HomeMy WebLinkAbout2014-409 Planning - Park Construction of NC, Inc. for McGowan Sewer Interceptor Construction Change Order #1 $470,589.95 Change Order
No. 01-FINAL
Date of Issuance: June 17,2014 Effective Date: June 17,2014
Project: McGowan Interceptor I Owner:Orange County,North Carolina Owner's contract No.: SRF#CS370884-02
Contract: McGowan Interceptor Date of Contract: February 28,2014
Contractor: Park Construction of NC,Inc. Engineer's Project No.: 13.01114
Post Office Box 500,Morrisville,North.Carolina 27560
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
Credit for change in pipe bedding,Change to Manhole#11 to connect to existing sewer,Revisions to Michael
Efland's easement,Temprorary relocation of existing force main,relocation of property owner fence,addition of
sewer service for Madison Efland property,Final adjustment of actual installed quantities
Attachments(list documents supporting change):
_Table entitled:"Final Adjustment of Installed Quantities",emails from Park dated February 26 and April 30,2014,
Frye Fence proposal dated April 24,2014,Letters from Park Construction dated April 17 and-28,2014
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days N Calendar days
Substantial completion(days or date): 180
$ 597,813.13 Ready for final payment(days or date): 210
gaefeme] [Deereese]from previously approved [R*Feme] [Deerease] from previously approved Change Orders
Change Orders No.N/A to No.N/A: No.N/A to No.N/A:
Substantial completion(days): N/A
$ 0.00 Ready for final payment(days): N/A
Contract Price prior to thi$Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): 180
$ 597,813.13 Ready for final payment(days or date): 210
[Increase] [Deem Ease]of this Change Order: [kietease] [Decrease] of this Change Order:
Substantial completion(days or date): 0
$ 470,589.95 Ready for final payment(days or date): 0
Contract Price incorporating this Change Contract Times with all approved Change Orders:
Substantial completion(days or date): 180
$ 1.068.403.08 Ready for final payment(days or date): 210
REC ACCEP D ACCEP '
By: By: _ By. ,
ol
VEngineRuth ized Signature) caner(Auril,rized Si nature) Contractor( uthori d Signature)
Date: 1�-4".&.=lit Date: Date: V
Approved by Funding Agency(if applicable):
Date:
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications institute.
Page I of 2
McGowan Interceptor
Orange County, North Carolina
Final Adjustment of Installed Quantities
r r
� ,m r, TO AL�iI'NSTALLED .VARIANCE ;
a .,i
r
SC PT
O`N UN1T ,Q
-
.r, r
-
AL
T1' OT` L
i•V' "1
•:.Q. T TA~�
J L
C
1' Mobilization(3%Max) LS 1.00 17,000.00 $17,000.00 1,00 $17,000.00 - $0.00
2 12"CL350 DI Gravity Sewer 0-6 LF 74.00 23.00 $1,702.00 23.00 $529,00 (51.00) -$1,173.00
3 12"CL350 DI Gravity Sewer 6-8' LF 100.00 23.00 $2,300,00 87.00 $Z001.00 (13.00) -$299.00
4 12"CL350 Di Gravity Sewer 8-10' LF 36.00 23.00 $828.00 22.00 $506.00 (14.00) -$322.00
5 12"CL350 Dl Gravity Sewer 10-12' LF 108.00 23.00 $2,484.00 99.00 $2,277.00 (9.00) -$207.00
6 12"CL350 DI Gravity Sewer 12-14' LF 120.00 23.00 $2,760.00 128.00 $2,944.00 8.00 $184.00
7 12"CL350 DI Gravity Sewer 14-16 LF 128.00 34.00 $4,352.00 141.00 $4,794.00 13.00 $442.00
8 12"CL350 Dl Gravity Sewer 16-18' LF 267.00 44.001 $11,748.00 259.00 $11,396.00 (8.00) -$352.00
9 12"CL350 DI Gravity Sewer 18-20' LF 393.00 54.00 $21,222.00 352.00 $19,008.00 (41.00) -$2,214.00
10 12"CL350 DI Gravity Sewer 20-22' LF 365.00 64.00 $23,360.00 369.00 $23,616.00 4.00 $256.00
11 12"CL350 Dl Gravity Sewer 22-24' LF 640.00 68.00 $43,520.00 632.00 $42,976.00 (8.00) -$544.00
12 12"CL350 DI Gravity Sewer 24-26' . LF 82.00 90.00 $7,380.00 84.00 $7,560.00 2.00 $180.00
13 20"x0.25"Enc.Bore&jack w/12"DIP C.Pipe LF 200.00 725.00 $145,000.00 205.00 $148,625.00 5.00 $3,625.00
14 IV Dia.Manhole 12-14' EA 2.00 3,000.00 $6,000.00 2.00 $6,000.00 - $0.0
15 4'Dia.Manhole 14-16' EA 3.00 3,200.00 $9,600.00 3.00 $9,600.00 - $0.00
16 4'Dia.Manhole 16-18' EA 1.00 3,800.00 $3,800.00 1.00 $3,800.00 - $0.00
17 4'Dia.Manhole 20-2Z EA 1.00 4,000.00 $4,000.00 1.00 $4,000.00 - $0.00
18 4'Dia.Manhole 22-24' EA 3.00 4,100.00 $12,300.00 3.00 $12,300.00 - $0.00
19 5'Dia.Manhole 24-26' EA 2.00 6,100.001 $12,200.00 2.00 $12,200.00 - $0.00
20 Tie in to Existing MH w/Booted Connection EA 1.00 3,750.001 $3,750.00 1.00 $3,750.00 - $0.0
21 Tie in to Existing Sewer EA 1.00 1,607.13 $1,607.13 1.00 $1,607.13 - $0.00
22 Abandon Existing Pump Station LS 1.00 8,000.00 $8,000.00 1.00 $8,000.00 - $0.00
23 Gravel Drive&Parking Repair SY 150.00 12.00 $1,800.00 150.00 $1,800.00 - $0.00
24 Construction Entrance EA 3.00 1200.00 $3,600,00 2.00 $2,400.00 1.00) -$1,200.00
25 Rock Excavation CY 2,000.00 120.00 $240,000,00 5,690.00 $682,800.00 3,690,00 $442,800.00
26 ISM Fence LF 2,500.00 3.00 $7,500,00 2,650.00 $7,950.00 150.00 $450.00
.C..h ��f O,.,,.�.^". 'N yyr'i 3"�F t P.f'i.ai.tiMhN F,,y.'H,r?,.k.'ab;�.,.e„.,1�''?,rarh•r.n,V-,�',,�„.d p'^t{fa a.i4.2...•:.h•5.'+:.•-..`,>,.t.rd.,�+r i i,l.rv.:Cs h., M tiM Now" u rn 4
1 Pipe bedding credit LS -465.00 $0.00 1.00 -$465.00
:2r 1, ,<
w-0g0 aa l<.,
. .r..•'.:aJtwh.
d,--`.$,
J-4.:;r,,•65.„,,.F00
2 MH#11 Change LS 10,682.51 $0.00 1.00 $10,682.51 1.00 $10,68251
3 Michael Efland Easement Revisions LS 3,551.91 $0,00 1.00 $3,551.91 1.00 $3,551.91
FM Relocation LS 12,499.15 $0.00 1.00 $12,499.15 1.00 $12,499.15
5 Efland Fence Relocation I LS 795.38 $0.00 1.00 $795.38 1.00 $795.3
6 IMadison Efland Service LS 1 1,900.00 $0.00 1.00 $1,900,00 1.00 $1,900.00
..' $597 813,13 s'-.:.:-:;_::;;:,::-: $1 068 403.08 -_:::; ::-::.: . :.: $470,589.95
Wes Wightman
From: Eric Olsen <eolsen @parknc.com>
Sent: Wednesday,February 26,2014 7:18 AM
To: Wes Wightman;Doug Chapman
Cc: Ken Malonson;Toby Chamberlain
Subject: RE:McGowan Interceptor-Pipe Bedding 24' + Depth
Wes.
We offer a credit of$465. I estimated the concrete cost at$665 offset by additional stone valued at$200.
Also, please let us know as soon as you can what the plans are for MH #11. I believe we're waiting on an invert elevation
and confirmation on up-sizing to a 5'diameter MH w/an Inside drop.
Thanks,
Eric Olsen
Park Construction
919.369.2236 cell
-----Original Message-----
From: Wes Wightman<Wes.Wightman @Mcgillengineers.Com>
To:Eric Olsen<eolsen @parlcnc.com>,Doug Chapman<Doitg.Chapman@Mcgillengineers.Com>
Cc:Ken Malonson<kmalonson @parknc.com>,Toby Chamberlain<tchamberlain @parknc.com>,Timothy
Williamson<tilliamson @parkno,com>, "Ron Bailey" <rbailey @parknc.com>,Kevin Lindley
<klindley @orangecountync.gov>, "wpore @cityofinebane.com" <wpore @cityofinebane.com>,David Houston
<David.Houston@Mcgillengineers.Com>
Date:Mon,24 Feb 2014 20:29:38+0000
Subject:RE:McGowan Interceptor-Pipe Bedding 24'+Depth
Eric, ,
After a review of this Information we do not take exception to the proposed change. However,we recognize that this
change also provides a cost saving for the project.
Regards,
Wesley Wightman,PE
Construction Services Manager
McGill Associates,P.A.
124019th St.Lane NW Hickory,NC 28601
Office: 828.328.2024 Cell: 828.234.71311 Fax: 828.328.3870
Email:wes wightman@mcglilengineers.com I Website:www.mcgillengineers.com
From:Eric Olsen[mailto:eolsen @parknc.com]
Sent:Friday, February 07,2014 9.58 AM
To:Wes Wightman;Doug Chapman
Cc:Ken Malonson;Toby Chamberlain;Timothy Williamson;Ron Bailey
Subject: McGowan Interceptor-Pipe Bedding 24'+Depth
i
Wes;
Please find attached the US Pipe DIP Design pamphlet which addresses the recommended pipe pressure class and laying
conditions at various depths of cover. Please reference Pages 5, 15 and 23 where I've highlighted the appropriate
Information for our condition on the McGowan Interceptor project.
As recommended by the pipe manufacturer, 12"CL 350 can be Installed at depths up to 28' in Type 4 or 5 laying
conditions.
In lieu of the concrete cap,we therefore propose Installing the 12" CL350 DIP in the deeper sections(greater than 24')
utilizing the Type 5 laying conditions criteria of bedding the pipe in compacted crushed stone 4" below the pipe and
backfllling with compacted crushed stone to the top of the pipe.
Please advise If this proposal is acceptable.
Thanks,
Eric Olsen
Park Construction
919.369.2236 cell
2
Wes Wightman
From: Eric Olsen <eolsen @parknc.com>
Sent: Wednesday,April 30,2014 10:15 AM
To: Wes Wightman
Cc: klindley @orangecountync.gov;Ken Malonson;Timothy Williamson;Toby Chamberlain;
Doug Chapman; David Houston
Subject: RE:McGowan Interceptor-Status of Outstanding Issues
Follow Up Flag: Follow up
Flag Status: Flagged
Wes,
We are requesting$3,551.91 for additional expense due to the easement relocation. Our costs are as follows:
Additional Clearing-$3,180.73
Re-staking MH #4-$371.18
Thank you,
Eric Olsen
Park Construction
919.369.2236 cell
-----Original Message-----
From: Wes Wightman<Wes.Wiglitman @Mcgillengineers,Com>
To:Eric Olsen<eolsen @parknc.com>
Cc: "klindley @orangecountync.gov"<klindley @orangecountync.gov>,Ken Malonson
<kmalonson @parknc.com>,Timothy Williamson<twilliamson @parkne.com>, "Toby Chamberlain" ..
<tchamberlain @parknc.com>,Doug Chapman<Doug.Chapman @Mcgillengineers.Com>,David Houston
<David.Houston @Mcgillengineers.Com>
Date:Fri,25 Apr 2014 20:00:53 +0000
Subject:RE:McGowan Interceptor-Status of Outstanding Issues
Please find a pdf of the revised drawing attached.
Wesley Wightman,PE
Construction Services Manager
3,ic,Ciil PA.
w
• U
p
[hIGINEC�ING'p.�
124019th St. Lane NW Hickory,NC 28601
1
Office: 828.328.2024 Cell: 828.234.7131 Fax: 828.328.3870
Email:wes wightman mcgillengineers.com I Website:www.mcgillengineers.com
From:Wes Wightman
Sent:Friday,April 25,201411:33 AM
To:'Eric Olsen'
Cc:klindley @orangecountync.gov; Ken Malonson;Timothy Williamson;Toby Chamberlain;Doug Chapman;'David
Houston'
Subject:RE:McGowan Interceptor-Status of Outstanding Issues
Eric,.
We should have the revised drawing for the revised MH#3-5 to you via email today. In the meantime,the new
coordinates for MH#4 are:
N:850232.94
E:1949754.91
Regards,
Wesley Wightman,PE
Construction Services Manager
McGill Asscieiates,P.A.
IT
[t41N[ERINO&
1240191h St.Lane NW Hickory,NC 28601
Office: 828.328.2024 Cell: 828.234.7131 Fax: 828,328.3870
Email:wes wightman[c-Dmcgillengineers.com Website:www.mcgillengineers.com
From:Eric Olsen(mallto:eolsen @parknc.com]
Sent:Thursday,April 24,2014 9:48 AM
To:Wes Wightman
Cc:klindlev @orangecountync.gov; Ken Malonson;Timothy Williamson;Toby Chamberlain;Doug Chapman
Subject: RE:McGowan Interceptor-Status of Outstanding Issues
Thank you for your prompt response.
1. Please provide coordinates and a sketch for the re-alignment at the Efland section (MH #3 to#5)so we can get our
surveyor started ASAP.
2.We are proceeding with this shift of MH #11.
3.We'd like the opportunity to further discuss the force main conflict at the Efland-Cedar Grove PS.The plans do not
show the force main therefore we made the assumption it left the station in another direction out of our way. It Is our
position that its location was known by the owner and it should therefore have been shown since It Is in conflict.
Nevertheless,we are proceeding with Its relocation in good faith so as not to delay the bore at that location.
2
Thanks,
Eric Olsen
Park Construction
919.369.2236 cell
-----Original Message-----
From: Wes Wightman<,Wes.Wi hg_tman@Mcgillenaineers.Com>
To:Eric Olsen<eolsen@parlcnc,com>
Cc: "lclindley@oran eg court nc,gov"<Iclindla@orangecou!Ltyne.gov>,Ken Malonson<
1malonson@j2ar1<nc.com.>, Timothy Williamson<twilliamson@parlcnc.com>,"Toby Chamberlain" <
tchamberlaincro,parlcnc.com>,Doug Chapman<Doug:Chapman Mc ig_ilengineers.Com>
Date:Wed,23 Apr 2014 21:15:29+0000
Subject:RE:McGowan Interceptor-Status of Outstanding Issues
Eric,
Please see our responses in RED below.
Wesley Wightman,PE
Construction Services Manager
McO ll Associates,P.A.
u�
�t
m
tNvINtESINO P.
1240 191h St,Lane NW Hickory,NC 2$601
Office: 828.328.2024 ] Cell: 828.234.7131 ] Fax: 828.328.3870
Email:wes.wightman .mcsillensineers.com ] Website:www.mcgillengineers.com
From:Eric Olsen fmalito:eolsen@parknc.com]
Sent:Wednesday,April 23,2014 9:34 AM
To:Wes Wightman
Cc:klindlev@oransecountync.go_v;Ken Malonson;Timothy Williamson;Toby Chamberlain
Subject:McGowan Interceptor-Status of Outstanding issues
Wes,
Please update us on the status of the following outstanding issues.,
1.TCE at Efland property: We should have the sewer line Installed to MH #3 by the end of the week and will be
ready to continue the Installation at the area In question beginning next week,The rock has not yet been shot
beyond Station 14+50+/-so of course that operation needs to resume so the pipe laying can continue. Please
provide direction before Friday so as not to delay the work. After discussions with the property Owner our
path forward will be as follows: MH#4 will shift 10ft along the alignment from MH#5(making that run
2171-F). MH#3 will remain in the same location with a slight angle change to MH#4. Mr, Kevin Lindley will be
marking the trees that Mr. Efiand agreed we can remove to complete this work, As Mr. Malonson suggested,
3
„� .. ..
ja
MIS
F'RYE:FENCE-CO., INC.
32 1 Durham DriVe Suite 115 —
RALF-IGH,NC-27603
Phone (919) 779.4760
Fax (919) 779-7667
PHONE OATS
7o: 4/24/14 _
Eric Olsen JOB NAME/LOCATION
Fence in Efland
JOB NUMBER JOB PHONE
We hereby submit specifications and estimates for:
I. Take down 70'ft,of existing fencing. $150.00
I1. Furnish and install 6'ft tall temporary chain link fencing along easement(approx. 80' ft.). $200.00
111. Reinstall existing chain link fencing. $400.0 0
$750.00
5% markup 37.50
1% bond 7.88
Total $795.38
WE .PROPOSE hereby to furnish material and labor—complete in accordance with the above specifications,for the arrm nP
dollars($ )•
Payment to 66 made as follows:
All material Is guaran(eed to be as specified.All work io be completed in a professional
manner'acoorilfng to standard practices Qny alteiation brdevtadontram elxive specificatiort3 Authorized
involving 64-a,00ste;(11 be exaWted only upon written orders,and 41 become fin'extra Signature
rpe over eM above'the estimate.-Ali agreements co wngeAl upon strikes,aWdents or
delays beyond out control.owiier to Carry fire,totnado;and other necessary'fnwianco.our Note:This proposal rosy be
workers are tulh covered try Worker's compensation insurance. withdrawn by us if not accept6d within days.
ACCEPT,ANCK OF PROPOSAL.—The above prices,
s eoilleallons end eondjtiois ere eatistaclory and are hereby accepted.you are
. Signature
Sulhorized lo'do the work as cpeciged.Paynientwili be made pe outlined above.
pate of Acceptance: Signature
Prmoaudr i3wr FMOItr(<)IOFTf COMPMKWTn DUOIWEUFVMC k PAIrrrEDln V.SA 13 • .
CONSTRUCTION OF NC INC.
April 28,2014
Mr.Wesley Wightman,P.E.
Construction Services Manager
McGill Associates,P.A.
Post Office Box 1136
Hickory,NC 28603.
Re: McGowan Interceptor,Orange County,NC
Subject: Force Main Relocation at Efland-Cedar Grove Pump Station
Dear Wes:
The existing 10-inch force main from the Efland-Cedar Grove Road pump station is in conflict with the pro-
posed sanitary sewer line installation at this location.As this force main was not shown on the drawings,it was
44 assumed that it left the pump station in a direction that would not be in conflict with the new work.
W It will be necessary to temporarily tie-into the existing force main at the edge of Efland-Cedar Grove Road in the
driveway to the pump station and just outside the valve vault installing temporary pipe outside our work area.
Our cost for this work is:
Materials/Equipment Rental
f 10"Uniflanges $ 311.74
t Pipe&fitting rental fl-om Xylem(2 months) $10,315.41
10-inch composite hose w/Flange Fittings
45 degree bends
tslj Flanged Tee w/2"Ball Valve
Check Valve
Air Release Valve
Labor&Equipment
Make tie-ins,install pipe $ 1,497.60
Disassemble system 374.40
Total $12,499.15
Please issue a change order for this additional work.Thank you.
Sincerely,
Park Construction of NC,Inc.
ff4la-1-
Eric E.Olsen
Project Manager/Estimator
cc:Ken Malonson
Toby Chamberlain
32561
Post off aG fox 500 a t orelsy lk,NC M560 ° p1me(919) 319-8801-8801 Fox(9191319-883,5
ME �
CONSTRUCTION OF NC, INC.
April 17,2014
Mr.Wesley Wightman,P.E.
Construction Services Manager
McGill Associates,P.A.
Post Office Box 1136
Hickoiy,NC 28603 .
ts-*
Re: McGowan Interceptor,Orange County,NC
Subject: Manhole 11 Revisions:Efland-Cedar Grove Gravity Connection
Dear Wes;
In accordance with Revised Plan Sheet C-102,we offer the following pricing:
0J
Materials
5'Diameter Precast Manhole $3,448.88
W Inside Drop $1,456.44
8"DIP from Exist.MH to MH 11 $ 576.06
#57 bedding stone $ 185.84
Labor&Equipment
Set MH#11 $2,665.64
Install Drop $1,777.10
Testing $ 290.38
Tie-in to Exist.MH,re-work invert/plug $2,839.87
b17 Install 8"DIP Gravity Sewer $ 696.90
Subcontractor
Core&Boot Exist.MH $ 530.25
Re-stake bore at Cedar Grove $ 318.15
Total $14,782.51
Please note that this additional cost will be off-set by$4,100,the original bid price for MH#11.Should you
have any questions,please feel free to call.
Thank you.
Sincerely,
Park Construction of NC,Inc,
Eric E.Olsen
Project Manager/Estimator
cc:ICen Malonson
Toby Chamberlain
32561
Post Office fox 500 ` hAarrismville,NC 27aO A FhQne(919)319-8801 41 Fax,(VI 9)019-883.5
�M E to