HomeMy WebLinkAboutAgenda - 05-19-2015 - 6iORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 19, 2015 Action Agenda Item No. 6 -i 1 SUBJECT: Interlocal Agreement with OWASA for Design of Wastewater Collection System Improvements in the Historic Rogers Road Neighborhood DEPARTMENT: County Manager PUBLIC HEARING: (Y /N) No ATTACHMENT(S): INFORMATION CONTACT: Bonnie Hammersley, 245 -2300 1) June 3, 2014 Interlocal Agreement John Roberts, 245 -2318 Relating to OWASA's Assistance To Orange County Planning of Waste Water System Improvements to Serve The Rogers Road Area 2) Proposed Interlocal Agreement with OWASA for Design of Wastewater Collection System Improvements in the Historic Rogers Road Neighborhood 3) OWASA Historic Rogers Road Area (HRRA) Sanitary Sewer Extension — Project Schedule PURPOSE: To approve and authorize the Chair to execute an Interlocal agreement with Orange Water and Sewer Authority ( OWASA) for the design of the wastewater collection system improvements in the in the Historic Rogers Road Neighborhood. BACKGROUND: On March 6, 2014 the Board authorized the Manager to- 1 . Negotiate a cost sharing agreement with the Towns of Chapel Hill and Carrboro for a preliminary engineering estimate to provide sewer service to the 86 parcels identified by the Task Force not to exceed $130,000. 2. Negotiate a contract with OWASA for a preliminary engineering estimate to provide sewer to the 86 parcels identified by the Task Force not to exceed $130,000. 3. Negotiate a contract with the Jackson Center for Rogers Road Neighborhood engagement, not to exceed $50,000. Both the Town of Chapel Hill and the Town of Carrboro reviewed preliminary engineering to provide sewer to the 86 parcels in the Historic Rogers Road Neighborhood identified by the Task Force and the Rogers Road Neighborhood outreach to be completed by the Jackson Center. The governing boards of each town subsequently authorized moving forward on these items. On May 8, 2014 the OWASA Board of Directors approved the Interlocal Agreement relating to OWASA's assistance to Orange County in planning for extension of Wastewater System Improvements to the Rogers Road Area (See Attachment 1). The Board of Commissioners approved the Interlocal Agreement on June 3, 2014. Next Steps: The preliminary engineering study to provide sewer to the 86 parcels identified by the Task Force was completed in March 2015. Based on the findings from the study, the consultant has estimated the project costs to install 3.5 miles of sewer lines at $5.7 million to include engineering design, permitting, bidding, construction, construction administration, construction observation and contingency. This amount does not include costs for private plumbing installation, easement acquisition or OWASA connection fees. OWASA will work with the County, Towns and consultant to develop estimates for these costs as the project proceeds. Staff estimates it will take no less than two years to design, permit, bid and construct the sewer lines (the easement acquisition process can impact the schedule). Understanding the importance of keeping the project moving, Orange County and OWASA have developed the attached inter -local agreement for Board consideration to continue OWASA's management of the next phase of the project (engineering design and permitting) to begin in July 2015. Staff estimates the cost of design and permitting at about $370,000 (not including easement acquisition) and it will take about a year to complete. The next step is to approve the Interlocal agreement with Orange Water and Sewer Authority ( OWASA) for the design of the wastewater collection system improvements in the Historic Rogers Road Neighborhood (Attachment 2). FINANCIAL IMPACT: The total cost to the County (43 %) for the design of the wastewater collection system improvements in the Historic Rogers Road Neighborhood is $159,100. RECOMMENDATION(S): The Manager recommends that the Board approve and authorize the Chair to sign the Interlocal Agreement with Orange Water and Sewer Authority ( OWASA) for the design of the wastewater collection system improvements in the Historic Rogers Road Neighborhood (Attachment 2). Attachment 1 INTERLOCAL RELATING TO 1 c, . ASSISTANCE 1 ORANGE COUNTY PLANNING O R, EXTENSION OF WASTEWATER SYSTEM IMPROVEMENTS TO SERVE THE ROGERS ROAD AREA This Interlocal Agreement for the preliminary engineering for a wastewater system project in the Rogers Road Area is dated as of 3 , 2014, and is entered into by and between Orange Water and Sewer Authority (hereinafter OWASA), an authority organized under Chapter 162A, North Carolina General Statues, and the County of Orange (hereinafter County), organized under Chapter 153A of the North Carolina General Statues. WHEREAS, the County desires at its expense to begin planning for the provision of wastewater system lines and facilities to serve residents located in the Rogers Road area of southern Orange County, herein the "Project," which will be connected to lines in areas already served by OWASA's existing public wastewater collection lines and facilities; and, WHEREAS, the County is to determine the scope of the Project; and WHEREAS, the County desires to obtain OWASA's assistance to obtain preliminary engineering work necessary to determine the scope and predict the costs of this Project, to the end that the Project improvements will be constructed and extended in accordance with OWASA's collection system standards, into which the Project lines will flow; and WHEREAS, OWASA desires and is willing to assist the County with the successful completion of this Project work; NOW, THEREFORE, the parties agree as follows: Purpose. The purpose of this Agreement is to establish the financial and other responsibilities of the parties for certain preliminary engineering necessary to determine the K M Page 2 of 5 scope of the Project, as will be described in Exhibit A, as the same may be revised from time to time by the parties. 2. Preliminary Engineering Activities. a. OWASA shall undertake to prepare or have prepared preliminary engineering work to assist the County in deteiillining the scope, location, design, and course of work that will be necessary to complete the Project. To the extent known and available at the time this Agreement is executed, the nature and extent of the Project shall be as described in Exhibit A, to be attached. If not available at the time this Agreement is executed, Exhibit A may be hereafter provided, or amended from time to time, by the parties, at the County's direction. b. OWASA shall employ engineers and consultants as necessary to assist in this work. OWASA's staff may also assist in this work. OWASA shall be solely responsible for costs incurred by its own staff work. Orange County shall reimburse OWASA for the costs of work by outside engineers and consultants engaged by OWASA, with the County's concurrence, for this work. C. Design plans for the Project shall be consistent with OWASA's usual standards and specifications, and shall be executed in accordance with OWASA's usual procedures, as well as with the County's directions as to scope of the Project facilities. OWASA shall develop the draft scope for this preliminary engineering work; provided, both the County and OWASA shall approve the final scope of work for the preliminary engineering work for the Project. d. The costs of the preliminary engineering for the Project shall initially be paid for by OWASA. Upon receipt of OWASA's invoices to recover the costs for this work, the County shall reimburse OWASA for all costs associated with the preliminary engineering work Page 3 of 5 for the Project. OWASA shall be solely responsible for the costs of its own staffs work in coordinating the preliminary engineering work for the Project. e. In order to ensure proper and effective project management, the engineering consultant and any sub - consultants shall report to OWASA staff who shall work closely with County staff to ensure the County's requirements for the Project are met. In the event of any apparent conflicts between the County's and OWASA's requirements, the parties shall work together to find reasonable compromise and accommodations for the Project, consistent with OWASA's service standards. f. In close coordination with OWASA and consistent with the need for effective project management, the County Staff will have full access to the engineering consultant(s) and all relevant sub - contractors, who, at the County's request, shall meet with the County representatives or otherwise provide any information needed by the County on any aspect of the Project. OWASA will authorize the engineering and consultant(s) and subcontractors to meet with County representatives and to provide any information needed by the County on any aspect of the Project. g. The County shall be responsible for contracting with and coordinating community outreach partnering with organizations such as the Jackson Center and Rogers Eubanks Neighborhood Association to identify action steps to provide information and assistance concerning the Project to the Rogers Road neighborhood. h. Costs for the Project shall not exceed one hundred thirty thousand dollars ($130,000.00). Should the parties anticipate costs will exceed this amount the parties shall consider an amendment to this Interlocal Agreement to address the cost increase. Page 4 of 5 3. Ownership Interests of the Parties; Duration of Agreement; Funding; Miscellaneous. Upon satisfactory completion of the Project, OWASA shall retain title to products and deliverables obtained pursuant to this Agreement, and shall share such deliverables with the County as the County may request. b. The preliminary engineering responsibilities and obligations of the parties shall continue until this phase of Project planning is completed. c. The County shall allocate sufficient funds to pay for all the expenses actually incurred, and for which it is responsible under the scope of this agreement. d. Both parties agree that it may be necessary to change the scope of work for the engineering consultant(s) required for the Project, and that any such changes must be approved by both parties. However, OWASA shall keep the County fully advised with respect to all change orders necessary for completion of the Project. e. Payment of the engineering consultant(s) will be administered and made by OWASA. The County will be invoiced monthly and will reimburse OWASA in full within 30 days for all expenses related to this Project. f. Each party will designate a single point of contact for the day -to -day administration for all aspects of this agreement for the express purpose of efficient project management. It will be the responsibility of this contact person to disseminate information to their respective organizations. g. Both parties recognize the importance of timely reviews and approvals. Each party will use their best efforts to provide and complete responses to issues dealing with plan reviews, proposed change orders, payment, and project acceptance. 7 Page 5 of 5 4. Amendments. All amendments to this agreement shall be approved by both parties and must be in writing. No amendments not in writing and executed with the formalities of this Agreement shall be valid. Trust and Support; Cooperative Effort. Both parties agree that there are inany issues and details relating to the successful completion of this project which are not specifically covered in this agreement. Both parties further agree to observe as a guiding principle, "trust and support," with respect to successfully resolving any issues which may arise during the duration of this agreement. IN WITNESS WHEREOF, the parties have entered into and caused to be executed in their names this Interlocal Agreement, to be effective from and after this of , 2014. ORANGE COUNTY Pre -audit Certification by County Finance Officer: Approved as to form and legality: Or "pie eounty Attorney Pre -audit Certification by OWASA Finance Officer: G o/ //,7/ OWASA General Counsel day ORITY 8 ��� 11� � ��r ••1111' �- �� ��1 ,•.,,`�. � II��i�,�•I�11 ����� Fit Md IMP OR _�S/ ■ ■� ■ ■ ■� ��■ ■1p ■�� , � .. Iii �I� 00,`,��� • ��► - III .T ■ ■ ■tl 1111111111■ ■ ■■■ _ I+ Attachment 2 NORTH CAROLINA ORANGE COUNTY INTERLOCAL AGREEMENT RELATING TO DESIGN OF A SEWER MAIN EXTENSION PROJECT IN THE ROGERS ROAD AREA This Interlocal Agreement is dated as of , 2015, and is entered into by and between Orange Water and Sewer Authority (hereinafter "OWASA "), a special purpose entity of local government organized under Chapter 162A, North Carolina General Statues, and the County of Orange (hereinafter "County "), organized under Chapter 153A of the North Carolina General Statues. WHEREAS, the County desires at its expense to design a public sewer collection system project of mains and other necessary components, to provide sewer collection service to presently unserved properties in the area shown on the' attached Exhibit A, (herein referred to as the "Project "), and WHEREAS, the Project is designed and intended to collect wastewater from the properties located in the presently unserved area shown on Exhibit A, attached hereto, (the "Project Area"), which is adjacent to areas presently served by OWASA, with the understanding that the wastewater collected in the Project Area will be caused to flow into the existing OWASA wastewater collection system, and be treated and may be used as reclaimed water or returned to the surface waters of the State after treatment as required by existing OWASA permits from NC DENR; and WHEREAS, the County has called on OWASA, and OWASA has agreed, as County's agent to undertake certain design services for and on behalf of the County, to assure that the Project is designed in accordance with OWASA's standards for its own system facilities; and 10 WHEREAS, OWASA and the County wish to cooperate to assure the successful completion of this Project; NOW, THEREFORE, the parties agree as follows: 1. Purpose. The purpose of this Agreement is to establish the financial and other responsibilities of the parties for design of the sewer main extension project to serve the Project Area, as represented in the map included in Exhibit A, showing the Project area. 2. Design Phase. a. At the conclusion of the Preliminary Engineering Phase for the Project, as that is defined in that previous Agreement between the parties dated , the County shall determine and approve the service area, scope, and design parameters for the Project, including the identification of each parcel of real estate (by PIN number) which County determines shall be served or otherwise benefitted by the Project, all subject to and in accordance with OWASA's usual design standards and system requirements. b. Using its own employees, and such engineers, consultants and sub- consultants as it deems appropriate, and in consultation with the County, OWASA shall undertake to complete final design and surveying and the County will pay the costs of that work, including the costs of OWASA's employees' work, all as necessary to complete the Project so as to allow for its design in accord with this agreement. During the design phase and prior to commencement of construction, the County shall obtain all easements, permits, privileges and assurances necessary for the construction and operation of the sewer system; such easements shall conform with the exclusive easements customarily required by OWASA for construction of such projects, and shall be assignable without the consent of the underlying fee owner to OWASA. Page 2 of 5 11 d. The Project shall be designed as a gravity -flow system, to the extent practical, and shall be designed to provide access to every Property identified by PIN on Exhibit A to connect and be served. e. The County shall be responsible for payment and satisfaction of all obligations arising out of the performance and completion of the Contract, due from it as Owner of the Project, and shall indemnify and hold OWASA harmless from claims that may arise out of the Contractor's performance, or out of the County's performance of its duties as Owner of the Project, or that may be made against OWASA, except for such sums as may become due upon the adjudication of gross negligence or willful misconduct on the part of OWASA's employees. f. In order to ensure proper and effective Project management, OWASA shall select and shall have charge of supervision of the engineering and other consultants who shall oversee the design of the Project. Those professional engineers and consultants shall be subject to the oversight and direction of OWASA's Engineer who shall have charge of OWASA's responsibilities hereunder. The Engineer and other consultants selected by OWASA shall report to OWASA staff, who shall work closely with County staff to ensure the County's requirements for the Project are met. In the event of any apparent conflicts between the County's and OWASA's requirements, the parties shall work together to find reasonable compromise and accommodations for the Project. In close coordination with OWASA and consistent with the need for effective Project management, the County Engineer or his/her designated representative will have full access to the Engineers and consultants working on the Project who shall upon request meet with the County representatives or provide any information needed by the County on any aspect of the Project. OWASA will authorize the Engineers and Page 3 of 5 12 consultants to meet with County representatives or provide any information needed by the County on any aspect of the Project. 3. The County shall allocate sufficient funds to pay for all the expenses incurred and obligations imposed within the scope of this agreement. 4. Change orders required for the Project will be approved by OWASA. However, OWASA shall keep the County fully advised with respect to all change orders necessary for completion of the Project. 5. Payment of the Engineers and other consultants shall be made by the County upon the approval and at the direction of OWASA. The County will be invoiced monthly and will reimburse OWASA in full within 30 days for all expenses related to this project as provided in Sections 2b. In addition, the County shall also reimburse OWASA all reasonable engineering staff cost associated with its staff for overseeing and managing the Project. OWASA shall itemize all such expenses in periodic invoices billed to the County. 6. Each party will designate a single point of contact for the day -to -day administration for all aspects of this agreement for the express purpose of efficient project management. It will be the responsibility of this contact person to disseminate information to their respective organizations. 7. Both parties recognize the importance of timely reviews and approvals. Each parry will use their best efforts to provide and complete responses to issues dealing with reviews, approvals, and payment. 8. All amendments to this agreement shall be approved by both parties and must be in writing. Page 4 of 5 13 9. Both parties agree that there are many issues and details relating to the successful design of this project which are not specifically covered in this agreement. Both parties further agree to share a guiding principle of "trust and support" with respect to successfully resolving any issues which may arise during the duration of this agreement. The parties have entered into this Interlocal Agreement this day of , 2015. ORANGE COUNTY ORANGE WATER AND SEWER AUTHORITY Orange County Commissioners, Chair Pre -audit Certification by County Finance Officer: Approved as to form and legality: Orange County Attorney " 0) ,'p -,A,"- OW1 Board of D' ctor , rhair Pre -audit Certification by OWASA Finance Officer: Page 5 of 5 14 z < �, U_ 0 0 0 N O O Lri w O a o H w �O II S�Py aOM m P -pP\�� O Q J � WEP`IE LO 0 ❑ LO ¢: O0 s0.R4� a �aa N �R0 4a R'h' O NJ f 0 P� �U 3No-4 Sy�m m Yd6� d ti JOB GENES c Z 0 m ,J Ob IOOHOS �13MV3S m F" U Z � O K O. PN'.WAY a ❑ 1S dvE)(33 i y s c SP�\K N Ct o. Qp J �9 OG� - Y F P \ d- INVERNESS 1O' NnNMOOv_3 ~ N HOUND CT U W J P� 2 m m �°- W U m 'lw LEAK LN NTI N C - m -� ,O z Otj w c = W o,� Attachment 3 OWASA HRRA Sanitary Sewer Extension — Project Schedule . Tasks 15 Months 3 4 5 6 7 8 i 9 1 30 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 Days * Notice to Proceed 1. Time may vary due to additional investigations, review, collaboration, and final corridor alignment O Public Outreach Meetings selection. 2. Time may vary due to the number of additional soil investigations, buffer and wetland delineation, and Q Deliverable additional historical /archaeological investigations required. • Review Meetings 3. Time may vary due to easement acquisition and land appraisals (if needed). 4. Time may vary due to permitting agency approval process and if unusual permitting issues arise. 5. Time may vary due to rebid (if needed) or if legal issues arise. 6. Construction time could change due to unknown excavation issues and abnormal weather issues. Exhibit 5 of the Historic Rogers Road Area Sanitary Sewer Extension Preliminary Engineering and Field Investigations Report - March 2015 (prepared by URS for OWASA) Notice to Proceed Overall Design Preli,minary and ,. Fina ■� ■��� Investigatio i� ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ -.: Permitting MR • ■■■■■■■■■■CCQ.!■■■■■■■■■ Constructlion * Notice to Proceed 1. Time may vary due to additional investigations, review, collaboration, and final corridor alignment O Public Outreach Meetings selection. 2. Time may vary due to the number of additional soil investigations, buffer and wetland delineation, and Q Deliverable additional historical /archaeological investigations required. • Review Meetings 3. Time may vary due to easement acquisition and land appraisals (if needed). 4. Time may vary due to permitting agency approval process and if unusual permitting issues arise. 5. Time may vary due to rebid (if needed) or if legal issues arise. 6. Construction time could change due to unknown excavation issues and abnormal weather issues. Exhibit 5 of the Historic Rogers Road Area Sanitary Sewer Extension Preliminary Engineering and Field Investigations Report - March 2015 (prepared by URS for OWASA)