Loading...
HomeMy WebLinkAboutAgenda - 06-02-2015 - 6iORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 2, 2015 Action Agenda Item No. 6 -i SUBJECT: Resolution to Endorse Orange County's Transportation Project Lists for the Burlington- Graham and Durham - Chapel Hill - Carrboro Metropolitan Planning Orqanizations and the Triangle Area Rural Planninq Organization DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) No ATTACHMENT(S): 1. Resolution Endorsing Projects for BGMPO, TARPO and DCHC MPO 2. BGMPO Priority Project Descriptions and SPOT 3.0 Scores 3. BGMPO Project List Map 4. TARPO Priority Project Descriptions and SPOT 3.0 Score 5. TARPO Project List Map 6. DCHC MPO Project Descriptions And SPOT 3.0 Scores 7. DCHC MPO Project List Map INFORMATION CONTACT: Bret Martin, Transportation Planner, 919 - 245 -2582 Tom Altieri, Comprehensive Planning Supervisor, 919- 245 -2575 Craig Benedict, Planning and Inspections Director, 919 -2585 PURPOSE: To consider a resolution (Attachment 1) endorsing transportation projects within the Burlington- Graham Metropolitan Planning Organization ( BGMPO), Durham - Chapel Hill - Carrboro (DCHC) MPO and the Triangle Area Rural Planning Organization ( TARPO) planning areas for State scoring and ultimate consideration of inclusion in the 2018 -2027 Statewide Transportation Improvement Program (STIP). BACKGROUND: Biennially, the North Carolina Board of Transportation (BOT) adopts a multi- year Statewide Transportation Improvement Program (STIP) containing funding and scheduling information for transportation projects throughout the state including those for highways, aviation facilities, public transportation, ferry travel, freight rail, and bicycle and pedestrian facilities. The STIP is the major tool the State uses for the implementation of locally and regionally adopted transportation plans, from which projects are conceived for programming consideration. In 2013 and 2014 the State, in conjunction with the metropolitan planning organizations (MPOs) and rural planning organizations (RPOs) throughout the state, completed the prioritization process for the 2016 -2025 STIP, which is scheduled to be finalized and adopted by the North Carolina Board of Transportation in July 2015. The State is once again beginning the process of developing the 2018 -2027 STIP, which is scheduled to be finalized and adopted in July 2017, and will be requesting local input for transportation project priorities to be submitted through each local government's respective MPO or RPO. Implicit in this process is the application of the Strategic Mobility Formula (SMF) developed as part of the Strategic Transportation Investments (STI) legislation adopted in 2013 as well as an updated scoring methodology that institutes some changes to the inputs and weights used to rank /prioritize projects for consideration of inclusion in the STIP that differ from the inputs and weights used for the development of the 2016 -2025 STIP. The scoring methodology is known as Strategic Planning Office of Transportation (SPOT) scoring. The last iteration of project scoring was known as SPOT 3.0, and the next iteration of project scoring is known as SPOT 4.0. Although the development of this slightly modified methodology has not yet been adopted by the North Carolina BOT, it is important to note that these changes may have some implications for the projects Orange County has previously submitted and will likely be submitting in this next iteration of project prioritization. Further information on the SMF is accessible using the following weblink: http: / /www.ncdot.ov/ download / strategict ransportationinvestments /Strategic ob�ormula Fact Sheet.pdf Further information on the BOT- recommended scoring /ranking methodology for the last iteration of STIP development (SPOT 3.0) is accessible using the following weblink- http://www.ncdot.gov/do n load /strateictransportation investments /Prioritization. pdf Proiect Submission Timeline Based on the State's timeline for the adoption of its final 2018 -2027 STIP, any new projects, project deletions from the existing database, or changes to project descriptions are to be entered into the new database in October for scoring by the State. The lists currently under consideration by the BOCC contain all of the projects Orange County will submit for scoring against the NCDOT- adopted scoring criteria. Once scores for each project are received, later in 2015 or early in 2016 the BOCC will be given the opportunity to rank the projects for each MPO and RPO in priority order to act as a guide for both Technical Comm ittee/Transportation Coordinating Committee and Transportation Advisory Committee /MPO Board representatives from Orange County to strategize /prioritize their assignment of local input points to projects during each organization's respective internal local input process. The Orange Unified Transportation Board (OUTBoard) considered and recommended to the BOCC the attached project lists for BGMPO, TARPO and DCHC MPO (Attachments 2, 4 and 6) at its May 20th meeting. Maps depicting the geographic locations of the proposed projects for each respective MPO /RPO planning area are provided as Attachments 3, 5, and 7. Proiect Inclusion Methodoloq Generally for all three (3) project lists, the starting point for staff was to carry forward those projects submitted as the County's project priorities from the last iteration of project prioritization in 2013 and 2014 that have a prior history of scoring and ranking through Orange County's and the MPO /RPO ranking processes. However, some modifications were made to the lists. Project deletions and explanations of the reasons for their deletion are provided in the tables that follow the project list description tables in Attachments 2, 4 and 6. New projects are noted in Attachments 2, 4 and 6 in the "SPOT 3.0 Score" column in the project list description tables. * *NOTE * *: Staffs original recommendation to the OUTBoard for the NC 54 project on the TARPO list was to submit either the widening of NC 54 (from Orange Grove Road to Old Fayetteville Road and a separate widening project from Dodsons Crossroads /Butler Road to Old Fayetteville Road) OR a less significant and impactful project along the same corridors involving alternative operational improvements that may address some existing congestion, safety, and K traffic operations deficiencies in response to the Town of Carrboro planning staffs opposition to a widening project. The idea was to pursue /submit the alternative operational improvements if it is determined by Orange County transportation planning staff and NCDOT Division 7 engineers that those subject improvements are feasible /practical for improving the noted deficiencies along the corridor without going to the extent of widening it. Staffs recommendation was that if the alternative operational improvements option is determined not feasible /practical to address the deficiencies, then the widening projects for the corridor should be submitted and pursued. The OUTBoard voted only to submit/pursue the projects involving alternative operational improvements. FINANCIAL IMPACT: There is no immediate financial impact associated with this item except that projects specifically categorized as bicycle and pedestrian projects will require a 20 percent local match from the County and will require the County to expend any costs related to right -of- way acquisition, engineering and design, and project management and administration if those projects are to be included in the STIP. The attached project lists contain a total of eight (8) separate bike /ped projects. All bike and pedestrian projects will require a future resolution or letter of commitment from Orange County indicating the County will provide the local match if any of the projects are selected for funding. RECOMMENDATION(S): The Manager recommends that the Board approve /endorse the resolution (Attachment 1) to submit transportation projects to the BGMPO, TARPO and DCHC MPO for State scoring and ultimate consideration of inclusion in the 2018 -2027 STIP. RES- 2015 -032 4 Attachment 1: Draft Resolution Endorsing Transportation Projects for Submission for State Scoring ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION ENDORSING ORANGE COUNTY'S LIST OF TRANSPORTATION PROJECTS FOR THE BURLINGTON - GRAHAM AND DURHAM - CHAPEL HILL - CARRBORO METROPOLITAN PLANNING ORGANIZATIONS ( BGMPO AND DCHC MPO) AND THE TRIANGLE AREA RURAL PLANNING ORGANIZATION FOR CONSIDERATION OF INCLUSION IN THE 2018 — 2027 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide Transportation Improvement Program (STIP) that identifies transportation projects to be implemented over the next ten years with State and Federal funding; and WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and regional importance to be included in the FY 2018 -2027 STIP; and WHEREAS, the BGMPO and TARPO Transportation Advisory Committees and the DCHC MPO Board are charged with the development of a Metropolitan Transportation Improvement Program (MTIP) or regional priority list; and WHEREAS, Orange County is a member jurisdiction of the BGMPO, TARPO and DCHC MPO; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the County's designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation ( NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail- system connectors; and WHEREAS, Orange County has outlined its transportation needs within the BGMPO, TARPO and DCHC MPO planning areas in attachments to this resolution; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board endorses the following list of transportation projects to be submitted for scoring by the State and to ultimately be considered for inclusion in the FY 2018 -2027 STIP. Burlington- Graham MPO: 1) Mattress Factory Road Interchange: Construct a new interchange at the existing grade - separated crossing of Mattress Factory Road and 1- 85/1 -40. 2) Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across East Washington Street and the NCRR /Norfolk Southern railroad right -of -way to intersect U.S. 70 and close the existing railroad crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. RES- 2015 -032 5 Attachment 1: Draft Resolution Endorsing Transportation Projects for Submission for State Scoring 3) Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities. Triangle Area RPO: 1) NC 54 Operational Improvements (Orange Grove Road to Old Fayetteville Road): Implement operational improvements along the corridor to address congestion, safety, intersecting street turning movement delays, and the lack of gaps in traffic for side street access to the facility as an alternative to widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side streets along the facility etc. 2) NC 54 Operational Improvements (Dodsons Crossroads /Butler Road to Old Fayetteville Road): Implement operational improvements along the corridor to address congestion, safety, intersecting street turning movement delays, and the lack of usable gaps in traffic for side street access to the facility as an alternative to widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side streets along the facility etc. 3) Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities. 4) Old Greensboro Road Paved Shoulders: Widen Old Greensboro Road (SR 1005) from Carrboro's extra - territorial jurisdiction (ETJ) to the Orange /Alamance County line to include four (4) -foot paved shoulders. 5) Efland -Cedar Grove Road Improvements: Widen Efland -Cedar Grove Road (SR 1004) from Highland Farm Road (SR 1332) to the northern property line of the U.S. Post Office north of Carr Store Road (SR 1352) from a two (2) -lane, 20 -foot cross section to a 24 -foot cross section with straightening of the roadway where needed, improvements to turn lanes, and the incorporation of bicycle facilities. 6) Orange Grove Road /Buckhorn Road Paved Shoulders: Widen Orange Grove Road (SR 1006) from Dairyland Road (SR 1177) to Buckhorn Road (SR 1114) and Buckhorn Road (SR 1114) from Orange Grove Road (SR 1006) to West Ten Road (SR 1144) to include four (4) -foot paved shoulders. 7) Orange Grove Road Paved Shoulders (From NC 54 to Arthur Minnis Road): Widen Orange Grove Road (SR 1006) from NC 54 to Arthur Minnis Road to include four (4) -foot paved shoulders. 8) Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4) -foot paved shoulders. 9) Orange Grove Road /Dodsons Crossroads: Widen Orange Grove Road (SR 1006) from 1 -40 to Dodsons Crossroads (SR 1102) and Dodsons Crossroads (SR 1102) from Orange Grove Road (SR 1006) to Dairyland Road (SR 1177) to include four (4) -foot paved shoulders. Durham - Chapel Hill- Carrboro MPO: 1) South Churton Street (Old NC 86) Improvements: Widen South Churton Street (SR 1009) from 1 -40 to U.S. 70 Business to multiple lanes with congestion management, limited access, bicycle and pedestrian, and aesthetic improvements. RES- 2015 -032 6 Attachment 1: Draft Resolution Endorsing Transportation Projects for Submission for State Scoring 2) 1 -40 Widening from 1- 40/1 -85 interchange to U.S. 15 -501: Widen 1 -40 from four (4) lanes to six (6) lanes from the 1- 40/1 -85 interchange to U.S. 15- 501 /Durham County line. 3) 1 -40 Widening from Old NC 86 to U.S. 15 -501: Widen 1 -40 from four (4) lanes to six (6) lanes from Old NC 86 to U.S. 15- 501 /Durham County line. 4) 1 -40 Widening from NC 86 to U.S. 15 -501: Widen 1 -40 from four (4) lanes to six (6) lanes from NC 86 to U.S. 15- 501 /Durham County line. 5) 1- 85/Old NC 86 Interchange Improvements: Reconstruct interchange at 1 -85 and Old NC 86. 6) 1 -85 /NC 86 Interchange Improvements: Reconstruct interchange at 1 -85 and NC 86. 7) NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. 8) Eno Mountain Road /Mayo Street at Orange Grove Road: Realign the intersection of Eno Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) and make safety improvements. 9) U.S. 70 East/1- 85/1 -40 Connector: Modify the 1- 85/1 -40 Connector (SR 1239) interchange at U.S. 70 to provide access from all directions. 10) Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor where they do not exist. 11) Eubanks Road Bike Lanes: Construct bicycle lanes on Eubanks Road (SR 1727) from Old NC 86 (SR 1009) to NC 86. 12) Mt. Carmel Church Road Bike /Pedestrian Improvements: Construct bike lanes and sidewalks from US 15 -501 to Bennett Road and bike lanes from Bennett Road to the Chatham County line. 13) Orange High School Road /Harold Latta Road Sidewalk Improvements: Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in -road signage at school entrances and exits on Orange Grove Road, and construct a sidewalk along entrance roads to CW Stanford Middle School. 14) Orange Grove Road /1 -40 Pedestrian Bridge: Construct a pedestrian bridge over 1 -40 alongside Orange Grove Road (SR 1006), construct a sidewalk along the north side of Orange Grove Road (SR 1006) from the pedestrian bridge to Timbers Drive, construct sidewalks along both sides of New Grady Brown School Road with a midblock crossing, and construct a sidewalk along one side of Oakdale Drive from Cheshire Drive to Orange Grove Road. 15) Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4) -foot paved shoulders. 16) Trail Connection from English Hill Lane to Buttonwood Drive: Construct a multi -use path connecting English Hill Lane to Buttonwood Drive. RES- 2015 -032 7 Attachment 1: Draft Resolution Endorsing Transportation Projects for Submission for State Scoring 17) Trail Connection from Patriot's Pointe to Timbers Drive: Construct a multi -use path connecting the southwest corner of Patriots Pointe to Timbers Drive to shorten walking distances for pedestrians. Upon motion of Commissioner , seconded by Commissioner the foregoing resolution was adopted this the 2nd day of June, 2015. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on June 2, 2015, as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of 12015. Clerk to the Board of Commissioners Attachment 2: Draft Burlington- Graham Metropolitan Planning Organization ( BGMPO) Project List Map ID #* Project Project Description SPOT 3.0 Score Construct two(2) -lane frontage road on south side of I -85x -40 from Ben Wilson Road to Mattress Factory /West Ten Road to provide localized access to properties planned Project was implemented using another funding Construct new interchange at existing grade- separated crossing of Mattress Factory Road and 1- 40/1 -85 to relieve existing and /or future expected congestion on for future economic development and to improve local connectivity and circulation between interchanges south of 1- 85x1 -00. source Park - and -Ride Lot in the projected under - capacity existing interchanges at 1- 40/1 -85 and Mebane Oaks Road and 1- 40/1 -85 and Buckhom Road and to serve existing and future growth in the A shared -use park -and- Buckhorn Economic Orange County requests funding for a park- and -ride facility to be located in the Buckhorn Economic Development District (EDD) /Mebane area for a cross - county bus route specific area around the proposed interchange. The proposed interchange would address both traffic capacity deficiencies and reduce crashes related to congestion Development District from Mebane to Durham to collect ridership in eastern Alamance and western Orange Counties as indicated in the Orange County Bus and Rail Investment Plan (OCBRIP). established at the Cone on parallel thoroughfares. The new interchange would also be an opportunity to provide pedestrian and biking facilities across 1- 40/1 -85 that do not currently exist in The park- and -ride facility will provide a transit connection to an area with a growing commuting presence to and from the Thangle Region. Health MedCenter the Mebane area. Mebane 1 Mattress Factory Specific improvements associated with the interchange include: 6.06 Division Road Interchange Construct four (4) -foot bicycle lanes from N. Frazier Road to Stagecoach Road with pedesthan /sidewalk facilities from Saddle Club Road to Stagecoach Road. At its eastern locally administered and did not score high Lebanon Road • Modified diamond interchange with a loop ramp in the southeast quadrant for 1 -40 eastbound exiting vehicles, enough make sidewalk improvements would provide multi -modal mobility and access to existing and future planned origins and destinations along Lebanon Road. • Five (5) -lane roadway section on Mattress Factory Road at the proposed interchange, projects to submit for scohn . • One bridge structure with a five (5) -lane section and bike /ped accommodations; • Traffic signals installed on Mattress Factory Road at the ramp intersection and Oakwood Street with coordinated signals, and Industrial Drive realignment to intersect Mattress factory Road either across from Oakwood Street or further north. Extend Mattress Factory Road northward a distance of approximately 240 feet across East Washington Street and the NCRR/Norfolk Southern railroad right -of -way Mattress Factory to intersect U.S. 70 at a 90 degree angle. The project would also call for the closure of the existing railroad crossover road connecting East Washington Street and 2 Road extension to U.S. 70 approximately 240 feet to the east that currently provides access across the railroad right -of -way to U.S. 70. The project would decrease travel time from 1.64 Division U.S. 70 points along Mattress Factory Road to access U.S. 70, would provide more direct north -south access across the existing railroad right -of -way, and eliminate inconvenient turning movements for motorists and trucks serving existing and future industrial uses south of U.S. 70 and along Mattress Factory Road. Widen Buckhorn Road from U.S. 70 to West Ten Road (SR 1144) to multi -lanes with bicycle and pedestrian facilities. This segment of roadway is over 95% within the BGMPO planning area and borders the western boundary of the 1- 40 /1- 85- Buckhorn Road EDD. This area is the focus of a growing problem oftraffic backing up 3 Buckhorn Road (SR on the northbound exit ramps of 1- 40/1 -85 onto southbound Buckhorn Road and at a left turn into a nonconforming business use just south of the interchange. 11.38 Division 1114) Widening Orange County has extended water and sewer to this area to serve public facilities and to increase the attractiveness ofthe EDD for development. The project was previously submitted through the DCHC MPO as a bike project requesting four (4) -foot paved bike lanes when Buckhom Road was located within that MPO's planning area. Map iU Number corresponds to the general location of each project on Attachment s: bumpu Project List Map. Proiects Deleted From Draft Priority List Project Project Description Reason For Deletion 1- 85x1 -40 Frontage Road Construct two(2) -lane frontage road on south side of I -85x -40 from Ben Wilson Road to Mattress Factory /West Ten Road to provide localized access to properties planned Project was implemented using another funding for future economic development and to improve local connectivity and circulation between interchanges south of 1- 85x1 -00. source Park - and -Ride Lot in the A shared -use park -and- Buckhorn Economic Orange County requests funding for a park- and -ride facility to be located in the Buckhorn Economic Development District (EDD) /Mebane area for a cross - county bus route ride facility has been Development District from Mebane to Durham to collect ridership in eastern Alamance and western Orange Counties as indicated in the Orange County Bus and Rail Investment Plan (OCBRIP). established at the Cone (EDD) /Mebane area The park- and -ride facility will provide a transit connection to an area with a growing commuting presence to and from the Thangle Region. Health MedCenter Mebane Project requires 20% local match, must be Construct four (4) -foot bicycle lanes from N. Frazier Road to Stagecoach Road with pedesthan /sidewalk facilities from Saddle Club Road to Stagecoach Road. At its eastern locally administered and did not score high Lebanon Road terminus, the bicycle improvements would connect to future planned bicycle improvements indicated in the DCHC MPO MTP on Lebanon Road. Both the bicycle lanes and enough make sidewalk improvements would provide multi -modal mobility and access to existing and future planned origins and destinations along Lebanon Road. final BGMPO's final list of projects to submit for scohn . Attachment 3: Burlington- Graham MPO Project List Map 9 y ti _RLO OC DANIE< O O N 7 0 7 Q � � K 7 N O STAGE "COACH -RD Z LEBANON RD S 4 O 2 'WI-OR ST w Z, K u M C G W m O RED GgTE RD o CREEKRQN 0 0 hq x Clt�y Of m � NGr �o Mebane �, Sr ° OA OOD S1 �? ,INDUSTRIAL DR Fp REST N SONTNi.EDR ------------- - _ - --------------- RR o P W WEST TEN o = m RD To Iz PN RD N B0 c O O IN Z 2 � x Z p iin = 3,000 fee t m QB -G MPO Boundary Mebane City Limits RD o mFeet County Planning and Inspections Buckhom EDD (PLUM) -Mebane ETJ Orange Brian Carson (58i2015) Attachment 4: Draft Triangle Area Rural Planning Organization (TARPO) Project List Rank/ Map ID #" Project Project Description /Need SPOT 3.0 Score HIGHWAY PROJECTS Description: Implement operational improvements along NC 54 from Orange Grove Road (SR 1006) to Old Fayetteville Road (SR 1937/1107) to address congestion, safety, intersecting street turning movement delays, and the lack of usable gaps in traffic for side street access to the facility as an alternative to widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side streets, and other possible treatments. This facility and the subject corridor are recommended in the Orange County Comprehensive Transportation Plan (OCCTP) as in need ofwidening from two (2) lanes to four (4) lanes, which is the form the project took when last submitted for consideration of inclusion in the 2016 -2025 STI P. These proposed operational improvements to the facility are an alternative to the initially conceived widening project and come in response to Widening Project: opposition by Town of Camboro planning staff regarding the facility's widening. The OUTBoard was presented with both options and voted to recommend 23.45 Regional pursuit ofthe option to implement these alternative operational improvements. 1 NC ro ements (Orange Improvements (Orange Grove Need: NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Fayetteville Road will substantially exceed the existing roadway capacity by 17.37 Division Road to Old Fayetteville Road) 2035, warranting an increase in capacity through widening. NCDOT traffic figures already indicate that traffic along the segment of NC 54 from Butler Road /Dodsons Cross Road to Neville Road is at capacity and will only continue to substantially exceed capacity in future years. Given these figures, it is also Operational likely that traffic along the segment of NC 54 from Neville Road to Old Fayetteville Road is also at or over capacity. Specific user input on the subject corridor Improvements Not reveals the lack of usable gaps in traffic streams at intersecting streets during peak periods that otherwise might be created by signalization. User input also Scored reveals the presence of extensive travel lane delay on the NC 54 facility as a result of the lack of adequate storage for left and right tums at some intersecting streets and entrances to businesses along the corridor. Among all projects recommended in the OCCTP, this project would likely score the highest relative to other projects given the improvements the project would provide for both congestion and benefit -cost factors. This project is also eligible forfunding at both the regional and divisional tiers, providing it a greater opportunity to be funded than projects that are only eligible forfunding at the division tier. This project will also be submitted as part of the DCHC MPO project list because it overlaps the MPO's planning area boundary. Description: Implement operational improvements along NC 54 from Dodsons Crossroads/Butler Road (SR 1102/1951) to Old Fayetteville Road (SR 1937/1107) to address congestion, safety, intersecting street turning movement delays, and the lack of usable gaps in traffic for side street access to the facility as an alternative to widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side streets, and other possible treatments. This facility and the subject corridor are recommended in the Orange County Comprehensive Transportation Plan (OCCTP) as in need of widening from two (2) lanes to four (4) lanes, which is the form the project took when last submitted for consideration of inclusion in the 2016 -2025 STI P. These proposed operational improvements to the facility are an alternative to the initially conceived widening project and come in response to opposition by Town of Camboro planning staff regarding the facility's widening. The OUTBoard was presented with both options and voted to recommend pursuit of the option to implement these alternative operational improvements. NC 54 Operational Need: NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will substantially exceed the existing roadway capacity 2 Improvements (Dodsons by 2035, warranting an increase in capacity through widening. NCDOT traffic figures already indicate that traffic along the segment of NC 54 from Butler N/A (New Project) Crossroads/Butler Road to Old Road /Dodsons Cross Road to Neville Road is at capacity and will only continue to substantially exceed capacity in future years. Given these figures, it is also Fayetteville Road) likely that traffic along the segment of NC 54 from Neville Road to Old Fayetteville Road is also at or over capacity. Specific user input on the subject corridor reveals the lack of usable gaps in traffic streams at intersecting streets during peak periods that otherwise might be created by signalization. User input also reveals the presence of extensive travel lane delay on the NC 54 facility as a result of the lack of adequate storage for left and right turns at some intersecting streets and entrances to businesses along the corridor. Among all projects recommended in the OCCTP, this project would likely score the highest relative to other projects given the improvements the project would provide for both congestion and benefit -cost factors. This project is also eligible forfunding at both the regional and divisional tiers, providing it a greater opportunity to be funded than projects that are only eligible forfunding at the division tier. This particular project is a subset of the project involving operational improvements to NC 54 from Orange Grove Road to Old Fayetteville Road and is being considered for submission separately because of its ability to score higher by targeting a more congested segment of the corridor. This project will also be submitted as part of the DCHC MPO project list because it overlaps the MPO's planning area boundary. Description: Widen Buckhom Road from U.S. 70 to West Ten Road (SR 1144) to multi -lanes with bicycle and pedestrian facilities. This segment of roadway is 3 Buckhom Road (SR 1114) over 95% within the BGMPO planning area and borders the western boundary of the 1A0/I -85- Buckhom Road EDD. 11.37 Division Widening Need: This qeneral vicinity of this proposed pro ect is the focus of a growing problem of traffic backing up on the northbound exit ramps of IA0 /I -85 onto Attachment 4: Draft Triangle Area Rural Planning Organization (TARPO) Project List Rank/ Map ID #* Project Project Description /Need SPOT 3.0 Score southbound Buckhom Road and at a left turn into a nonconforming business use just south of the interchange. Orange County has extended water and sewer to this area to serve public facilities and to increase the attractiveness of the EDD for development. The project was previously submitted through the DCHC MPO as a bike pro ect requesting four (4 )-foot paved bike lanes when Buckhom Road was located within that MPO's planning area. Description: Widen Old Greensboro Road (SR 1005) from Carrboro's extra - territorial jurisdiction (ETJ) to the Orange/Alamance County line to include four (4)- foot paved shoulders. This project would be a segment of the North Carolina Mountains to Sea Bicycle Route (designated as North Carolina Bike Route 2). Part Old Greensboro Road Paved of this project is located within the DCHC MPO planning area. This project is recommended as a bikeway improvement in the OCCTP. 4 Shoulders 8.44 Division Need: This project would provide a continuous paved bikeway segment from Carrboro through the southwestern portion of Orange County to connect with other bikeway segments that comprise the state's Mountain to Sea bicycle route. The project is not likely to score very high using either the State's highway or bike/ pedestrian scoring factors because of its rural context and is only eligible forfunding at the division tier. Description: Widen Efland -Cedar Grove Road (SR 1004) from Highland Farm Road (SR 1332) to the northern property line of the U.S. Post Office north of Carr Store Road SR 1352) from a two (2)�ane, 20 -foot cross section to a 24 -foot cross section with straightening of the roadway where needed, improvements to turn lanes, and the incorporation of bicycle facilities. This project is recommended in the OCCTP. Efland-Cedar Grove Road (SR This project proposal overlaps with STIP project W5143 to improve the horizontal alignment ofthe curve on Efland -Cedar Grove Road north of its intersection 5 1004) Improvements with Highland Farm Road. This project is scheduled for construction completion in 2016. 7.49 Division Need: The project would improve travel time with an increase in design speed and would improve safety with travel lane straightening and an increase in pavement width. This segment of Efland -Cedar Grove Road is a travel alternative to NC 86 for traffic from northwestern Orange County to access IA0/85, and as such, traffic is projected to continue to increase in future years. This project is not likely to score very high using the State's congestion scoring factor and is only eligible for funding at the division tier. However, the project may score well against the State's safety scoring factor. Description: Widen Orange Grove Road (SR 1006) from Dairyland Road (SR 1177) to Buckhom Road (SR 1114) and Buckhom Road (SR 1114) from Orange Grove Road (SR 1006) to West Ten Road (SR 1144) to include four (4) -foot paved shoulders. This project is recommended as a set of bikeway improvements Orange Grove Road /Buckhom in the OCCTP. 6 Road Paved Shoulders 6.43 Division Need: This project would provide one segment of a bikeway connection through western Orange County from Camboro to the Buckhom Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible forfunding at the division tier. BIKEWAY PROJECTS — Description: Widen Orange Grove Road (SR 1006) from NC 54 to Arthur Minnis Road to include four (4) -foot paved shoulders. This project is recommended as Orange Grove Road Paved a set of bikeway projects in the OCCTP. 7 Shoulders (From NC 54 to Arthur Minnis Road) * — Need: This project would provide one segment of a bikeway connection through western Orange County from Camboro to the Buckhom Road and Mebane 17.57 Division area and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible forfunding in the division tier. Description: Widen Dairyland Road (SR 1004/1113/1177) from Union Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4)-foot paved shoulders. Part of this project is located within the DCHC MPO planning area. The portion of this project within the DCHC MPO planning area is being recommended for inclusion in that project list. This project is scheduled in the STIP for a feasibility study (STIP # EB- 5108). The project is recommended as a 8 Dairyland Road Paved bikeway improvement in the OCCTP. 17.40 Division Shoulders Need: This project would provide one segment of a bikeway connection through western Orange County from Camboro to the Buckhom Road and Mebane area and improve the safety of the subject thoroughfare for motorized vehicular travel. The project is not likely to score very high using the State's bile/ pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier. Description: Widen Orange Grove Road (SR 1006) from 1-40 to Dodsons Crossroads (SR 1102) and Dodsons Crossroads (SR 1102) from Orange Grove Road 9 Orange Grove Road / Dodsons (SR 1006) to Dairyland Road (SR 1177) to include four (4)-foot paved shoulders. This project is recommended as a set of bikeway improvements in the 15.09 Division Crossroads Paved Shoulders OCCTP. Attachment 4: Draft Triangle Area Rural Planning Organization ( TARPO) Project List Rank/ Map ID #* Project Project Description /Need SPOT 3.0 Score The vehicles eligible for use Need: This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from the area south of the schools and Up to six (6), 25 -foot, 18- passenger cutaway bus vehicles to accommodate bus service expansion as recommended in the Orange County Bus and Rail Investment Plan within the TARPO planning area have been ordered and Orange County Bus and connect to a proposed bikeway facility on Orange Grove Road northward into Hillsborough. The project would also improve safety for motorized vehiculartravel will be delivered to the Rail Investment Plan on this segment of Orange Grove Road. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context Park - and -ride or kissand- and is only eligible for funding in the division tier. -neap iu Number corresponds to the general iocanon of eacn project on Attachment a: 1AKPO Pro /ea List neap. ** Bike projects require a 20q local match and must be locally administered. Right- of-way acquisition is also not a permissible cost to be funded by NCDOT forthese projects. * ** Project is in the existing STI P, the project is being resubmitted in its STI P form. Proiects Deleted From Draft Prioritv List Project Project Description Reason For Deletion Orange Public The vehicles eligible for use Transportation Expansion Vehicles to Implement the Up to six (6), 25 -foot, 18- passenger cutaway bus vehicles to accommodate bus service expansion as recommended in the Orange County Bus and Rail Investment Plan within the TARPO planning area have been ordered and Orange County Bus and (OCBRIP) and the Five -Year Orange County Bus Service Expansion Program. will be delivered to the Rail Investment Plan County in August 2015. Park - and -ride or kissand- ride improvements at the Park -and -Ride Cedar Grove Community Improvements at Cedar Implement park - and -ride improvements at the Cedar Grove Community Center for potential fixed -route service to Hillsborough. Center were incorporated Grove Community Center into the construction plans (Conceptual) for the Cedar Grove Community Center rehabilitation. Attachment 5: TARPO Project List Map 13 Caswell —— Person — —_ �q I °S S 49 = LAWS STORE, 157 j I w j 0 0 ° u~i A FT ?G� S7O Z �M \LL RD v M A G7 s < Y °h F °o�FR Q; Ro 57 I I ti °Rs a �o ti' °yRo O °H<gAG KENION RD �� NP�°�GJJ�G HALLS MALL RID �Q I t { MPRYS RD 5� I 4 .�• 70 ® I ° j R WESTle D = 70A C9 R °N �° O SRO Alamance m 6G '�'• 70 Q I v ,y Durham 751 86 O� ,ORLAND RO �O IARTHUR M 15 Z O la z A � u, TEER�� p p ny D Z AQ RD 15 j + LRID 54 O= MORROW 501 � o Co o O 54 v �� °� OLD OREENSgOR � p w Chatham 1�- — — — — N 1 in = 3 miles I 0 1 --------------------------- - Miles B -G M PO DCHC M PO Orange County Planning and Inspections Brian Carson (5/8/2015) Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project List Ma ID #" Project Project Description/Need SPOT 3.0 Score HIGHWAY PROJECTS Description: Develop congestion management, limited access, bicycle and pedestrian improvements, and aesthetic and capacity improvements along South Churton Street (Old NC 86 /SR 1009) from 1-40 to U.S. 70 Business. More specifically, the project would widen South Churton Street along this segment to multiple lanes with a landscaped median and would widen the railroad bridge. This project is recommended in the DCHC MPO Metropolitan Transportation Plan (MTP). The feasibility study completed by NCDOT in February 2002 recommends a four (4)4ane divided curb and gutter cross section with a 16 -foot median forthe entire segment. Orange County will stress the need to study improvements within the current right- of-way (ROW)forthe segment north of 1 -85 because of the significant built constraints along the corridor and its proximity to the Town of Hillsborough's historic district. Orange County will request that, where South Churton Street (Old NC 86) conditions do not prevent the addition of frontage roads, the feasibility study include the addition offrontage roads with limited access from 1 Improvements the corridor. 22.36 Division Need: Traffic counts along South Churton Street (Old NC 86) indicate that the corridor is near capacity for average annual daily counts and over capacity for peak periods. Capacity improvements would ease congestion and improve travel time along this primary north -south corridor connecting the Town of Hillsborough and northern Orange County to IAO and 1 -85. This was the second highest scoring project on Orange County's list in the last iteration of STIP development. The project is included in the draft 2016 -2025 STIP but is not considered committed because the right -of -way, utilities and construction phases of the project are scheduled in the last five years. Consequently, it must be resubmitted for consideration. Description: Widen IAO from four (4) lanes to six (6) lanes from the 1- 40/1 -85 interchange to the Durham County line (U.S. 15 -501). The project is recommended in the DCHC MPO MTP. 41.96 Statewide 1-40 Widening from 1- 40/1 -85 interchange to Need. According to data from NCDOT, traffic along this corridor is near capacity and is expected to exceed capacity in future years. The 2 U.S. 15-501 project would reduce congestion and travel time and will likely score relatively well when compared to other projects submitted because of 30.18 Regional the added emphasis on congestion and benefit -cost. This project is eligible forfunding at the statewide, regional and divisional tiers. 23.59 Division This project is included in the draft 2016 -2025 STIP but is not considered committed because the right- of-way and construction phases of the project are scheduled in the last five years. Consequently, it must be resubmitted for consideration. Description: Widen IAO from four (4) lanes to six (6) lanes from Old NC 86 to the Durham County line (U.S. 15501). This is a subset of the full 1-40 widening project recommended in the DCHC MPO MTP. Need: According to data from NCDOT, traffic along this corridor is near capacity and is expected to exceed capacity in future years. The project would reduce congestion and travel time and will likely score relatively well when compared to other projects submitted because of 3 IAO Widening from Old NC 86 to U.S. 15 -501 the added emphasis on congestion and benefit -cost. This project is eligible for funding at the statewide, regional and divisional tiers. N/A (New Project) The full 1-40 widening project is included in the draft 2016 -2025 STIP but is not considered committed because the right- of-way and construction phases of the project are scheduled in the last five years. Consequently, it must be resubmitted for consideration. This subset of the full project is being recommended for submission because it is a lower cost project concentrated along a shorter segment of the corridor where congestion is the most profound, and consequently, the project has a greater chance of being funded and included in the STIP in earlier years than in the existing draft 2016 -2025 STIP. Description: Widen IAO from four (4) lanes to six (6) lanes from NC 86 to the Durham County line (U.S. 15 -501). This is a subset of the full 1-40 widening project recommended in the DCHC MPO MTP. Need: According to data from NCDOT, traffic along this corridor is near capacity and is expected to exceed capacity in future years. The 4 IAO Widening from NC 86 to U.S. 15 -501 project would reduce congestion and travel time and will likely score relatively well when compared to other projects submitted because of N/A (New Project) the added emphasis on congestion and benefit -cost. This project is eligible for funding at the statewide, regional and divisional tiers. The full 1-40 widening project is included in the draft 2016 -2025 STIP but is not considered committed because the right- of-way and construction phases of the project are scheduled in the last five years. Consequently, it must be resubmitted for consideration. This subset of the full project is being recommended for submission because it is a lower cost project concentrated along a shorter segment of the Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project List Map ID #` Project Project Description/Need SPOT 3.0 Score corridor where congestion is the most profound, and consequently, the project has a greater chance of being funded and included in the STIP in earlier years than in the existing draft 2016 -2025 STIP. Description and Need: Reconstruct interchange at 1 -85 and Old NC 86 to relieve existing and /or future expected congestion on the under - 5 1 -85/Old NC 86 Interchange Improvements capacity existing interchange, to accommodate future capacity improvements to both Churton Street and I -85, and to increase operational N/A (New Project) efficiency at the on -ramp /off -ramp intersections with Churton Street. The new interchange would also be an opportunity to provide pedestrian and biking facilities across 1 -85 that do not currently exist along the corridor. Description and Need: Reconstruct interchange at 1 -85 and NC 86 to relieve existing and /orfuture expected congestion on the under - 6 1-85/NC 86 Interchange Improvements capacity existing interchange, to accommodate future capacity improvements to 1 -85, and to increase operational efficiency at the on- N/A (New Project) ramp /off -ramp intersections with NC 86. The new interchange would also be an opportunity to provide pedestrian and biking facilities across 1 -85 that do not currently exist along the corridor. Description: Widen NC 86 from U.S. 70 bypass to north of NC 57 to four (4) lanes with intersection improvements at U.S. 70 bypass and NC 57. Improvements at the NC 86 /U.S. 70 intersection should include extending the queuing lane fortraffic turning east onto U.S. 70 bypass from northbound Churton Street /NC 86. Improvements at the NC 86 /NC 57 intersection should include a crosswalk and provide a safe crossing for pedestrians with a sidewalk connecting the intersection of NC 86 and NC 57 to Rencher Street. This project is not 24.16 Regional 7 NC 86 Improvements north of Hillsborough currently listed or recommended in the DCHC MPO MTP but is recommended in the DCHC MPO CTP. 19.46 Division Need: The segment of NC 86 between NC 57 and U.S. 70 is highly congested. Traffic counts indicate that this segment of NC 86 is over capacity for average annual daily counts. Capacity improvements would ease congestion and improve travel time along this primary north - south corridor connecting the Town of Hillsborough to NC 57 and northern Orange county. Description: Realign the intersection of Eno Mountain Road and Mayo Street with Orange Grove Road and make safety improvements. Eno Mountain Road and Mayo Street at This project is not provided /recommended in the DCHC MPO MTP but is recommended in the DCHC MPO CTP. 8 Orange Grove Road intersection realignment 5.10 Division and safety improvements Need: The project would improve safety, reduce travel time, and improve traffic flow between residential and commercial areas in the Town of Hillsborough. Description: Modify the 1 -85 Connector interchange at U.S. 70 to provide access from all directions. The existing Connectorjust east of Efland is not accessible to traffic on eastbound U.S. 70 and there is no access to westbound U.S. 70 from the Connector. This project is recommended in the DCHC MPO MTP. 9 U.S. 70 East /I -85 Connector Need: The project would enable traffic from northwestern Orange County to access 1 -85 more easily without risking the many points of 7.34 Regional traffic conflict through Efland. Traffic has increased on Efland-Cedar Grove Road as an alternative to NC 86. Much of that traffic currently 4.90 Division "dog -legs" through Efland via Forrest Avenue to Mt. Willing Road to access 1- 85/1 -40. Traffic counts reveal that traffic has increased approximately 40q overthe past 10 years on Mt. Willing Road just south of Forrest Avenue, while traffic on U.S. 70 east of Efland -Cedar Grove Road has increased only 2%. The project would dramatically improve travel time fortraffic from northwestern Orange County to 1- 85/1-40 and would dramatically ease congestion during peak periods in Efland. Description: Improve Homestead Road from Old NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridorwhere those facilities do not exist. This project is provided /recommended in the DCHC MPO MTP. 10 Homestead Road bike lane and sidewalk Need: There are three (3) schools in the vicinity of Homestead Road: Chapel Hill High School, Smith Middle School, and Seawell 10.37 Division installation Elementary School. Many students live within walking and biking distance of Chapel Hill High School and must walk or cycle along or across Homestead Road on a daily basis. Provision of bikeway and pedestrian facilities is necessary to give students a comfortable and safe place to travel separate from that of motorized vehicular traffic. Homestead Road is also a commuting route for adult utilitarian bicyclists connecting residential areas to other arteries serving employment centers. Description: Construct bicycle lanes on Eubanks Road from Old NC 86 (SR 1009) to NC 86. This project is provided /recommended in the DCHC MPO MTP. 11 Eubanks Road bike lane installation 11.75 Division Need: This project would provide a separate facility for both recreational and commuter bicyclists to reduce /eliminate the bike/automobile modal conflict along this corridor. The project would also provide access to the Morris Grove Elementary School on Eubanks Road. Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project List Ma ID #" Project Project Description/Need SPOT 3.0 Score BIKE /PED PROJECTS — Description: Construct bike lanes and sidewalks from US 15/501 to Bennett Road and bike lanes from Bennett Road to the Chatham 23.06 Division (U.S. 15- County line. This project is provided /recommended in the DCHC MPO MTP. 501 to Bennett Road 12 Mt. Carmel Church Road Bike/Pedestrian Improvements Need This project p rovide a continuous paved bikewa y facilit y from Cha p el Hill through southeastern rn Oran g a Coun ty. into Chatham 18.57 Division (Bennett County. The project connects to another project submitted by Chatham County to construct bike lanes along Mt. Carmel Church Road Road to Chatham County from the Orange County line to Old Farrington Point Road. This segment is listed as a Statewide bicycle facility in the DCHC MPO MTP line) and is a continuation of the state's Mountain to Sea bicycle route through Orange County. Description: a) Construct sidewalk along west side of Orange High School Road from Harold Latta Road to U.S. 70, b) Construct sidewalk along south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road; c) Install high - visibility crosswalks and in -road signage at school entrances and exits on Orange Grove Road; and 13 Orange High School Road /Harold Latta Road d) Construct sidewalk along entrance roads to CW Stanford Middle School. 18.06 Division Sidewalk Improvements Need: Orange Grove Road serves two schools north of U.S. 70, Orange High School and CW Stanford Middle School. There are currently no dedicated pedestrian facilities along Orange High School Road to accommodate students accessing the schools from residential areas to the north and east. The project would provide safe and comfortable pedestrian connections from these areas to the schools. The Orange County Safe Routes to School Action Plan identifies these sidewalk and crosswalk improvements as central elements in the plan for both Orange High School and CW Stanford Middle School. Description: a) Construct a pedestrian bridge over 1-40 alongside Orange Grove Road and construct a sidewalk along the north side of Orange Grove Road from the bridge to Timbers Drive, b) Construct sidewalks along both sides of New Grady Brown School Road with midblock crossing; and Orange Grove Road /1-40 Pedestrian Bridge c) Construct sidewalk along one side of Oakdale Drive from Cheshire Drive to Orange Grove Road. 14 and Supporting Sidewalk Improvements Need: IAO separates two schools, Grady Brown Elementary and Cedar Ridge High School, from residential areas north of I-40. The 17.44 Division schools are within walking distance of residential areas, but bicyclists and pedestrians must share the roadway with motorvehicles crossing the existing narrow two (2)-lane bridge that carries Orange Grove Road over 1-40. The bridge is too narrow to accommodate a pedestrian walkway. Lack of an adequate pedestrian crossing presents an unsafe environment for students to walk to the schools. The Orange County Safe Routes to School Action Plan identifies the pedestrian bridge and supporting sidewalk improvements as central elements in the plan for Grady Brown Elementary School. Description: Widen Dairyland Road from Union Grove Church Road to Orange Grove Road to include four (4)-foot paved shoulders. Part of this project is located within the TARPO planning area. The portion of this project within the TARPO planning area is being recommended for inclusion in that project list. This project is scheduled in the STIP for a feasibility study (STIP # EB- 5108). This project is provided /recommended in the DCHC MPO MTP. 15 Dairyland Road paved shoulders 17.40 Division Need: This project would provide one segment of a bikeway connection through western Orange County from Camboro to the Buckhom Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State's congestion and benefit-cost scoring factors and is only eligible for funding at the division tier. Description: Construct a multi -use path connecting English Hill Lane to Buttonwood Drive to provide pedestrian connectivity from residential areas east of English Hill Lane to both Orange High School and CW Stanford Middle School. 16 Trail Connection from English Hill Lane to Buttonwood Drive Need: Project is recommended as an improvement in the Orange County Safe Routes to School Action Plan. An existing barrier to 23.05 Division pedestrians toward Orange High School and CW Stanford Middle School exists between residential areas along and east of Buttonwood Drive and residential areas along and west of English Hill Lane. The improvement would provide a direct pedestrian connection from highly o ulated residential areas furtherwest from the schools and make walking distances saferand more manageable. Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project List Map ID #' Project Project Description/Need SPOT 3.0 Score Up to six (6), 25 -foot, 18- passenger cutaway bus vehicles to accommodate bus service These vehicles were submitted to compete for a 100% State match during the last Description: Construct a multi -use path connecting the southwest comer of Patriots Pointe to Timbers Drive to shorten walking distances expansion as recommended in the Orange County Bus and Rail Investment Plan iteration of STIP development The vehicles did not score high enough to receive the and Rail Investment Plan (OCBRIP) for pedestrians. State Match and will be considered replacement vehicles as opposed to expansion 17 Trail Connection from Patriots Pointe to Need: Project is recommended as an improvement in the Orange County Safe Routes to School Action Plan. An existing barrier to 20.57 Division Implement park - and -ride improvements in the Efland area for cross -county, fixed -route Timbers Drive pedestrians exists between Patriots Point Apartments and Timbers Drive such that long walking distances are required for pedestrians service between Mebane and Durham. Efland stop on the Go Triangle Orange- Durham Express service has been established from Patriots Pointe to access the New Grady Brown Elementary School and Cedar Ridge High School along Orange Grove Road with no at the Efland- Cheeks Community center. Orange Grove Road Extension Extend Orange Grove Road from the east side of South Chudon Street (SR 1009) to designated pedestrian facilities. The improvement would provide a direct pedestrian connection from Patriots Point to Timbers Drive and U.S. 70 Business not need to be resubmitted. Orange Grove Road in the direction of the schools that make walking distances more manageable. 'Map I Number corresponds to the general location or each project on Attachment 1: DCHC MPO Project List Map. "Bike/Pedestrian projects require a 20q local match and must be locally administered. Right- of-way acquisition is also not a permissible cost to be funded by NCDOT forthese projects. Proiects Deleted From Draft Prioritv List Project Project Description Reason For Deletion Orange Public Transportation Expansion Up to six (6), 25 -foot, 18- passenger cutaway bus vehicles to accommodate bus service These vehicles were submitted to compete for a 100% State match during the last Vehicles to Implement the Orange County Bus expansion as recommended in the Orange County Bus and Rail Investment Plan iteration of STIP development The vehicles did not score high enough to receive the and Rail Investment Plan (OCBRIP) (OCBRIP) and the Five -Year Orange County Bus Service Expansion Program. State Match and will be considered replacement vehicles as opposed to expansion vehicles for this next iteration of STIP development Park - and -Ride Improvements in Efland Implement park - and -ride improvements in the Efland area for cross -county, fixed -route This was a Go Triangle project that will not be implemented on a greenfield site. An (Conceptual) service between Mebane and Durham. Efland stop on the Go Triangle Orange- Durham Express service has been established at the Efland- Cheeks Community center. Orange Grove Road Extension Extend Orange Grove Road from the east side of South Chudon Street (SR 1009) to This project is funded in the committed portion of the draft 2016 -2025 STIP and does U.S. 70 Business not need to be resubmitted. This was a Go Triangle project that may be implemented on a greenfield site in the Park -and Ride Improvements in Hillsborough Implement park - and -ride improvements in Hillsborough for cross-county, fixed -route future. A temporary parkand -ride for the Orange- Durham Express route has been (Conceptual) service between Mebane and Durham. established at the North Hills Shopping Center until a permanent greenfield site can be identified and constructed. Construct a train station in Hillsborough and implement AMTRAK service as designated Hillsborough Train Station in Hillsborough's Rail Station Small Area Plan and in the Orange County Bus and Rail This project is funded in the committed portion of the draft 2016 -2025 STIP and does Investment Plan. The train station could also serve future commuter rail operations and not need to be resubmitted. anchor a multimodal transportation hub in Hillsborough. Buckhom Economic Development District Construct a park- and -ride facility to be located in the 1- 85'Buckhorn Road Economic A shared -use park-and-ride, facility been established at the Cone Health (EDD) /Mebane Area Park -and -Ride Development District (EDD) or Mebane area to collect ridership in eastern Alamance MedCenter Mebane MedC and western Orange Counties. This project does not score high enough in the Statewide or Regional funding tiers and Widen 1 -85 from four (4) lanes to six (6) lanes from the 1- 4011 -85 interchange to the is too expensive in the Division funding tier to be included in the STIP. Traffic counts I -85 Widening Durham County line and reconstruct interchanges and bridge structures. have shown trends in traffic along the facility to be relatively stable over the past few years, and Orange County and the Town of Hillsborough's focus has shifted to improving the interchanges at Old NC 86 and NC 86. Attachment 7: DCHC MPO Project List Map 18 Caswell W TRVON ST E TRVON ST Person ---- --------- -------------- OG DIMS 1111 40 w', 70A 15 86 - 117 0 57 OA 86 70 See Inset 70A Alamance 70 Durham 751 86 15 54 501 54 - -- - -- Chatham -------- - - - - -- -- - -- - -- - -- - - — -- — -- — -- — -- — - 1 in = 3 miles 0 1 ------------------------- MMM=Miles B-G MPO DCHC MPO Orange County Planning and Inspections Brian Carson (5/8/2015)