Loading...
HomeMy WebLinkAboutAgenda - 03-05-2015 - 2ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 5, 2015 Action Agenda Item No. 2 SUBJECT: Orange County Bus and Rail Investment Plan Annual Report and Update DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) No ATTACHMENT(S): A. Memo from Triangle Transit with Attachments (A -1, A -2, and A -3) INFORMATION CONTACT: Bonnie Hammersley, Orange County Manager, 919- 245 -2300 David King, Triangle Transit General Manager, 919- 485 -7424 PURPOSE: To receive Triangle Transit's annual report and update on the Orange County Bus and Rail Investment Plan ( OCBRIP) and provide feedback. BACKGROUND: The OCBRIP was approved by the BOCC in June 2012. The OCBRIP provides local and regional transit opportunities including expanded bus service and proposed light rail. Voters in November 2012 approved a one -half cent sales tax to fund the local portion of the Plan and collection of the sales tax began on April 1, 2013. This is the second annual report that Triangle Transit has provided to the Board, the first taking place at the Board's February 4, 2014 meeting. Attachment A is a memo from David King, General Manager of Triangle Transit (TTA), which outlines its update and associated attachments. Additional background documents such as the adopted OCBRIP and Interlocal Implementation Agreement can be found via the following link, listed under Transportation Documents: http: / /www.co. orange. nc .us /planning /transportation.asp NEXT STEPS: The following items will be coming to the BOCC in the near future: 1. Update on Durham - Orange Light Rail Transit Project (April 14 BOCC Work Session); and 2. OCBRIP financial updates for approval in accordance with the Interlocal Implementation Agreement. FINANCIAL IMPACT: There is no financial impact associated with receiving the annual report and update. The OCBRIP serves as the financial plan for expending: • Half -cent transit sales tax revenues; • $7 County vehicle registration fees; • $3 regional /TTA vehicle registration fees; and • Existing regional /TTA rental car tax revenues. RECOMMENDATION(S): The Manager recommends the Board: 1. Receive the report and update; and 2. Provide feedback as appropriate. Attachment A Memorandum To: Orange Board of County Commissioners From: David King, General Manager, Triangle Transit Date: February 27, 2015 Re: Update on Implementation of the Orange County Bus and Rail Improvement Plan We appreciate the opportunity to provide the Board with an update on implementation of the Orange County Transit Plan. We will report on the following issues: • FY14 Annual Progress Report • Planned Uses of Bus Service and Bus Capital Revenues for Triangle Transit and Chapel Hill Transit • Hillsborough Train Station • Chapel Hill Transit North -South Corridor Study A separate update on the Durham - Orange Light Rail Transit Project is scheduled for the April 14th meeting of the Board of Commissioners. We've attached the following documents for your review: 1. Orange County Transit Plan FY14 Annual Progress Report 2. Table of 5 -Year Bus Revenue Forecast to Adopted Plan 3. Chapel Hill Transit North -South Corridor Study Update Y s 1 In 2012, voters approved a local sales tax to support funding for the Orange County Bus and Rail Investment Plan (Transit Plan). This annual progress report highlights the goals, 10 accomplishments, projects and finances of the Transit Plan during Fiscal Year 2014. FY2014 ORANGE COUNTY Bus &Rail Investment Progress Report *This Progress Report covers July 1, 2013 to June 30, 2014 The long range goals of the Transit Plan are to: • Improve overall mobility and transportation options in the region • Provide geographic equity • Support improved capital facilities • Support transit supportive land use • Provide positive impact on air quality Accomplishments During the year, the following service enhancements were made by Chapel Hill Transit (CHT), Orange Public Transportation (OPT) and Triangle Transit: 0 Chapel Hill Transit added year -round evening and night service on: V CM Route V CW Route D Route J Route • Chapel Hill Transit added two additional evening trips on F Route Additional Saturday service was added to CM, CW and JN Routes (not pictured) Triangle Transit added more frequent weekday service between the Streets at Southpoint Park - and -Ride and UNC Chapel Hill on Route 800 Orange County and Triangle Transit staff held four workshops in Cedar Grove, Efland, Hillsborough and Mebane and received public comments on preliminary concepts for future bus expansion in central and rural Orange County r Carr Mill Mall a R . Z 'o .g •a \`o Library QUniversity • Mall ' 15 �. o• ;Chapel Hill , : ��NC Chape : , , Southern Village_ The charts show revenues and expenses for the Orange Bus and Rail Investment Plan for FY14. The revenues to fund the Transit Plan include a one -half cent sales tax, a $7 County Vehicle Registration Tax and the Regional Vehicle Rental Tax. Expenditures include bus services, light rail project development and administration. Orange County Expenditures a C Orange County Revenues ** Administration n $54,848 $7 Vehicle Registration Fee A $565,560 Bus Services* O $530,100 Rental Car Taxes �� _ $476,437 Light Rail Development O $2,008,215 Sales Tax O $6,559,793 *During FY14, bus expenditures totaled $353,400f or CHT and $176,700 for Triangle Transit. In FY15, 64% of bus service expenditures will go to CHT, 12% to OPT and 24% to Triangle Transit. ** FY14 revenue shown excludes interest on investments of $4,551; FY 14 Ending Reserves total $6,125,407 (FY13 $1,112,229; FY14 $5,013,178). These reserves will be used for services and capital projects identified in the "Next Steps" section of this report. Next Steps The following services will be implemented in the upcoming fiscal year (July 2014 through June 2015): • Chapel Hill Transit will add additional morning service along the A, D and J routes; additional mid -day service on the NS route and additional Saturday service on the D and FG routes • Orange County will provide expanded service in rural portions of the county; additional senior center shuttle options; two fixed routes connecting Mebane, Efland and Hillsborough; more service on the Hillsborough to Chapel Hill midday shuttle; and continuation of the Hillsborough Circulator service in the spring of 2015 • New express service by Triangle Transit between Hillsborough, Duke University, and downtown Durham with an extension to Mebane and Efland • Later Saturday evening and Sunday service on Triangle Transit routes between Durham, Chapel Hill and RTP, connecting with Route 100 to RDU Airport and Raleigh Over the next five years, Chapel Hill Transit, Orange Public Transportation and Triangle Transit will implement new or expanded bus services. Residents will also see new bus shelters, Park -and- Ride lots, and sidewalk connections to bus stops. Chapel Hill North -South Bus Project Chapel Hill Transit is conducting the North South Corridor Study along the Martin Luther King Jr. Boulevard - South Columbia - US 15 -501 South Corridor. The study is funded by a federal grant which is not part of the OCBRIP plan. The OCBRIP plan does include funding set aside for capital improvements, if this project moves to construction in the future. During 2014, a Public Involvement Plan, Purpose and Need Statement and Tier 1 Analysis were completed No Build, Bus Rapid Transit (BRT) Low and BRT High transit modes passed Tier 1 Analysis and moved into the Detailed Definition of Alternatives phase. CHT held three public meetings in March 2014 and will continue to share the study with the public and collect feedback. Hillsborough Amtrak Station Work on the station awaits a rail corridor capacity analysis to be performed by the North Carolina Railroad Company, Norfolk Southern and Triangle Transit. Planning work will begin after the analysis is complete. Durham - Orange Light Rail Transit Project In February, the Federal Transit Administration approved Triangle Transit's request to enter Project Development on the proposed 17 -mile Durham - Orange Light Rail Transit Project. Environmental work is underway with a Draft Environmental Impact Statement to be published and available for public comment in spring 2015. The proposed light rail line will run from Chapel Hill to Durham and cost an estimated $1.34 billion (in 2012 dollars). The Orange portion of the voter - approved one -half cent sales tax will help fund the local share of the rail project. MINIM Attachment A -2 Updated 5 -Year Bus Revenue Forecast Compared to Adopted Plan Bus Operations - Updated 5 -Year Forecast (Dollars shown in $1000's) Orange FY14 FY15 FY15 FY16 FY17 FY18 FY19 Total Total Hours - Orange County 0.00 458.45 7,685 20,292 30,199 34,568 945.76 35,301 30.0% 35,601 137.54 163,645 Total Cost 0.00 $ 736 $ 1,884 $ 2,904 $ 3,509 $ 3,650 $ 3,788 $ 16,471 Federal Share 2.3% $ - $ - $ 35 $ 70 $ 114 $ 160 $ 379 State Share 5.1% $ - $ 44 $ 125 $ 194 $ 235 $ 245 $ 844 Local Share 81.8% $ 736 $ 1,758 $ 2,622 $ 3,101 $ 3,154 $ 3,233 $ 13,466 Farebox 3.9% $ - $ 82 $ 122 $ 144 $ 146 $ 150 $ 644 TTA OBRIP New Hours (FY14 $108 /hr) 315.25 Federal Share 1,102 4,603 6,961 7,926 0.00 8,224 0.00 8,306 State Share 37,121 Total Cost 7.52 $ 119 $ 513 $ 799 $ 967 $ 1,004 $ 1,045 $ 4,446 Federal Share 0.00 $ - $ - $ 10 $ 19 $ 31 $ 44 $ 104 State Share 7.5% $ - $ 9 $ 38 $ 60 $ 73 $ 75 $ 255 Local Share 58.48 $ 119 $ 422 $ 629 $ 744 $ 754 $ 776 $ 3,444 Farebox 15.0% $ - $ 82 $ 122 $ 144 $ 146 $ 150 $ 644 CHT OBRIP New Hours (FY14 $103 /hr) 4,575 10,929 16,355 19,219 19,457 19,625 90,160 Total Cost $ 471 $ 1,161 $ 1,791 $ 2,169 $ 2,264 $ 2,355 $ 10,211 Federal Share $ - $ - $ 25 $ 51 $ 83 $ 116 $ 275 State Share 7.5% $ - $ 35 $ 87 $ 134 $ 163 $ 170 $ 589 Local Share $ 471 $ 1,125 $ 1,678 $ 1,984 $ 2,019 $ 2,069 $ 9,347 Farebox 0.0% $ - $ - $ - $ - $ - $ - $ - OPT OBRIP New Hours (FY14 $44 /hr) 2,008 4,759 6,883 7,424 7,620 7,670 36,364 Total Cost $ 88 $ 211 $ 315 $ 372 $ 382 $ 388 $ 1,756 Federal Share $ - $ - $ - $ - $ - $ - $ - State Share $ - $ - $ - $ - $ - $ - $ - Local Share 100.0% $ 88 $ 211 $ 315 $ 372 $ 382 $ 388 $ 1,756 Farebox 0.091. $ $ $ $ $ $ $ Bus Capital - Bus Acquisitions - Updated Assumptions Orange FY14 FY15 FY16 FY17 FY18 FY19 Total TTA Bus Acquisitions (2 buses) 0.00 458.45 0.00 487.31 0.00 0.00 945.76 Federal Share 30.0% 0.00 137.54 0.00 146.19 0.00 0.00 283.73 State Share 5.0% 0.00 22.92 0.00 24.37 0.00 0.00 47.29 Local Share 65.0% 0.00 297.99 0.00 316.75 0.00 0.00 614.75 CHT Bus Acquisitions (8 buses) 0.00 0.00 1,417.99 1,461.94 1,004.84 0.00 3,884.77 Federal Share 30.0% 0.00 0.00 425.40 438.58 301.45 0.00 1,165.43 State Share 5.0% 0.00 0.00 70.90 73.10 50.24 0.00 194.24 Local Share 65.0% 0.00 0.00 921.69 950.26 653.15 0.00 2,525.10 OPT Bus Acquisitions (2 buses) 0.00 150.41 0.00 0.00 164.84 0.00 315.25 Federal Share 30.0% 0.00 45.12 0.00 0.00 49.45 0.00 94.58 State Share 5.0% 0.00 7.52 0.00 0.00 8.24 0.00 15.76 Local Share 65.0% 0.00 97.77 0.00 0.00 107.15 0.00 204.91 Totals - Orange County 0.00 608.86 1,417.99 1,949.26 1,169.68 0.00 5,145.79 Total Federal Share 30.0% 0.00 182.66 425.40 584.78 350.90 0.00 1,543.74 Total State Share 5.0% 0.00 30.44 70.90 97.46 58.48 0.00 257.29 Total Local Share 65.0% 0.00 395.76 921.69 1,267.02 760.29 0.00 3,344.76 Bus Capital - Facilities - Updated Assumptions Orange FY14 FY15 FY16 FY17 FY18 FY19 Total Total Cost 25.00 950.05 1,541.75 2,467.95 2,222.24 0.00 7,206.99 Federal Share Bus Facility 38.0% 0.00 361.02 585.86 937.82 844.45 0.00 2,729.16 State Share Bus Facility 8.0% 0.00 76.00 123.34 197.44 177.78 0.00 574.56 Local Share Bus Facility 54.0% 25.00 513.03 832.54 1,332.69 1,200.01 0.00 3,903.27 6/23/2014 Attachment A -3 Chapel Hill Transit North -South Corridor Study www.NSCStudy.org SUMMARY: CHT North -South Corridor Study examines a variety of public transportation options and alignments and will conclude with the identification of a Locally Preferred Alternative (LPA) for the corridor. The study reviews the transportation corridor from the Eubanks Road Park and Ride to the Southern Village Park and Ride. The study began in January 2014 and is expected to conclude this fall. STUDY COMMITTEES: The Study is guided by two committees — Policy and Technical. The Policy Committee - responsible for the overall direction of the study and is comprised of elected, government and organizational officials from the study area. The committee members provide policy guidance throughout the study duration. The Technical Committee - responsible for advising on technical issues. The committee is a cross - section of transportation, planning and development professionals from the public and private sectors, community and business leaders. TRANSPORTAITON NEEDS: • Capacity — CHT ridership has increased by more than 20% between 2005 and 2012, and buses often operate at capacity during weekday peak hours. • Population - Chapel Hill is comparatively young, but its fastest - growing demographic is over age 65. • Development - major development opportunities at the northern and southern ends of the corridor will fundamentally reshape mobility patterns and needs within the corridor. • Travel Demand Management - multi -modal transportation investments are necessary to accommodate anticipated increases in travel demand resulting from planned development within the corridor. • Sustainable Growth - Chapel Hill — and the surrounding region — has demonstrated a commitment to sustainable growth strategies in their adopted plans and policies. PUBLIC INVOLVEMENT: There are several ways to stay informed and provide feedback: sign up for project updates through the study website, participate in the online community forum called MindMixer or attend public meetings. As of today, two rounds of public meetings were held. Meeting materials are available on the project website: http: / /nscstud..or_ study- documents /. The next round is planned for spring. PROJECT STATUS: The Study is currently in the detailed evaluation (Tier 2) phase. Three elements to be evaluated in Tier 2 to determine preferred alternative(s) that Ware subject to further refinement: 1) Modes; 2) Alignments; and 3) Runningways. 10 Modes Alignments � Pe4MGY HSCS Sb4m� hIdAYGUrY L�ORYMM � �' re �' �: ementA ... Se"Fiq Al Segment Al No Build S,aWfAE NANW'm emom W, Segment B Sp, u egret C s� B RT Law 7 e mentD ' 1 r a nt E tv, B RT High 5 6 CS HAWS Runningways - "mix- and - match" approach along the corridor • Mixed Traffic Dedicated Side (Curb) Lanes Dedicated Center Lanes NEXT STEPS: Tier 2 Detailed Evaluation - March 2015 to early July 2015 • March 2015 - Finalize Service Plans (draft available at www.nscstudy org) 11 • March 2015 to May 2015 - Ridership Forecasting, Capital Cost, Operations and Maintenance Cost, Station Area Socio- Economic Analysis • Spring 2015- Public Engagement PROJECT SCHEDULE: CONTACT INFORMATION: Brian M Litchfield Transit Director (919) 969 -4908 blitchfield c�r�,townofchapelhill.org Mila Vega Transit Service Planner /Project Manager (919) 969 -4916 mveg_ac�r�,townofchapelhill. org