization has a 5 -year starting time limit, and a 25 -year life. Construction of the newly authorized development may begin anytime, must begin by June 23, 2019, and be completed by June 23, 2039. Approvals of new facilities on the site are to be administrative approvals, with authority delegated to Town staff by the Special Use Permit to issue permits authorizing construction, following a staff determination that any proposed development is consistent with the terms included in the Special Use Permit. There is a list of 86 stipulations in the Special Use Permit. Many are procedural requirements, many focus on specific design provisions for new facilities and site work, and several focus on construction management. Following are conditions /requirements /restrictions that are particularly relevant for this Implementation Plan. The full set of 86 stipulations appears in Appendix 2. Procedural Stipulations: An administrative Zoning Compliance Permit (ZCP) must be approved by Town staff prior to any development on the site, confirming compliance with provisions of the Special Use Permit and other Town regulations. ZCP's will be issued for specific site improvements, road improvements, and building construction. Building permits will also be required prior to the start of any building construction. Prior to issuance of a ZCP for building construction, approval of building elevations and site lighting by the Town's Community Design Commission is required. • Prior to the issuance of the first ZCP, the following detailed plans must be submitted to and approved by Town staff: grading, landscape protection, planting, solid waste management, and construction management. • Prior to issuance of a ZCP, a Construction Management Plan and Traffic and Pedestrian Control Plan shall be prepared and approved. • The County shall provide to the Town updates and reviews of construction every five years, beginning June 23, 2019. • Updated traffic analyses shall be prepared in 2020, 2030, and 2040. Use and Design Stipulations: • Only governmental services and facilities are authorized for the site. • Detailed plans must be consistent with approved general site plan. Southern Orange County Government Services Campus I Implementation Report Page 4 • Required bicycle and pedestrian improvements along Homestead Road and internal to the site. • Reconstruction of stormwater management ponds to occur at the time that the existing main entrance road to the site is re- aligned. • Detailed site plans for buildings, parking, infrastructure, and roadways to be submitted with each Zoning Compliance Permit application. These and other stipulations of the Special Use Permit are important considerations as phasing plans are drawn for development of planned facilities over time. 4. REVIEW OF DEVELOPMENT OPPORTUNITIES ON SITE The Southern Orange County Government Services Campus is an important and strategic part of the County's land holdings, and provides significant opportunities for needed expansion of facilities and services over time as Orange County's population grows. Orange County has been attentive to recent and expected trends, and needs for facilities. Following is a list of initiatives focusing demands and needs for facilities over the last decade: • 2000 Space Study, updated in 2004, 2005, 2006, and 2007 • 2010 Space Needs Study • 2013 Orange County Facilities Report • 2014 Space Study Follow -up The most recent initiative is a recently completed 2015 Orange County Space Study, which builds upon previous work and comprehensively examines the County's current and projected space needs. Beginning in November 2014, it drew upon the collective experience and information provided by an assembled Space Study Work Group to do an inventory and assessment of existing facilities, project future demand, estimate needs for future space, and provide input into the County's CIP budget process. Key findings of the Space Study are: • Current space, overall, is generally adequate for current needs. • Some short -term adjustments to space are possible now. • Long -term, addition of space and facilities is needed. • A key opportunity for additional space and facilities is at the Southern Campus. • Southern Campus key points: • The Senior Center needs more space, and there is room for expansion. • Current infrastructure on site is inadequate for growth; proposed CIP project. • County needs that could be addressed on the Southern Campus include: ■ Redundant IT hub ■ 911 Center ■ Court facilities ■ Human Services Facilities ■ Educational /multi - purpose facilities. These findings, along with the collection of previous studies help clarify the opportunities and potentials for the Southern Campus property. Southern Orange County Government Services Campus I Implementation Report Page 5 * 10 It is clear from these reports and studies that the best opportunities on the Southern Campus property focus on expansion of the Southern Human Services building and expansion of the Robert and Pearl Seymour Center. Expansion of floor area in these two buildings was also a key recommendation in the approved Master Plan for the site. Following are additional details exploring these two key opportunities. A. EXPANSION OF SOUTHERN HUMAN SERVICES BUILDING A key opportunity is expansion of the existing Southern Human Services Building, and this expansion is recommended to become Phase 1 of implementation of the Master Plan. The building is well- situated and designed to accommodate an addition to the rear of the building, adding a total of 15,000 square feet of floor area in a two -floor configuration. The one -story configuration of the existing building stays in place. Expansion of that existing floor plan to the rear of the building offers the opportunity for an additional 7,500 square feet on that same level. Because the site slopes down, away from the building to the rear, there is opportunity for a lower floor to be added of an additional 7,500 square feet. Additional parking and access areas would be required to accompany this 15,000 square foot addition, and those can be added with relatively little disturbance to site features. Following below is a rendering of how this expansion might be accomplished, fitting into the existing topography on the site. ❑ Existing Building ❑ Existing Pavement ❑ New Building Addition ❑ New Pavement Addition Additional parking could be added by making more efficient use of the area in front of the building (west of the building). Additional parking /loading /drop -off areas can be added around both sides of the existing building and new addition. No changes would be necessary to the entrance road to the site to accomplish this expansion. Southern Orange County Government Services Campus I Implementation Report Page 6 * 11 B. EXPANSION OF SEYMOUR CENTER Orange County's plans anticipate expansion of the existing Seymour Center facility. There are several options for how a major building addition could be accomplished. The most efficient and effective addition would be placed at an existing juncture in the existing building, and extend out to the west. This building addition would be accompanied by a realignment of the main entrance road into the site, and repair /reconstruction of existing stormwater management ponds. Following is an illustration of how this addition might be placed on the site: ❑ Existing Building ❑ Existing Pavement ❑ New Building Addition ❑ New Pavement Addition In addition, review and examination of the existing Seymour Center building as part of the work on this Implementation Report identified a number of small /minor changes that could be considered that would add capacity to the facility at modest cost. There remains a long -term need for a major building expansion here to accommodate growing demand for services to older adults, especially in light of the changing demographic profiles of our communities. A recommendation of this report is that consideration be given to pursuing these smaller adjustments soon, with construction of a major building addition planned further out (as described below in the phasing discussion). C. SITE FOR VETERANS MEMORIAL A recent proposal for use of a portion of this site was brought to the Board of County Commissioners on May 5, 2015: construction of a proposed Veterans Memorial. Over the past several years, interested Orange County residents and others in support of honoring the contributions and service of Orange County military veterans have organized in an effort to raise funds to construct a Veterans Memorial within Orange County. Attention turned to the County's Homestead Road tract in the spring of 2015, Southern Orange County Government Services Campus I Implementation Report Page 7 * 12 and a promising idea emerged. A small piece of this property was once the location for the former Hoyle home site, with a residence that has since been demolished. The site of the former residence, surrounded by large trees and adjacent to the existing entrance road coming into the site, would be a desirable location for the proposed Veterans Memorial. As discussion of this idea evolved, it became clear that this home site could be used for the Memorial in a way that did not compromise or reduce the potential for construction of new County facilities on the site. In addition, the home site is in a location that can be accessed both by the existing internal road configuration, and the proposed new realigned internal road network. An advantage of that site geography is that the timing of construction of the Memorial could take place at any time, either before or after the internal road realignment. The following sketch shows this location on the property: The Board of County Commissioners approved this idea in principle on May 5, and directed County staff to proceed and participate in the ongoing project planning process. D. NEW, SECOND POINT OF ACCESS A key opportunity identified in the Master Plan is the possibility of adding a second point of access into the site, using an existing right -of -way abutting the site to the east. This new point of access appears on the Master Plan, as shown previously on page 3 of this Implementation Report. As the amount of building floor area on this site increases from the existing 61,000 square feet to over 300,000 square feet, the second point of access into the site is very important. The second access also will allow for efficient movement of buses and other vehicles through the site without requiring turnarounds and redundant paths. Phasing considerations are very important here, and the component parts of site development align well. This second means of access into the site will need to be in place before construction work starts to realign the existing entrance road. And the realigning of the existing entrance road would most efficiently take place at the same time as the proposed building expansion for the Seymour Center Southern Orange County Government Services Campus I Implementation Report Page 8 * 13 (which also will be accompanied by reconstruction of the existing stormwater management ponds in that same area). Accordingly, construction of this new point of access into the site would need to be included in Phase 1 of implementation, so that access to the site remains in place while the existing road entrance to the site is reconfigured in Phase 2. E. REPAIR OF STORMWATER MANAGEMENT FACILITIES There are two stormwater detention ponds currently existing near the site's entrance on Homestead Road. Both are in poor condition and in need of repair /reconstruction /replacement. The Master Plan identifies and acknowledges this need (as does the approved Special Use Permit), and proposes to replace the existing ponds with two new ponds, one on each side of the newly realigned entrance road. In addition to satisfying stormwater management requirements, these ponds will also be strategically located in a manner that will provide a significant site amenity along this main entry drive. As noted above, the phasing of site elements can work well and efficiently by (1) Constructing the new access road as part of Phase 1 of implementation, and (2) Including the realignment of the entrance road, the reconstruction of the stormwater ponds, and the major expansion of the Seymour Center, all of which are in close proximity to each other, together in Phase 2. This is described below in the phasing discussion. F. SUBDIVISION OF SITE INTO THREE PARCELS A final key consideration is a recommendation that the 34 acre site be subdivided into three parcels, each slightly larger than 10 acres in size, to allow flexibility for the County in securing potential financing for separate phases of this implementation. The proposed configuration of the subdivision appears below. 11 Ili �, �, ... �_ •- � � Southern Orange County Government Services Campus I Implementation Report Page 9 * 14 S. RECOMMENDED APPROACH TO DEVELOPMENT In consideration of the approved Master Plan for this site, the approved Special Use Permit with specific conditions, and the information and ideas described in this Implementation Report, an approach comes together for construction of these additional governmental facilities The approach starts with a clear vision of the site and its existing facilities, as described previously and illustrated in this drawing: a 34 acre site with three existing facilities. rd The first phase of implementation should include a 15,000 square foot expansion of the Southern Human Services building. This would be an extension to the rear of the existing building, with 7,500 square feet on the same level as the existing facility, and another 7,500 square feet as a lower level. Included in Phase 1, along with the building addition, would be a reconfiguration and addition to the existing parking lot (retaining as many existing parking spaces as possible for reasons of efficiency and cost), construction of the new second access into the site, bicycle /pedestrian improvements along Homestead Road, and reservation of a Veterans Memorial site. Following is a drawing illustrating what would be included in Phase 1. Southern Orange County Government Services Campus I Implementation Report Page 10 \i @III Phase 1 Implementation ti 15 , , �I , , , 1 , I , `s , ,k , , , , ------------ - - - - -� I � I r � I � 0 , , STRIAN AES TEA 0 ROAD , IF - - - - -- _�- Ao - - - -- -_ - - - - - -- - I EXISTING BUILDINGS _ EXISTING ROADS AND PARKING NEW BUILDING ADDITIONS NEW ROADS AND PARKING Southern Orange County Government Services Campus I Implementation Report Page 11 * 16 Phase 2 would include more extensive work on the site. Phase two would involve (1) An additional expansion of the Southern Human Services Building, with associated additional parking and circulation roads; (2) Expansion of the Seymour Center, with associated additional parking and drop -off areas; (3) Reconfiguration of the existing entrance drive (using the Phase 1 newly constructed secondary entrance road for all access while the main entrance is being rebuilt); and (4) Reconstruction of the stormwater management ponds, designed to become an amenity for the site. The following drawing illustrates what site and building components would be included in Phase 2: - - HOME37ggp gpAD -- - -- EXISTING BUILDINGS ~ - _ — — — ------ — � _ . EXISTING ROADS AND PARKING - NEW BUILDING ADDITIONS NEW ROADS AND PARKING NEW STORM WATER AREA Southern Orange County Government Services Campus I Implementation Report Pagc * 17 Phase 3 is the most conceptual, due in part to its being 10 -15 years out. All infrastructure improvements and elements required as conditions of the Special Use Permit approval would very likely be completed by the end of Phase 2 of this implementation plan. Phase 3 becomes, in some ways, a placeholder for future needs. Phase 1 would likely add 15,000 square feet of floor area (addition to Southern Human Services Center). Phase 2 would likely add approximately 46,500 square feet (16,500 square foot addition to the Seymour Center, and a second addition of 15,000 square feet to the Southern Human Services Center). That leaves approximately 250,000 square feet of additional new building capacity that can be built as needs and circumstances require in the future. The following sketch shows the three locations on the site where additional buildings and parking could be located, as approved in the Master Plan and authorized with the Special Use Permit: a" 0 NEW BUILDING ADDITIONS NEW ROADS AND PARKING NEW STORM WATER AREA FUTURE DEVELOPMENT AREA Southern Orange County Government Services Campus I Implementation Report Page 13 of 6. PRELIMINARY COST ESTIMATES Following are initial preliminary cost estimates, in current dollars, with contingencies added, for funding needed to accomplish the first two phases of implementation, as described in this Implementation Report. Phase 1: Two -story building addition to Southern Human Services Building, with related parking and internal road changes, and construction of new, second access into the site (as illustrated on page 11). Building Addition to SHS - 15,000 sf With Related Site Work, Parking Infrastructure Costs, Including New Road Total Phase 1 $6,000,000 to $6,625,000 $1,800,000 to $1,980,000 $7,800,000 to $8,605,000 Phase 2: Additional 2 -story expansion of the Southern Human Services Building, 2 -story expansion of the Seymour Center, reconfiguration of the existing entrance drive, and reconstruction of the stormwater management ponds (as illustrated on page 12). 2nd Building Addition to SHS - 15,000 sf With Additional Site Work, Parking Building addition to Sr. Center - 16,500 sf With Site work for new parking areas Infrastructure costs Total phase 2 $6,000,000 to $6,625,000 $6,600,000 to $7,425,000 $6,000,000 to $660,000 $13,200,000 to $14,710,000 7. SPECIFIC IDEAS FOR CONSIDERATION In addition to the planning for future site development, ideas were generated during discussions as part of work on this Implementation Report that may be considered as detailed plans are drawn. Regarding the Southern Human Services Building: There is interest and opportunity in considering the lower floor of the proposed Phase 1 building addition for Emergency Services operations. The combination of good access for equipment and loading, a safe and easily secured physical setting (in a setting resembling a lower -level basement), and proximity to Chapel Hill and Carrboro is unique. This building addition is proposed at 15,000 square feet, meaning that 7,500 square feet of lower level space would be available. Southern Orange County Government Services Campus I Implementation Report Page 14 * 19 Regarding the Seymour Center: Study of the site and this facility resulted in a series of suggestions for relatively minor structural changes that would result in an increase in the amount of usable space in the Center. These are not included as part of the Phase 2 building expansion, but rather offered as ideas for smaller projects that could enhance the usability of the existing building, in the interim period before Phase 2 work can be funded and implemented. Part of the scope of this implementation phase was to secure assistance and suggestions from a professional with expertise in emerging trends in senior center focus and design. Assistance was obtained from Rick Eldridge, Executive Director of the Rufty - Holmes Senior Center in Salisbury, NC, and a contributor to regional and national examination of these issues. Following is a list of these suggestions for consideration, with sketches on the following pages, suggesting ideas which would enhance capacity of the building, while awaiting the full building addition: 1) Remove /re- locate the wall separating the hallway from the large multipurpose room. 2) Fill -in the floors /ceilings between levels. 3) Relocate open lounge space in lobby to new flooring area and construct new offices in lobby. 4) Convert areas used for fitness machines to office space (with construction of new fitness wing). 5) Reconfigure the Computer Lab to regular classroom space over time by investing in laptops or tablets rather than desktop units, and making sure the building has Wi -Fi throughout. Additional comments are included in Appendix 4. Following are sketches highlighting the areas of the building described above. Purple indicates possible areas for expansion through remodeling of existing space; yellow indicates opportunity for expansion with new building construction. Construct new fitness center Enlarge multi - purpose room Ideas for Improvements focused on 1st Floor of Seymour Center. Southern Orange County Government Services Campus I Implementation Report Page 15 * 20 Ideas for Improvements focused on 2nd Floor of Seymour Center. The menu of potential renovations and additions listed above include minor interior renovations, extensive interior renovations and small additions. Current program offerings point to the need for additional space prior to the proposed two story addition (Phase II) through one or more of the methods highlighted above. We highly recommend that each concept be thoroughly studied and estimated since it is our experience that small renovation and building addition projects can be very expensive on a cost per square foot basis. A cost range for the types of construction outlined could range $75 to $400 per square foot. 8. NEXT STEPS This Implementation Report suggests an approach and framework for adding facilities to the Southern Orange County Government Services Campus pursuant to the Master Plan and Special Use Permit that have been approved for the site. Following are recommendations for next steps. A. ESTIMATED TIMELINES Next steps include preparation of detailed drawings and construction plans for the facilities recommended in Phase 1, along with appropriate funding allocations. Work on detailed building and infrastructure designs could begin during the summer of 2015, in anticipation of construction beginning during 2016. Work to design a Veterans Memorial could begin immediately, in partnership with organizations that have been involved in that effort. Southern Orange County Government Services Campus I Implementation Report Page 16 * 21 B. DETAILED DRAWINGS The following sets of detailed drawings and construction plans will be needed to move forward with implementation of Phase 1: • Construction plans, in coordination with NCDOT and the Town of Chapel Hill, for a new 10' bike /pedestrian facility along Homestead Road. • Construction plans, in coordination with NCDOT and the Town of Chapel Hill, for the new road segment to the east of the property labeled "Chapel Ridge Drive." • Construction plans for the internal road and parking reconfigurations as shown for Phase 1. • Design and building plans for the 15,000 sf addition to the Southern Human Services Building. • Plans for site work to accommodate water and sewer service to the new building addition. • Grading plans. • Landscape protection and planting plans. • Solid Waste Management, Stormwater Management, Utility, and Lighting plans. • Construction Management plan. C. PERMITS TO BE OBTAINED The following permits /approvals will need to be obtained prior to the start of construction for facilities identified in Phase 1: • Approvals from the Town of Chapel Hill and NCDOT for improvements in public rights -of -ways and the new intersection of Chapel Ridge Drive and Homestead Road. • Approval of a Zoning Compliance Permit from the Town of Chapel Hill (administrative approval) for site work. • Approval of building elevations and site lighting by Community Design Commission. • Building permit for any building addition. APPENDICES 1) Master Plan 2) Approved Special Use Permit 3) Veterans Memorial Information 4) Recommendations from Rick Eldridge, with Seymour Center Floor Plans Southern Orange County Government Services Campus I Implementation Report Page 17 22 Appendix r ADOPTED Octobu 16, 2012 ti -I*llj do. NX 1161MT►M41 4911jo kefcr* 1v140 ►I LTA IQk1&14ZINN *IK4FALTjIIIA Master Plan 23 Table of Contents MASTER PLAN OVERVIEW ............... ............................... 1 Planning Objectives .............................. ............................... 1 MASTER PLAN MAP ........................ ............................... 2 DESIGN GUIDELINES ........................ ............................... 4 SITE PLANNING .................................... ..............................4 General................................................. ............................... 4 SitePlans ................................................ ..............................5 SolidWaste Plan ................................... ............................... 6 Construction Management Plan ........... ............................... 6 SteepSlope Plan ................................... ............................... 7 GradingPlan ........................................... ..............................7 Landscape Protection Plan ................... ............................... 7 PlantingPlan .......................................... ..............................7 INFRASTRUCTURE ................................ ..............................7 Water and Sewer .................................. ............................... 7 Storm wate r ........................................... ............................... 8 Lighting /Street and Parking Lots ........... ............................... 8 UNDISTURBED AREAS ........................... ..............................9 SUSTAINABILITY ................................... ..............................9 Orientation............................................ ............................... 9 Daylight................................................. ............................... 9 Shading................................................. .............................10 Water Efficiency .................................... .............................10 Landscape........................................... ............................... 10 Materials............................................. ............................... 10 Energy Management Plan ................... ............................... 10 BUILDINGS.......................................... .............................10 Building Flexibility ................................. .............................10 BuildingEntry ........................................ .............................10 Pedestrian Scale .................................... .............................11 Building Height/ Roof Form .................. .............................11 Aesthetics........................................... ............................... 11 Appendices................................... ............................... 12 24 MASTER PLAN OVERVIEW In an effort to prepare for the public service needs of future residents in the southern portion of Orange County, the county has developed a long -range Master Plan for the Southern Orange County Government Service Campus. Located at 2551 Homestead Road in Chapel Hill, the campus site is the current location for the Robert and Pearl Seymour Center and the Southern Human Services Center. The campus provides ample opportunities for future development of government services that can serve citizens in southern Orange County. Multiple facilities can be easily located within one convenient and cohesively designed campus. The site is served by public transportation, and is located adjacent to future centers of activity (i.e., Carolina North), creating opportunities for increasing access to public services via alternative modes of transportation — on foot or by bike. This Master Plan is a general, long -range site plan that provides guidance for development of government service facilities over a 25 year planning timeline. The purpose of this Master Plan is to provide a framework within which future government facilities can be planned, designed, and constructed. The intent of this Master Plan is to provide a general framework for future development that is flexible to new planning and design innovations that will arise over the course of campus development. This Master Plan consists of (1) a map that identifies areas for future development and areas that should remain undisturbed, and (2) a set of design guidelines that will guide future development actions on this site. Any future changes that occur to either of the two elements of the Master Plan require corresponding revisions to the other element. Planning Objectives The Master Plan was developed under the policy direction of the 2030 Orange County Comprehensive Plan and the Chapel Hill 2020 Comprehensive Plan. Key planning objectives of the Master Plan include: • Coordinate locations of development and public services • Support non - automobile modes of travel • Protect rural lands, and promote clustered, walkable developments • Provide efficient and fiscally responsible public facilities • Protect natural resources and promote sustainable development • Foster compact communities and hubs of activity Plan Development This Master Plan was developed under the supervision of the Southern Orange County Government Services Campus Master Plan Project Program Team and ultimately adopted on October 16, 2012 by the Orange County Board of Commissioners. Two public information sessions were provided on September 4, 2012 at the Seymour Center and the Southern Human Services Center, providing the public with opportunity to view and respond to draft versions of the Master Plan. The appendices provided in this document provide background analysis and information used to develop this Master Plan. Southern Orange County Government Services Campus I MASTER PLAN Page 1 25 MASTER PLAN MAP The 33 -acre campus site offers opportunities for centralized, convenient, accessible, and co- located government facilities within one campus that is served by public transportation. Located adjacent to the Carolina North campus, this site also offers opportunities to connect to the Town of Chapel Hill's greater greenway, pedestrian, and bicycle networks by providing pedestrian and bicycle facilities that link to the Carolina North Greenway and to future facilities planned along Homestead Road. The intent of the Master Plan map is to identify general areas where development should be placed in the future. Accordingly, the map identifies development areas that could accommodate 350,000 additional square feet of floor area, the maximum area that can be permitted for the site per Town of Chapel Hill development regulations. If the site were fully built -out to the maximum floor area permitted, the floor area would cover approximately 28 percent of the total site.',. The campus will be the site for future government services uses. The specific uses that will be developed on this site will be determined over time as specific government facility plans are developed. The Plan Map outlines specific "development areas" where land disturbance activities can occur. These areas may include buildings, parking, stormwater facilities, landscaping, roads, sidewalks and trails, and bike paths. In addition, the Plan addresses opportunities for expansion of existing facilities — the Seymour Center and the Southern Human Services Center. Specific guidance for development of future facilities within these "development areas" are explained in the Design Guidelines section of this Master Plan. As specific site plans are developed, "development areas" may also include natural areas; these areas will not be disturbed for the purpose of protecting existing tree stands, environmentally sensitive areas, or natural recreation areas. The Plan identifies the southwest corner of the site as an area that should remain undisturbed and where development activities should not occur. The roads, pedestrian and bicycle paths, and greenways on the Master Plan map denote general areas where these facilities should be placed. The Master Plan does not identify the precise locations of these facilities, which will be determined upon development of future detailed plans and site plan approval. The percent of the total campus area that could be developed with one -story buildings (i.e., one -story floor area) is calculated by adding the existing floor area (61,750 square feet) to the potential addition of floor area (350,000 square feet) totaling 411,750 square feet. Dividing the total future floor area (411,750) by the total square footage of the site (1437480 square feet or 33 acres) results in the future potential floor area being 28 percent of the total site. This calculation is provided to assist in understanding the quantity of development that can be permitted on the site. It does not suggest that future development be in the form of one -story buildings, or that floor area should total 28 percent of the site. Southern Orange County Government Services Campus I MASTER PLAN Page 2 26 27 DESIGN GUIDELINES This set of Design Guidelines is intended to guide design and siting of future individual government facilities uses. Specific site design objectives for the Master Plan include: • Develop a walkable campus of clustered county services • Be clear about preservation areas and development areas • Promote green design of public facilities • Promote energy efficiency, and reduction of resource consumption • Emphasize transportation connections, with particular attention to non - automobile options • Address tree canopies, greenways, and open space • Coordinate building locations and parking locations • Design road and pedestrian networks to achieve safety and connectivity These Design Guidelines are organized into five core areas: (1) Site Planning (2) Infrastructure (3) Undisturbed Areas (4) Sustainability (5) Buildings SITE PLANNING General The design intent is to create a campus approach for the design of future buildings and development areas. Buildings will be sited to create strong relationships between existing and future buildings on the site and the related pedestrian, bicycle, and vehicular access. Pedestrian access to all new buildings and throughout the campus must be carefully designed with attention to adjacent landscaping to promote walking. Development will follow the natural contours of the site where possible. Preserving significant trees has been a key element of all prior planning efforts on the site, and this Master Plan reinforces that effort by designating specific areas for tree protection. New facilities will be oriented with consideration of sun, wind, and microclimate factors, especially the possible use of daylighting to offset the use of artificial lighting in occupied spaces. Future site designs will follow various elements of the 2020 Chapel Hill Comprehensive Plan. 1) A vibrant center of activity and services 2) A compact community where larger existing areas are left undisturbed 3) Promotion of alternate modes of transportation (environmentally friendly) 4) Green connections to adjacent properties 5) Preserve areas on site and within the developed areas 6) Protect natural resources with effective on site stormwater management and preservation areas Southern Orange County Government Services Campus I MASTER PLAN Page 4 W All plans for new projects at this site will be developed using the Town of Chapel Hill's Design Guidelines as well as the High Performance Guidelines: Triangle Region Public Facilities. All new development will include detailed site plans which will be approved prior to issuance of a Zoning Compliance Permit. Site Plans Site Plans will be approved as part of the Town of Chapel Hill's Zoning Compliance Permit process required for all new development. Future site plans for the site will meet the following guidelines: 1) All vehicular parking layouts will comply with Town of Chapel Hill Standards Lot Layout Schedule Plan. 2) All vehicular pavements will meet minimum town standards for asphalt paving sections. 3) Bicycle parking will comply with all Town of Chapel Hill standards. 4) Roadway sections will include curb and gutter sections with sidewalks on at least one side. A minimum of two travel lanes and bike lanes. Additional turn lanes will be added as needed for intersections. See illustrated streetscape. 5) Roadway designs will comply with all requirements of AASHTO and The Town of Chapel Hill. 6) Bus stops will be provided as necessary and conform to the latest Town of Chapel Hill Standards. 7) Pedestrian walkways will be a minimum of five feet wide and meet Town of Chapel Hill Standards, while using existing topography and natural constraints. Pedestrians will have priority over vehicles in all roadway and parking area crossings. Raised crosswalks will be provided in roadway and parking lot areas for significant pedestrian movements. 8) All concrete curb and gutter will comply with the applicable Town of Chapel Hill Standards. 9) Accessible ramps will be provided at all street intersections and driveway crossings. Ramps will conform to the Town of Chapel Hill Standards and ADA requirements. 10) Sight distance triangles shall be provided at all roadway intersections. A minimum 10'X70' sight triangle will be provided. No plantings will be allowed in the sight triangle. 11) A typical roadway section is provided to show the locations of all utilities in the streets. This section will included street lights which will be located per Town of Chapel Hill standards. 12) All new work to be done on the site will require clearing limits which will be shown on the plans along with the tree protection fencing. All tree protection fencing will comply with the Town of Chapel Hill standards and details. No work can take place until the tree fencing is in place and reviewed and approved by the Town's Urban Forrester. 13) Traffic calming areas, if provided, will comply with the latest Town of Chapel Hill Standard details and signage. Pedestrian crossing will be provided on raised crosswalks and so will comply with all Town Standards. The following street cross - section illustrates the intent for future streets identified on the Master Plan map. They shall include a minimum of two travel lanes, bike lanes, and sidewalk on a minimum of one side of the street. Southern Orange County Government Services Campus I MASTER PLAN Page 5 29 Figure 1: Illustrative Streetscape Section $WIIRRYf J �y 5 SEER LWE wATO IJNC ELECiHIL C.�CfBCCu ILLUSTRATIVE STREET SCAM SEC110N SCA krs. 000WW CIMMOOOMDWO MW o�&?YTedFoof archieens e w Solid Waste Plan A Solid Waste Plan will be approved prior to issuance of a Zoning Compliance Permit and will address the following: 1) New buildings will be required to comply with all applicable Town Standards for Solid Waste Management. Screen walls and concrete pads will be compatible with adjacent buildings on the site and comply with minimum Town of Chapel Hill Standards. 2) Dumpster pads will be constructed of concrete pavement with a minimum compression strength of 4000 psi and sized in accordance with the number of dumpsters needed. The pads will be a minimum of 20 feet deep. All dumpster pad areas shall be designed to accommodate the Town's front loading refuse truck and have an inside turning radius of 40 feet. Backing movements needed to access the pads shall not exceed 100 feet. Heavy duty pavements shall be provided along the access route from the primary roadways to any dumpster area. Recycling roll cart areas shall be provided in all dumpster layouts, and shall conform to all applicable Town Standards. Construction Management Plan A Construction Management Plan will be approved prior to issuance of a Zoning Compliance Permit. A construction staging and access plan shall be required for all new construction on the site. These plans shall indicate routes for the material deliveries as well as construction staging and fencing areas. All traffic control construction plans shall conform to the latest NCDOT Manual on Uniform Traffic Control Devices. Southern Orange County Government Services Campus I MASTER PLAN Page 6 30 Steep Slope Plan A Steep Slope Plan will be approved prior to issuance of a Zoning Compliance Permit, and shall address the following guidelines. a) A Steep Slope Plan will be provided which designates the slopes by 0 -10 %, 10 -15 %, 15 -25 %, and 25% or greater. b) Each slope area will show all clearing limits and the distribution for that slope category on the grading plan. c) No work will be done on slopes greater than 25% without prior approval of the Town. Specialized site construction techniques will be approved by the Town of Chapel Hill for work in any of these areas. Grading Plan An approved Grading Plan is required prior to issuance of a Zoning Compliance Permit. A Grading Plan will be prepared for all new work with new and existing contours at two foot intervals, limits of disturbance, and tree protection fencing locations. The Plan will denote the total perimeter of disturbed areas, as well as existing and proposed impervious surface totals for the property. Landscape Protection Plan A Landscape Protection Plan shall be approved prior to issuance of a Zoning Compliance Permit. A Landscape Protection Plan will be proposed for any new work at the site. The plan will show all existing rare and specimen trees per the Town of Chapel Hill Standards. These trees will be drawn showing their critical root zones. All trees to be removed shall be noted. A clearing limit with the new tree protection fencing shown will be required. A pre- construction /demolition conference will be conducted with the Town of Chapel Hill's Urban Forester to discuss the Landscape Protection Plan. The plan shall comply with all applicable patterns of the Town's Tree Protection Ordinance. The tree canopy coverage calculations will be shown on the plan. Planting Plan An approved Planting Plan is required prior to the issuance of a Zoning Compliance Permit. A Planting Plan will be provided which labels all landscape buffer yards and screens. All existing easements shall be shown on the planting plan. New landscape buffers and parking lot plantings shall be shown along with the calculations for a 35% shading requirement. All new grading and utilities shall be shown on this plan. INFRASTRUCTURE Water and Sewer All water and sewer layouts will conform to the latest OWASA Standards and Specifications. Fire hydrant layout will be provided around the primary road system and comply with all requirements of the Town of Chapel Hill Fire Department. All utilities will be located underground. All water and sewer lines will require a dedicated OWASA easement. All utilities will be located under paved areas where possible with appropriate easements. Stormwater piping and structures will be installed per Town of Chapel Hill Standards. A 20 foot minimum dedicated easement will be provided over all lines and structures for the Town of Chapel Hill. No plantings will be allowed over the utility easements. Southern Orange County Government Services Campus I MASTER PLAN Page 7 31 Stormwater 1) A Stormwater Impact Statement will be prepared for any proposed improvement to the site. The Stormwater Impact Statement will include the following information: a) Written narrative describing existing and proposed conditions, anticipated stormwater impacts and management structures and strategies to mitigate impacts b) Description of land uses and area (in square footage) c) Existing and proposed impervious surface area in square feet for all subareas and project area d) Ground cover and uses information e) Soil information (classification, infiltration rates, depth to groundwater and bedrock) f) Tim of concentration calculations and assumptions g) Topography (2 -foot contours) h) Pertinent on -site and off -site drainage conditions i) Upstream and /or downstream volumes j) Discharges and velocities k) Backwater elevations and effects on existing drainage conveyance facilities 1) Location of jurisdictional wetlands and regulatory FEMA Special Flood Hazard Areas m) Water quality volume calculations n) Drainage areas and sub -areas delineated o) Peak discharge calculations and rates (1, 2, and 25 -year storms) p) Hydrographs for pre -and post - development without mitigation, post — development with mitigation q) Volume calculations and documentation of retention for 2 -year storms) r) 85% total suspended solids (TSS) removal for post - development stormwater run -off s) Nutrient loading calculations t) Stormwater best management practice (BMP) sizing calculations u) Pipe sizing calculations and schedule (include hydraulic grade line and energy grade line calculations and profiles) 2) A Stormwater Management Plan is required for all new work at the site. The plan will included proposed and existing contours at a 2 foot intervals. All existing drainage conditions, features and stormwater piping and structures shall be shown on the plan. All Resource Conservation District (RCD) areas on the site shall be noted with delineated boundaries. All proposed stormwater systems and drainage conditions must be shown. A piping system for the new stormwater system shall be shown with the associated schedule. New roof drains from all buildings shall be shown to their terminations. All proposed stormwater easements shall be labeled and provide a 20 foot width at a minimum. All proposed best management practices shall be shown on the plan with associated details and sections. New plantings and stabilization techniques shall be noted on this plan. A Stormwater Management Plan will included compliance with the latest Town of Chapel Hill requirements as well as Jordan Lake Rules, and shall be approved prior to issuance of a Zoning Compliance Permit. Lighting /Street and Parking Lots All street and parking lighting plans will be approved by the Town of Chapel Hill Community Design Commission (CDC) prior to issuance of a Zoning Compliance Permit. Southern Orange County Government Services Campus I MASTER PLAN Page 8 32 UNDISTURBED AREAS Future site plans will identify areas where land disturbance activities will not occur. 1) No work is allowed in designated undisturbed areas, except for connections of pedestrian paths and greenways. 2) Tree protection fencing is to be provided during construction activities to delineate the amount of clearing in the area. 3) Areas shall be walked for best route and flagged prior to installation of fencing by designer and Urban Forester. 4) Designated disturbed areas are portions of the site needed to support the development area, and may include buildings, parking, stormwater facilities, landscaping, roads, sidewalks and trails, and bike paths. They may also include undisturbed areas identified at the site plan development stage of planning and design. 5) Site plans shall show all clearing limits and tree protection fencing. SUSTAINABILITY All new projects at the site will be done following the Town of Chapel Hill Design Guidelines as well as the High Performance Guidelines: Triangle Region Public Facilities prepared by the Triangle J Council of Governments. Balancing the fulfillment of our current needs without compromising the ability of future generations to meet their needs is the essence of sustainability. Orange County, as an early proponent of sustainable design, will be seek to apply design solutions used on recently completed facilities as well as new technologies and designs where feasible on this site. Orientation The natural setting of the site, its contours and vegetation, shall be viewed as assets to be preserved and woven into the design as much as possible. For the Chapel Hill climate, buildings oriented with the longitudinal axis of the building in the east /west direction will typically have lower energy costs than buildings oriented with the longitudinal axis of the building in the north /south direction. Daylight Using daylight from windows, clerestories, skylights, atriums, etc, is encouraged to reduce artificial lighting and increase user satisfaction. Skylights and atriums should allow narrow building footprints to be naturally lit. Windows close to the ceiling are encouraged to allow greater penetration of daylight. Interior offices should incorporate transoms and vision lights to allow light infiltration into deeper spaces. Uncontrolled use of daylight can lead to user discomfort and increase mechanical cooling requirements. Buildings should incorporate appropriate shading devices over windows and entryways. Roof overhangs, recessed windows, sunshades, and arcades are all devices which can be used to create shade on the face of a building. Automated, motion - sensor or user - controlled interior lighting, either natural or artificial, should be provided to maintain user comfort and reduce energy costs. Southern Orange County Government Services Campus I MASTER PLAN Page 9 33 Shading Passive solar shading is useful for conserving energy, animates buildings and public spaces, and creates additional design opportunities (e.g., a deep -set window shaded by the building frame or by the addition of sunscreens), and will be considered as designs for future buildings on the site are developed. Water Efficiency Water use reduction and irrigation efficiency measures limit or eliminate the use of potable water for landscape irrigation. Designs should reduce the volume and slow the flow of storm water runoff through the landscape with vegetated swales and sequences of check dams and catchments, cisterns and water collection points in parking lots. Rainwater collection is widely used in existing Orange County facilities and should be considered for toilet flushing and irrigation. Landscape Reduce site disturbance and /or restore damaged areas. Choose landscaping which reduces the heat island effect and that is native to North Carolina. Materials Where possible, use durable, recyclable materials made from recycled content that are locally produced. Energy Management Plan The design of future buildings and its systems shall provide energy efficiency of 20 percent above what is required by ASHRAE Standards. The use of sustainable forms of energy (such as solar, wind, geothermal and biofuels) shall be utilized where possible. Any proposed efforts to increase energy efficiency will include investigation of possible participation in the NC Green Power Program or similar programs. Projects shall be monitored over time to help evaluate achievement of goals related to energy efficiency, reduction of carbon footprints, and reduction of single automobile trips. BUILDINGS Building Flexibility Flexible building design that accommodates change is very important and is a proven way to respond to programmatic needs that evolve over time. Initial building phases should be designed as a first step in a larger collection of integrated buildings. To accomplish this, consider the following: 1) Simple Forms: Simple rectilinear forms are preferred because these forms are more easily adaptable to change than buildings with complicated forms. Individual forms should be designed to complement one another as well as their surroundings. 2) Planned Expansion (Additions and Renovations): As site permits, each future building should allow for growth. 3) Massing: Buildings shall be set back off all internal streets and driveways in a consistent manner to produce visual unity. Building Entry An Entrance is a primary building design feature and should be well defined and easily recognizable as a point of entry, regardless of the size of the building. Building entrances provide links between individual building design and site design and should be well defined. At ground level, building design should focus Southern Orange County Government Services Campus I MASTER PLAN Page 10 34 on the pedestrian. Building entrances should be oriented to pedestrian plazas and entry courts and should be open and inviting. Pedestrian Scale At building entrances and on streetscape facades, elements that relate buildings to the size of humans are important. While buildings may be up to 60 feet high, these larger masses can be broken into smaller visual elements through sensitive use of building materials, window articulation and building massing. Building Height/ Roof Form Building heights and their roof forms can be used to promote an overall sense of cohesiveness and offers an opportunity to focus attention to certain key buildings or areas. 1) Building Height: The maximum allowable height for buildings is 60 feet above ground, as measured from the average grade of the site. The maximum height could reach four stories. Floors below grade are permitted. The floor levels of new buildings should match the floor levels of the adjacent existing buildings. Established vertical heights should be maintained to continue the vertical campus grid and allow upper levels of buildings to be connected by bridges. 2) Roof - Mounted Infrastructure Screening: Roof parapets should be used to screen roof - mounted equipment. Roof - mounted mechanical equipment and vent stack pipes should be grouped together and screened from all views on campus. Taller equipment should be enclosed by walls or grills that are in harmony with the design of the building and provide for the required air circulation needs of the equipment. Satellite dishes and antennas must be fully concealed if located on a building. Roof drains shall direct water underground and divert water from structures and paved surfaces to prevent erosion or ponding. Aesthetics Future designs should maintain a uniform architectural style within the development area being proposed. In general, future architectural styles should be compatible with existing architectural styles and should express an image of governmental facilities. Forms and shapes are to be simple, yet creative and appealing and should relate to nearby forms. Southern Orange County Government Services Campus I MASTER PLAN Page 11 35 APPENDICES 1) Context and Background Information Report (July 5, 2012) 2) Site Context Map 3) Site Conditions Map Southern Orange County Government Services Campus I MASTER PLAN Page 12 A� 7 Appendix 1: Southern Orange County Government Services Campus Master Plan Context and Background Information Report July 5, 2012 Al 1 Contents • Project Fundamentals — Objectives • Contextual Information for Site — Regulatory History — Site Conditions and Constraints — Proximate Proposed and Pending Developments — Policy Framework — Key Regulatory Considerations 2 Project Fundamentals: Project Objectives Develop and Adopt Master Plan — General site plan / building program — Plan for phasing — Design Guidelines • Obtain Development Approvals from TOCH — Special Use Permit Modification — Short -term building — Initial Zoning Compliance Permit 3 Contextual Information 1. Existing Site Context 2. Regulatory History of Site 3. Site Conditions and Constraints 4. Proximate Proposed and Pending Developments 5. Policy Framework 6. Key Regulatory Considerations 4 m Southern Human Services Campus 39 m 4. Proximate Proposed & Pending Developments Carolina North i • Site: 947 acre Horace Williams Tract • Mixed -use research and learning campus • Focus on sustainability and fostering innovation • Located due south of Southern Orange Campus Numerous studies, plans, and public input opportunities between 1990 -2008 — 2007 Ecological Assessment Report — 2007 Carolina North Plan — 2008 Carolina North Design Guidelines 11 4. Proximate Proposed & Pending Developments Carolina North • 2007 Carolina North Plan — 50 year development plan for 250 acres — Development concentrated on 228 acres — 8 -9 million sf development — 311 acres in conservation • 2009 SUP for Innovation Center • 2009 Development Agreement and U -1 Zoning — 20 -year agreement for mid -stage plan — 3 million sf of building on 133 acres in SE corner — Uses: university, research, civic, hospital, cultural, housing, businesses, office, recreation, utility, open space 12 42 54 -year Development Plan Southern Orange Campus Carolina North Plan x .. � - • r is N , �k�,•' ' A'.�L e SUemisdlert All 0 e,711- - - J Odo6x 31, 200H � 0 SU0 7000 7510 4DOO FEET >o H °'nes:eaQ Carolina North Plan Southern Orange Cam Mid Stage a — I Li us g p Approx. 3 M 5 -F. A J J' s n — ;; o JI r � v' 0• t 1 j� 1 •�.. I l � - PineYMOUntainR�- 4 - - -- Estes give S n I SLC)IT11551011: _ - aclabe- 31.2006 "Note: School site & PoIlWFlre site to be identified 0 500 T000 1500 x000 FEET 43 Projected Development: First 800,000 square feet Research Building One 225,000 sf Small Ceutral Utility Plant 5,000 sf Law School 250,000 sf Research Building Two 120,000 sf Housing 200,000 sf n Eclstingt3uldings Gamlina North 'L 7 oevelopmrntA9. —.rA Boundary n Froposed lauodings - Roposed Reads Proposea Uw Spaw Pmpoe d Reds Paved Parking M Buildings - lint 600.000 sq. R -Sidewak ImprovemeW9 ___ ;` &ke lane Improvements MINK Realigned Alrwrt lk OTo% Signal lmprwemanls Utility Cemdo, 13--y - Bus Shaper + Rarlmad 77 Cpan 4Pamr THE UNIVERSITY of NORTH CAROLINA at CHAPEL HILL 45 ME" SHELTER ILLLS TRATIVE SITE PLAN CONCEPT PLAN PHASE THE INTER FAITH COLNCL CHAPEL HILL, NORTH CAROLINA GGA ARCHITECTS June 5, 2009 47 CL ar , FM- as r, r nwnia.mam s f weer { JIMSARCUTECTS — _ 5. Policy Framework Orange County Comprehensive Plan • BOCC Planning Principles • Efficient and Fiscally Responsible Public Facilities • Sustainable Growth and Development • Energy Efficiency, Reduced Consumption, Air Quality Protection • Natural Area Resource Preservation • Preservation of Rural Land Pattern • Water Resources Preservation • Promotion of Economic Prosperity and Diversity • Preservation of Community Character 25 5. Policy Framework Orange County Com rghensive Plan • Key Land Use Goals for Consideration 1. Coordinating new development with public service capacity 2. Development that supports non -auto modes of travel 3. Patterns of development that mix uses, limit sprawl, and protect rural lands 4. Promoting clustered, walkable developments 5. Supporting green design of public facilities 6. Land uses that protect natural and cultural resources 26 5. Policy Framework Orang.e County Comprehensive Plan • Key Transportation Goals for Consideration: 1. Multi -modal transportation system 2. Transportation that is accessible to all users 3. Integrated land use and transportation planning 4. Provision of public transit, walking, and biking facilities 5. Provision of public transit facilities (carpooling, park- and -ride) 6. Evaluate and serve special needs (seniors, disabled, disadvantaged, youth) 27 5. Policy Framework Orange County Com rehensive Plan • Key Natural /Cultural Resource Goals for Consideration 1. Energy conservation and use of non - renewable energy sources 2. Sustainable quality and quantity of ground and surface water resources (emphasis on Jordan Lake) 3. Stormwater best management practices 4. Reduction of greenhouse gas emissions and air pollution 5. Promote use of fuel- efficient vehicles 6. Conserve high priority natural areas and wildlife habitats 28 5. Policy Framework Orang.e County Comprehensive Plan • Key Services /Facilities Goals for Consideration 1. Growth consistent with adequate and sustainable County services and facilities 2. Ensure wastewater disposal facilities are appropriate given present and future demand for service 3. Strive to meet 61% waste reduction goal 4. Minimize construction waste 5. Set -aside adequate space and access for waste management and recycling on -site 29 5. Policy Framework 2020 Chapel Hill Comprehensive Plan • Year -long effort to produce draft plan • Emphasis on citizen engagement, key themes, four geographic focus areas for further study • Key Themes: 1. Transportation: Variety and Ecological Consciousness 2. Economic Development: with emphasis on UNC 3. Destination for cultural and entertainment events 4. Improved range of housing choices 30 5. Policy Framework 2020 Chanel Hill Comprehensive Plan • Ideas from the plan relevant to this site: 1. Vibrant center of culture, academia, diversity, and ideas 2. Compact community; population growth expected 3. Promote environmentally - friendly modes of transportation 4. Focus on green infrastructure , emphasis on connections 5. Focus on hubs of activity, with multiple destinations 6. Support and encourage community engagement 7. Be clear about preservation areas and development zones 8. Tree canopy, greenways, and open space 9. Allocation of scarce public resources 10. This site in one of four designated "Focus Areas" 31 5. Policy Framework 2020 Chapel Hill Comprehensive Plan • Focus Area 3 Considerations: 1. Carolina North 2. Connections 3. Transit corridor 4. Complete streets 5. Coordinate development with transportation network cvftm"Apt�' SHE Daprl 32 6. Key Regulatory Considerations • New Development Standards: — 2010 Tree Protection Ordinance • Options for Securing Development Approvals — SUP Major Modification — SUP Minor Modification — Concept Plan Review — Zoning Compliance Permits 6. Key Regulatory Considerations e Protection Ordinance (2010) • Sets out protection of tree canopy cover • Supports Town sustainability goals to reduce carbon emissions and urban "heat island" effect • Institutional Use Canopy Requirement — 40% 33 34 6. Key Regulatory Considerations Tr= rotection Ordinance (2010) • Highest priority for maintenance and tree replacement on -site • Fee -in -lieu of tree replacement is an option • Modifications to standards possible if other sustainability goals met: — LEED — Stormwater management — Goals of the Town Comp Plan, etc. 35 6. Key Regulatory Considerations e Protection Ordinance (2010) • Process for Calculating — Determine net lot size — Calculate required canopy coverage (40 %) — Measure area of existing canopy to be protected — Determine canopy deficit — Calculate replacement trees needed to reach goal 36 — —A exvsking o o tree protection andfor sift fence 37 54 6. Key Regulatory Considerations Special Use Permit Modification • Process: • Application submittal • Town Manager Analysis / Preliminary Conference • Town Manager's Report to Planning Board • Planning Board Review • Town Council /Public Hearing • Town Manager Report /Recommendation for Action • Town Council Action • Key Considerations: — Lengthy, expensive process — If no activity within 2 years, SUP modification expires — 1 -time, 12 month extension available — Can secure building / grading permits 39 6. Key Regulatory Considerations Concept Plan • Process: —Application Submittal — Review by Community Design Commission — Possible review by Town Council • Key Considerations: — Preliminary step toward formal development plan — Shorter and less expensive process — Not possible to obtain grading permits with concept plan approval 40 56 . i Southern Orange County Government Services Campus Master Plan rm' 41 57 58 Prepafmd y: Kay, Peur4toin, Chapel I W1 P[anningwid Swtainab I ity ORAN,,( E I " OUN17 Y Appendix 2 ly '11) %IN () PCH APE HJ 5 1, 405 MARTIN LIlTHER K.ING JR BLVD (,"HAPEL I EILL, NC 275 H (919)9,6&2729 S—'PE(3,At-.(j$ R L ',, �,LMWIJ, -1- — 59 NORTH, CAR,01-INA KNOW All. M B Y T1111.SE PRESENTS, that tbe -undmigrw'd applicarit, orange count y IvIving to 111c TcWn OC Chapel Hill For a Spe;� ial UP4 fk z-11JA. Modifivatiom was, p witrd by thc I owit of ChupO HJU onlunc 23, 2014 the terms of sai d upprowd being, �N' tlollows,: NAM,Z OF PRWECTI St"T'allem, omge county ("knernmem Service's camplis" NAME OF DEVELOPER.'. Orange CtmaAvl GOverffillevit DFSC`.'R1PTI()N OF PREMISE 1,C)(7A]"I ON: 25 5 I Hoummad Road ORANGE COUN7Y RNRCEL IDFN'TIFTER NUMBER, 9930-H-8257 DESCRIP-THIN OF DE-VELOPMENT, GROSS IL,AND, AFJ,,.A,: 343 acrc�; FLOOR AREA,-. 300,000 square Fa;xt proposcd-1 61 ,'750 squan fiat cxWi ng PARKING SPACES; 600 nVIN WhirUbF SPMX*�, 218 ZXislirIg $I%N= EM)", EAN (,-Aj S St 63 01%�quare f el S S PECIAt,'FERMS AN]?, CONDITIOWS 11 X, v c 10PITnem acrording wig tficSitc Plan cl%cd 6"mriwch,-6,2WA, with 01c rollowing mudif"IMIiUll OfTePL1121509W 1. Modiflemion of„' able 3 8 of i,,he Land Use Managenum OT(linauct to a],Iow a 9040cm: mwOnurn, Sucank"lAry ,b46Wq,,, JwIgfil intenon; to the Siiib in the area idewi:ried tpn the appvoved Iflans as the 1101-11-Ilym lfrmdon 0rivelopimpt A rem, 'nrk firlding, is, for IN'lled ori a dcummhwiflon that public Parpmms, aw m4 °m 1,0; an i1vairmt "I , �Xjrw tkgrcc as thic Proposal is I inteTnal I* FAW site, 2),no( Visible ficim, Hovimestead 1�ozd, 3) could rvAucc imNmviom surlhte nrea. oven.fll by oncouraging mmvpnt dovelopaw-af, and dl) k :3 fk:iH,1yft'v1 benefits all of Ow renidems of Orange cuuvvXv as well as LMrvc pyrinciples Of ffier("hapci Ifill Elewloprn�enl acocnfirig to the she PIRn d'alc-d M rdi 6, 7014, i'm fik�, ill CNA[W�Jfill Plag'111i11�,m [)e�,,pattmerfl, condi,'Uoncd con A Che foll'awing; 60 Southern Orange County Government Services Campus SPECIAL USE PERMIT PAGE 2 StjpAlafiQt1q _pp�jfi ic to the Development 5, I . Construction Dcadli= That construction begins by June 23, 2019, to be completed by June 23, 2039. 2. Consolidating of Current Special Use Permits: That the three existing Special Use Permits for the Inter-Faith Project Home Start (Deed Book 109 Page 437), Orange County Southern Human Services Center (Deed Book 1283 Page 257), and Robert and Pearl Seymour Center (Deed Book 1009 Page 437) be consolidated into this Special Use Permit Modification and all conditions of those three permits are in effect with approval of this Special Use Permit Modification for Southern Orange County Government Services Campus unless modified. 3. Detailed Plan Review and Approval: That prior to the issuance of Zoning Compliance Permits for individual buildingsJparking, final detailed site plans shall be approved by the Town Manager that include: 1) Grading, 2) Landscape Protection, 3) Planting, 4) Solid Waste Management, and 5) Construction Management, shall confonn to plans and conditions approved by the Council and demonstrate compliance with the standards of the Land Use Management Ordinance and the Design Guidelines for the Southern Orange County Government Services Campus expansion, and Town Design Manual. Plans, pints, and associated detailed requirements as set forth in the stipulations of this resolution and incorporated into the special use permit modification shall be reviewed and approved by the Town Manager, or his designee, as well as outside agencies where indicated. 4. Council 5-Year Update and Review: That the applicant provides the Town Council with updates and reviews of construction every five years following approval of the Special Use Permit Modification. 5. 0 e Q v rnment " Fag i Ii fy sgs: That any use within the 34.3 acre site, other than governmental services and facilities intended - — ­ —, " _1L to provide protective, administrative, residential, social, transit, and recreational services directly to the general public, are not allowed, 6. Land lLstlitmsit ication authorizes the addition of the following on the 34.3 acre site: ty: This Special Use Permit Modif Land [Jse: Public Use Facilities Floor Area -Nows-.1-of"floor area proposed (61, 75(D s.f. existing) Impervious Surface 39,0,000 s.f new impervious surface 241,550 s.f, ting) Land Disturbance 533,600 s.f. Access 7, Accessibility Reguirements: Prior to issuance of a Certificate of Occupancy for new buildings, the applicant shall provide the minimum required handicapped infrastructure according to Americans with Disabilities Act and associated codes and standards, 8. Performance Ban& 'Mat prior to commencing construction activity for required improvements in the public right-of-way, a performance bond shall be provided to the Town to insure that improvements are in accordance with Town standards. Transportation 9. Transit Improvemen SL : That prior to the issuance of a Zoning Compliance Pennit for individual buildings transit improvements shall be approved by the Town Manager. 10. Bus Pull-Off Payment-in-Lieu: That prior to the issuance of the first Zoning Compliance Permit, the applicant provide a 55,000 payment-in-lieu for a Homestead Road bus pull -off on the south side of Homestead Road. If after five years following issuance of a Certificate of Occupancy it is determined that a pull-off is not necessary, the payment-in-lieu will be refunded to the applicant, upon the request of the applicant. 11. Vehicle Parking: That for each new building, associated vehicle parking must comply with the Land Use Management Ordinance Section 5.9. 11 Bicycle Parking: That for each new building, associated bicycle parking must comply with the Land Use Management Ordinance Section 5.9. 13, Homestead Road Sidewa k/Multi- Modal -Path: That as part of the construction associated with the realignment of the internal drive, the applicant will extend the existing sidewalk and the proposed 10 foot bicycle /pedestrian path along Homestead Road to the west of the site to the Weaver Dairy Road Extension on the eastern leg of the intersection. The new multi-modal path shall be built to Towti/AASTITO, standards and physically separated from Homestead Road, buffered from the vehicular travel lane. 14. 1 ternM Drive That all new internal driveways shall be constructed to provide for 2-way traffic, 5-foot sidewalks on at least one side of the street and a pavement design to provide for daily bus traffic, emergency vehicle access, and safe multi -modal transportation that includes bicycling. A separate "climbing lane" is constructed for bicyclists 61 Southern Orange County Government Services Campus SPECIAL, USE PER-MIT PAGE I from Homestead Road to the first driveway intersection. Sharrow markings are to be indicated on the internal drives in all other locations. 15. E , astem Drive M..Tuming Movements: That, due to potential site distance issues, the proposed eastern driveway shall be limited to right -tuna in/right-turn out access only. 16, Qhape[ Ridge Drive Encroachment Agreement: It will be necessary to obtain an Encroachment Agreement from the Town prior to beginning land disturbance for construction of the new driveway, 17. Syhsequ nt Transportation Impact Analysis (TIA) Updates: It will be necessary to prepare an updated TIA in 2020, 2030, _ ye_ and 2040 according to the Guidelines and Procedures used in the November 2013 Traffic Impact Analysis and the Town's Traffic Impact Analysis Guidelines. The cost of preparation of the TIA shall be borne by the developer and shall be conducted by the Town's T[A consultant. Updated TIAs shall address the accuracy of the projections and assumptions in November 2013 for the Development. The Town may require additional roadway mitigation measures based on the findings and recommendations of the updated'FlAs. 18. Eastbound Deceleration Lane: It will necessary to construct an eastbound right turn deceleration lane with 150 feet of storage on Homestead Road at the existing main entrance within one year after completion of Phase I (described in the November 2013 TIA) construction. 19, Tr ffic Sigi1a and the ..a--.-. -1: It will be necessary to design and install a traffic signal at the intersection of Homestead Road , existing driveway entrance within one year after completion of Phase I (described in the November 2013 TIA) construction. The design and construction of the traffic signal details shall accommodate pedestrian amenities (high visibility crosswalks with pedestrian signals), street lighting, and bicycle activated loops and be subject to approval of the Town and the North Carolina Department of Transportation. 207raffic_Signja rqui Fee: Prior to issuance of the first Zoning Compliance Permit, the applicant shall provide a $2,000 JL - 9 - -- payment to the Town for retiming traffic signals in proximity to the site. 21, 1 i:iqt'qz-Cha el Ridge Drive Public Right-of-Way: That the new roadway shall be constructed with Town Manager approval. This section ofroadway shall be maintained by the applicant or until theTown accepts it for Town triamtenance. 22, Homestead Road Crosswalk: That the applicant will provide a crosswalk from the site to the north side of Homestead Road, at such time as sidewalk is constructed on the north side of Homestead Road, with approval by the Town Manager. 23. Greenwav, Link to Carolina North: That the applicant will provide a greenway link to the University of North Carolina property to the west, Carolina North. 'That the greenway link accessed off the internal drives, connects to the nearby UNC's trail and is built to Town/AASHTO standards prior to issuance o,fa Certificate of Occupancy of Phase I (described in the November 2013 TIA) construction. 24. nw Q - ree X Easement: That the applicant obtain a greenway easement or similar permission, as required by the University of North Carolina for the greenway link to their trail. The link will only be required if the University grants the easement to Orange County. 25. New Natural Surface Trails: That new trails connecting to Carolina North shall be natural surface, and in order to prevent unnecessary trail length, be located to connect directly with on -site buildings and roads. 26. Existiriv On-Site Natural Surface Trail from Carolina North: That the applicant shall connect the existing on-site natural trail from Carolina North to the proposed 10-fo,ot greenway connection. 27, Intemal "l,00D" Road Desiun: The internal loop road in the central /southern part of the site shall be adjusted to reduce the degree to which the loop of the road extends to the west. The final design of the road shall be approved by the Town Manager prior to approval ofthe final plans, 28, Encroachment ALreement Driveway-fingrovements / NCDOT Rig ht -OF Wav: That prior to issuance of a Zoning Compliance Permit for individual buildings, an encroachment agreement between the applicant, and NCDOT shall be executed for improvements in the NCDOT right-of-way. 29. RegLiriht Pqhl.ic R-igbkgf-Way: Prior to a Certificate of Occupancy, it will be necessary to repair all damage for work in the public right-of-way, to the satisfaction of the Town, related to the construction of this project, which may include pavement milling and overlay. 30. Work Zone Traffic Control Plan: Prior to issuance of a Zoning Compliance Permit for individual buildings, it will be necessary to provide a Work Zone Traffic Control Plan and a Construction Management Plan for approval. The Work Zone Traffic Control Plan shall comply with the Manual on Uniform Traffic Control Devices. 31. Vehicular Parking: That prior to the issuance of individual Zoning Compliance Permits for new construction, the applicant shall provide dimensioned details for the vehicular parking spaces and compliance with 5,9 of the Land Use Management Ordinance. 32, DBLicalefluUngr That prior to the issuance of individual Zoning Compliance Pen-nit for new construction, the applicant shall provide dinnensioned details for the number of Class I and I Class 11 bicycle parking spaces that comply with 'Town parking standards, Section 5.9 of the land Use Management Ordinance, 62 Southern Orange County Government Services Campus SPECIAL USE P1 RMiT PAGE 33. Tmansp9_rtatiop Management Plan: That a Transportation Management Plan for individual building proposals shall be approved prior to issuance of the Zoning, Compliance Permit with annual updates required. The required components of the Transportation Management. Plan include: a. Designation of a Transportation Coordinator to communicate and promote alternate modes of transportation. b. Submission of an Occupancy Survey due 90 days after issuance or the final Certificate of Occupancy. c. Submission of an updated annual 'Transportation Management Plan Report and Resident and Employee Surveys during survey years. d. Measures to gradually attain the goals of the program. c. Annual survey of employees for any increase demand for additional bicycle parking. Landscaping and Elevations 34. Landscape Buffers: The following : landscape bufferyards shall be provided: Location I, andsc,ape Buffer Southern Property Line (Carolina North) 20 ft. wide Type C Western Property Line (R-2) 20 ft. wide Type B Northern Property Eastern Property Line ie (Homestead. Road.)' 20 ti� p wide Type BB 35. landscape Protection: That prior to issuance of a Zoning Compliance Permit for new construction, a Landscape Protection Plan shall be approved by the Town with details including trees to be removed and preserved., critical root cones of all rare and specimen trees, with names and species. 36. Tree Save Area: That the mature hardwood forest in the southwest corner and along the western edge of the property shall be protected. A note to this effect shall be placed on the plans. 37. Tree Protection Fencin -g: That prior to issuance of a :cloning Compliance Pen -nit for new construction, the applicant shall provide Town standard landscaping protection notes on Final Plans, including a noted indicating that tree protection fencing will be installed and inspected prior to land - disturbing activity. Tree protection fencing shall be provided around . construction limits, parking, and staging/storage areas. 38. CAr!d apg Planting Ptah: That prior to issuance of a loaning Compliance Permit for new construction, the applicant shall provide a detailed Landscape Planting Plan with a detailed planting list, for approval by the Town. The Plan shall meet the minimum 40% tree canopy coverage requirement of the entire site, including surface parking areas and adhere to screening and shading standards for Section 5.9.6 (a -d) of the Land Use Management Ordinance.. 39, Invasive Exotic Vegetation: That prior to the issuance of a Zoning Compliance Permit, the applicant shall identity on the planting plan, known invasive exotic species of vegetation, as defined by the Southeast Exotic Pest Plant Council (SE- EPPC) and provide notes indicating removal from the landscape bwfFer areas, Prior to planting. 40. Design Cam: That the Design Guidelines for the site be modified to call explicitly for: I. covered walkways that link buildings on the site whenever building location, driveway configuration, and topography allow; 2, clustering of buildings on the site to achieve walkabnlity, visibility, and connectedness while maximizing preservation of undisturbed areas; and 3. sharrows instead of bike lanes for internal driveways and streets including sharrow bicycle signage cons"eted to industry standards. 41. Community Design Commission Approval: Prior to issuance of a Zoning Compliance Permit for new construction, the applicant shall obtain. Community Design. Commission approval ofbuilding elevations and site lighting including special consideration of the location and screening ofIIVAC. Environment 42. Energy Management and Efficiency: That prior to issuance of a Zoning Compliance Permit for new construction, the applicant shall provide an Energy Management Plan (EMP) for Town approval. The plan shall incorporate a "20 percent more energy efficient' feature to outperform the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) energy efficiency standard 90.1 -2010. The property owner shall provide, by the Certificate of Occupancy date, a letter scaled, by a licensed, professional engineer showing the anticipated energy performance of the buildings, as designed and built, satisfies the "20 percent more energy efficient" expectation. Stormwater Mana,:ep ment 43. Siorruwatgr.Management Lqn: That this project must comply with the Section 5.4,51orinwaler Management of the Land Use Management Ordinance. 63 Southern Orange County Government Services Campus SPECIAL USE PERMIT PAGE 5 44. Jordan Stonnwater Management for New I)cvelooment That if the total disturbed area exceeds 0,5 acres, this project must comply with Section 5.19 ,Jordan Watershed Storntwaler Management far Ncvv Development of the Land Use Management Ordinance to provide: the required, reductions in nitrogen and phosphorus loads for new development and redevelopment projects,_ 45. Erosion Control Ins ections: That, in addition to the requirement during construction for inspection alter every rainfall, the applicant shall inspect the erosion and sediment control devices and offsite roadways daily, make any necessary repairs or adjustments to the devices, remove deposition of wet or dry silt on adjacent road +ways and maintain inspection logs documenting the daily inspections and any necessary repairs. 46. Phasic Dan: That prior to issuance of a Zoning Compliance Permit, the applicant shall obtain Town Manager approval of a Phasing, Plan that provides details of which improvements are to be constructed during each phase. The phasing pllan . shall detail that public 'improvements and stormwater management structures will be completed in each phase prior to requesting a Certificate of Occupancy. Construction for any phase may not begin until all public improvements in previous phases are complete, with a note to this effect on the final plans and plats. 4T Jordan Surety: That if the total disturbed area exceeds 0.5 acres, prior to issuance of a Certificate of Occupancy, the owner shall post a maintenance bond or other surety instrument satisfactory to the Town Manager, in an amount equal to one hundred twenty -five (125) percent of the construction cost of each stormwater management facility to assure maintenance, repair, or reconstruction necessary for adequate performance of the stormwater management facility, or establish a stormwater maintenance (sinking fund) budget and escrow account in accordance with the requirements of Section 5.1.9 of the Land Use Management Ordinance. 411. Erosion Control bond: That if one acre or more is uncovered by land; disturbing, activities for this project, then a performance guarantee in accordance with Section 5 -97.1 Bonds of the Town Code of Ordinances shall be required prior to final authorization to begin land - disturbing activities, 49. Stormwater wi aciltttee,sw,_TWa�serr euats autd C7peratictti and Maintenance Plans: That all stormwater detention, treatment and conveyance facilities located on and below the ground shall be wholly contained within an easement entitled: "Reserved Stormwater Facility Easement Hereby Dedicated" and shall be reserved from any development which would obstruct or constrict the effective management:, control, and conveyance of stormwater from or across the property, other than the approved, design and operation functions. A copy of the final plat or easement exhibit, signed and sealed by a North Carolina- registered Land, Surveyor and recorded by the County Register of Deeds, arid, containing the following notes shall be submitted prior to issuance of the Certificate of Occupancy. I . A suitable maintenance access (minimum 20' wide) to accommodate heavy equipment from the nearest public right -of -way to the Reserved Stormwater Facility Easement must be provided and shown on the plans. 2. The "Reserved Stormwater Facility Easements" and the facilities it/they protect are considered to be private, with the sole responsibility of the owner to provide for all required maintenance and operations as approved by the Town. 3, The Reserved Stormwater Facility Easement and the Operations and Maintenance Plan are binding on the owner, heirs, successors, and assigns. 50. Stormwater iipc rat�cany nii,mlulauntunance, Plan Recordation: "That prior to issuance of a Certificate of Occupancy, a Stormwater Operations and Maintenance Plan, signed by the owner and recorded at the County Register of Deeds, shall be provided for the proposed stormwater management facilities and submitted to the Stormwater Management Engineer for approval. A schedule of inspection and maintenance tasks shall be included. The operation and maintenance plan shall require the owner of structural. BMP's to perform and maintain a record of annual inspections by a qualified, professional. 51. Erosion Control: That during the construction phase, additional erosion and sediment controls may be required if the proposed measures do not contain the sediment Sediment leaving the property is a violation of the Tow'n's Erosion and Sediment Control Ordinance. The applicant shall inspect erosion and sediment control devices daily, make necessary adjustments to the devices and maintain inspection logs documenting inspections and repairs.. 51 Curb Inlets:, That the applicant shall provide pre -cast curb inlet hoods and covers stating, "Dump No Waste! Drains to Jordan bake", in accordance with the specifications of the Town Standard Detail SD -5A, for all new curb inlets for private, Town and State fights-of-way, 53. On Site1Adaacant Stprmwa2l r i catiares,: That prior to issuance of a Zoning Compliance Permit for new construction, existing site conditions and features shall be located on plans, including all on -site and adjacent stormwater drainage features. The final plans must provide proper inlet protection for the stormwater drainage inlets on or adjacent to the site to ensure the stormwater drainage system will not be obstructed with construction debris. 54. P.E. Certification: That prior to the issuance of a Certificate of Occupancy for any phase, the applicant shall provide a certification, signed and sealed by a North Carolina- licensed Professional Engineer, that the stormwater management facilities are constructed in accordance with the approved plans and specifications. Water, Sewer, and Other Utilities; 55. Utility/Lighting Plan .. ,p ruoval: That prior to issuance of a Zoning Compliance Permit for new construction, the final utility /lighting plan shall be approved by the Town, Orange Water and Sewer Authority, Duke Energy Company, and other local utility service providers. 64 Southern Orange County Government Services Campus SPECIAL USE PERMIT PAGE 6 56. Lighting _'law That prior to issuance of a Zoning Compliance Permit for new construction, the applicant shall submit a lighting plan, scaled by a Professional Engineer, demonstrating compliance with Section 5.11 of the Land Use Management Ordinance and Town standards, for approval. 57, Street Lighting Plan: Prior to issuance of a Zoning Compliance Permit for new construction, the applicant shall install street lighting along the access driveway from Homestead Road and the new road, Chapel Ridge Drive. The plan shall be approved by the Town and where necessary, by NCDOT. 58. R location of Overhead Utilities 13ndeyg iw . .9und: That prior to a Certificate of Occupancy, the applicant shall install afl new or relocated utilities underground, except for 3 phase or greater electric lines, 59, Utility Easement Plats: That prior to issuance of a Zoning Compliance Permit for new construction, casement plats and documentation shall be approved by the Town and OWASA and recorded by the applicant. Safely 60. Safe_ ty Plan: That prior In the issuance of a Zoning Compliance Permit for new construction,, the applicant shall provide a detailed safety plan, to be reviewed by the Town, regarding 1) visibility and appropriate trimming of landscaping materials, where appropriate, 2) limited access control, including provision of locks and safety standards, 3) use of alamns and carneras, as appropriate and 4) sufficient lighting in parking areas. 6L Fire Sprinklers: That prior to issuance of a Zoning Compliance Permit for new construction, plans shall show all proposed fire department connections to required fire sprinklers, which shall be installed according to NC Fire Code prior to a Certificate of Occupancy. 62. H Active: That all required fire hydrants must be installed, active, and accessible for the Fire Department use prior to the arrival of combustible materials on site. That fire protection systems shall be installed according to Town Ordinance, the NC Fire Code, and NFPA 13. 63, Firefighting Access during Construction: That prior to issuance of a Certificate of Occupancy, NC Fire Code (Section 1410.1 Required Access), and vehicle access for firefighting shall be provided to all construction or demolition sites including, vehicle access to within 100 feet of temporary or permanent fire department connections and hydrants. Vehicle access shall be provided by either temporary or permanent roads capable of supporting vehicle loading under all weather conditions. 64. Fire I lydrant and FDC Locations: That prior to the issuance of a Zoning Compliance Permit, the locations of existing and proposed fire hydrants and Fire Department Connections (FDC) shall be approved, Fire Department Connections shall be located on the street side of the building within 100 feet of a hydrant. Hydrant spacing shall comply with the Town Design Manual. Design shall be approved prior to issuance of a Zoning Compliance Permit. 65. Fire Flow Re nom That prior to issuance of a Zoning Compliance Permit for new construction, the applicant shall provide a fire flow report, with an OWASA flow test that meets Town Design Manual standards, sealed by an Engineer registered in the State of North Carolina for approval. 66. Fire Apparatus Access Road: That any fire apparatus access roads, (any public/private street, parking lot access, fire lanes and access roadways), used for fire department access, shall be all weather and designed to carry the imposed load of fire apparatus weighing at least 75,000 lbs. Fire apparatus access roads shall have a minimum width of 20' with an overhead clearance of at least 13'-6" for structures not exceeding 30' in height and shall provide access to within 150' of all exterior portions of the building. 67, Fire Aerials: That where a building exceeds 30' in height or 3 stories above the lowest level of Fire Department Access, overhead power and utility lines shall not be allowed within the aerial apparatus access roadway and the roadway shall have an unobstructed width of 26' exclusive of the shoulders. At least one of the apparatus access roadways shall be located within a minimum of 15" and maximum of 30'from one complete side of the building. 68. Fire Access Grade and A -....pprp4cb: That fire apparatus access roads shall not exceed 10% in grade unless approved by the Town and all approach and departure angles shall be within the limits established based on the Department's apparatus. 69. Heavy-Duty Pavin : That prior to issuance of a Certificate of Occupancy, the applicant shall provide heavy duty paving designed and built to withstand fire apparatus weighing at least 75,000 pounds. 70. Fire Lane: That prior to issuance of a Certificate of Occupancy for new construction., the fire lane must be marked and signed in accordance with Town standards, with the associated plans approved by the Town prior to issuance of a Zoning Compliance Pennit. 71. I"m,in-QTlqn-qy..,Coinmunications Systei That the developer shall provide building design features which enable public safety responders' radios to penetrate and provide reliable radio transmissions within the buildings. Solid 3Kqste i� M.a.i 4ge.ment and-Recycling 72, Solid Waste Manap-ement Plan: That prior to issuance of a Zoning Compliance Permit for new construction, a detailed Solid Waste Management Plan, including a recycling plan and a plan for managing and minimizing construction debris, shall be approved. Each bulk waste container shall be labeled as to type of material to be collected. Prior to issuance of a 65 Southern Orange County Government Services Campus SPECIAL USE PERMIT PAGE 7 Zoning Compliance Permit, the developer shall provide documentation of an agreement for solid waste collection by a private provider, where necessary. 73. Refuse Container Adjustment: That prior to issuance of a Zoning Compliance Permit for new construction, the proposed location of the refuse container shall be rotated southward, to be on axis with the building face, to improve access for solid waste vehicles. 74. Construction Waste: That per Orange County Ordinance, clean wood waste, scrap metal and corrugated cardboard, all present in construction waste, must be recycled, and haulers of construction waste must be properly licensed. The developer shall provide the name of the permitted waste disposal facility to which any land clearing or demolition waste will be delivered. State and Federal Approvals 75, State or Federal Approvals: That prior to issuance of a Zoning Compliance Permit for new construction, any required State or federal permits or encroachment agreements (e.g,, 401 water quality certification, 404 permit) shall be provided to the "town of Chapel Hill. 76, North.Carolina Department of,rran,sportation Approvals: That prior to issuance of a Zoning Compliance Permit for new construction, plans for any improvements to State-maintained roads or in associated rights-of-way shall be approved by the Town and NTCDOT. Miscellaneous 77. Construction Management Plan: That prior to issuance of a Zoning Compliance Permit for new construction, a Construction Management Plan, that includes the following details, shall be approved: 1) construction vehicle traffic management, 2) on-site construction parking areas including plans to prohibit parking in residential neighborhoods, 3) construction staging and material storage areas, 4) construction trailers and associated temporary structures, and 5) proposed Town Noise Ordinance compliance. 78. Traffic and Pedestrian Control Plan: That prior to the issuance of a Zoning Compliance Permit for new construction, the applicant shall provide a Work Zone Traffic Control Plan for Town approval, for vehicular movement on any public street that will be disrupted during construction, including safe pedestrian circulation. At least 5 working days prior to any proposed lane or street closure the applicant must apply for a lane or street closure permit, 79. Addressing: That prior to issuance of a Zoning Compliance Permit for new buildings, the Town shall assign a building and unit address. 80. Unified Sign Plan: That prior to issuance of a Certificate of Occupancy for Phase I (described in the November 2013 TIA) a L)nified Sign Plan shall be approved by the Town Manager. 81. Construction Sign RM4Lipod: That prior to the issuance of a Zoning Compliance Permit for new construction, a sign detail shall be approved. Prior to the start of land disturbing activities when the Building Pen-nit has been issued, the applicant shall post a construction sign at the development site that lists the property owner's representative and telephone number, the contractor's representative and telephone number, and a telephone number for regulatory information. Non-illuminated signs with a maximum area of 32 square feet and height of 8 feet are allowed (§5.14.3(g) of LUMO). 82. On _Burning: That the open burning of trees, limbs, stumps, and construction debris associated with this development is prohibited. 83, As-Built Plans: That prior to issuance of the first Certificate of Occupancy, the applicant shall provide to the Town certified as-built plans for building footprints, parking lots, street improvements, storm drainage systems and gtormwater management structures, and all other impervious surfaces. 84, Vested Ri ght: This Special Use Permit Modification constitutes a site specific development plan establishing a vested right as provided by N.C.G.S. Section 160A-385.1 and Appendix A of the Chapel Hill Land L)se Management Ordinance. 85. Continued Validity: That continued validity and effectiveness of this approval shall be expressly conditioned on the continued compliance with the plans and conditions listed above. 86. Non-Severability: That if any of the above conditions is held to be invalid, approval in its entirety shall be void. �10, 114� 1 10,1101,110 R1101WORIM KNI [10EIVA 0 MIS 12 =1 WSE�� Itt?m No. 7-c SUBJEC 11 ' rr p emorial Site on vie Say,thern Camp Veterans� M us ............... ............... DEPARTMENT. Asset Management Seirvir. es, PUBLIC IHEA RING: (YIN), No Departmentof Environment, Agriziulturem Parks& Reereation ATTACHMENT($).' 1) -Site Locator 21, Copy of April 29, 2015 Electronic Letter to BOCC,Chair INFORMATION CONTACT: Jeff Thompson, .,9- 26,58 David Stanefl, 919 245-2522 C om rii issionler Ba rry J ,cobs, 19 19,245,,, 2130 Coimrrfiissionet Reriee Price,, 9,19-245- 2130 M PURPOSE; 'T pprow in priociplo the siting of a fuiture, Voterans- Memoria, I upon the Southern Campus in aicooirdain with the recen,,tlly approved Campus Master Plan, and authorize the, Manaf,)ier and staff to parfi<Jpate, in the mrogoin I p(plect planninig process, BACKGROUND: Over the past severa[ years, interested! GranQe County residents and supporters of honaring the canfitWions and service of Orange Counity veterans Ii e organized on an effort to raiSO fUnds, site and construct a Vetemns Meniorial ("Menioriial") within ran us County. In the past several months, these supporters have rais,ed, modest funds for this effort and have focused efforts, on siting the Memofial' i,,,n the hapel Hill" area, working in conjunction with Towiij of Chapel Hill staff. 'In the spri,,nig of, 2015, re present at[ves from the Board (Coin missiloners, Barry Jac obis, and Renee Prim ) and :o, n,l staff began im tin ig w1th the comirviktee During these meetings, the potentiliall for locatinig the memonal on Courdy-owned sites on sou,thern Orange Counly was, diSGU55ed, and ultimate,ly, strong interest was reftected for the Southern Hurnan SerWceis Centeir oampus, On April 113, a class of students at C,VV, Stainford Middle Schoo[, which had been wotking inclopondo ruts y on a ola pirojea w desigo avotoran's rnomonal, presen,,ted their oesigTns to the, committee,, 'The committee, also had the opportundy to walk to Soluthern Garnpus site wit'll, -the, pru:rj,aclt dE,,rsjgner to h)o ,t possible locations, and expressed interesi in the form" r home site wrft 'iiin the camptis, On April 21,, 2015, a meefing of the Veterans Memorial Committee with, Town and iCounty staff was li,eld at the Chapel H11 Libirajry to discuss, and reach consensus on requesting the siting of the Memorial on or near the former I ioryle home, site in coniphance with, the recently' approved 67 Southern Campus Master Plan (note Attachment 1, "'Site Locator"), Attendees of this meeting included residents and supporters from southern, central and northern Orangle County - all of whom participated in the consensus. This, resident group submitted an April 291, 201�5 electronic letter (with the formal signed letter to be provided) to the Board Chair outlining the consensus and the desire to site the Memorial according to the Site Locator. The letter (Attachment 2) emphasized the desire to begin raising funds for the design, construction and maintenance of the Memorial, Should the Board approve the siite In principle, staff recommends the Board reserve the right of final construction approval contingent upon Board approval of- 1) ownership, 2) design', 3) budget and certification of adequate development and construction funds, raised; and 4) the approval of an ongoing operations and maintenance agreement for the Memorial, Additionally, the development will also be, contingent upon the approval of the Memorial according to the design guidefines and other requirements stipulated within the approved Special Use Permit issued by the Town ® Chapel Hill. I imp I I R1 VD-111 1 g - r. W FINANCIAL IMPACT: None, at this t The preliminary recommendation is for the County to own the property underlying the Memorial as well as the finished Memorial itself. Final Board approval is, contingent upon ownership structure, the project budget, certification of adequate funds, raised for the project, design approval, and operations, and mailintenance agreements acceptable to the Board. These elements will be developed and presented to the Board as the project progresses, RECOMMENDATION(S): The Manager recommends the Board: 1 ) Approve in principle the siting of a future Veterans Memorial upon the Southern Campus in accordance with the recently approved Campus Master Pilan, with development contingent upon the approval of the Memorial according to the des,ign g deilines and other requirements stipulated within the approved Special Use Permit issued by the Town of Chapel Hill; 2) Authorize the Manager and staff to participate in the ongoing project planning process; w _ _ ve the right of final construction approval contingent upon Board approval of- 1) ownership, 2) desigin; 3) budget and certification of adequate development and construction funds raised; and 4) the approval of an ongoing operations and maintenance agreement for the Memorial, .: ttachrr §§ W Attachment 2 April 29, 2015 The Honorable Earl McKee Chairman, Orange County Board of Commissioners 5200 Kilter- Road ROLIgemont, NC 27572 Dear Commissioner McKee-. Oil November 22, 2010, Colonel Fred Black, U.S. Army (Retired) and a Vietnam Veteran, then serving as the Veterans Memorial Corninittee Chairman, petitioned the Town Council to approve the siting of a proposed Veterans Memorial at Chapel Hill at time Chapel Hill Memorial Cemetery. This request was approved and the Veterans Memorial Committee began time design phase. A preliminary concept design was developed and brought before the Town Council and approved in April 2013. This merriorial is for all veterans and includes veterans in neighboring communities. We are now formulating the plan for project funding where we will solicit funds needed for memorial construe ti oil. Concurrent with our efforts, veterans, students, and fantifics of veterans of Orange County have also asked time question, "Why don't we have a County Veterans Mernorial?" That challengc has created an opportunity for the veterans of Chapel Hill to join with county veterans to build a noble memorial for time Town of Chapel Hill and Orange County within Chapel Hill. We have shared our memorial's concept with Orange County veterans and it has been well received. This comity memorial may be a good and appropriate fit for flic Orange County Southern Human Set-vices complex oil homestead Rd. Space for a memorial on the "hoillestead" site area may be available. The Veterans Committee has looked at this alternate site and, if available, would provide a premiere location for a Veterans Mernorial at Chapel Hill. It is well-suited for a memorial oil the upper hillside. There is ampic parking, public transportation, and the center is frequently visited by both Chapel Hill and county citizens. I share this information with you now, as we have been asked to consider combining efforts. Time county will soon be asked about a memorial aild an appropriate site. We think that Homestead Road site in Chapel Hill would be well-served to be the home for a vetcralls, memorial for the veterans of Orange County. Most respectfully, JIM ME RRIT'T BRUCE RUNSBERG Veterans Memorial Committee Chairman Co-Chainrian OP . ... .. M, 70 SYMDLpr Center, Ist Floor (Existing), Seymour Center, 2,rd Floor (Existing), 71 RECOMMENDATIONS FROM RICK ELDRIDGE, RUFTY - HOLMES SENIOR CENTER Attached please find a copy of the Seymour Center's floor plans with notes relating to my recommendations. As we discussed on -site, there are several things the Center could do in remodeling existing space to gain usable square footage: 1) Remove /re- locate the wall separating the hallway from the large multipurpose room 2) Fill -in the floors /ceilings between levels 3) Relocate open lounge space in lobby to new flooring area (# 2) and construct new offices in section of lobby; 4) Convert areas used for fitness machines and small exercise classes to office /classroom space (in conjunction with construction of a new fitness wing) I would also suggest that consideration be given to reconfiguring the Computer Lab to regular classroom space over time by investing in laptops or tablets rather than desktop units, and making sure the building has Wi -Fi throughout. Looking at the exterior of the Center building, we identified several options for expansion into newly constructed space. After studying these, I believe it would be good to investigate extending the large multipurpose room into the courtyard area rather than the rear side. The space is already flat and I don't believe you would have to move any utilities. I also feel that coming out into the courtyard area from the other side with a new space for fitness would be better than adding a two -story wing in the front. The new fitness facility could have 1 % to 2 story high ceilings to accommodate various indoor activities such as volleyball and basketball, as well as exercise classes and the use of fitness equipment. By not extending the building toward the front, you might alleviate the need to change the road and drainage ponds out front. A curved driveway is not all bad, if you view it aesthetically. My observation is that the Center needs more office space, classroom space, multipurpose & dining space, and space for health & wellness programs. By remodeling existing space, I think the Center can gain additional office and classroom space. The multipurpose room could be an additional 1/3 rd larger, and a new fitness wing could be 4,000 — 6,000 square feet. The Center already has a great mix of spaces that can be adapted for various purposes. Give me a call should you desire to discuss this in more detail. Rick Eldridge Rufty - Holmes Senior Center