HomeMy WebLinkAbout2014-409 Planning - Park Construction of NC, Inc. for McGowan Sewer Interceptor Construction Change Order #1 $470,589.95 Change Order No. 01-FINAL Date of Issuance: June 17,2014 Effective Date: June 17,2014 Project: McGowan Interceptor I Owner:Orange County,North Carolina Owner's contract No.: SRF#CS370884-02 Contract: McGowan Interceptor Date of Contract: February 28,2014 Contractor: Park Construction of NC,Inc. Engineer's Project No.: 13.01114 Post Office Box 500,Morrisville,North.Carolina 27560 The Contract Documents are modified as follows upon execution of this Change Order: Description: Credit for change in pipe bedding,Change to Manhole#11 to connect to existing sewer,Revisions to Michael Efland's easement,Temprorary relocation of existing force main,relocation of property owner fence,addition of sewer service for Madison Efland property,Final adjustment of actual installed quantities Attachments(list documents supporting change): _Table entitled:"Final Adjustment of Installed Quantities",emails from Park dated February 26 and April 30,2014, Frye Fence proposal dated April 24,2014,Letters from Park Construction dated April 17 and-28,2014 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days N Calendar days Substantial completion(days or date): 180 $ 597,813.13 Ready for final payment(days or date): 210 gaefeme] [Deereese]from previously approved [R*Feme] [Deerease] from previously approved Change Orders Change Orders No.N/A to No.N/A: No.N/A to No.N/A: Substantial completion(days): N/A $ 0.00 Ready for final payment(days): N/A Contract Price prior to thi$Change Order: Contract Times prior to this Change Order: Substantial completion(days or date): 180 $ 597,813.13 Ready for final payment(days or date): 210 [Increase] [Deem Ease]of this Change Order: [kietease] [Decrease] of this Change Order: Substantial completion(days or date): 0 $ 470,589.95 Ready for final payment(days or date): 0 Contract Price incorporating this Change Contract Times with all approved Change Orders: Substantial completion(days or date): 180 $ 1.068.403.08 Ready for final payment(days or date): 210 REC ACCEP D ACCEP ' By: By: _ By. , ol VEngineRuth ized Signature) caner(Auril,rized Si nature) Contractor( uthori d Signature) Date: 1�-4".&.=lit Date: Date: V Approved by Funding Agency(if applicable): Date: EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications institute. Page I of 2 McGowan Interceptor Orange County, North Carolina Final Adjustment of Installed Quantities r r � ,m r, TO AL�iI'NSTALLED .VARIANCE ; a .,i r SC PT O`N UN1T ,Q - .r, r - AL T1' OT` L i•V' "1 •:.Q. T TA~� J L C 1' Mobilization(3%Max) LS 1.00 17,000.00 $17,000.00 1,00 $17,000.00 - $0.00 2 12"CL350 DI Gravity Sewer 0-6 LF 74.00 23.00 $1,702.00 23.00 $529,00 (51.00) -$1,173.00 3 12"CL350 DI Gravity Sewer 6-8' LF 100.00 23.00 $2,300,00 87.00 $Z001.00 (13.00) -$299.00 4 12"CL350 Di Gravity Sewer 8-10' LF 36.00 23.00 $828.00 22.00 $506.00 (14.00) -$322.00 5 12"CL350 Dl Gravity Sewer 10-12' LF 108.00 23.00 $2,484.00 99.00 $2,277.00 (9.00) -$207.00 6 12"CL350 DI Gravity Sewer 12-14' LF 120.00 23.00 $2,760.00 128.00 $2,944.00 8.00 $184.00 7 12"CL350 DI Gravity Sewer 14-16 LF 128.00 34.00 $4,352.00 141.00 $4,794.00 13.00 $442.00 8 12"CL350 Dl Gravity Sewer 16-18' LF 267.00 44.001 $11,748.00 259.00 $11,396.00 (8.00) -$352.00 9 12"CL350 DI Gravity Sewer 18-20' LF 393.00 54.00 $21,222.00 352.00 $19,008.00 (41.00) -$2,214.00 10 12"CL350 DI Gravity Sewer 20-22' LF 365.00 64.00 $23,360.00 369.00 $23,616.00 4.00 $256.00 11 12"CL350 Dl Gravity Sewer 22-24' LF 640.00 68.00 $43,520.00 632.00 $42,976.00 (8.00) -$544.00 12 12"CL350 DI Gravity Sewer 24-26' . LF 82.00 90.00 $7,380.00 84.00 $7,560.00 2.00 $180.00 13 20"x0.25"Enc.Bore&jack w/12"DIP C.Pipe LF 200.00 725.00 $145,000.00 205.00 $148,625.00 5.00 $3,625.00 14 IV Dia.Manhole 12-14' EA 2.00 3,000.00 $6,000.00 2.00 $6,000.00 - $0.0 15 4'Dia.Manhole 14-16' EA 3.00 3,200.00 $9,600.00 3.00 $9,600.00 - $0.00 16 4'Dia.Manhole 16-18' EA 1.00 3,800.00 $3,800.00 1.00 $3,800.00 - $0.00 17 4'Dia.Manhole 20-2Z EA 1.00 4,000.00 $4,000.00 1.00 $4,000.00 - $0.00 18 4'Dia.Manhole 22-24' EA 3.00 4,100.00 $12,300.00 3.00 $12,300.00 - $0.00 19 5'Dia.Manhole 24-26' EA 2.00 6,100.001 $12,200.00 2.00 $12,200.00 - $0.00 20 Tie in to Existing MH w/Booted Connection EA 1.00 3,750.001 $3,750.00 1.00 $3,750.00 - $0.0 21 Tie in to Existing Sewer EA 1.00 1,607.13 $1,607.13 1.00 $1,607.13 - $0.00 22 Abandon Existing Pump Station LS 1.00 8,000.00 $8,000.00 1.00 $8,000.00 - $0.00 23 Gravel Drive&Parking Repair SY 150.00 12.00 $1,800.00 150.00 $1,800.00 - $0.00 24 Construction Entrance EA 3.00 1200.00 $3,600,00 2.00 $2,400.00 1.00) -$1,200.00 25 Rock Excavation CY 2,000.00 120.00 $240,000,00 5,690.00 $682,800.00 3,690,00 $442,800.00 26 ISM Fence LF 2,500.00 3.00 $7,500,00 2,650.00 $7,950.00 150.00 $450.00 .C..h ��f O,.,,.�.^". 'N yyr'i 3"�F t P.f'i.ai.tiMhN F,,y.'H,r?,.k.'ab;�.,.e„.,1�''?,rarh•r.n,V-,�',,�„.d p'^t{fa a.i4.2...•:.h•5.'+:.•-..`,>,.t.rd.,�+r i i,l.rv.:Cs h., M tiM Now" u rn 4 1 Pipe bedding credit LS -465.00 $0.00 1.00 -$465.00 :2r 1, ,< w-0g0 aa l<., . .r..•'.:aJtwh. d,--`.$, J-4.:;r,,•65.„,,.F00 2 MH#11 Change LS 10,682.51 $0.00 1.00 $10,682.51 1.00 $10,68251 3 Michael Efland Easement Revisions LS 3,551.91 $0,00 1.00 $3,551.91 1.00 $3,551.91 FM Relocation LS 12,499.15 $0.00 1.00 $12,499.15 1.00 $12,499.15 5 Efland Fence Relocation I LS 795.38 $0.00 1.00 $795.38 1.00 $795.3 6 IMadison Efland Service LS 1 1,900.00 $0.00 1.00 $1,900,00 1.00 $1,900.00 ..' $597 813,13 s'-.:.:-:;_::;;:,::-: $1 068 403.08 -_:::; ::-::.: . :.: $470,589.95 Wes Wightman From: Eric Olsen <eolsen @parknc.com> Sent: Wednesday,February 26,2014 7:18 AM To: Wes Wightman;Doug Chapman Cc: Ken Malonson;Toby Chamberlain Subject: RE:McGowan Interceptor-Pipe Bedding 24' + Depth Wes. We offer a credit of$465. I estimated the concrete cost at$665 offset by additional stone valued at$200. Also, please let us know as soon as you can what the plans are for MH #11. I believe we're waiting on an invert elevation and confirmation on up-sizing to a 5'diameter MH w/an Inside drop. Thanks, Eric Olsen Park Construction 919.369.2236 cell -----Original Message----- From: Wes Wightman<Wes.Wightman @Mcgillengineers.Com> To:Eric Olsen<eolsen @parlcnc.com>,Doug Chapman<Doitg.Chapman@Mcgillengineers.Com> Cc:Ken Malonson<kmalonson @parknc.com>,Toby Chamberlain<tchamberlain @parknc.com>,Timothy Williamson<tilliamson @parkno,com>, "Ron Bailey" <rbailey @parknc.com>,Kevin Lindley <klindley @orangecountync.gov>, "wpore @cityofinebane.com" <wpore @cityofinebane.com>,David Houston <David.Houston@Mcgillengineers.Com> Date:Mon,24 Feb 2014 20:29:38+0000 Subject:RE:McGowan Interceptor-Pipe Bedding 24'+Depth Eric, , After a review of this Information we do not take exception to the proposed change. However,we recognize that this change also provides a cost saving for the project. Regards, Wesley Wightman,PE Construction Services Manager McGill Associates,P.A. 124019th St.Lane NW Hickory,NC 28601 Office: 828.328.2024 Cell: 828.234.71311 Fax: 828.328.3870 Email:wes wightman@mcglilengineers.com I Website:www.mcgillengineers.com From:Eric Olsen[mailto:eolsen @parknc.com] Sent:Friday, February 07,2014 9.58 AM To:Wes Wightman;Doug Chapman Cc:Ken Malonson;Toby Chamberlain;Timothy Williamson;Ron Bailey Subject: McGowan Interceptor-Pipe Bedding 24'+Depth i Wes; Please find attached the US Pipe DIP Design pamphlet which addresses the recommended pipe pressure class and laying conditions at various depths of cover. Please reference Pages 5, 15 and 23 where I've highlighted the appropriate Information for our condition on the McGowan Interceptor project. As recommended by the pipe manufacturer, 12"CL 350 can be Installed at depths up to 28' in Type 4 or 5 laying conditions. In lieu of the concrete cap,we therefore propose Installing the 12" CL350 DIP in the deeper sections(greater than 24') utilizing the Type 5 laying conditions criteria of bedding the pipe in compacted crushed stone 4" below the pipe and backfllling with compacted crushed stone to the top of the pipe. Please advise If this proposal is acceptable. Thanks, Eric Olsen Park Construction 919.369.2236 cell 2 Wes Wightman From: Eric Olsen <eolsen @parknc.com> Sent: Wednesday,April 30,2014 10:15 AM To: Wes Wightman Cc: klindley @orangecountync.gov;Ken Malonson;Timothy Williamson;Toby Chamberlain; Doug Chapman; David Houston Subject: RE:McGowan Interceptor-Status of Outstanding Issues Follow Up Flag: Follow up Flag Status: Flagged Wes, We are requesting$3,551.91 for additional expense due to the easement relocation. Our costs are as follows: Additional Clearing-$3,180.73 Re-staking MH #4-$371.18 Thank you, Eric Olsen Park Construction 919.369.2236 cell -----Original Message----- From: Wes Wightman<Wes.Wiglitman @Mcgillengineers,Com> To:Eric Olsen<eolsen @parknc.com> Cc: "klindley @orangecountync.gov"<klindley @orangecountync.gov>,Ken Malonson <kmalonson @parknc.com>,Timothy Williamson<twilliamson @parkne.com>, "Toby Chamberlain" .. <tchamberlain @parknc.com>,Doug Chapman<Doug.Chapman @Mcgillengineers.Com>,David Houston <David.Houston @Mcgillengineers.Com> Date:Fri,25 Apr 2014 20:00:53 +0000 Subject:RE:McGowan Interceptor-Status of Outstanding Issues Please find a pdf of the revised drawing attached. Wesley Wightman,PE Construction Services Manager 3,ic,Ciil PA. w • U p [hIGINEC�ING'p.� 124019th St. Lane NW Hickory,NC 28601 1 Office: 828.328.2024 Cell: 828.234.7131 Fax: 828.328.3870 Email:wes wightman mcgillengineers.com I Website:www.mcgillengineers.com From:Wes Wightman Sent:Friday,April 25,201411:33 AM To:'Eric Olsen' Cc:klindley @orangecountync.gov; Ken Malonson;Timothy Williamson;Toby Chamberlain;Doug Chapman;'David Houston' Subject:RE:McGowan Interceptor-Status of Outstanding Issues Eric,. We should have the revised drawing for the revised MH#3-5 to you via email today. In the meantime,the new coordinates for MH#4 are: N:850232.94 E:1949754.91 Regards, Wesley Wightman,PE Construction Services Manager McGill Asscieiates,P.A. IT [t41N[ERINO& 1240191h St.Lane NW Hickory,NC 28601 Office: 828.328.2024 Cell: 828.234.7131 Fax: 828,328.3870 Email:wes wightman[c-Dmcgillengineers.com Website:www.mcgillengineers.com From:Eric Olsen(mallto:eolsen @parknc.com] Sent:Thursday,April 24,2014 9:48 AM To:Wes Wightman Cc:klindlev @orangecountync.gov; Ken Malonson;Timothy Williamson;Toby Chamberlain;Doug Chapman Subject: RE:McGowan Interceptor-Status of Outstanding Issues Thank you for your prompt response. 1. Please provide coordinates and a sketch for the re-alignment at the Efland section (MH #3 to#5)so we can get our surveyor started ASAP. 2.We are proceeding with this shift of MH #11. 3.We'd like the opportunity to further discuss the force main conflict at the Efland-Cedar Grove PS.The plans do not show the force main therefore we made the assumption it left the station in another direction out of our way. It Is our position that its location was known by the owner and it should therefore have been shown since It Is in conflict. Nevertheless,we are proceeding with Its relocation in good faith so as not to delay the bore at that location. 2 Thanks, Eric Olsen Park Construction 919.369.2236 cell -----Original Message----- From: Wes Wightman<,Wes.Wi hg_tman@Mcgillenaineers.Com> To:Eric Olsen<eolsen@parlcnc,com> Cc: "lclindley@oran eg court nc,gov"<Iclindla@orangecou!Ltyne.gov>,Ken Malonson< 1malonson@j2ar1<nc.com.>, Timothy Williamson<twilliamson@parlcnc.com>,"Toby Chamberlain" < tchamberlaincro,parlcnc.com>,Doug Chapman<Doug:Chapman Mc ig_ilengineers.Com> Date:Wed,23 Apr 2014 21:15:29+0000 Subject:RE:McGowan Interceptor-Status of Outstanding Issues Eric, Please see our responses in RED below. Wesley Wightman,PE Construction Services Manager McO ll Associates,P.A. u� �t m tNvINtESINO P. 1240 191h St,Lane NW Hickory,NC 2$601 Office: 828.328.2024 ] Cell: 828.234.7131 ] Fax: 828.328.3870 Email:wes.wightman .mcsillensineers.com ] Website:www.mcgillengineers.com From:Eric Olsen fmalito:eolsen@parknc.com] Sent:Wednesday,April 23,2014 9:34 AM To:Wes Wightman Cc:klindlev@oransecountync.go_v;Ken Malonson;Timothy Williamson;Toby Chamberlain Subject:McGowan Interceptor-Status of Outstanding issues Wes, Please update us on the status of the following outstanding issues., 1.TCE at Efland property: We should have the sewer line Installed to MH #3 by the end of the week and will be ready to continue the Installation at the area In question beginning next week,The rock has not yet been shot beyond Station 14+50+/-so of course that operation needs to resume so the pipe laying can continue. Please provide direction before Friday so as not to delay the work. After discussions with the property Owner our path forward will be as follows: MH#4 will shift 10ft along the alignment from MH#5(making that run 2171-F). MH#3 will remain in the same location with a slight angle change to MH#4. Mr, Kevin Lindley will be marking the trees that Mr. Efiand agreed we can remove to complete this work, As Mr. Malonson suggested, 3 „� .. .. ja MIS F'RYE:FENCE-CO., INC. 32 1 Durham DriVe Suite 115 — RALF-IGH,NC-27603 Phone (919) 779.4760 Fax (919) 779-7667 PHONE OATS 7o: 4/24/14 _ Eric Olsen JOB NAME/LOCATION Fence in Efland JOB NUMBER JOB PHONE We hereby submit specifications and estimates for: I. Take down 70'ft,of existing fencing. $150.00 I1. Furnish and install 6'ft tall temporary chain link fencing along easement(approx. 80' ft.). $200.00 111. Reinstall existing chain link fencing. $400.0 0 $750.00 5% markup 37.50 1% bond 7.88 Total $795.38 WE .PROPOSE hereby to furnish material and labor—complete in accordance with the above specifications,for the arrm nP dollars($ )• Payment to 66 made as follows: All material Is guaran(eed to be as specified.All work io be completed in a professional manner'acoorilfng to standard practices Qny alteiation brdevtadontram elxive specificatiort3 Authorized involving 64-a,00ste;(11 be exaWted only upon written orders,and 41 become fin'extra Signature rpe over eM above'the estimate.-Ali agreements co wngeAl upon strikes,aWdents or delays beyond out control.owiier to Carry fire,totnado;and other necessary'fnwianco.our Note:This proposal rosy be workers are tulh covered try Worker's compensation insurance. withdrawn by us if not accept6d within days. ACCEPT,ANCK OF PROPOSAL.—The above prices, s eoilleallons end eondjtiois ere eatistaclory and are hereby accepted.you are . Signature Sulhorized lo'do the work as cpeciged.Paynientwili be made pe outlined above. pate of Acceptance: Signature Prmoaudr i3wr FMOItr(<)IOFTf COMPMKWTn DUOIWEUFVMC k PAIrrrEDln V.SA 13 • . CONSTRUCTION OF NC INC. April 28,2014 Mr.Wesley Wightman,P.E. Construction Services Manager McGill Associates,P.A. Post Office Box 1136 Hickory,NC 28603. Re: McGowan Interceptor,Orange County,NC Subject: Force Main Relocation at Efland-Cedar Grove Pump Station Dear Wes: The existing 10-inch force main from the Efland-Cedar Grove Road pump station is in conflict with the pro- posed sanitary sewer line installation at this location.As this force main was not shown on the drawings,it was 44 assumed that it left the pump station in a direction that would not be in conflict with the new work. W It will be necessary to temporarily tie-into the existing force main at the edge of Efland-Cedar Grove Road in the driveway to the pump station and just outside the valve vault installing temporary pipe outside our work area. Our cost for this work is: Materials/Equipment Rental f 10"Uniflanges $ 311.74 t Pipe&fitting rental fl-om Xylem(2 months) $10,315.41 10-inch composite hose w/Flange Fittings 45 degree bends tslj Flanged Tee w/2"Ball Valve Check Valve Air Release Valve Labor&Equipment Make tie-ins,install pipe $ 1,497.60 Disassemble system 374.40 Total $12,499.15 Please issue a change order for this additional work.Thank you. Sincerely, Park Construction of NC,Inc. ff4la-1- Eric E.Olsen Project Manager/Estimator cc:Ken Malonson Toby Chamberlain 32561 Post off aG fox 500 a t orelsy lk,NC M560 ° p1me(919) 319-8801-8801 Fox(9191319-883,5 ME � CONSTRUCTION OF NC, INC. April 17,2014 Mr.Wesley Wightman,P.E. Construction Services Manager McGill Associates,P.A. Post Office Box 1136 Hickoiy,NC 28603 . ts-* Re: McGowan Interceptor,Orange County,NC Subject: Manhole 11 Revisions:Efland-Cedar Grove Gravity Connection Dear Wes; In accordance with Revised Plan Sheet C-102,we offer the following pricing: 0J Materials 5'Diameter Precast Manhole $3,448.88 W Inside Drop $1,456.44 8"DIP from Exist.MH to MH 11 $ 576.06 #57 bedding stone $ 185.84 Labor&Equipment Set MH#11 $2,665.64 Install Drop $1,777.10 Testing $ 290.38 Tie-in to Exist.MH,re-work invert/plug $2,839.87 b17 Install 8"DIP Gravity Sewer $ 696.90 Subcontractor Core&Boot Exist.MH $ 530.25 Re-stake bore at Cedar Grove $ 318.15 Total $14,782.51 Please note that this additional cost will be off-set by$4,100,the original bid price for MH#11.Should you have any questions,please feel free to call. Thank you. Sincerely, Park Construction of NC,Inc, Eric E.Olsen Project Manager/Estimator cc:ICen Malonson Toby Chamberlain 32561 Post Office fox 500 ` hAarrismville,NC 27aO A FhQne(919)319-8801 41 Fax,(VI 9)019-883.5 �M E to