Loading...
HomeMy WebLinkAboutAgenda - 03-15-1994-IX-B 1 ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda ACTION AGENDA ITEM ABSTRACT Item No. =X_5 Meeting Date: MARCH 15, 1994 SUBJECT: PROPOSED AMENDMENTS TO THE TWO ECONOMIC DEVELOPMENT DISTRICTS --------------------------------- ---------------------------------- DEPARTMENT: COUNTY COMMISSIONERS PUBLIC HEARING YES: NO: X --------------------------------- ---------------------------------- ATTACHMENT(S) : (1) MEMO FROM INFORMATION CONTACT: ALICE GORDON ALICE GORDON CONCERNING ECONOMIC DEVELOPMENT DISTRICTS DATED 2/28/94 AND A RELATED MEMO DATED 2/11/94; (2) PROPOSED LAND USE PLAN AND ZONING ORDINANCE TEXT AMENDMENTS FOR THE TWO EDDs (Annotated Pages from March 1 Agenda Packet) ; (3) MEMO FROM VERLA INSKO CONCERNING ECONOMIC DEVELOPMENT NODES. TELEPHONE NUMBER - Hillsborough - 732-8181 Chapel Hill - 968-5401 Durham - 688-7331 Mebane - 227-2031 ----------------------------------------------------------------------- PURPOSE: To consider various amendments to the Land Use Plan and Zoning Ordinance associated with the establishment and approval of two Economic Development Districts (EDDs) . BACKGROUND: The Orange County Board of Commissioners approved on March 1, 1994 two Economic Development Districts at I-85/Buckhorn Road and I- 85/US70. The attachments to this abstract outline several amendments for the Board's consideration. The amendments address two major policy questions: 1. Location of Commercial, industrial, economic development, and similar non-residential activity nodes Before March 1, Orange County required that major commercial activity nodes be located in areas in or near population centers (towns or transition areas) . These were essentially urban nodes with urban, centralized services. For the "Locational Criteria" in the Land Use Plan that are relevant, see "Public Services/Utilities" and "Population Density" and also "Soil Conditions" and "Existing Land Use". After March 1, we are allowing these more intensive land uses in many other essentially rural parts of the county. (See Gordon's Economic Development Districts memos dated February 28 and February 11. ) 2. Board Review of Economic Development Proposals Before March 1, the Commissioners reviewed virtually all major projects in Orange County. After March 1, a significant number of major developments could be reviewed by staff only. (See Gordon's Economic Development Districts memos of February 28 and February 11. f 2 RECOMMENDATION(S) : (1) To discuss the amendments as listed in the two Gordon memos and in the document listing proposed Land use Plan and Zoning Ordinance text amendments associated with the establishment of Economic Development Districts. (2) To refer the amendments to the Planning Board for review with the understanding that the Planning Board's recommendation to the Commissioners will be made in time for the amendments to be heard at the May public hearing. MEMORANDUM ? J 1• To: Board of Commissioners From: Alice Gordon ftKG- Subject: Recommendations - Economic Development Districts Proposal Date: February 28, 1994 Included below is a list of recommendations for action on the proposal for the Economic Development Districts (EDDs). Please refer to my "Points to Ponder" memorandum of February 11 for further information. Establishment of Nodes Motion: That we approve the establishment of two of the three Economic Development Districts, namely, A. I-85/Buckhorn Road EDD B. I85/US Hwy 70 EDD, with the specific changes to Orange County land use regulations being given in subsequent motions. Action on the I-8 5/Buckhorn Load EDD and the 185/US Hwy 70 EDD A. Problems with the EDD Proposal for Land Use Plan and Zoning Ordinance Changes 1. Proposed standards fail to require that commercial development a. have public utilities (such as water and sewer service) b. be located in areas-udth that are planned for higher population densities (transition areas and towns) although our current regulations in both the Land Use Plan and Zoning Ordinance do contain these provisions. 2. Proposed standards are 'fuzzy" so that a lot of judgment is involved. B. Recommended Actions to Address These Two Problems Motion:. That changes to the Land Use Plan and Zoning Ordinance that are made to implement the Economic Development Districts Proposal will include the following elements: 1. Land Use Plan Use the type of iocationai criteria found in our current Land Use Plan. The current criteria are clear an requ"r nodes to have both public utilities and medium to high pop ion density. Details of the changes will be given elsewhere. Economic Development Districts Proposal - Gordon Page 4 s 2_ Zoning Ordinance a. Change the proposed text so that public utilities including water and sewer are required, as in our current regulations. b. For major developments, prezone the two districts and use type Design Manual for standards, but have the responsibility for approval lie with the commissioners. Comment: There is a major judgmental component in the fuzzy standards. For projects with a large impact, that judgment should be exercised by the commissioners. Minor developments could still be approved by staff. c. To implement this approval process for major developments that are proposed to be permitted as uses by right: i. Define a development as minor if - floor area is less than 20,000 square feet .. and - area of disturbed land is less than 40,000 square feet Otherwise it would be a major development. ii. Approve projects using a special use permit that would indicate that the approval would be given if design standards are met. (Note: Another possibility would be to require site plan approval by the Planning Board for major developments.) Detain of the changes will be given elsewhere. Other Issues A. Monitoring of the Economic Development Districts I am pleased that the most recent Planning Board recommendation (p.5 of March 1 packet) includes monitoring of the EDDs and that the monitoring will include a fiscal impact (cost-benefit) analysis as well as a check to see whether the EDDs meet certain goals of the Strategic Plan. If the BOCC approves major developments, this would give us an even better feeling for how well the EDD process is working and whether changes are necessary. I also hope that any unaddressed issues raised in Section V of my February 11 memorandum will receive further consideration B_ Overall Criteria for Projects in All Economic Development Districts. In Section IV of my February 1 1 memorandum, I suggested that certain overall criteria be used for developments in the EDDs. We should do a more complete evaluation of this approach. FEB-15-1994 1°::26 FROM ALICE GORDON TO 6443004 P.02 MEMORANDUM 5 To: Board of Commissioners and Manager From: Alice Gordon PAG Subject: Points to Ponder - Economic Development Districts (EODs) Date: February 11, 1994 included below is a list of points to ponder while you are considering the proposal for the Economic Development Districts. 1. Land Use Plan According to the December 6 BOCC agenda packet, "the Board of Commissioners asked that specific parcels be identified for pre-zoning for economic development purposes in a manner consistent with the Orange County Land Use Plan.- A. Existing Modes. In the current Orange County Land Use Plan, commercial - industrial nodes exist in the 185/Buckhorn Road area and in the 1851US70 area. There is no existing node in the 144/0106 area (and only a small percentage of transition area), so the ED node in this area is not consistent with our current Land Use Plan. B_ Criteria for Location of Activity Nodes. The "locational criteria" for -commercial- industrial transition activity nodes" and for "commercial transition activity nodes" differ from the locational criteria for "economic development activity nodes (transition areas)" in systematic ways. For example, here is a comparison using three of the criteria, namely, land slope, public serviceslutilities, and population density. Land Slope Com Ind -- "Located on land with slopes of less than 15X grade Ec Dev - "Located on land with slopes of less than 15X grade. .kihere slopes of 151[ or greater are oresent, protection can be orovtldjed thraunh aroQerit desi a construction �i " Public Services/Uttlities Cam Ind - "Located in areas ch are or could be reasonably and effectively served by centra) zed public services and utilities." Ec Day - "Located generilu in areas which are or could be reasonably and effectively served by public services and facilities. When lggated in aCgas where such services =facilities ere not orel2nt or olannyg'_gepersi,Son canditions must be Unable for on-site sew§ge dis1208a,l jy, ems-" FEB-15-1994 15:27 FROM ALICE GORDON TO 6433004 P.03 , Points to Ponder - Gordon ti population Density Cam Ind - "Located in areas with moderate to high population densities_" Ec Day - "Located in areas with, or lanald for, moderate to high population densities. C. Comments/Questions/Recommendations 1. Why were these changes made in the existing land use plan? It would have been helpful if such changes had been highlighted. 2. Note that the 144/01d 86 proposed node is in the Hillsborough Cooperative Planning Zone. it is also close to the Rural Buffer, apart of the Joint Planning Area with Chapel Hill and Carrboro. 3. it appears that no useful purpose is served by adding a new land use plan category. We should continue to use the existing land use plan category, "commercial-industrial transition activity node." d. The 144/01d 06 node has more unaddressed issues than the other two nodes. 11. Design Manuel It appears that the Design Manual has sections where fuzzy standards are utilized. For example, consider sections 3.1 "Architectual Design" and 3.2 "Landscape Design" (found in the version of the manual i have, which may or may not be the latest version: A. "Fuzzg" Standards It is hard to know what is expected of a developer, given the way the manual is written. For example, in section 3.1 concerning "compatibility with neighbors" we encounter this sentence: "Unless there are overriding concerns or poorly defined aspects, a new building must reflect the architectural character of surrounding buildings in the following ways:" (a list follows) An example in section 3.2 concerning "preservation of existing features" is found in the following sentence: "Wherever possible, access to views are to be preserved for adjacent property owners and passing motorists." Also in section 3.2 is this guideline for landscaping parking areas: "Where practical, lowering the grade of the parking lot from existing street elevations may aid in obscuring views of automobiles while promoting views of architectural elements of the structures beyond." rtb-17-1774 l:> ( r tull -vLILt r uMiA H U-+ Pointe to Ponder - Gordon 7 Throughout the manual, terms such as 'wherever possible" and "where practo cal" make the standards fuzzy and as a result there is a lot of staff judgment Involved in deciding whether or not the standards have been met. B. Nixing of Objective Standards and 'Fuzzy' Standards Objective standards (e.g. setback requirements) and fuzzy standards are mined together in a textbook-like format_ C. Comments/questions/Recommendations i. Who will make the judgments required to implement the design guidelines? Will additional staff be required? Will they be trained as architects? 2. How will the Design Manual get changed? Will the SOCC need to approve changes? In other words, how does the Design Manual work in relation to the Zoning Ordinance and any other land use regulations? 3. It would appear that the Design Manual should be made more concise and more objective. The fuzzy standards should be separated from the objective standards, so that everyone can more easily ascertain what is required. i 11. Costs One important question is whether the Economic Development Districts will be of benefit to the county financially. There are several aspects to this question. A. water and Sewer Service. One important concern is who will provide the water and sewer infra- structure for the economic development districts. What will the provision of water and sewer cost? Who will pay for It? Of particular note is the statement that future sower line extensions for the UN/Suckhorn node are possible from the Efland sewer system. (See the Analysis and Evaluation section for this node in the December b BOCC packet) What about connecting to the system in Alamance County? 0. Transportation As with water and sewer service, we need to know how transportation facilities will be provided and who will pay for them. Will there be public transportation facilities so that workers can get to their jobs without relying exclusively on the automobile? C. Cost/Benefit Analgsis Even if the BOCC will not require a Cost/benefit analysis before approving Economic Development Districts, we need to decide now what kind of analysis will be required later. FEB-15-1994 15:28 FROM ALICE GORDON TO 6443004 P.05 Points to Ponder -- Gordon D. Comment s/Questions/RecommendetIons 1. Who will provide water and sewer service and at what cost? 2. Who will provide transportation facilities and at whet cost? 3. What elements does the 006C wish to have included in the cost/benefit analysis? 111. Criteria for Projects in A�1 Economic Development Districts The goals of the Strategic Plan include the "creation of diversified and environmentally safe businesses ...to provide jabs for county residents and to increase the non-residential taxi base..." Of course the creation of economic development districts cannot accomplish all the goals of the Strategic Plan, but the districts can be more directly targeted to achieve the goals if overall cri teria for developments were added to specific uses allowed in the economic development districts. The following are the overall critetia suggested for developments in Economic Development Districts: I_ low water usage 2. little or no production of hazardous waste or pollutants 3. little or no heavy truck triffic, low noise levels Staff has already done some work do the low water usage criterion, but the BOCC needs to consider the following questions: 1. Should developments which violate the criteria be allowed, even with a special use permit? 2. How would each criterion be defined? 3. Should there be other critiria, such as an assurance that the jobs would be for county residents or a certain level of wages would be paid? V. Pilot Projects Since the approval of Economic Development Districts has an unknown outcome, should some kind of pilot project approach be utilized? Here are some questions to consider: 1. Should the uses in each district be further differentiated and some comparisons in outcome made later? 2. Should there be a period during which the BOCC has some role in the approval of major development projects? 3. Would it be prudent to allow additional uses to be permitted through a planned development process? 4. There is other information described on these pages which could be gathered. The general question is what aspects of the EDDs does the SOCC wish to monitor. Would a two or three year period be appropriate? TOTAL P.05 ANNOTATED PAGES FROM THE MARCH 1, 1"4 BOARD OF CO1 nssIONERS AGENDA PACKET. PAGES T THROUGH 16 FOLwwED BY PAGE 5 9 (CA"I eS 1 n A'2P PROPOSED LAND USE PLAN TEXT AMENDMENTS ASSOCIATED WITH ESTABLISHMENT h0 7"eS) OF ECONOMIC DEVELOPMENT DISTRICTS I. Amend Section 3.3 -Land Use Plan Categories by changing the table of basic and detailed land use categories to read as follows: BASIC CATEGORY ORANGE COUNTY LAND USE PLAN CATEGORIES DEVELOPED Urban Existing Urban Activity Node Proposed Urban Activity Node TRANSITION 10-Year Transition 20-Year Transition Commercial Transition Activity Node Commercial-Industrial Transition Activity Node F"nomic Development('IIrtmsidon) Activity Node COMMUNITY Rural Community Activity Node RURAL Rural Buffer Rural Residential Agricultural-Residential Rural Neighborhood Activity Node Rural Industrial Activity Node Agricultural Areas CONSERVATION Public Interest Area Water Supply Watershed Water Quality Critical Area Resource Protection Area New Hope Creek Corridor Open Space In addition, amend the table of Land Use Plan Category Descriptions to include a new category entitled"Economic Development Activity Node"to read as follows: ECON0I[ICDRV&L0PMENTACI7W YNODE:Land in Transition areas of the County which has been specifically targeted for economic development activity consisting of light industrial,distribution, office, service/retail uses, and flex space (Typically one-story buildings designed, constructed, and marketed as suitable for use as offices but able to accommodate other uses;e.g.,warehouse,showroom, manufacturing assembly or similar operations.). Such areas are located adjacent to interstate and mgjor arterial highways, and subject to special design criteria and performance standards. Amend Section 3.4 - Locational Criteria by adding criteria by which to evaluate the location of CNG Economic Development Activity Nodes [Transition]. PLAN CATEGORY ECONOMIC DEVRELOPMENT ACTIVPIYNODES [TRANSITION AREAS] �se. Land Sloes- ate �' a�s o s th �'o r 15 rare Cam. _ present,prate ' n h site n on ti s. 10 O K W)7-,# 'Located outside of areas where 100-year flood prone areas and wetlands are present here CAAAla s. F • Locat in areas here detri tal devel ent im on I State blSe feder kno d uniq ndan ere pecies, tldli hats orrid an be //�� rte rou p r si a ' nand struction 'ces. C�O/1tA(�CvC i•` 43ba ry ' ' ated ' wh n al sot itio uit r dMelop'Itent bee of ainage acteristic d load-bear Scapa or devreent. / tilt ' ated a ly in hick could asonab d effectiu y yG seru publi ices an tlities. orated t as w �e h s sand il' ' s are n present or an d, g er it co :ti must s 'table -site w e dis stems. Transoortaiion System: Located in areas adjacent to interstate and major arterial highways, OI K,particularly those with the potential for providing access to public transit facilities. Enerry Use:Located within 10 minutes commuting time from an Urban area and designed so that business uses provided within developments limit the number of short distance commutes for goods and services. �� in esign e n - (i�s� a �ZatedaW� m areas re develop ould have etrimen impact productive ral use s d anage re and, or ere the sting land c ter can tamed th r site a ' nand cons on pr tires. /' •1, to areas 'ties. JU« �OpG ! H •Locate as where ental deuel ment impac n local, St fede4<a nowle h' ric, c al or arch olo site or my-d g ublic s does n or can be m' d through site des' d cons practices. Amend Section 3.5 - Land Use Goals and Draft Policies, Goal Six, to include the following: CAA86�6 611 The following Economic Development (Transition) Activity Nodes have been designated: ,Qel -3);I-85IBuckhorn (CK-5); and I-85/US 70 (ENO-2). And revise the following (wording to be deleted shown in stye-tkreu; new wording shown in 011AA1cr£. /F boldface): /M4,5 SSA Ry 67 The following areas in the County are identified as appropriate for industrial uses and have TD been designated as Commercial-Industrial Nodes.Efland Center(CK-1);Miles North (CK-2); .Z j e-04)00" Miles South (CK-3); Bee W" and Harmon Young (BB-4). 80l'E, 6.9 The following Rural Neighborhood Activity Nodes have been designated.Toler's Store(CG-3); Villine's Store (LR-3); Walnut Grove (CG-5); Underwood's Store (LR-3); Fairfield (CK-4); Coleman Loop(HB-1);Law's Store (ENO-1);Adam and Eve(BH-1); Oak Grove(BH-3); and Calvander W-WT 6) and Blackwood Station W as part of the Orange County-Chapel Carr6w�u Joint Planning Area Land Use Plan. I 10A Par[' of C 0 r1 T%e(tc t&L Tf- ! ,.n ti,J frn v tTy 900c; liar ,._�• Located away troy ices -that would, if developed, create a threat to un or endangered identittisd by the state or federal mot. dies a® Soil �suedi Located in areas . are suitable for. urban uses because �of good-general soil conditions characteristics and load bearing ca;�ac_jt or sits. develop%ent. Pubjjg_AMiQ"/m-'1i i". Lacatsd inn areas which are or could be reasably and effectively served byi .centralised and utilities. public services t W Mudiktion Focused on .thy intersection of .arterial and/or collector highways and extond nq .S.miles beyand such intersections or within one ails- at '" interstate interchange. $98Q— UM. Located within less than to minute comutinq tine td fkm an Urban Area. NXIOUBB Laud a'sa. Located within i tified Ton or Tventy Year o Transition areas. - - Located away from areas where devslopseant would have a detrimental impact an productive agricultural uses and managed- forest land. IV, . Located in areas with aodsrate to high u population densities. ffia+wic and Located away asi areas- whore development would have a dotrimsntal impact on stato or federally acknowl.sdged historic-cultural sites or county identified Public -Interest. Are". Acf�mi 9640e.0 any M4* ACTZVM fLand sip. Located on- land with slqmW of less than 155 grads. Located outside of 10 flood prove areas "I U E dtntit: by the goers of-Saginsess. Al amd Located away from sites that would, if develape�d, create a threat to unique or -ndangsred species as identified by the state or federal gwez d . V/22,2.//Soi?. Gowt4a . Located in areas where general soil editions are suitable for urban uses because of good drainage characteristics and load boating capacity for site development. Abiblic IfiLCYARAWUtiliUSa. Located in areas which are or Could bd reasonably and effectively served by centralised public services and utilities. ( t Itatian • Focused on the ion of arterial D and/Or Collector highways and ercGaeediZtg .5 silos bay o�ed such ions or within oes ails'of are intesstate intst�change and thin 1000 feat of rail lines. 108 t $nerqy Uga. Located within 1084 than a 10 ainuts c==Qti t D from an Urban area. OI&i&t4= Located within identified Ten -or T linty-yam Transition Iftman. �+ki:1 !_ ,.IQ -al. Located away fros areas where devsl- would have a datrinental iagnct on productive es agricultural us and aariag0d forest land. ViAmlation en v,. Located in areas with moderate to high gopalation densities. i41&t aric and cait»M�• Located away from areas. where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or County identified public Interest Areas. RGML v Land .- Located on land with slopes of 1080 than 15% grade. ffAralgim. Located outside of 100-year flood prone areas as Corps of 8a9inaars. tiara and Fauna. Located away front►► sites that would, if dovslop0d, are-to a tit to unique or endangered species as ide>tified by the *tats or federal government. mil cOnditiame located in areas where general sail conditions are suitable for on-site swrMp disposat'.systess. Located in areas that will not require urban-type services. Focused on the intersection of arterial and/or eolleetow higbm"s and. exteaftug .5 miles beyond such an -. intersectLon. Sao= Visa. xo evatnatioet. .and On. Location cdtavact80ised by across-road that serves as a fooa2 area for the su mmbding rural and fare PoPulatJ-M sac contains three or nova caomarcial or institutional land:-anus. . Located at sites within rural areas that would not uoraasonably intrude upon the existing landscape character. . Located in areas which would serve the smcroeuediag law-density neural and agricultural population, generally 1000-3000 persons. gistcria and CMl W& . Located away fry arenas where development would have a ditilm0ntal impact on state or federally acknawl0 t 4- histMic-cultural sites or County identified Public Interest areas. U 11 4. Amend Section 3.8- Cheeks Township Plan by increasing the number of activity nodes from four to five and adding a description of the new activity node, CK-5, to read as follows: REFERENCE: CK-5(I-85/Buckhorn) LOCATION:I-85 and 1-40, Buckhorn Road(SR 1114), and U.S. 70 PLAN CATEGORY Economic Development(Transition)Actiuity Node ANALYSISAND EVALUATION.•This node is located at the intersection of an interstate highway and collector road.Access is also available from a major arterial road.Mcljor non-residential land uses in the area include Hancor Products and the Orange Alamance Water System office and water tank. Scattered residential development is also present,particularly along Buckhorn Road and just south of the Southern Railroad. The tract includes the Southern Railroad and is crossed by a gas pipeline as well as a Duke Power Transmission line. The area is on the western edge of the Upper Eno River watershed and contains gently rolling topography. Intermittent streams which cross the property flow south to join Sevenmile Creek. Soils not suitable for development are found along the streams. The area is presently served by a central water system (Orange Alamance), and future sewer line extensions are possible from the Efland sewer system. Since the area is located in a water supply watershed, new development will have the option of limiting the amount of impervious surface (buildings,parking, etc.)or installing wyt detention basins for stormwater control.New development must also comply with performance standards established specifically for Economic Development Activity Nodes. Access to the site is best provided by-way-of a service road extending from Buckhorn Road to Redman Road (SR 1311). The western portion of the area nearest to Buckhorn Road is best suited for service/retail land uses, while the remainder is appropriate for a mix of light industrial, distribution, flex space, and office uses. 5. end Section 3.9-Hillsborough To lan by increasing the number of activi nodes from four to ive and adding a description of the ew vity node, HM-5, to read as follo RE C *HB-5 a-40 101d N.C. 6) ON:1-40 101d N.C. 86(So h Chum in treet Extension) PLAN RY:Economic velopment(Tr sition)Activity Node ANAL AND EVALUATI N:This node is loc d at the intersection an interstate ighev and a minor rial road whi serves as a mc41or ntranceway to Hill rough. The ode rids southwest fro the South Railroad and includ the Interstate-401 Id 86 interchan e. In the area alo Old 6 and 1-40, there are some oderate to s p slopes and soils w ch may restrict but not p hi it development. Most of the includes sl s over 7.5 percent. 1 pes over 15 percent are ge rally found along drainageways. Soils uns table for developmen fairly common through he southwestern portion of the a. Some oil categories are res ted due to slope, while oth s p sent limitations due to wetness o low s ngth. Cates Creek d its tri taxies flow through the site so h est to northeast. The fl p n along Cates Cree could serve separate uses but should not be considerable restriction o dev lopment. A ,;igni ant area of botto land forest has also been id fled in proximity to C s C kin the Inven ry of the Natural Are and Wildlife Habitats of an a County(Site E07). ther si nifieant cult al resource to be recogni d and protected during evelo ent is the remains the"Ne Chapel H' Road", as shown on a su by.George Tate in 891. Th a areas should be preserve as open s ace or buffer areas through proper site design and construction practices. 12 th the exception of a to -density subdiuision, ecoach Run, ac ed from N.C.86, there w d be significant disrup n of areas with a re de tial character. d oval development h been pl ed,however,to id verse impacts on eigh ring residen al co unities.Moderate ensity resi tial and low ntensi office develop ent h been loc and/or atural vegetati a buffers retain to "scree existing eighborhoo from mo intensiu uses. Beca a the 1-401 d N.C. 86 interch ge se s as a majo access poi to Hillsbo ugh, t retention of u etatiue uffers along Old N.C. 6 c d also prese a the ch acter of that a tran way. Without i vement, the abili of Id N.C. 86 to h le additional traffic ay hinder some develop nt. urthermore, the 'al for vehicular ac s to Old N.C. 86 is m d from within the si Neuert Bless, the existence nearby public Ovate sewer services, dire access to the in ate syste makes the no esirable for ne deu opment, inclu ng light 'ndustrial, di 'bution,flex ace, office, an se 'ce/retail uses. he exis nce of the in rstate syste and rail ruice also adds to the potenti of the de as part f a region transit system. 6. Amend Section 3.10 -Eno Township Plan by revising the description of activity node ENO-2 to read C A(A-NW as follows: /F REFERENCE.ENO-2 (Eno) (I-861U.S. 70) /l/FCs--SS X y LOCATION.-1-85 and U.S. 70 PLAN CATEGORY 7'L Economic Development(Transition)Activity Node IN UF_ ANALYSISAND EVALUATION.This node is located at the intersection of an interstate highway and ��p a major arterial road, and includes a two-mile stretch along U.S. Highway 70. The area is also serviced by a spur of the Southern Railroad. The entire area is located in the Lower Eno River watershed, with Rhodes Creek and other tributaries flowing north through the area toward the Eno River. Floodplains on Rhodes Creek could be a somewhat restrictive for development. Soils unsuitable for development are located primarily along the streams. Slopes between 7.5 and 15 percent are scattered throughout the area,however, the majority of the area slopes are less than 7.5 percent. Slopes over 15 percent are concentrated along the drainageways. Existing land uses range from adjacent mobile home parks to a variety of service and commercial uses. Therefore, appropriate infill development is projected for this area. New commercial and industrial uses should be generally confined to the areas south of U.S. 70 and 1-85 in order to reduce negative impacts on the Eno River State Park. Access along U.S. 70 may be difficult in areas of moderate or steep slopes,however,the widening of 1-85 and the associated redesign of the interchange will provide greater access to adjoining properties. Moderate-density residential and low intensity office development has been located and/or natural vegetative buffers retained to "screen" existing neighborhoods from more intensive uses. 7. Amend Section 3.12 - Chapel Hill Township Plan by revising the last paragraph in the subsection, Distribution of Land Use Plan Categories, to read as follows: There are no activity nodes in Chapel Hill Township north of the JPA An 4Ue Economic Development(Transition)Activity Nodes, epte in See Tewflehip 6&49 ig, and ene in Hillsborough Township (HB-5), however, extends as fW seat-es slightly beyond the Chapel Hill Township line. of the-ate. The node in Hillsborough Township crosses the Duke Power transmission line north of Davis Road and is adjacent to 1-40 east of Old N.C. 86 in the northwestern corner of Chapel Hill Township. �3 8. Amend Section 4.1 - Overview of Implementation Strategies by adding an "Economic Development Activity Node" row to the "Land Use Element Categories-Zoning District Matrix". The subsection, "Zoning Ordinance", would also be amended (as follows) to add a description of the "Economic Development Activity Node" category. ECONOMICDEVELOPMENTACTIVPIYNODE:Identifies areas in Transition areas of the County which have been specifically targeted for economic development activity consisting of light industrial, dis,l ibution,flex space,office,and service/retail uses.Such areas are located adjacent to interstate and mq,'or arterial highways, and subject to special design criteria and performance standards. The applied zoning district is ED (Economic Development). The subsection,"Economic Development Plan",is also proposed for revision and would read as follows (wording to be deleted shown in strike-feu; new wording shown in boldface): Economic Development Plvn The physical land use planning activity cannot be separated from economic considerations. In determining the appropriate pattern of land use for the County an assumption is implicitly made regarding the type of growth favored and the response of the economy to such growth. Conscious efforts to broaden and diversify the economic base of the area and promote certain forms of economic development should complement physical planning considerations affecting land use patterns, particularly as they impact on the maximization of opportunities for County residents for housing and work, and the protection of the environment. -4-pa e2epe-pae.mie development plan and related pekeies The Orange County Industrial Facilities and Pollution Control Authority was created by the Board of County Commissioners on October 23, 1978, and formally organized on March 5, 1979, is the bedyprimarily Feepeneibk fop these sesivisies to work toward the establishment and expansion of manufacturing companies within Orange County. Creation of this Authority made it possible for manufacturing companies to be eligible for Industrial Revenue Bonds. In December 1982,the Orange County Economic Development Commission(EDC)was established and charged with carrying out an economic development program for all portions of the County and its constituent municipalities. The EDC's purpose is to increase economic development through clear, effective strategies and policies which stimulate balanced development at appropriate rates in suitable locations. One of the mcljor accomplishments of the EDC has been the preparation of a Strategic Plan for Orange County's Economic Development. The Plan was adopted on March 8, 1989,including a goal to: "...insure the desired quality of life...by encouraging economic development through investment in human resources, the expansion of existing businesses, and the creation of diversified and environmentally safe businesses...to provide jobs for county residents and to increase the non-residential tax base...% As one means of implementing the Plan, a resolution was adopted in October, 1990 by the Planning Board and the Economic Development Commission establishing procedures to address comprehensive planning and economic development matters of mutual interest. I I I I I • 1 1 1 1 1 1 ''�' � � � � � I I • I I � I i l l � •�� = 1 i i �� I I .� � � � I I N � 1 • I I I • v �+ G �r Rti C OC •• CLD • Y OL ` • vI N I L ct, J ... cc c oo tJ C < � 15 PROPOSED ZONING ORDINANCE TEXT AMENDMENTS ASSOCIATED WITH ESTABLISHMENT OF ECONOMIC DEVELOPMENT DISTRICTS 1. Amend Article 4.2.19 - District Statements of Intent and Application Criteria [Economic Development (ED) District] by revising it to read as follows (wording to be deleted shown in ; new wording shown �a4 in boldface): G Economic Development(ED)District a. Intent p,K The purpose of the Economic Development (ED)District is to provide locations for a wide range of leap-intmoisy light industrial, iiessisusieae , distribution,flex space, office, and research servicelretail uses . Flex space typically includes one-story buildings designed, constructed, and marketed as suitable for use as ojf•ices but able to a�ecommodate other uses,e.g.,warehouse,showroom,manufacturing,assembly or similar operations. Such areas have been targeted for economic development and are located adjacent to interstate and mgjar arterial highways. They are subject to special design criteria and performance standards used to minimize impacts beyond the space occupied by the use. b. Application Criteria (SAN This district will usually be applied where the following conditions exist• 1. ,Site The district is located adjacent to a Federal Interstate Highway, with direes seeese to or a mgjor arterial road and upithapa- _1_5 Mike of an 2. The site district is located outside of the Chapel Hill - Carrboro Rural Buffer area as designated in the adopted Comprehensive Plan. 3. AM uses The Bite district shall not be located within a the critical area of a designated water supply watershed. 'LA�j( i Urban services, such as water and sewer mains, are desirable, but not required if acceptable Galternatives are available. buiJANO(e). 2. Amend Article 4.3-Table of Permitted Uses by deleting the list of permitted uses and providing the following D.K, notation in the ED row: Refer to Article 629-Development Standards for Economic Development(ED)Districts. 3. Amend Article 5.1.2 - Establishment of Dimensional Requirements (Schedule for Non-Residential 0. Development) by deleting the existing standards and providing the following notation in the ED row: Refer to Article 629-Deelopment Standards for Economic Development(ED)Districts. CAmend Article 6 by adding a new Article 6.29 - Development Standards for Economic Development (ED) Districts to read as follows: 6.29 Development Standards for Economic Development(ED)Districts 6.291 Purim (goal Six of the Land Use Element of the Comprehensive Plan is the promotion of economic development which emphasizes local employment needs while preserving the character of communities and protecting the natural environment. To that end, these provisions are established to create review procedures and appropriate design standards for application within portions of the county tageted for economic development activities; e.g., Economic Dmelgmwd Districts. 6292 Design Review Process before any new sit+e'development may be undertaken in an Economic Development District, a site plan must be approved and a zoning conphance permit issued in accordance with the G ) provisions of Article 14 Site Plan Approval Procedures) of this Ordinance. Prior to P� submission of an application for site plan appal, applicants will be required to meet with / representatives of the Planning and Inspections, and Economic Development Dtoa tments to identify policies,procedures, regulations, and fees applicable to development proposals. Plans for development proposals in an Economic Development District will be reviewed by the l� Planning and Inspections Department staff for compliance with the standards ds contained in Y the following section.Such review will also be carried out in accordance with the provisions Gp,NnK�SS/OsrGl�s of Article 14.3(Site Plan Review)of this ordinance. In addition to the submittal requirements contained in Article 1422, a complete application Apr shall also include. lylQ,Jor / 1. Building elevation drawings for each proposed structu v;and �QUP!0�7w�, R A minimum of two(2)drawings of sections through the site illustrating casting and proposed grades, as well as the relationship of difibrnt site featuses. Failure to meet the criteria for site plan approval listed in Article 14.3, to address agency comments solicited during the plan review process,and/or to adhere to the design standards applicable within Fkanarnic Dlevelo msent Dishicts will result in denial of a development application. In such cases, the development plans will be returned to the applicant with a written explanation of the reasons for denial and the changes required for the application to be approved An applicant shall have the option of revising the development plans to comply with the site plan and design criteria As an alternative, the applicant may also submit the plans for the review and approval of the Planning Board and Board of County Commissioners in accordance with the p��'ors of Article 7 lavnned,��lopment Districts. 0.*Oe tri�eve a/�►,.►e s,�,s �Gsve NSf��c� 629.3 Standards �Qev se. qigoe. ct��ro /'eslexSib� AA ec�t�/'ta•� The dedgn standards applicable within Economic Development Districts are shown an the fallowing pages and are divided into two categories, GA---f e5) Desi" 9--idshmes Performance Standards and Design Criteria. Losd Um The Performance Standards establish'land use intensity ratios'ep the duw dimensiwW op ag uN�Q'h or radios ouii)rnade construction to natural featum as well as standards to eliminate or mitigate nrusavnces and undesirable impacts on 4,c i� 17 the endrmunent; both natural The Design Criteri a -to the establish standards for landscape aMrarchitectural features,parking and circulation,service and storarse, and signs and lighting i.e., how the use'fits'the site and how it relates to the surrounding area. (The wording highlighted in "strike t1wetq#" format has been revised to reflect the revised organization and content of the Design Manual.) 6).�-5. Amend Article 7 by revising Article 7.2.1 to include the PD-ED Planned Development-Economic Development District as a permitted Planned Development District as follows: 7.2.1 Establishment of the Planned Development Districts Planned Development districts that correspond to the following districts authorized in Article 4 are hereby created. R-13 - PD-H-R-13 R-8 - PD-H-R-8 R-5 - PD-H-R-5 R-4 - PD-H-R-4 R-2 - PD-H-R-2 R-1 - PD-H-R-1 RB - PD-H-RB LC-1 - PD-C -LC-1 NC-2 - PD-C-NC-2 CC-3 - PD-C- CC-3 GC-4 - PD-C - GC-4 0I-1 - PD - 0I-1 I-1 - PD -I-1 I-2 - PD -I-2 I-3 - PD -I-3 ED - PD-ED Pt-I- PD -PW-I PD -MU PD -R PD -MHP OAmend Article 7 by adding a new Article 7.21-PD-ED Planned Development-Economic Development District to read as follows: �f 7x.21 PD-ED PLANNED DEVELOP�NT-ECONOMIC DEVELOPMENT DISTRICT CA o«r�G / t The f+ Umdng regulations and mquiranents apply to PD-ED Planned Development-Economic Necessa- Development Dom. f� p�721.1 PD-ED District Definition and Intent ove PD-ED districts may be established in accordance with the general procedures and 1"e!l�S�oxS requirements set forth in Articles 71 through 7.9 and with the intensities and in locations in accordance with the Cann rehensive Plan and the Zoning Ordinance and Atlas. The purpose of this district is to provide for properly located and planned non-residential development consistent with Orange County's Strategic Plan for Economic Development. Specifically, this district is intended to provide an oppa lunity for development plans, submitted under the pnouisions of Article 6.29[Development Standards for Ecanomic / Development(ED)Districts]of this ordinance,to be considered for approval when such plans do not / 1. Meet the criteria for site plan approval listed in Article 14.3; /1�cessa-�y / 2. Address agency comments solicited during the site plan review process; and/or //IGO/ro/'•v><e 3. Adhere to the design standards applicable within Economic Development Districts as /�eU/5%OfLS set forth in Article 829 of this ordinance; and which propose a design solution which is equal to or better than could be obtained through the application of the criteria and standards contained in the Design Manual. (The last sentence beginning"and which..." was added following discussions with the County Attorney to clarify that failure to adhere to criteria and standards, and/or address agency comments is not sufficient grounds alone for application acceptance and consideration.) In such cases, application for and approval of a Planned Development District shall be governed by the general and specific standards and procedures for the issuance of a Planned Development Permit as set forth in this Article. 6. Amend Article 22 - Definitions by adding a definition of"Economic Development Activity Node" to read as follows: Economic Development Acdvitr Nook - Land in Trwznhm areas of the County which has been specifically targeted for economic development activity consisting of light industrial, distribution, fleas space, off ice, and service/retail uses. Such areas are located adjacent to interstate and major arterial highways,and subject to special design criteria and performance standards. Flex space typically includes ane-story buildings designed, constructed, and mar*eted as suitable for use as offices but able to accommodate other uses;e.g., wamhouw, shO9Ur own6 manufacturing assembly or similar operations. Qu � . Sye C �er,�ri7 c1 ,� .• �. 7iiL ��,�5 �T �+e�-s� .17 C erg A-41 s es 9 �9 3. That residential uses be eliminated from the list of permitted uses allowed in Secondary Development Areas in the I-40 101d N.C. 86 Economic Development District. That Section 2.4, subsection entitled"Water Supply&Sewage Disposal", / be revised to include a statement encouraFine the installation of"dry" C, T6 sewer lines, at the time of site development, where septic systems are usedCYork with utility providers to establish incentives for installation of such lines, including a waiver of tap-on fees That Section 2.1, subsection entitled "Schematic Plans", be revised to include a statement that property owners and/or developers,particularly L those with large tracts of land, are encouraged to prepare plans which reflect market forces while providing a coordinated"theme"or"blend"of hec6155 compatible uses. In addition, encourage the Economic Development ?Commission to continue its efforts to involvelcommunicate with all landowners in accomplishing the same goal. 6. That the Economic Development Districts be monitored for at least 2-3 years as suggested by the Commissioners to identify the following impacts. �0 e S ' D a. What will be the fiscal impact; i.e., impact on the County's operating budget and tax base,of non-residential developmee t in the Economjc Development Distri ? U5 U eew5'1 re;" b. What additional residential growth will eggenerated as a result of the Economic Development Districts? (1) How many of the employees working at businesses in the Economic Development Districts live in Orange County? (2) How many of the jobs will be filled by new vs. existing residents? (3) What will be the fiscal impact of new residential growth attributable to the Economic Development Districts? C. What wages will be paid/are being paid by businesses which locate in the Economic Development Districts? The Planning Board recognized that confidentiality and/or legal limitations may limit the availability of some data. 7 That all references to"special use"approval be clarified to mean approval /' ,/��/? of a special use permit through the planned development process. W!7 j The vote of the Planning Board was unanimous (11-0). Copies of the draft Planning Board minutes are attached which detail the discussion of the Planning Board on all issues referred to them by the Board of Commissioners. MEMORANDUM TO: BOCC FROM: Verla Insko N SUBJECT: Economic Development Districts DATE: March 7, 1994 Here is my thinking on the questions Alice raised at the 3/1/94 meeting. 1. Re: Locational Criteria The BOCC made a major policy change on Tuesday night. The old policy stated that the Commissioners would locate industrial and commercial development near existing population centers. The new policy states that the Commissioners are willing to locate industrial and commercial development just about anywhere in the county -- in EUDs. The question Alice asked us to discuss is: Do we want to make this kind of sweeping change? If so, why? I don't fully understand the implications of this change nor can I justify it to my own satisfaction I got stuck on Tuesday because the I-40/01d 86 node doesn't conform to the old locational criteria, and I kept confusing the two questions. But, I missed the point. We should not create a broad policy to fit one exception(or one Intersection). We should deal with the big policy question first -- where should industrial development be located? If we like the old locational criteria for the general policy and we still want a node at I-40, then we decide how to make both tbfts work. Maybe we create a rural EDD that is distinctly different from an urban EDD. Anyway, this question deserves a full discussion. 2. Re: A BOCC review process for large projects? I support having the Commissioners, planning board or someone other than staff review and give the final approval for the larger projects -- at least for the time being. I like the idea of an abbreviated review based on some nuw er of acres of disturbed land, but I don't have a strong opinion on how big the protect should be before the review process kicks in. The . question for me on this issue is, who is accountable for possible mistakes? cc: John Lick, Ted Abernathy, Marvin Collins