Loading...
HomeMy WebLinkAboutAgenda - 03-01-1994 - VII-A 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 1, 1994 Action Agenda Item # V(f_-A SUBJECT: ECONOMIC DEVELOPMENT DISTRICTS PROPOSAL - PROPOSED AMENDMENTS TO: *LAND USE ELEMENT AND ZONING ORDINANCE,INCLUDING DESIGN MANUAL" DEPARTMENT: Planning& Inspections PUBLIC HEARING: —X—Yes No ATTACHMENTS: INFORMATION CONTACT: Planning Director X2592 NOTE: Refer to "Attachment List" immediately following"Recommendation" (p.6) for list of TELEPHONE NUMBERS: attachments in order of presentation. Hillsborough 732-8181 Please refer to Design Manual as well. Durham 688.7331 Mebane 227-2031 Chapel Hill 968-4501 PURPOSE: To consider or000sed amendments to the Land Use Element and Zoning Ordinance establishing Economic Development Districts, including a arovosed Design Manual containing performance standards and design criteria applicable within the proposed districts. BACKGROUND: At its December 21, 1993 meeting, the Board of Commissioners considered Economic Development District proposals for decision. Several concerns were expressed about the Design Manual, including the following. 1. The Table of Permitted Uses in Section 2.2 should be revised to eliminate water storage tanks, radio and TV towers, transmission lines, motor freight terminals, storage and distribution of petroleum products, and freestanding restaurants, service stations,and retail stores as permitted or special uses. The Table should also permit churches and clubs or lodges. 2. Section 3.5, Service and Storage, should be revised to address noise originating from rooftop air conditioning equipment,to refer to trash areas and dumpsters as solid waste containers and recycling bins,and to provide a sketch which not shows screening techniques for solid waste containers but recycling bins as well. 3. Section 3.2, Landscape Design, should be revised to require a 100-foot setback along Old N.C.86,an arterial street,in addition to dedicating an additional 20 feet right-of-way. Where collector roads intersect with Old N.C. 86, a setback of 100 feet applied in the first 100 feet from the intersection, 75 feet in the next 100 feet, 50 feet in the next 100 feet, then 25 feet for the remainder of the frontage along collector road The setback would apply to buildings, parking, loading, and storage arena. 4. Section 3.3, Circulation and Parking, should be revised to change all references to"should" to"must" or"shall". 4 2 In addition to the changes to the Design Manual, the Board of Commissioners also felt that another public hearing should be held on the Manual and the Table of Permitted Uses (included in the Manual). The Board set the public hearing for January 18, 1994. However, due to the lack of a quorum of Planning Board members, the public hearing was opened then continued to the February 1 Commissioners' meeting. Citizens present at that meeting were permitted to present their comments for inclusion in the official public hearing record at this meeting. Minutes of the January 18, 1994 meeting as well as written comments provided at that meeting have been included as part of the "official" public hearing record (conducted on February 1). Following the December 21, 1993 meeting, Staff revised the Design Manual to reflect the Board's concerns. Insofar as the requirement of a 100-foot setback along Old N.C. 86 is concerned, a"sliding scale" solution was developed to address small lots fronting on that thoroughfare(see Section 3.1 -Architectural Design).Application of a 100-foot setback in addition to a right-of-way dedication of 20 feet may have resulted in "taking" situations. The scale requires a setback of 15%of the lot depth for buildings and structures(not less than 25 nor more than 100 feet), and 5% of the lot depth for vehicular use and storage areas (not less than 10 nor more than 100 feet). As illustrated in the"case study" in the Design Manual, the scale allows smaller, existing lots to be developed. Larger lots with greater depth would have to meet the greater setback requirements. The Design Manual was also the subject of discussion at a work session held on January 10, 1994.At that session,the Board identified additional concerns,including the following. 1. The Table of Permitted Uses in Section 2.2 should be revised further to identifv specific types of manufacturing uses which would be allowed as permitted uses in each district. 2. Thresholds should be identified for "low water usage" so that prospective uses which exceeded those thresholds would require approval by the Board as a Special Use. In addition, the location of existing water/sewer lines, the cost of extending major service lines to the Economic Development Districts, and the capacity of treatment plants should be identified Staff revised the Design Manual to address the Board's concerns. Provided as an attachment is a summary of the evolution of the Permitted Use Table in Section 2.2. The principal concerns voiced at the February 1 public hearing are listed below. Staff' comments regarding the concerns are provided in italics type. 1. Rationale for the permitted use table and the difference in the three districts. Using the 1.40 101d N.C.86 district as a starting point, the range of permitted industrial uses is the most limited in this district The list is based on a review of those types of industries which would provide the"best fie in view of the location of the district, surrounding uses, and the desire to "match up" with similar types of uses in the Research Triangle Park (RTP) area. Wholesale (distribution), office, and service uses were included on the list to provide for an appropriate mix of uses normally associated with business parks. Retail uses were limited to those which would locate in service courts or multi-use buildings to discourage convenience shores and fast food restaurants, e.g., the strip. Insofar as the I-85/Buckhorn Road district is concerned, a broader range of industrial uses is permitted because of the proximity of the district to Mebane's industrially zoned and developed jurisdiction.Wholesale uses are also permitted, 3 but retail,office,and service establishments are classified as"special uses"to give more emphasis to the "light industrial-distribution"focus of the district. In the case of the I-851U.S. 70 district, the full array of industrial, distribution, retail, office, and service uses is allowed,principally because of the character of existing development both within the area and across the county line in Durham. To address a concern about the specific types of industrial uses permitted, the Economic Development Director has provided a listing of the types of uses permitted under each industry group listed in the permitted use table.He has also provided examples of existing industries in the county which fall into each category. This information is provided as an attachment to the abstract. 2. Potential for the Town of Hillsborough to incorporate the Economic Development Districts and undo the County's plans. One means of addressing such concerns is to amend the Cooperative Planning Agreement to include a new land use designation entitled"Economic Developmen t District". Associated with this change would be an amendment to the text of the Agreement to indicate that the I-40 101d N.C.86 district would remain within the jurisdiction of the County.Such an amendment would assure that annexation of the district could not take place without the approval of the County.It would also reduce the administrative/enforcement responsibilities of the Town associated with plan approvals but still provide opportunities for review/comment on specific pytects. 3. Desire for minimum lot size and impervious surface (or building coverage) limits comparable to those of RTP. Provided as an attachment is a comparison of the proposed EDD standards with those of Durham's "business park"and"research applications"zoning districts. The"research"district standards are based on similar standards included in the restrictive covenants of RTP. To determine how the"reseamh"district compared with the EDD standards, the 15% building coverage limit was used as a starting point. Applied to an 8-acre lot,a w&story'office"building could be no more than 52,300 sq.fl. in area. Staff determined that a lot of 10.3 acres in sin would actually be needed to meet building coverage and setback standards, and still provide sufficient area for the building and required off-strut parking. Staff then went through the same exercise for the same building size and determined that in Durham's"business park"district,a lot sire of 4.2 acres would be required, even though the minimum lot an requirement was only three acres. The influencing factor in this case was the impervious surface limit of 60%. Staff then applied the EDD standards to the 52,300 sq.fir building and found that for of j'ice, retail, distribution, and industrial uses, results similar to those of the Durham "business park" standards were achieved. Staff also found through further analysis that reductions in lot sin resulted in reduced building size but the landscape, building, site, and impervious surface ratios remained the same. The controlling factor was found to be the site volume ratio. Finally, staff varied the site volume ratios to see which ratio would come closest to providing a 60% impervious surface limit. Staff'found that no change was 4 necessary for distribution and industrial uses (from previous analysis) but that retail and office standards needed to be changed to the following: Use Current SVR Revised SVR Retail 1.000 1.500 office 2.000 2.500 With these changes, all uses will provide approximately 60% impervious surface or 40% open space. This standard is consistent with pending open space strategies of preserving approximately 40% open space in the "Open Space Area" surrounding Hillsborough. This approach is preferable to establishing minimum lot sizes, etc., since it provides design flexibility while retaining consistent landscape, building, site, and impervious surface ratios regardless of lot size. One other change recommended by staff involves the number of large and small trees per acre of unobstructed open space for industrial uses. The analysis conducted by staff revealed a distortion caused by significant amounts of natural vegetation being retained on site. Staff recommends that the tree standard for industrial uses be increased fwn 6 to 20 large bores per acne. The standard for small bees would be reduced slightly from 11 to 10 bmes per acre(see page 3.2.17 of Design Manual). Rather than refer the matter to the Planning Board at its February 1 meeting, the Board of Commissioners chose to continue discussion of the district proposals at its February 15 meeting.In addition to comment from one citizen, most of the discussion centered around questions raised by Commissioners Gordon and Willhoit. Rather than expect answers to all of the questions, the Commissioners asked that they be referred to the Planning Board for review and recommendation at its February 21 meeting. Staff has provided copies of the question sheets as well as responses (see minutes and staff memorandum). Since some of the questions involve Land Use Plan and Zoning Ordinance amendments, staff has provided copies of those proposals. Planning; Board Rommmendation: At its February 21, 1994 meeting, the Planning Board considered the questions referred to it by the Board of Canrmiseioners, as well as the evidence received at the February 1, 1994 public hearing and subsequent meetings, and recommended approval of the proposed text and map amendments to the Land Use Element and Zoning Ordinance, including the Design Manual, as revised, and the establishment of all three districts, with the following changes: 1. That the bee standard for industrial uses in all districts be increased from 6 to 20 large trees per acre and that the standard for small trees be reduced from 11 to 10 trees per acre. 2. That the Site Volume Ratios for retail and office uses in the I-40 101d N.C. 86 district be changed as follows: LLK Current SVR Revised SVR Retail 1.000 1.500 Office 2.000 2.500 5 3. That residential uses be eliminated from the list of permitted uses allowed in Secondary Development Areas in the I-40 101d N.C. 86 Economic Development District. 4. That Section 2.4, subsection entitled"Water Supply & Sewage Disposal", be revised to include a statement encouraFine the installation of"dry" sewer lines, at the time of site development, where septic systems are used. Work with utility providers to establish incentives for installation of such lines, including a waiver of tap-on fees. 5. That Section 2.1, subsection entitled "Schematic Plans", be revised to include a statement that property owners and/or developers,particularly those with large tracts of land, are encouraged to prepare plans which reflect market forces while providing a coordinated"theme"or"blend" of compatible uses. In addition, encourage the Economic Development Commission to continue its efforts to involve/communicate with all landowners in accomplishing the same goal. 6. That the Economic Development Districts be monitored for at least 2-3 years as suggested by the Commissioners to identify the following impacts. a. What will be the fiscal impact; i.e., impact on the County's operating budget and tax base,of non-residential development in the Economic Development Districts? b. What additional residential growth will be generated as a result of the Economic Development Districts? (1) How many of the employees working at businesses in the Economic Development Districts live in Orange County? (2) How many of the jobs will be filled by new vs. existing residents? (3) What will be the fiscal impact of new residential growth attributable to the Economic Development Districts? C. What wages will be paid lane being paid by businesses which locate in the Economic Development Districts? The Planning Board recognized that confidentiality and/or legal limitations may limit the availability of some data 7. That all references to"special use"approval be clarified to mean approval of a special use permit through the planned development process. The vote of the Planning Board was unanimous (11-0). Copies of the draft Planning Board minutes are attached which detail the discussion of the Planning Board on all issues referred to them by the Board of Commissioners. 6 RECOMMENDATION: The Administration recommends approval of the proposed text and map amendments to the Land Use Element and Zoning Ordinance, including the Design Manual, as revised, and the establishment of all three districts, per the Planning Board recommendation. ATTACHMENT LIST Attachments, in order of appearance, include the following: 1. Proposed land use plan teat amendments (pp.7-12) 2. Proposed zoning ordinance text amendments (pp.13.16) 3. BOCC February 1, 1994 Draft Minutes (pp.17.18) a. Staff'analysis of evolution of permitted use table (pp.19-22) b. Staff comparison of dimensional requirements in I-40/01d N.C. 86 district with Durham Business Park and Research Applications districts (p.23) C. Permitted use table (pp.24-29) 4. BOCC February 15, 1994 Draft Minutes (pp.30-32) a. Staff'comparisons of minimum lot size standards - Application of Durham Business Park and Research Applications districts vs. EDD standards (pp.33-34) b. Roth better submitted at February 15, 1994 meeting(p.35) C. Economic Development Director memorandum of February 15, 1994 (pp.36-43) d. Commissioner Gordon memorandum of February 11,1994(see BOCC 2/15/94 and PB 2/21/92 draft minutes for responses (pp.44-47) e. Planning Director response to Commissioner Gordon's FAX of February 3, 1994 (pp.48-50) 5. Planning Board February 21, 1994 Draft Minutes (pp.51-65) a. Commissioner Willhoit's questions, including Planning Director responses and Planning Board comments (pp.66.69) b. Summary Sheet - "Considerations Concerning Cost-Benefit Analysis" (pp.70.71) C. February 21, 1994 Letter to Planning Board submitted by Robert Ayers and Harold Harris(p.72) NOTE Additional reference materials distributed previously may also be found in the foHoowing agenda packets: 1. February 22, 1993 public hearing, 2. May 24, 1993 public hearing; 3. December 6, 1993 regular meeting; 4. December 21, 1993 regular meeting, 5. January 4, 1994 work session packet 6. January 18, 1994 regular meeting/public hearing, 7. February 1, 1994 regular meeting/public hearing; and 8. February 15, 1994 regular meetiag/public hearing. 7 PROPOSED LAND USE PLAN TEXT AMENDMENTS ASSOCIATED WITH ESTABLISHMENT OF ECONOMIC DEVELOPMENT DISTRICTS 1. Amend Section 3.3 - Land Use Plan Categories by changing the table of basic and detailed land use categories to read as follows: BASIC CATEGORY ORANGE COUNTY LAND USE PLAN CATEGORIES DEVELOPED Urban Existing Urban Activity Node Proposed Urban Activity Node TRANSITION 10-Year Transition 20-Year Transition Commercial Transition Activity Node Commercial-Industrial Transition Activity Node E onomic Development(Transition) Activity Node COMMUNITY Rural Community Activity Node RURAL Rural Buffer Rural Residential Agricultural-Residential Rural Neighborhood Activity Node Rural Industrial Activity Node Agricultural Areas CONSERVATION Public Interest Area Water Supply Watershed Wager Quality Critical Area Resource Protection Area New Hope Creek Corridor Open Space In addition, amend the table of Land Use Plan Category Descriptions to include a new category entitled"Economic Development Activity Node" to read as follows: BOOKOWMOMLOPIOWTACTEEMNOD&Land in Transition areas of the County which has been specifically targeted for economic development activity consisting of light industrial,distribution, GMM service/retail uses, and flex space (Typically one-story buildings designed constructed, and marketed as suitable for use as offices but able to accommodate other uses;e.g.,warehouse,showroom, manufacturing assembly or similar operations.). Such areas are located adjacent to interstate and mgior arterial highways, and subject to special design criteria and performance standards. 2. Amend Section 3.4 - Locational Criteria by adding criteria by which to evaluate the location of Economic Development Activity Nodes [Transition]. PLAN CATEGORY-ECONO1fUIC DBVFI.OPIcNT ACTIVlTYNODES [TRANSMOlV AREASI Luria Skm Located in areas with slopes of less than 15%grade. Where slopes of 15%or greater are Present,protection can be provided through proper site design and construction practices. 8 Hydroloer:Located outside of areas where 100year flood prone areas and wetlands are present. Where flood prone areas and wetlands exist, protection can be provided through proper site design and construction practices. Flora and Fauna: Located in areas where detrimental development impacts on local, State or federally-acknowledged unique or endangered species, and wildlife habitats and corridors can be protected through proper site design and construction practices. Soil Conditiona:Located in areas where general soil conditions are suitable for development because of good drainage characteristics and load-bearing capacity for development. Public Savioes/Utilities:Located generally in areas which are or could be reasonably and effectively served by public services and facilities. When located in areas where such services and facilities are not present or planned,general soil conditions must be suitable for on-site sewage disposal systems. 1'r+avisaortatiori System: Located in areas adjacent to interstate and mgjor arterial highways, particularly those with the potential for providing access to public transit facilities. Ener" Use:Located within 10 minutes commuting time from an Urban area and designed so that business uses provided within developments limit the number of short distance commutes for goods and services. Fadedw Land Usc Located in designated Ten or Twenty-Year Transition Areas. Aatricultnne and Fm+esb%. Located away from areas where development would have a detrimental impact upon productive agricultural uses and managed forest land, and/or where the existing landscape character can be maintained through proper site design and construction practices. Aamladm Dbuitr- Located in areas with, or planned for, moderate to high population densities. Historic and Cnitnrnl:Located in areas where detrimental development impacts on local, State or federally-acknowledged historic, cultural and/or archaeological sites, or County-designated Public InterestAreas does not exist or can be mitigated through proper site design and construction practices. 3. Amend Section 3.5 - Land Use Goals and Draft Policies, Goal Si:, to include the following: 611 The following Economic Development (Transition) Activity Nodes have been designated: I.40101d NC 86(HB-5),I.85 1Buckhom (CK-A and I-85 1US 70(ENO-2). And revise the fallowing (wording to be deleted shown is etrAe-Oweeg* new wording shown in boldface): 67 The following areas in the County are identified as appropriate for industrial uses and have been designated as Commercial-Industrial Nodes:Etland Center(CK-1);Miles North(CK-2); Miles South (CK-3. go@ W" and Harmon Young (HB-4). 6.9 The following Rural Neighborhood Activity Nodes have been designated-Toler's Store(CG-3); Villine's Store (LR-3,k Walnut Grove (CG-5); Underwood's Store (LR-3); Fairfield (CK-4); Coleman Loop(HB-1);Law's Store(ENO-1), Adam and Eve(BH-1); Oak Grove(BH-3); and Calvander WmW 6) and Blackwood Station WJaT,l as pmt of die Orange County-Chapel Hig-Carrbory Jdnt Planning Area Land Use Plan. 9 4. Amend Section 3.8 - Cheeks Township Plan by increasing the number of activity nodes from four to five and adding a description of the new activity node, CK-5, to read as follows: REFERENCE: CK-5(I-85/Buckhorn) LOCATION--I-85 and I-40, Buckhorn Road(SR 1114), and U.S. 70 PLAN CATEGORY Economic Development(Transition)Activity Node ANALYSISAND EVALUATION.•This node is located at the intersection of an interstate highway and collector road.Access is also available from a major arterial road. Mgior non-residential land uses in the area include Hancor Products and the Orange-Alamance Water System office and water tank. Scattered residential development is also present,particularly along Buckhorn Road and just south of the Southern Railroad. The tract includes the Southern Railroad and is crossed by a gas pipeline as well as a Duke Power Transmission line. The area is on the western edge of the Upper Eno River watershed and contains gently rolling topography. Intermittent streams which cross the property flow south to join Seuenmile Creek. Soils not suitable for development are found along the streams. The area is presently served by a central water system (Orange Alamance), and future sewer line extensions are possible from the Efland sewer system. Since the area is located in a water supply watershed, new development will have the option of limiting the amount of impervious surface (buildings,parking, etc.)or installing wet detention basins for stormwater control.New development must also comply with performance standards established specifically for Economic Development Activity Nodes. Access to the site is best provided by-way-of a service road extending from Buckhorn Road to Redman Road (SR 1311). The western portion of the area nearest to Buckhorn Road is best suited for servicelretail land uses, while the remainder is appropriate for a mix of light industrial,distribution, flex space, and office uses. 5. Amend Section 3.9-Hillsborough Township Plan by increasing the number of activity nodes from four to five and adding a description of the new activity node, HB-5, to read as follows: REFERENEI-HB-5(I.40101d N.C. 86) LOCATION. I,40 101d N.C. 86(South Churton Street Extension) PLAN CATEGORY Economic Development(Transition)Activity Node ANALYSMANDZVALUAITONN.-This node is located at the intersection of an interstate highway and a mina' arterial road which serves as a mayor entranceway to Hillsborough. The node extends southwest from the Southern Railroad and includes the Interstate-40101d 86 interchange. In the area along Old 86 and 1,40, there are some moderate to steep slopes and soils which may restrict but not prohibit development. Most of the area includes slopes over 7.5 percent. Slopes over 15 percent are generally found along drainageways. Soils unsuitable for development are fairly common throughout the southwestern portion of the area Some soil categories are restricted due to slope, while others present limitations due to wetness or low strength. Cates Creek and its tributaries flow through the site southwest to northeast. The floodplain along Cates Creek could sere to separate uses but should not be a considerable restriction on development. A significant area of bonamlavnd forest has also been identified in proximity to Cates Creek in the Inventory of the Natural Areas and Wildlife Habitats of Orange County(Site E07).Another significant cultural resource to be recognized and protected during development is the remains of the"New Chapel Hill Road, as shown on a survey by Geroge Tate in 1891. These areas should be preserved as open space or buffer areas through proper site design and construction practices. 10 With the exception of a low-density subdivision, Stagecoach Run, accessed from N.C. 86, there would be no significant disruption of areas with a residential character. Additional development has been planned,however,to avoid adverse impacts on neighboring residential communities.Moderate-density residential and low intensity office development has been located and/or natural vegetative buffers retained to "screen" existing neighborhoods from more intensive uses. Because the I-40 101d N.C. 86 interchange serves as a major access point to Hillsborough, the retention of vegetative buffers along Old N.C. 86 could also preserve the character of that entranceway. Without improvement, the ability of Old N.C. 86 to handle additional traffic may hinder some development. Furthermore, the potential for vehicular access to Old N.C. 86 is limited from within the site. Nevertheless, the existence of nearby public water and sewer services, and direct access to the interstate system makes the node desirable for new development, including light industrial, distribution, flex space, office, and service/retail uses. The existence of the interstate system and rail service also adds to the potential of the node as part of a regional transit system. 6. Amend Section 3.10 -Eno Township Plan by revising the description of activity node ENO-2 to read as follows: REFERENCE:ENO-2(Eno) (7.85 1U.S. 70) LOCATION. 1-85 and U.S. 70 PLAN CATEGORY Economic Development(Transition)Activity Node ANALYSIS AND EVALUATION-•This node is located at the intersection of an interstate highway and a mg1or arterial road, and includes a two-mile stretch along U.S. Highway 70. The area is also serviced by a spur of the Southern Railroad. The entire area is located in the Lower Eno River watershed,with Rhodes Creek and other tributaries flowing north through the area toward the Eno River. Floodplains on Rhodes Creek could be a somewhat restrictive for development. Soils unsuitable for development are located primarily along the streams. Slopes between 7.5 and 15 percent are scattered throughout the area,however, the mgjority of the area slopes are less than 7.5 percent. Slopes over 15 percent are concentrated along the drainageways. Existing land uses range from ai#acent mobile home parks to a variety of service and commercial uses• Therefore, appropriate infill development is projected for this area. New commercial and industrial uses should be generally confined to the areas south of U.S. 70 and 1.85 in order to reduce negative impacts an the Eno River State Park. Access along U.S. 70 may be difficult in areas of moderate or steep slopes,however,the widening of 1-85 and the associated redesign of the interchange will provid4 greater weess to adjoining properties. Moderate-density residential and low intensity office development has been located and/or natural vegetative buffers retained to "screen" existing neighborhoods from more intensive uses. 7. Amend Section 3.12 - Chapel Hill Township Plan by revising the last paragraph in the subsection, Distribution of Land Use Plan Categories, to read as follows: There are no activity nodes in Chapel Hill Township north of the JPA An mere Economic Development(Transition)Activity Nodes, &,W ww in Hillsborough Township (HB-5), however, extends me for eeeiA so slightly beyond the Chapel Hill Township line. *#he•are& The node in Hillsborough Township crosses the Duke Power transmission line north of Davis Road and is ac(jacent to 1.40 east of Old N.C. 86 in the northwestern corner of Chapel Hill Township. 11 8. Amend Section 4.1 - Overview of Implementation Strategies by adding an "Economic Development Activity Node" row to the "Land Use Element Categories-Zoning District Matrix". The subsection, "Zoning Ordinance", would also be amended (as follows) to add a description of the "Economic Development Activity Node" category. ECONOAICDEVELOPM&1VTAC7IVI7YNODE.Identifies areas in Transition areas of the County which have been specifically targeted for economic development activity consisting of light industrial, distribution,flex space,office,and service/retail uses.Such areas are located adjacent to interstate and mgior arterial highways, and subject to special design criteria and performance standards. The applied zoning district is ED (Economic Development). The subsection,"Economic Development Plan", is also proposed for revision and would read as follows (wording to be deleted shown in st.rihe Owe new wording shown in boldface): &a wmic Dawkpment Plane The physical land use planning activity cannot be separated from economic considerations. In determining the appropriate pattern of land use for the County an assumption is implicitly made regarding the type of growth favored and the response of the economy to such growth. Conscious efforts to broaden and diversify the economic base of the area and promote certain forms of economic development should complement physical planning considerations affecting land use patterns, particularly as they impact on the maximization of opportunities for County residents for housing and work, and the protection of the environment. dedelep, lem pameme . The Orange County Industrial Facilities and Pollution Control Authority was created by the Board of County Commissioners on October 23, 1978, and formally organized on March 5, 1979, io Ow body poinerily peops"bk fsp own agg to work toward the establishment and acpansion of manufacturing companies within Orange County. Creation of this Authority made it possible for manufacturing companies to be eligible for Industrial Revenue Bonds. In December 1982,the Orange County Economic Development Commission(EDC)was established and charged with carrying out an economic development program for all portions of the County and its constituent municipalities. The EDC's purpose is to increase economic development through clear, effective strategies avid policies which stimulate balanced development at appropriate rates in suitable locations. One of the mayor accomplishments of the EDC has been the preparation of a Sb-ategic Plan for Orange County's Economic Development. The Plan was adopted on March 8, 1989, including a goal 4W '...insure the desired quality of life...by encouraging economic development through investment in human resources, the expansion of existing businesses, and the creation of diversified and environmentally safe businesses...to provide jobs for county residents and to increase the non-residential tans base...'. As one means of implementing the Plane, a resolution was adopted in October, 1990 by the Planning Board and the Economic Development Commission establishing procedures to address comprehensive planning and economic development matters of mutual interest. 6U � I I i ' • 1 i I ! i ! i = I I I I I � I l i i i f • I • I = 1 j I I I l �ti I I I I I • � • ` j I { i l � 1 1 1 • I I i • ' N � v •� C,.jiIIII �� � 1111 • iIl • N V � h G e < •_ 1 r V • • • M • I I • � � I I I � v •.J.. ec aK I • _ I I P.r lu ail - I I �y .A I I I I I I �I I • � O I I � 1 I s m v o z z < c Z 5 Z u tv MEN�• � ee _, u Lul � Z R � � C � � a •v � � = � - - �' C < w U U U ? U U 13 PROPOSED ZONING ORDINANCE TEXT AMENDMENTS ASSOCIATED WITH ESTABLISHMENT OF ECONOMIC DEVELOPMENT DISTRICTS 1. Amend Article 4.2.19 - District Statements of Intent and Application Criteria [Economic Development (ED) District] by revising it to read as follows (wording to be deleted shown in ; new wording shown in boldface): Economic Development(ED)District a. Intent The purpose of the Economic Development (ED) District is to provide locations for a wide range of low inteft ei#y light industrial, inetiou4sis e�l, distribution,/lac space, office, and research service/retail uses Floc space typically includes one-story buildings designed c0nsblucAed and marketed as suitable for use as offices but able to aoeornmodo�e other user e.g.,warehouse,showroom,manufacturing,assembly or similar operations. way .Such areas have been targeted for economic duulapmait and are located adjacent b intrntoate and mgjar ar*nal highways. They are subject to special design criteria and performance standards used to minimise impacts beyond the space occupied by the use. b. Application Criteria This district will usually be applied when the following conditions exist: 1. Sib Thu district is located adjacent to a Federal Interstate Highway, with dipms seeege to or a meow arterial road 2. The sine district is located outside of the Chapel Hill - Carrboro Rural Buffer area as designated in the adopted Comprehensive Plan. -2. -4-14 ku she"be . . �i 0 Gem, and OU I@#@ shoU have fmnsege eps she kiepesete e 3. AA@ "M 2U rite district shall not be located within a the critical area of a designated water supply watershed 4. Urban services,such as water and sewer mains, are desirable, but not required if acceptable alternatives are available. 2. Amend Article 4.3-Table of Permitted Uses by deleting the list of permitted uses and providing the following notation in the ED row: Refer to Ardck 6.29-Deuekpnnent Stmnda,ds for z= n k D uclgxneW(RD)Districts. 3. Amend Article 5.1.2 - Eatabliahnnent of Dimensional Requirements (Schedule for Non-Residential Development) by deleting the existing standards and providing the following notation in the ED row: Refer to Amick 6.29-Daxlopment Standads for Re mantic Development(BD)Districts. 14 4. Amend Article 6 by adding a new Article 6.29 - Development Standards for Economic Development (ED) Districts to read as follows: 6.29 Development Standards for Economic Development(ED)Districts 629.1 Per a4t (goal Six of the Land Use Element of the Comprehensive Plan is the promotion of economic development which emphasizes local employment needs while preserving the character of communities and protecting the natural environment. To that end, these provisions are established to create review procedures and appropriate design standards for application within portions of the county targeted for economic der gwsent activities; e.g., Economic Development Districts. 6.292 Design Review Process Be&v any new site development may be undertaken in an Economic Development District, a site plan must be approved and a zoning compliance permit issued in accordance with the protnuons of Arack 14 (Sine Plan Approval Procedures) of this Ordinance. Prior to submission of an application for site plan approval,applicants will be required to meet with representatives of the Planning and Inspections, and Economic Development Departments to identify policin procedures, regulations, and fives applicable to de elapment proposals. Plans for development proposals in an Economic Development District will be reviewed by the Planning and Inspections Department staff for eompliamm with the standards contained in flit follawirsg section.Such review,will also be carted out in accordance with the provisions of Artiek 14.3(Site Plan J?mm)of this ordinance. In adaldion to die submittal requirements contained in Amick 1424 a complete application small also include 1. Building elevation drmoings for each proposed stractarG and 2. A minimum of two(2)drawings of sections through die site illustradM existing and proposed grades, as well as the relationship of di fte ent site features. Failure to moat the criteria for site plan approval listed in Article 14.3, to address agency comments salieitad during the plan n vier process,and/or to adbee to dse design standards applicable within Economic Diaelapmemt Districts will result in denial of a development qW ica"L In such cases, the daeloprne nt plats will be ndurned to dse applicant with a wn um aplanartim of dw reasons for denial and the changes required for the application to be apps+ n d An gwhcarnt slma ham the aptian of revising dw dankprrent plan to eornply with the site plat and design cruna.As an alterna hm the applicant mad►also subunit the plan for the review, and approval of the Planning Board and Board of County Cormrnissionus .in aaaorrdance with Ilse prwsaistans of Amick 7-Planned Developmsent Districts. 6.29.3 D m&n Standards The design standards applicable widsin Economic Development Districts ace shown an the following pages and are divided into two categories, GoWeNnee P *rmance Standards and Dra:gn Criteria. LmwP4k&&&mdiv The Performnasee Standards amblish'land use inknsity ratios"an As 96FOO diff or ratios of mat-made eonstrvcam to natural features as well are standards to eliminam or midgatie nuisances and undesirable impacts on 15 the enuir+onmer;4 both natural and manmade. The Design 6+ai roes Criteria- - ke establish standards for landscape and architectural features,parking and circulation,service and storage, and signs and lighting;i.e., how the use'fits"the site and horn it relates to the surrounding area. (The wording highlighted in "stAke-Owe> " format has been revised to reflect the revised organization and content of the Design Manual.) 5. Amend Article 7 by revising Article 7.2.1 to include the PD-ED Planned Development-Economic Development District as a permitted Planned Development District as follows: 7.2.1 Establishment of the Planned Development Districts Planned Development districts that correspond to the following districts authorized in Article 4 are hereby created.• R-13 - PD-H-R-13 R-8 - PD-H-R-8 R-5 - PD-H-R-5 R-4 - PD-H-R-4 R-2 - PD-H-R-2 R-1 - PD-H-R-I RB - PD-H-RB LC-1 - PD-C-LC-1 NC-2- PD-C-NC-2 CC-3 - PD-C- CC-3 GC-4 - PD-C- GC-4 0I.1 - PD - 0I.1 I-1 - PD -I-1 I.2 - PD -I-2 I.3 - PD -I-3 ED - PD-ED PW-I- PD -PW-I PD -MU PD -R PD -MHP 8. Amend Article 7 by adding a new Article 7.21-PD-ED Planned Development-Economic Development District to read as follows: 721 PD-ED PLANNED D 0TjQ.Ph[SNT-BCONOWC DRVELONEU4T DISTRICT The f hllaraiW regulations mhd rsgrdranaats apply so PD-ED Plmuud Daxlopmau-Economic DareAWnwht Districts. 7211 PD-ED District Ddnidm and Intent PD-ED distriess nW be eatfisbed in acaordmace with the gaheral procedures and regw wnents art forth in Articles 71 through 7.9 and with the intvaadn and in locations in accordance With the(.rara:prr/aahaue Plan and the Zoning Ordinance and Alas. The purpose of this district is to provide for propv*locarped and pla med non-residendal davloprnaat eormis nt with Ormhge County's Sbrotrgic Plan for Bconomic DemkVnieu Specifically, this district is intended to provuk an apportranio fir damkpnent Plans, submitted w u rr tae provisions of Article 629 lDaxloprnent Standards for E.conanic 16 Development(ED)Districts]of this ordinance, to be considered for approval when such plans do not: 1. Meet the criteria for site plan approval listed in Article 14.3; 1 Address agency comments solicited during the site plan review process and/or 3. Adhere to the design standards applicable within Economic Development Districts as set forth in Article 629 of this ordinance; and which propose a design solution which is equal to or better than could be obtained throagh the application of the criteria and standards contained in the Design Manual. (The last sentence beginning"and which..." was added following discussions with the County Attorney to clarify that failure to adhere to criteria and standards, and/or address agency comments is not sufficient grounds alone for application acceptance and consideration.) In such cases, application for and approval of a Planned Development District shall be governed by the general and specific standards and procedures for the issuance of a Planned Development Permit as set forth in this Article. 6. Amend Article 22 - Definitions by adding a definition of "Economic Development Activity Node" to read as follows: B�comanuc Diwelonrment Activii�► Node - Land in Transit= areas of the County which has been spedfrcally targeted iw a mmie deuelaPnwnt activi& Ong of light industrial, dWtbibudan, Roc spas, office, and serviceln*d uses. Such areas are located adjacent to imterstate and mWor ar* ial h;ghuigM and sukmd to special design criteria and performance &%nndards. Floc spade typically includes one-story buildings vie:igmed constructed and marketed as suitable for use as offim but able to accommodate other uses;e-g., warehouse, showroom, manuAwturing assembly or similar opvoliorrs. NHEREAf, despite thesa eantributions and many more, the role of Mrican- Aaarieans in history has been consistently overlooked and undervalued in the literature, teaehinq and study of American history; Now, THEREFORE, do w, the Commissioners of Orange County proclaim the month of lebrv.& y, 1994 as BLACK HISTORY MONTH` and commend this observance to Orange County citizens. VOTE: UNANUOUS V1• - NONE VII. lC4 ZC DZP DISTRICTS DESIGN SLIM This item was presented by Marvin Collins for the purpose of reeeivinq citizen c==ent on a proposed Design Manual containing performance standards and design criteria applicable within proposed Economic Development Districts (EDDs) . The agenda abstract list the. concerns expressed at the December 21, 1993 and the January la, 1994 meeting and the changes to the Design Manual in response to these concerns. All comments from the last Public Hearinq will be incorporated into the record of this meatinq. Ted Abernathy showed an an aerial photograph the location and size of each node. I' :-�. P�zC a:unrs eo�oc�rs Roy Ruth spoke in support of the changes that have been made. He made reference to the I-40JOld NC Mode and indicated he cannot make recommendations concerning *permitted uses" until a rationale is set which defines or categorizes permitted uses. No noted that criteria required in the zoning provisions for the Research Triangle Park include a minimum building lot size of eight (s) acres with no more than 15= of the :total area of a tract being covered by buildings. ltr. Roth�s complete statement is in the Permanent Agenda Fil* in the Clerk's office. Dolly Hunter spoke in support of the LDDs. : She noted that the Economic Development Commission and its citizen subcommittees and the Planninq Board have worked vary hard to fulfill the goal of the- County Commissioners and be consistent with the. band Use Plan. She feels the buffer and landscape requirements in the design manual are too restrictive. she suggested a parallel access road along Old NCE4 saying that DOT will never allow multiple turnouts onto this higbvay. Ann Joyner reiterated that members sarvin4 on the Economic Development Commission and the Planning Board have spent such time on this project. She feels that ZDDs will broaden the tax base and maintain the quality of life. She urged the Board to approve the design standards. She foals that different design standards are needed for different locations. Billy Smith spoke for citizens who ii!vo on Oak Dale Drive and Cornwallis Kills saying that they need the opportunity to be able to sell their land. He is unhappy about the Quickie Bart in front of his house. He asked how long it will take for someone to act fcr them. Marvin Collins explained that it will be Kay 23 before their petition will be '-card at public hearing. John Link Dade reference to the turn lane in front of Mr. Smith's house and said that the turn lane will use the right-of-way on both the west and east sides of the road. He recommended that Chair Carey writs a letter to the Division Engineer and ask for a written response on how the decision was made and what their plans are for this area. Lindsey Efland, Chair of the Econcmic Development Commission, stated that the tills to act is as soon as possib+e. The Board gave this protect to a Task Force, and have received their recommendation. He asked that the Board please decide on the proposal because many other issues are awaiting an answer on this one. Carl Waters indicated that this could be another Meadowlands. There are not many complaints about Meadowlands. This could be a good thing for the community. A action was sad* by Commissioner Insko, seconded by Commissioner Gordon to include the consents made at the January 18, 1994 meeting an the design standards for the EDDs in the minutes of this meeting. They are included by reference. VOTS: VXAKIXM After a brief discussion, the Board decided to put this item on the next aqenda for receipt of limited public comment and for Board discussion. The Board will .call xarvin Collins with any specific concerns they have about the design standards. A notion was made, by Commissioner Gordon, seconded by Commissioner Halkictis to continue the public hearing to February 15, 1994. VOTE: UXANIMUS VIII. jamb A notion was made by Commissioner Halkiotis, seconded by Commissioner Gordon to approve those items on the Consent Agenda as stated r_low: AIL am[ aama�c�r The Board approved an agreement with the City of Durham establishinq a mechanism for the transfer of Federal transportation planning plans and authorised the County Manager to sign the agreement. ALI. DMUM I= cmrr - V 1 xR=XYQ The board approved and authorized th* Chair to sign the renewal of a contract with Durham Tech for administrative support for fire training classes held in Orange County for emergency management personnel. ria BID A=2 - POLICS VIZTCLas This item was removed from Consent Agenda and considered at the and of the Consent Agenda. jts 1 = T8! COORDINATED TRANSPORTATION PROGRAM The Board approved to change the name of the Coordinated Agency Transportation program to this Coordinated Area Transportation program. This 19 EVOLUTION OF PERMITTED USE TABLE PROPOSED ECONOMIC DEVELOPMENT DISTRICTS Since the first public hearing on the proposed Economic Development Districts on February 22, 1993, numerous changes have been made to the Table of Permitted Uses in response to concerns voiced at neighborhood/township meetings, work sessions, and/or public hearings. Listed below is a summary of evolution of the Table of Permitted Uses contained in Section 2.2 of the Design Manual. MEETING PERMITTED USE SUMMARY COMMENT February 22, 1993 Original Proposal Original proposal Public Hearing Uses by right - 58 revised as result of Special uses - 13 public information All uses - 71 meetings prior to public Revised Proposal hearing, 15 uses by Uses by right - 34 right deleted, 9 uses by Special uses - 23 right changed to SUP, All uses - 57 and 1 new SUP added. May 24, 1993 Uses by Right EDD proposal revised to Public Hearing Primary area - 41 eliminate Bingham Secondary area- 22 districts and divide Special Uses remaining districts into Primary area - 9 Primary and Secondary Secondary area- 7 Development Areas. All Uses Primary area 50 Secondary area- 29 20 MEETING PERMITTED USE SUMMARY COMMENT December 11, 1993 I-40/OLD NC 86 DISTRICT EDD proposal revised to BOCC Goal Setting Retreat Uses by Right provide Table of Primary area - 57 Permitted Uses for each Secondary area- 24 district; uses divided by Special Uses industry group, Primary area - 14 resulting in greater Secondary area- 7 number of uses (e.g.; All Uses manufacturing and Primary area - 71 processing operations Secondary area- 31 broken down into 19 separate uses); US 70BUCHHORN DISTRICT distinction made Uses by Right between retail uses in Primary area - 31 freestanding vs. Secondary area- 24 multiple use building in Special Uses response to concern Primary area - 14 about strip Secondary area- 7 development. All Uses Primary area 45 Secondary area- 31 I.851US 70 DISTRICT Uses by Right Primary area - 61 Secondary area-24 Special Uses Primary area - 10 Secondary area- 7 All Uses Primary area - 71 Secondary area- 31 21 MEETING PERMITTED USE SUMMARY COMMENT December 21, 1993 I.40/OLD NC 86 DISTRICT Permitted use table Commissioners Meeting Uses by Right reformatted; uses Primary area - 54 revised to address Secondary area- 25 concerns about water Special Uses storage tanks, radio/TV Primary area - 8 towers, transmission Secondary area- 7 lines, motor freight All Uses terminals, and storage Primary area - 62 and distribution of Secondary area- 32 petroleum products; uses also revised to US 70BUCHHORN DISTRICT permit churches, and Uses by Right clubs and lodges. Primary area - 32 Secondary area- 10 Special Uses Primary area - 41 Secondary area- 22 All Uses Primary area - 73 Secondary area- 32 I-851US 70 DISTRICT Uses by Riaht Primary area 63 Secondary area- 25 Special Uses Primary area - 11 Secondary area- 8 All Uses Primary area - 74 Secondary area- 33 22 MEETING PERMITTED USE SUMMARY COMMENT January 10, 1994 I-40/OLD NC 86 DISTRICT Permitted use table Work Session Uses by Right revised to provide more Primary area - 74 specificity regarding Secondary area- 27 types of manufacturing Special Uses uses permitted and on Primary area - 10 what basis (e.g.; Secondary area- 8 manufacturing uses All Uses expanded from 19 to Primary area - 84 45); also reflects final Secondary area- 35 Planning/ DC staff review of concerns US 70/BUCHHORN DISTRICT identified to date. Uses by Right Primary area - 74 Secondary area- 12 Special Uses Primary area - 42 Secondary area- 22 All Uses Primary area - 116 Secondary area- 34 I-8&US 70 DISTRICT Uses by Right Primary area - 105 Secondary area- 27 Special Uses Primary area 12 Secondary area- 8 All Uses Primary area - 117 Secondary area- 35 COMPARISON OF DIMENSIONAL REQUIREMENTS — I-40/OLD NC 86 ECONOMIC DEVELOPMEN DISTRICT AND DURHAM BUSINESS PARK AND RESEARCH ZONING DISTRICTS Within the Durham Business Park and Rsearch Applications zoning districts, the following provisions apply. The provisions applicable within the Research Applications zoning district are modeled after similar provisions contained in the restrictive covenants for the Reasearch Triangle Park.The provisions of both Durham districts are compared to those proposed for the I-40/Old NC 86 Economic Development District. Dimensional I-40/Old NC 86 Economic Durham City/ un Zoning District Requirement Development District Business Park Research Applications None required — lot size Eight (8)acres,and each lot Minimum determined by needs of use At least 25 acres with 50—foot must be at least 400 feet in Tract Size and application of design perimeter buffer width criteria None required — lot size Minimum determined by needs of use Eight(8)acres,and each tot Lot Size and application of design At least three (3)acres must be at least 400 feet m criteria width None required— lot coverage Impervious surface of no more Building coverage of no more I.ot Coverage determined by application of than sixty percent(60%) than fifteen percent(15%) design criteria Limit of 45 feet,eacept height may be increased one foot for Building Height each additional two feet of Limit of 50 feet No limit building setback provided Fifteen percent(15%)of lot Building Setback depth,but not im than 25 35 feet if< 10 acres 150 feet+ one(1)foot for filet nor mote than 100 feet 60 feet if> 10 acres each acre I Me percent(5%)of lot Parking/Storage depth,but not leas than 10 15 feet if< 10 acres 150 feet+one(1)foot for Setback feet nor more than 100 feet 35 feet if> 10 acres each acre J1 PERMITTED USE TABLE — ECONOMIC DEVELOPMENT DISTRICTS MOTE:Where an"X"appears in the column,the use is allowed,and development plans will be reviewed and approved by County staff.If the letter"A"or"B"appears in the column. the use is allowed,but only after a public hearing has been conducted,and a Special Use Permit appoved for the use by either the Board of County Commissioners (A) or the Board of Adjustment(B).Where the use is not listed or the column is vacant,the use is not allowed. 1-85Buckhorn Road I-40/01d NC 86 I-85NS Highway 70 Land Use Primary Secondary Primary Secondary Primary Secondary Area Area Area Area Area Area RESIDENTIAL Dwelling,sin e—famil Only in designated X X X Dwelling,two—family locadbas and subject X X X Dwelling,multi—family to des&standards X X X Dwelling,mobile home (For replacement of X X X existut mobile home) Temporary mobile home For custodial care B B B B B B Temporary mobile home (For occupancy during construction of permanent residendel unit and for X X X 30 days after issuance of Certfimte of Occupancy) AGRICULTURE,FORESTRY dt FL%M4G Animal hospital/veterinarian B X X class I kennel B B X Class II kennel B B B CONSTRUcnON Building contractors X X Plumbing,heating,electrical,and similar trade X X contractors MANUFACTURIPI(3,ASSEMBLY,AND PROCESSIM Food Products see listing below — Dairy X X X — Bakery X X X — Bottling plans X X X — Miscellaneous food preparation;e{.,coffee X X X roasting,condiments,confectionary proclucts,etc. j Paper Products see listing below — Converted paper and papaboard pndum X X X — Paperboard cons dom and boats X X X Furniture and Fbttura see lbtkl below — Household and office furniture X X — Miscellaneous furniture and lbttto<es X X Printing and Publishing Establishmens X X X Pharmaceutical Products X X X Rubber and Plastic Products see listing below — Rubber and plastic footwear X X — Rubber and plastic hose and belting X X — Miscellaneous plastic products;e.g.,plastic pipe, X X packaging materials,etc. Economic Development Dittric s Design Manual Page 2.2-3 C� PERMITTED USE TABLE — ECONOMIC DEVELOPMENT DISTRICTS NOTE:Where an"X"appears in the column,the use is allowed,and development plans will be reviewed and approved by County staff. If the letter"A"or"B"appears in the column,the use is allowed,but only after a public hearing has been conducted,and a Special Use Permit appoved for the use by either the Board of County Commissioners (A) or the Board of Adjustment(B). Where the use is not listed or the column is vacant, the use is not allowed. I-85/Bucithom Road 1-40/01d NC 86 I-85AJS Highway 70 Land Use Primary Secondary Primary Secondary Primary Secondary Area Area Area Area Area Area MANUFACTURING,ASSEMBLY,AND PROCESSING Continncd Stone,Glass,Clay,and Concrete Products see listing below — Flat glass X X — Glass and glassware X X — Pottery and related products X X — Cut stone products X X Fabricated Metal Products see listing below — Metal cans and shipping containers X x — Cutlery and hand tools X X — Heating equipment,except electric and warm X x air,and plumbing fnaure — Fabricated structural metal products X X — Nuts,bolts,screws,rivets,and washers X x Industrial Machine see listing below — Engines and turbines X x — Farm/garden machinery and equipment X x — Metalworiting machinery and equipment X x — Special industrial machinery; e.g.,textile X x machinery — General industrial machinery and equipment; X x e.g.,purification equipment,ball and roller bearings,etc. — Office,computing,and accounting machines X X X Electronic Equipment see listing bebw — Electric transmission and distribution X X X — Electrical industrial a toes X X X — Household applianew X X X — Electric lighting and wking equipment X X X — Radio and television receMng equipment X X X — Communications equipment X X X — Electronic components and accessories X X X Transportation Equipment see listing below — Motorcycles,b' les,and parts X X X — Miscellaneous transportation equipment;e.g., X X X motor vehicle components Instruments see listing below — Measuring,analyzing, and controlling instruments X X X Economic Dow1opment Districts Design Manual Page 22.4 PERMITTED USE TABLE — ECONOMIC DEVELOPMENT DISTRICTS NOTE:Where an"X'appears in the column,the use is allowed,and development plans will be reviewed and approved by County staff.If the letter"A"or"B"appears in the column. the use is allowed,but only after a public hearing has been conducted,and a Special Use Permit appoved for the use by either the Board of County Commissioners (A) or the Board of Adjustment(B). Where the use is not listed or the column is vacant, the use is not allowed. I-8S/Buckhorn Road I-40/01d NC 86 I-851US Hi;hway 70 Land Use Primary Secondary Primary Secondary Primary Secondary i Area Area Area Area Area Area MANUFACTURING, ASSEMBLY,AND PROCESSING Continued Instruments Continued —see listing below) — Photographic,medical,and optical goods X X X — Watches and clocks X X X Miscellaneous Manufacturing Industries (see listing below) — Jewelry and silverware x )( X — Musical instruments X X X — Toys,sportmg, and athletic goods X X X — Pen,pencils,office,and artist supplies X X X — Miscellaneous manufacturing industries;e.g., X X X costume jewelry,novelties,buttons,etc. TRANSPORTATION,COMMUNICATIONS,AND UTILITIES Railibus Passenger shelter X X X X X X Bus terminate and garages X X Surface and structure parking as principal use (*ben associated with a local or regional X X x Uanspoenaaan goal such as mass transit or park—and—ride) Public utility stations and sub—stations,switching A A A A A A stations,and telephone ezhanges Radio and television transmitting and receiving B B towers Elevated water storage tanks B B B As accessory use without Special Use Hermit Transmission lines B B B B B Water and sanitary sever pumping statiom X X X X X X Motor freight terminals X X Postal and parcel deltvery services X X X Storage and warchousft,inside building x x X Storage of goods,outdoors (Acre miyoalyand X X X subject to scree ti WHOLESALE TRADE Dumbie Goods LsSe lists below — Automotive pans and supplies X X X In as enclosed build' — Furniture and home furuis " X X X — Lumber and other construction materials X X X — Electrical goods �—x X X Economic Detelbpmeat Detak s Design Mantra/ Page 2.2S PERMITTED USE TABLE — ECONOMIC DEVELOPMENT DISTRICTS NOTE:Where an"X"appears in the column,the use is allowed,and development plans will be reviewed and approved by County staff.If the letter"A"or"B"appears in the column, the use is allowed,but only after a public hearing has been conducted,and a Special Use Permit appoved for the use by either the Board of County Commissioners (A) or the Board of Adjustment(B). Where the use is not listed or the column is vacant, the use is not allowed. 1-85Buckhorn Road 1-40/01d NC 86 1-85/US Highway 70 Land Use Primary Secondary Primary Secondary Primary Secondary Area Area Area Area Area I Area WHOLESALE TRADE Continued Durable Goods Continued— see listing below — Sporting,recreational, photographic, X X X and bobby goods;toys and supplies — Hardware,plumbing, and heating equipment X X X and supplies — Machinery,equipment,and supplies X X X Non—Durable Goods see listing below — Paper and paper products X X X — Pharmaceuticals and cosmetics X X X Apparel and piece goods X X X — Groceries and related products X X X — Beer,wine,and distilled alcoholic beverages X X X RETAIL TRADE Storage and distribution of petroleum products i (Facibties for local dwnbution and gales only— A A bufir terminals and tank farms rolubited Farm equipment sales A X Motor vehicles,new and used,sales and rental A X Motor vehicle service station A X Nightclubs,bars,and pubs (Only as accessory use X X X to hotel,motel or restaurant Restaurants(carry—out,drive—in,and general) A x in a separate,free—standing building Restaurants(carry—out,drive—in,and general) when located in a service building,court or plaza, A X X or enclosed mall co=JWng of multiple mea Retail trade,sales and renal of durable and convenience goods,merchandise,and equipment, A X including mail order home,in a separate,free— standing building Retail trade,sales and rental of durable and convenience goods,merchandise,and equipment, A X X including mail order houses,when located in a service building,court or plaza,or enclosed mall consisting of multiple uses. FINANCE, MURANM AND REAL ESTATE Banks,savings and loans,and credit unions A A X X X X Credit agencies and institutions A A X X X X Economic Deselbpment Datrices Design Manual Page 11.6 PERMITTED USE TABLE — ECONOMIC DEVELOPMENT DISTRICTS NOTE:Where an"X"appears in the column,the use is allowed,and development plans will be reviewed and approved by County staff.If the letter"A"or"B"appears in the column, the use is allowed,but only after a public hearing has been conducted,and a Special Use Permit appoved for the use by either the Board of County Commissioners (A) or the Board of Adjustment(B). Where the use is not listed or the column is vacant, the use is not allowed. I-85Bucthorn Road 1-40/01d NC 86 1-95/US Highway 70 Land Use Primary Secondary Primary Secondary Primary Secondary Area Area Area Area Area Area FINANCE, INSURANCE,AND REAL ESTATE Continued Security and commodity brokers,and investment A A X X X X offices Insurance carriers and agents A A X X X X Real estate agents and brokers A A X X X I X SERVICES Day care facility,including large day care home B B X X X i X Hotels and motels A x X Churches X X X X X X Community center A A A A A A Schools,elementary,middle,and high A X X Schools,vocational A X X Schools,dance,art,and music B X X X X Beauty and barber shops B B X X X X Clubs and lodges,and social,fraternal,and union A A A A A A clubhouses Indoor theaters A X X Funeral homes A X X Health services,including doctors and dentists A A X X X X offices,and medical and dental laboratories Laundry,dry cleaning,and shoe repair services B B X X X X Libraries A A X X X X Golf driving and practice ranges x Art/photographic studios B B X X X X Recreational facilities Non— fit A A A A A A Recreadonal facilities Profit A A A A A A Repair service,electronic and appliance A A X X X X Research facility X X X Assembly facili — lest than 300 person ca Lacity A X X Assembly facility— 300 or more person capacity A X X Motor vehicle maintenance and re shop) A X Other offices and personal services;e.g.,attorneys, watch and jewelry repair,computer programming and data processing,employment and travel A A X X X X agencies,advertising agencies,and amounting, engineering,architectural,and surveiing offices E=wmic Z iMlgpment Districts Design Manua) Page 22.7 PERMITTED USE TABLE — ECONOMIC DEVELOPMENT DISTRICTS NOTE:Where an"X"appears in the column,the use is allowed,and development plans will be reviewed and approved by County staff.If the letter"A"or"B"appears in the column, the use is allowed,but only after a public hearing has been conducted,and a Special Use Permit appoved for the use by either the Board of County Commissioners (A) or the Board of Adjustment(B). Where the use is not listed or the column is vacant, the use is not allowed. I-85/Bacthorn Road I-40/01d NC 86 I-85/US Highway 70 1 Land Use Primary Secondary Primary Secondary Primary Secondary i Area Area Area Area Area Area GOVERNMENT Governmental protective services j (Police and Ire stations,rescue squads,and X X X X X X volunteer fire departments) Parks,public and non—profit X X X X X I X Governmental facilities and office buildings X X X X X X (Including solid waste collection centers) OTHER USES Accessory uses X X X X X X Historic buildings for non—residential/mixed use A A A A A A Emnomic Deselopment Ditak s Design Manual Page 2.2.8 r DR rT KINOis VROK THE Pse117 t 15, 199 RRG=AR SOCC xLETING &L ZC DM3Zop= DISTRICTS D&NIGN I UMAL No presentation was made. The County Commissioners received as part of their agenda a complete copy of the Design Manual for the Economic Development Districts (EDDs) . CITI M CCKNMTB Avis Lloyd-Kimbell daughter of James Rippy, asked that all of her father's property be included in the I-40 EDD node. The property is located between the I-40 node and Cornwallis Hills. There are seven acres just west of Cates Creek not included in the I-40 node. She noted that he has paid taxes on this property for 52 years and has not been allowed to do anything with this property. somm0 DIS@QSExas Commissioner Gordon made reference to her four page memo to the Board of Commissioners and Manager dated February 11, 1994 which lists issues for further discussion and consideration. She read the memo, explaining that she would like the Planning Board to consider certain items when making their recommendation. A copy of this memo is in the Permanent Agenda rile and made a part of these minutes by reference. Marvin Collins responded to Commissioner Gordon's comments about the Design Manual being consistent with the Land Use Plan and noted that there is a rY-92-93 goal which specifically talks about the EDDs and mentions that it is the intent to change the Land Use Plan. In terms of location criteria, he actually feels that the criteria proposed for the EDDs are better than those currently existing for commercial-industrial activity nodes. The proposed design standards provide examples of how particular criteria should be applied. They also take into account areas planned for short or long range utility services. with regard to Commissioner Gordon's question about who will make the judgments required to implement the design guidelines, Marvin Collins said that he feels confident enough to make these judgments and also has staff he feels can make these judgments. In terse of "fuzzy standards" he said that these standards were based on design manuals received from across the country. There is not an objective standard that will cover every situation. Every piece of ground to be developed has different characteristics about it. There first must be a site analysis and from that site analysis the designing process. He emphasized that they will not need additional staff to implement the design standards. with regard to Commissioner Gordon's questions about water and sewer costs, Commissioner willhoit said that his vision of the Buckhorn node is that it will be connected to the Efland sewer system. It will provide some economic viability to the County's sewer line so that it can be used to expand services to other areas of Efland which have failed septic systems. He would like for it to be stated that connections will not be allowed to be made to the Alamance County line. John Link, speaking from a Manager's perspective, noted that he expects the private sector to pay for water and sewer extension except for those monies which are included in the County's Capital Improvement Plan. The Board discussed water and sewer service to the EDDs. The existing sower system has a collection and pumpinq capacity of 500, 0oo gallons per day, and the County has an agreement with the Town of Hillsborough for them to treat up to 380r000 gallons of the County system's wastewater per day. Chair Carey noted that although transportation is a concern, the reality is that many citizens are leaving the county to work elsewhere. He fools confident that transportation will be forthcoming from the Trianql• Transit Authority. Commissioner Gordon made reference to the cost benefit analysis and asked that the Board direct staff to identify information they should be collecting in the next two or three years to report back to the Board. she asked the Planning Board and Staff to come up with some suggestions for the Board's consideration. She suggested that the County Commissioners may want to monitor such things as (1) do the jobs go to County residents, (2) are they good paying jobs, (3) how much residential activity can be traced directly to this nodes, etc. Commissioner Insko made reference to page 3 . 3 . 10 in the Design Manual and asked for clarification on the widening of old 86 and changing it from five lanes. Marvin Collins indicated that this can be accomplished by working with the Town of Hillsborough to change the proposed cross-sectio;, design of old 86. He confirmed that two Hillsborough Town Commissioners have indicated support for such a change. Narvin Collins confirmed that right-of-way will be reserved and used for bus transportation or light rail depending on the density. Commissioner Insko said that it would help her to know when there will be a change in the Land Use Plan as a result of the Design Manual. She tools that if a district is good for Orange County it should be approved because they now know what the changes in the Lased Use Plan are. One of her concerns about the I-40/01d 86 node is how the Board will coordinate with Hillsborough to sake sure there is not strip development all the way out Churton Street to Old is to 1-40. Hillsborough recommended that there be a joint process to look at this area and she is supportive of that process. This node will impact on both the southern and northern part of Orange County. Chair Carey suggested that all questions and comments be referred to the Planning Board along with the entire proposal. It feels it will be necessary for the Board to identify the elements they want to track over the next few years. He expressed a concern about the need for additional staff to do the tracking and everything else that will need to be done. A action was made by Commissioner Willhoit, seconded by Commissioner Halkiotis to refer this matter to the Planninq Board, along with Commissioner Gordon's memo, the consents as stated above, and the following suggestions: I. Consider removing permitted manufacturing uses from the ?- 40/Old 86 node, or at least making then special uses; 2. Consider adequacy of proposed ordinance modifications in addressing access/driveway cuts onto Old 86, i.e. , property fronting on Old 861 3. Consider phasing of implementation of prezoned areas to coincide with the extension of sewer service. The character of development without sewer may preempt the type of development that is desired; 4. Residential uses in secondary area 1-40/86: Consider making residential uses special uses OCrC•uCm Comm 9116 c.. �� J consider reducinq permitted residential density such that it is not more attractive (profitable) than business development Consider not zoninq residential areas until a to be specified amount of the primary area has been developed VOTE: UNANIMOUS I I � � ; is a Pb2 � � � � � � � aka � � � � ' �, �• ,� '^ 6i C z QQQS; Z Z �O �n �p Z •n �n v� �n 6i vi In vi o do rr •. N .•+ M ... Lrr A � N N � p 7 to O �1 M fV .4 z 'fl ... Z a � Z � pa m ca _ Z a a o Ii ar uj CL Q Gy � � < "� Z U 96 m Sc en N N N N v `? m � N N N N p v�get N W-i' fO Cr w .r !!�� vVV�77 pppp 4 � CL h h h h N h �' N .••� N .•� l'r1 �+ M N N �c qu m � I x .� In a3 a3 a3 a3 u 3 v 9 -0 M N Q C eQrt Q Q vl "' Q Q Q h Q q Q Ci N O ,,� M N O M N ^ O G i G i i i i i i i i i no i i t i a i i 7 aa �Ny z .r M M N N N � , o Z d nn Q �i w VR I A oy � S U_ °U w ag � 96 aN 8 � en V mMM MMM CONCERNING ECO`iOIIIC DEVELOP-MZE`'T DISTRICTS Rov W. Roth My r-.-.arks wig -.rimarly be concerned with`h e I-4ol'old Nc 86 EDD. I wart:o say t= that I shay_your j j for this Economic Development District. I too would tike :o see a "showcase" 9=1 into Orange County - or IEL'sborough - -om I-40 which presents a r.< business pa 3er a ing with controlled environment, and which will offer jobs .o Orange Count' residents.. However, I am concerted with the execution of:his vision, as defined in ;arts of:re Design Manual. I have been and still am concerned with the elimination some 4-500 acres of open space 4om the Cooperative Land Use Plan, in the formation of this EDD. But I will accept that, if the vision can be reached. I am concerned, and have some confusion, with some sections of the Design Manual. (I do have :o ask at this poim, are we each to king about the same Design Manual? I assume that there have been no Bother changes since the Tau 18 Public Hearing.) Consider the Permitted Use :ables, for a moment. I feel that some very positive steps were taken in the last draft, but I am confused with the rationale used to dr.amane whew uses are to be permitted. I recognize that it is difficult to deter=* le whether a permitted use should or should not be accepted in one of the EDDs. But, wiry should household furniture mamficture be allowed in one district and nat another, while both have gaper products mamAcyzine. Why should plastic products manufacture be permitted in one district and not another, while both may have pbarmaceutical products manufacture? My pouts is, that the rationale for accepting or rejecting a permitted use seems somewhat arbitrary. Two weeks ago, W. Willhoit asked me for my recommendations concerning "permitted uses". rm sorry that I can't do this unless - or untsff - a rationale is set which defines or categorizes permitted uses. At this point, I don't know what this rationale is or should be. Let's look at Research Triangle Park for a moment, an area which many hold up as a success:ul model. Criteria required in the m®g provisions for the Research Triangle Park include a minimurn building lot in of eight(8)acrek with no more than IS% of the total are of a tract being covered by build:^vs. I did not no hey sim7ar wteris in the Design M. Anual. I may have missed it, but I could and no minimum limitation on tract sae. I XWW that this type of limitation should be incorporated into the maul. My conclusion and rxom nendations?.The Planning Board and the EDC have come a long way. There is a sbwW vision of bow the I-4WW NC E6 dist =should look. However, I do not think that the Design Manual presently, completely implements this vision. On the one hand, the manual excrucia&A•den h the type of wire that should be used to support a newly planted tree, while on the other hand, I an tso won of lot size. I agree that this EDD should be planned so that annexation by Msborough and strip development are avoided. My recommendation is to proceed row with the other two dimrlct%but spend a Attie more time with the I-4010ld NC 86 planning. Let's make sun that the vision is acheived. MAeJtt-4,._, I feb94 vE v 'ASS INZ& r.7A k i 0 R A�N/G E C 0 U N`T�YJ PRE SEAVA TION-PROGRESS-PE0P�6 Memorandum to: Board of County Commissioners From: Ted Abernathy Re: Standard Industr' al Classification (SIC) for Economic Development Districts Attached for your use is a summary of most of the manufacturing uses that are proposed for the Economic Development Districts. This is just to provide additional clarification about definition and reflects no changes. Many whole categories of manufacturing are proposed to not be allowed at I-40/01d NC 86. These include Group 21 - Tobacco Products; Group 22 - Textile Mill Products; Group 23 - Apparel; Group 24 - Lumber and Wood Products; Group 28 - Chemical and Allied Products; Group 29 - Petroleum Refining; Group 31 - Leather Products; and Group 33 - Primary Metal Industries. In other cases, such as Food Products and Paper Products, only selected subcategories are proposed to be allowed. The write-ups are take from the S.I.C. Manual which I will have available at the February 15th meeting. Please call me with any specific questions that you have. ORANGE COUNTY ECONOMIC DEVELOPMENT COMMISSION POST OFFICE BOX 1177 - HILLSBOROUGH.NORTH CAROLINA 27278 (919)732-8181 (919)968-4501 (919)688-7331 (919)227-2031 FAX(919)644-3008 37 MAJOR GROUP 20. - FOOD AND KINDRED PRODUCTS This major group includes establishments manufacturing or processing foods and beverages for human consumption, and certain related products, such as manufactured ice, chewing gum, vegetable and animal fats and oils, and prepared feeds for animals and fowls. Products described as dietetic are classified in the same manner as nondietetic products (e.g. , as candy, canned fruit, cookies) . Local example - Simply Delicious. Subcatecories - Maior Groue 20 202 - Dairy Products This industry group includes establishments primarily engaged in: ( 1) manufacturing creamery butter; natural, processed, and imitation cheese; dry, condensed, and evaporated milk; ice cream and frozen dairy desserts; and special dairy products, such as yogurt and malted milk; and (2 ) processing (pasteurizing, homogenizing, vitaminizing, bottling) fluid milk and cream for wholesale or retail distribution. Independently operated milk receiving stations primarily engaged in the assembly and reshipment of bulk milk for use in manufacturing or processing plants are classified in Industry 5143. 205 - Bakery Products 2051 Bread and Other Bakery Products. Except Cookies and Crackers Establishments primarily engaged in manufacturing fresh or frozen bread and bread-type rolls and fresh cakes, pies, pastries and other similar "perishable" bakery products. Establishments primarily engaged in producing "dry" bakery products, such as biscuits, crackers, and cookies are classified in Industry 2052. Establishments primarily engaged in manufacturing frozen bakery products, except bread and bread-type rolls, are classified in Industry 2053. Establishments producing bakery products primarily for direct sale on the premises to household consumers are classified in Retail Trade, Industry 5461. 209 Miscellaneous Food Preparations and Kindred Products 38 MAJOR GROUP 26. - PAPER AND ALLIED PRODUCTS This major group includes establishments primarily engaged in the manufacture of pulps from wood and other cellulose fibers, and from rags; the manufacture of paper and paperboard; and the manufacture of paper and paperboard into converted products, such as paper coated off the paper machine, paper bags, paper boxes, and envelopes. Also included are establishments primarily engaged in manufacturing bags of plastics film and sheet. Certain types of converted paper products are classified elsewhere, such as abrasive paper which is in Industry 3291; carbon paper in Industry 3955; and photosensitized and blueprint paper in Industry 3861. Local example - Mebane Packaging. Subcategories - Major Group 26 2657 Folding a e board Boxes, Including sanitary Establishments primarily engaged in manufacturing folding paperboard boxes from purchased paperboard, including folding sanitary food boxes or cartons except milk cartons. Local example - Mebane Packaging. 267 Converted Pacer and Paperboard Products, Except Contai ers and Boxes 2671 Packaginc Pacer and Plastics Film Coated and Laminated Establishments primarily engaged in manufacturing coated or laminated flexible materials made of combinations of paper, plastics film, metal foil, and similar materials (excluding textiles) for packaging purposes. These are made from purchased sheet materials or plastics resins and may be printed in the same establishment. Establishments primarily engaged in manufacturing coated or laminated paper for other purposes are classified in Industry 2672, including establishments . manufacturing all gummed or pressure sensitive tape; those manufacturing unsupported plastics film are classified in Industry 3081; those manufacturing aluminum foil are classified in Industry 3497; and those manufacturing paper from pulp are classified in Industry 2621. MAJOR GROUP 27. - PRIxTING pUBLISHIXG. AYD ALLIE I1iDUSTRIEB This major group includes establishments engaged in printing by one or more common processes, such as letterpress; lithography (including offset) , gravure, or screen; and those establishments which perform services for the printing trade, �c such as bookbinding and platemaking. This major group also includes establishments engaged in publishing newspapers, books, and periodicals, regardless of whether or not they do their own printing. News syndicates are classified in Services, Industry 7383. Establishments primarily engaged in textile printing and finishing fabrics are classified in Major Group 22, and those engaged in printing and stamping on fabric articles are classified in Industry 2396. Establishments manufacturing products that contain incidental printing, such as advertising or instructions, are classified according to the nature of the products - for example, as cartons, bags, plastics film, or paper. Local example - The Village Companies, The Daily Tar Hee . MAJOR GROUP 30. - RUBBER AND MISCELLANEOUS PLASTICS PRODUCTS This major group includes establishments manufacturing products, not elsewhere classified, from plastics resins and from natural, synthetic, or reclaimed rubber, gutta perch&, balata, or gutta siak. Numerous products made from these materials are included in other major groups, such as boats in Major Group 37, and toys, buckles, and buttons in Major Group 39. This group includes establishments primarily manufacturing tires, but establishments primarily recapping and retreading automobile tires are classified in Services, Industry 7534 . Establishments primarily engaged in manufacturing synthetic rubber and synthetic plastics resins are classified in Industry Group 282. Subcategories - Major Group 30 302 Rubber and Plastics Footwear 3021 Rubber and Plastics Footwear Establishments primarily engaged in manufacturing fabric upper footwear having rubber or plastics soles vulcanized, injection molded, or cemented to the uppers, and rubber and plastics protective footwear. Establishments primarily engaged in manufacturing rubber, composition, and fiber heals, soles, soling strips, and related shoe making and repairing materials are classified in Industry 3069; those manufacturing plastics soles and soling strips are classified in Industry 3089; and those manufacturing other footwear of rubber or plastics are classified in Industry Group 314. 3084 Plastics Pik Establishments primarily engaged in manufacturing plastics 40 pipe. Establishments primarily engaged in manufacturing plastics pipe fittings are classified in Industry 3089. Local example - Hancor. MAJOR GROUP 32. - STONE, CLAY, GLASS, AND CONCRETE PRODUCTS This major group includes establishments engaged in manufacturing flat glass and other glass products, cement, structural clay products, pottery, concrete and gypsum products, cut stone, abrasive and asbestos products, and other products from materials taken principally from the earth in the form of stone, clay, and sand. When separate reports are available for mines and quarries operated by manufacturing establishments classified in this major group, the mining and quarrying activities are classified in Division B, Mining. When separate reports are not available, the mining and quarrying activities, other than those of Industry 3295, are classified herein with the manufacturing operations. If separate reports are not available for crushing, grinding, and other preparation activities of Industry 3295, these establishments are classified in Division B, Mining. Subcategories - Major Group 32 321 Flat Glass 3211 Flat Glass Establishments primarily engaged in manufacturing flat glass. This industry also produces laminated glass, but establishments primarily engaged in manufacturing laminated glass from purchased flat glass are classified in Industry 3231. 322 Glass and Glassware. Pressed or Blown This group includes establishments primarily engaged in manufacturing glass and glassware, pressed, blown, or shaped from glass produced in the same establishment. Establishments primarily engaged in manufacturing glass products made from purchased glass are classified in Industry 3231. 3229 Pressed and Blown Glass and Glassware. Not elsewhere Classified Establishments primarily engaged in manufacturing glass and glassware, not elsewhere classified, pressed, blown, or shaped from glass produced in the same establishment. Establishments primarily engaged in manufacturing textile glass fibers are also included in this industry, but establishments primarily engaged in manufacturing glass wool insulation products are classified in Industry 3296. Establishments primarily engaged in manufacturing fiber optic cables are classified in Industry 3357, and those manufacturing fiber optic medical devised are classified in Industry Group 384 . Establishments primarily engaged in the production of pressed lenses for vehicular lighting, beacons, and lanterns are also included in this industry, but establishments primarily engaged in the production of optical lenses are classified in Industry 3827 . Establishments primarily engaged in manufacturing glass containers are classified in Industry 3221, and those manufacturing complete electric light bulbs are classified in Industry 3641. 328 Cut Stone and Stone Products 3281 Cut Stone and Stone Products Establishments primarily engaged in cutting, shaping, and finishing granite, marble, limestone, slate, and other stone for building and miscellaneous uses. Establishments primarily engaged in buying or selling partially finished monuments and tombstones, but performing no work on the stones other than lettering, finishing or shaping to custom order, are classified in Division F, Wholesale Trade or Division G, Retail Trade. The cutting of grindstones, pulpstones, and whetstones at the quarry are classified in Division B, Mining. MAJOR GROUP 34. - TABRICATXD METAL PRODUCTS, EXCEPT MACHINERY AND TRANSPORTATION EOUINCEXT This major group includes establishments engaging in fabricating ferrous and nonferrous metal products, such as metal cans, tinware, handtools, cutlery, general hardware, nonelectric heating apparatus, fabricated structural metal products, metal forgings, metal stampings, ordnance (except vehicles and guided missiles) , and a variety of metal and wire products, not elsewhere classified. Certain important segments of the metal fabricating industries are classified in other major groups, such as machinery in Major Groups 35 and 36; transportation equipment, including tanks, in Major Group 37; professional scientific and controlling instruments, watches, and clocks in Major Group 38; and jewelry and silverware in Major Group 39. Establishments primarily engaged in producing ferrous and nonferrous metals and their alloys are classified in Major Group 33. Local example - W.S. Brady, Parker Hannifin, Kamtec. 42 MAJOR GROUP 35. - INDUSTRIAL AND COMMERCIAL MACHINERY AND COMPUTER EQUIPMENT This major group includes establishments engage in manufacturing industrial and commercial machinery and equipment and computers. Included are the manufacture of engines and turbines; farm and garden machinery; construction, mining, and oil field machinery; elevators and conveying equipment; hoists, cranes, monorails, and industrial trucks and tractors; metalworking machinery; special industry machinery; general industrial machinery; computer and peripheral equipment and office machinery; and refrigeration and service industry machinery. Machines powered by built-in or detachable motors ordinarily are included in this major group with the exception of electrical household appliances. Power-driven handtools are included in this major group, whether electric or otherwise driven. Establishments primarily engaged in manufacturing electrical equipment are classified in Major Group 36, and those manufacturing handtools, except powered, are classified in Major Group 34. Local example - Parker Hannifin, Triem. MAJOR GROUP 36. - ELRCTRONIC AND OTHER RLRCTRICAL EQUIPMMT AND CQWONENTS. EXCEPT COMPUTER RQUIPMRNT This major group includes establishments engaged in manufacturing machinery, apparatus, and supplies for the generation, storage, transmission, transformation, and utilization of electrical energy. Included are the manufacturing of electricity distribution equipment; electrical industrial apparatus; household appliances; electrical lighting and wiring equipment; radio and television receiving equipment; communications equipment; electronic components and accessories; and other electrical equipment and supplies. The manufacture of household appliances is included in this group, but industrial machinery and equipment powered by built-in or detachable electric motors is classified in Major Group 35. Establishments primarily engaged in manufacturing instruments are classified in Major Group 38. Local example - General Electric. MAJOR ORM 38. - 10MURING, ANALYSING AND CONTROLLING IN82RLMEM: PROTOGRAPSIC. MRDICAL AND OPTICAL GOODS: MATCHES AND CLOCKS This major group includes establishments engaged in manufacturing instruments (including professional and scientific) for measuring, testing, analyzing, and controlling, and their associated sensors and accessories; optical instruments and lenses; surveying and drafting instruments; hydrological, hydrographic, metorological, and geophysical equipment; search, detection, navigation, and guidance systems and equipment, surgical, medical, and dental instruments, equipment, and supplies; ophthalmic goods; photographic equipment and supplies; and watches and clocks. Local example Wilmore Elecronics, Data Spectrum. MEMORANDUM Tc: Qoard of Ccrnmissloners and Manager From: Altca Garton $00 SubJect: Points to Ponder - Economic Cevelopment Districts (ECDs) Data: =eervary 11, 1994 Included oelow is a list of points to pander while you ere considering :fie proposal for the Economic Deyslapment Districts. I. Lend Use Plan According to the December 5 80CC agenda packet, 'the Board of Commissioners asked that specific parcels be identified for prs-aonl,g economic deyelopment purposes In a manner consistent with the Orange County Land Use Plan.' A. Existing Nodes. In the current Cramp County Lend Use Plan, commercial - industrial nodes exist in the IWOUCkhem Road area and in the 1115/U570 area. There is no existing node in the 140/01de6 area (anti only a smell percentage of transition area), so the ED node in this area is not consistent with our current Land Use Plan. 0. Criteria for Loestion of ACtivity Nodes. The "locational criteria' for commercial- industrial transition activity nodes' and for *commercial transition activity nodes' differ from the Tocational criteria for 'economic development activity nodes (transition areasY in syatemottc ways. For exempt 1, hers Is a comeari son using three of the criteria, namely, land sloae, public services/utilities, and populetton density. Land Slops Carr Ind - 'Locatsd on lend with Slopes of less then 15X grade 21=22 D, ay� - 'Located on lend with slopes of l ass than 1511 grade. _ Nary fi.ii 22 of 1 �X or glMetar era prawn prota tjan wow by - vided through amer si is desi go and canet nicti cm mmet i cos Public Services/Utilttiss Cam Ind - 'Located in arses rich are or could be reasonably and effectively served by cantrs)-Ird public servlcis and utilities.' Ec Dey - 'Locatsd aen� ;n ones which ere or could be reasonably end effectively served:by public services and facilities. )IC?R jggatsd in enss gmersl scf i cwdtti:ns must De su+tebt9 t Ir OM-2112% 96=1 disaosal •yst_sm_s.' 45 rcin:s tc Pcnaer - Gcrdcn Population Density Cam Ind - 'Located in areas with moderate to high population densities.' EC Dev - 'Located in areas with, or olannea ter moderate to high Population densities. C. Comments/Questions/Recommendeti off s I. Why wars these changes made in the existing land use pion? It would have been helpful if such changes had been highlighted. 2. Note that the 140/01d Q8 proposed nods is in the Hfllaborough Cooperative Planning tone. it is also close to the Rural Huffer, a part of the Joint Planning Area with Chapel Hill and Carrboro. 3. It appears that no useful purposs is served by edding a new land use plan category. We should continue to use the existing land use plan category, 'commercial-industrial transition activity node.' 4. The 140/01d 56 node has more unaddressed issues then the other two nodes. 11. Design Manuel It appears that the Design Manual has sections where fuzzy standards are utilized. For example, consider sections 3.1 'Architectual Design' and 3.2 'Landscape Design" (found in the version of the manual i have, which may or may not be the latest vision): A. 'Fuzzy• standards It is hero to know whet 11 aacpeeted of a developer, given the way the manual is written; For example, in section 3.1 concerning 'compatibility with neighbors' we encounter this sentence: 'Unless this we overriding concsms or poorly deftned aspects, a maw building must reflect the architectural character of surrounding buildings in the following weys:o to list follows) An U401141e in section 3.2 concerning "pr9servetion of existing features• is found in the following sentence: i 'Wheraver possible, access to views are to be preserved for adjacent property owners and passing motorists.' Also In section 3.2 is this guideline for landscaping pw*Ing areas: "Whore practical, lowering the grade of the parking lot from existing street elevations may aid In obscuring views of automobiles while przmoting views of architectural elements Of tPo structures beyond.' Points to Pander - CcruQn Throughout the manual, terms such as 4wheraver possiblad and 'where Rroctical' meke the standards fuzzy and as a result there is a lot of staff judgment involved in deciding whether or nct the standards have osen met. S. Mixing of Objective Standards and 'Fuzzy' Standards Objective standards ;a.g. setback requirements) and fuizV standards are mixed together in a taxtbook-iiks format. C. Comments/Quests Ono/RtcommondstIons 1. who will make the judgments required to implement the desigr, guidelines? will additional staff be required? will they be trained as architects? 2. How will the Design Manuel gat changed? Will the DaCC need to approve changes? In other words, how doss the Design Manuel work in relation to the Zoning Ordinance and any other land use regulations? 3. it would appear that the Design Manuel should be mods more concise and Mors objscttvs. The fuzzy standards should be separated from the objective standards, so that everyone can more easily ascertain what is required. 111. Costs Ons important question is wfwther the Economic Development Districts will be of benef It.to the county financially. This on several aspects to t;iis question. A. Wetsr and Sower Ssrvies. One important concern 1s who will provide the water and sewer infre- 4tructure for the economic development districts. What will the provision of water end.sewer cost? Who will pay for it? Of particular note is the statement that future tower tine extensions for the legnuckhorn nods are ayssiols from the Eflend sewer system. (Sea the Anelysis and Evaluation section for this node in the December 6 OOCC Packet) What about connecting to the system in Alamonce County? D. TransportatieA As with water end sewer service, we need to know how transportation facilities will be provided and who will pay for them. Will there be public transportation facilities so that worksrs can get to their jobs without relying exclusively on the automobile? C. C48t/1148011t Anelysls Evan if the @CCC will not require a cost/benefit analysis before eoproving EconzmtC Development-DistMc*". we nerd to decide now what kind of arelysts wilt be required later. Points to Po^,csr - 3orccn D. Comments/Questions/Recommendations I. who w!11 provide water end sewer service and at what cost? 2. Who will provide transportation facillties and at what cost? 3. what elements doss the SOCC wish to have included in the cost/benefit analysis? IV. Criteria for Projects in All Economic Development Districts The goals of the.Strategic Plan include the 'creation of diversified and environmentally safe businesses ...to provide fobs for county residents and to increase the non-residential tax base..." Of course the creation of economic davelopment districts cannot accomplish all the goals of the Strategic Plan, but the districts can be more directly targeted to achieve the goals if overall criteria for davelopments were added to specific uses allowed in the economic development districts. The following are the overall criterie suggested for developments in Economic Development Districts: 1. 1 ow water usage 2. little or no production of hazardous waste or pollutants 3. little or no heavy truck traffic, tow noise levels Staff has already done some work on the low water usage criterion, but the BOCC needs toy consider the following questions: I. Should developments which violets the criteria be allowed, even with a special use permit? 2. How would each criterion be defined? 3. Should there be other criteria, such as an assurance that the Jobs would be for county residents or a certain level of wages would be paid? i V. Pilot Projects Since the approval of Economic Development Districts has an unknown outcome, should some kind of pilot project approach.be utilized? Here are some questions to consider: 1. Should the uses in each district be further differentistsd and some comparisons; in outcome mods later? 2. Should there be a period during which the BOCC has some role in the approval of major development projects? 3. Would it be prudent to allow additional uses to be permitted through a planted development procsss? 4. Thers is other information described on theta pages which could be gathered. The general question is whet aspects of the M does the BOCC wish to monitor. would a two or three year period be appropriate? ORANGE COUNTY PLANNING DEPARTMENT 306F REVERE ROAD 48 HILLSBOROUGH, :NORTH CAROLINA 27278 u!. FAX MEMORANDUM TO: Commissioner Alice Gordon FAX NO: (919) 9677-�-31823. FROM: Marvin lanning�Director FAX NO: (919) 644-3002 SUBJECT: Economic Development Districts NUMBER OF PAGES: 3 DATE: February 14, 1994 COPIES: Board of County Commissioners John Link, County Manager Geoffrey Gledhill, County Attorney Ted Abernathy, Economic Development Director Provided below are answers to your February 3, 1994 FAX A. I-85Buckhorn Road Economic Development District 1. LAND USE a. Does any of the proposed Economic Development node lie outside the current Commercial- Industrial node?YES.What is the designation for the current node?CH-2,MILES NORTH. b. If the answer to a.above is"yes",then what is the current land use designation of that"extra" area? 10-YEAR TRANSITION. C. If the answer to a.above is"m", then is any land currently in the node to be excluded from the new E¢anamic Development node?ALTHOUGH THE ANSWER TO a.IS"NO",NONE OF THE REMAINING LAND IN THE COMMERCIAL-INDUSTRIAL NODE IS PROPOSED FOR CHANGE IN TERMS OF LAND USE DESIGNATION. 2. ZONING a. What are the current zoning designations of the land within the current Commercial-Industrial node? R-1 RESIDENTIAL,OFFICE is INSTITUTIONAL,EXISTING COMMERCIAL b, COMMUNITY COMMERCIAL-3, AND INDUSTRIAL-1. THE OVERLAY DISTRICTS OF MTC (MAJOR TRANSPORTATION CORRIDOR AND U-ENO-PW (UPPER ENO PROTECTED WATERSHED ALSO APPLY. b. If the new Economic Development node includes more land than the current node, what are the current zoning categories for that extra land? THE ECONOMIC DEVELOPMENT DISTRICT DOES NOT INCLUDE MORE LAND THAN THE CURRENT NODE.FOR THE LAND IN THE ECONOMIC DEVELOPMENT DISTRICT WHICH LIES OUTSIDE THE CURRENT NODE,THE CURRENT ZONING IS R-1 RESIDENTIAL. 49 C. If the new Economic Development node will contain less land than the current node, what will be the new zoning categories for that land?NONE OF THE LAND IN THE REMAINING PORTION OF THE CURRENT NODE; E.G., OUTSIDE THE ECONOMIC DEVELOPMENT DISTRICT, WILL CHANGE IN TERMS OF ZONING DESIGNATION. B. I.85/U.S.Highwav 70 Economic Development District 1. LAND USE a. Does any of the proposed Economic Development node lie outside the current Commercial- Industrial node?NO.What is the designation for the current node?E-WENO), U.S. 70 AND I-85; AND E-3 (DUKE FOREST), U.S. 70, N.C. 751,AND OLD N.C. 10. b. If the answer to a.above is"yes",then what is the current land use designation of that "extra" area? NOT APPLICABLE. C. If the answer to a. above is "no", then is any land currently in the node to be excluded from the new Economic Development node?YES,PROPERTIES FRONTING ON OR HAVING ACCESS VIA OLD N.C. 10 HAVE BEEN EXCLUDED IN RESPONSE TO CITIZEN COMMENT RECEIVED AT PUBLIC HEARINGS. 2. ZONING a. Wbat are the current zoning designations of the land within the current Commercial-Industrial node? R-1 RESIDENTIAL, PD-H-R-4 (STONEGATE MEP) GENERAL COMMERCIAL.-4, COMMUNITY COMMERCIAL-3, AND INDUSTRIAL-1. THE OVERLAY DISTRICTS OF MTC (MAJOR TRANSPORTATION CORRIDOR AND L-ENO-PW(LOWER ENO PROTECTED WATERSHED ALSO APPLY. b. If the new Economic Development node includes more land than the current node, what are the current zoning categories for that extra land?NOT APPLICABLE. C. If the new Economic Development node will contain less land than the current node, what will be the new zoning categories for that land?NONE OF THE LAND IN THE REMAINING PORTION OF THE CURRENT NODE; E.G., OUTSIDE THE ECONOMIC DEVELOPMENT DISTRICT, WILL CHANGE IN TERMS OF ZONING DESIGsNATION. C. I.40101d N.C. Hlahwav 88 Economic Development District 1. LAND USE What are the current land use categories in the area proposed for the new Economic Development node?What are the approximate percentages of land area for each? CURRENT LAND USE CATEGORIES AND THE APPROXIMATE PERCENTAGES OF LAND AREA FOR EACH ARE AS FOLLOWS: 10-YEAR TRANSITION 1% 80-YEAR.TRANSITION 15% RURAL RESIDENTIAL 84% 50 2. ZONING What are the current zoning categories in the area proposed for the new Economic Development node? What are the ai mroximate percentages of land area for each? CURRENT ZONING CATEGORIES AND THE APPROXIMATE PERCENTAGES OF LAND AREA FOR EACH ARE AS FOLLOWS: AGRICULTURAL-RESIDENTIAL 41% R-1 RESIDENTIAL 59% 51 DRAFT EXCERPT FROM PLANNING BOARD MINUTES FEBRUARY 21, 1994 MEMBERS PRESENT: Bill Waddell (Chair) , Karen Barrows, Virginia Boland, Clint Burklin, Carol Cantrell (7:45) , Betty Eidenier (9:00) , Jean Hamilton, Paul Hoecke, Joan Jobsis, Larry Reid ( 7 :50) , Elizabeth Walters. MEMBERS ABSENT: Kent Scott (excused) . STAFF PRESENT: Marvin Collins, Mary Willis, Joanna Bradshaw. AGENDA ITEM #10: PLANNING BOARD ITEMS a. Economic Development Districts Proposal Presentation by Marvin Collins. (The abstract is an attachment to these minutes on pages . The complete abstract and attachments are on file in the Planning Department. ) Collins began by noting that, at its February 1 meeting, the Board of Commissioners referred a number of items to the Planning Board for its consideration. He indicated he would go through the list of considerations after answering any general questions or concerns that the Planning Board may have. Cantrell suggested that, in the future, revisions to the Design Manual be number in order to assure proper insertion into individual's copies. Collins responded that any revision sheets from this point forward will be numbered and dated. He continued that the next revision should be the finished copy. Waddell suggested that a complete and correct copy be provided for the Planning Board and Board of Commissioners. Reid asked about changes once the document was completed noting that some questions asked by Commissioners seemed to indicate it was felt the document would be "set in stone" , particularly those items listed in the Permitted Use Table. Collins 52 responded that all of the objectionable uses that have been identified at various meetings have been deleted from the list of permitted uses. The most up-to-date version of the Permitted Use Table is a part of the abstract attachments in this agenda packet. Collins explained the breakdown of uses contained in the table noting that I-40/Old NC 86 is the most restrictive, I-85/Buckhorn is a step-down, and, the one with the widest range of permitted uses is I-85/US 70. The attempt was to include uses that would not be objectionable, but consistent with uses already in the County or within this region, particularly the Research Triangle Area/Park. For I-4/Old NC 86, the attempt was to model it somewhat after the research applications district that is contained in the Durham City/County Ordinance. Reid asked about the possibility of amendments. Collins responded referring to Commissioner Gordon's suggestion regarding monitoring for two or three years. He indicated continuous monitoring would take place to be sure the results are those desired by the County. If that is not the case, then changes could be proposed. Barrows referred to the letter from Roy Roth and his comment that "the rationale for accepting or rejecting a permitted use seems somewhat arbitrary" . She asked how Collins would respond to that comment. Collins responded that the manufacturing uses had been reviewed again and the thought was to be at least restrictive as the research applications district in the Durham City/County Ordinance but, recognize that there are other uses which could go into the node which have no adverse impact. Collins continued that the other types of uses, office, distribution, retail were reviewed. The only concern with office and distribution seemed to be a specific concern with things like truck traffic. For retail, the concern that was voiced was "we don't want another strip" . The way this was addressed was through allowing those uses on a Special Use Permit basis. Collins noted that in reviewing the I-85/Buckhorn district, Ted Abernathy, EDC, had indicated that one of the things that has to be considered is what is right next door, which, in that case is Mebane's manufacturing zone. In looking at the range of permitted uses in that zone, the decision was made to allow a wider range of manufacturing uses and distribution and put other uses in a Special Use Permit category. 53 Collins noted again that I-85/US 70 District has the widest range of uses principally because of two factors. The way it has developed historically and the uses that are already in place. Collins continued his presentation by addressing the considerations referred by Commissioner Willhoit, noting that all of his questions or considerations pertain to the I-40/Old NC 86 Economic Development District. The first question from Commissioner Willhoit was whether to consider permitted manufacturing uses from the I-40/Old NC 86 node, or at least making them special uses. Collins referred to a listing of manufacturing uses permitted (an attachment to these minutes on page ) and indicated those permitted in comparable Durham Zoning Districts. Wherever the word "Yes" is used, that reflects the effort to model this district after the research application or RTP restrictive covenants. Generally, when the word "No" is used, that is to reflect uses that exist in the County. One example of that is paperboard container boxes, Mebane Packaging, which is in Mebane's jurisdiction but, is actually in Orange County. Collins noted that comments heard about Mebane Packaging did not indicate reasons why it would be objectionable for such a use in this district. Collins referred to the miscellaneous permitted uses noting that while they do not already exist in Orange County, staff discussion indicated they felt there would be no opposition to those uses. It was felt that they would not generate any real adverse impacts either in terms of byproducts or lots of truck traffic or a large number of employees. Collins asked that the Board remember that any reference to Special Use means a Planned Development approval process; rezoning, special use and site plan all in one process. When "Special Use" is -written out, it is always in the Planned Development application context. The decision that confronts the Planning Board is whether you feel this list of permitted uses is acceptable. If the desire is to limit the I-40/Old NC 86 district to an office/distribution center with limited retail, either eliminating manufacturing uses or requiring them to obtain a special use permit through the "planned development" is an option. If there is a concern that the range of possible uses is still too open and requires closer scrutiny, approval through the "planned development" 54 process is an option. However, the staff feels that the performance standards and design criteria in the Design Manual will adequately address concerns about specific uses. The "monitoring' process recommended by Commissioner Gordon will also provide information as to whether more control is required. Waddell commented that he felt the Planning Staff had made efforts to address concerns of the public as well and make the permitted uses more viable. Collins responded that he and Ted Abernathy, EDC director, agree that if the uses are "pruned" further, the real question becomes, even if they are adopted, will anyone use them. It is the same situation that resulted when Chapel Hill created a mixed use district near I-40 and Airport Road. They made the restrictions so tight and the list of uses so limited, that it was never used. They are now in the process of trying to get a small area plan for the area. Joan Jobsis stated that she had been a part of the economic development process for about four years. The original intent was to develop an economically prezoned area that could promote development in the county. After a great deal of deliberation, these sites were selected as the most probable places where development could occur. This would allow designed development that would not infringe on surrounding areas but would not be scattered all over the county. These are areas that will be developed in one way or another. If we become terribly restrictive, it will overthrow the whole intent which was to help economic development in the county which meant industry as well as commercial and office space. She continued that she did not want to become so restrictive that all of manufacturing is outlawed. She expressed the concern that it has already become too restrictive and it is made very difficult for anyone to come in and develop industry in our county. If we want industry, which was the intent of all the years of _work on this, we have to promote some zoning that allows industry. Cantrell asked if Collins wanted the Planning Board to prepare comments to insert after each question/consideration. Collins responded that if the Board would like to have a consensus or a formal vote after each question, the responses could be filled in using the format (copy attached) as included in the agenda materials. Waddell asked if the Board would like to respond individually to the questions. It was the consensus 55 of the Board to provide comments and explanations and a motion after each question. Walters expressed concern that too many restrictions would keep those in the area "on hold" and continue to allow them no use of their land. Waddell stated that each issue could be addressed individually and, hopefully, provide Commissioner Willhoit with answers to his concerns. Jobsis asked if it is possible to recommend that Planning Board does not promote removing permitted manufacturing from the I-40/Old NC 86 district. She noted that she felt it should not be limited further. Waddell responded that perhaps each issue should be voted on and verbalize feelings on both sides and give a rationale for those feelings. Burklin stated that he was pleased with the slate of permitted uses and the sites and the Design Manual. He indicated he felt the manual makes the permitted uses acceptable. He expressed concern regarding problems that might occur if some of these uses are placed adjacent to each other. He felt some of the uses would not be compatible with each other. He suggested that the EDC, after this is in place, very actively work to develop a vision for each of these that is based on market analysis and tries to work toward promoting, not restricting, compatible uses. He suggested that EDC work collectively with the individual landowners to find compatible uses. He felt a continual promotional effort would help toward finding such uses. Jobsis noted that the original work with EDC was very much along the same lines as the comments made by Burklin. The step-down idea of uses that would be blocked together was a part of the discussion. Collins agreed. One of the things that the Work Group focused on was looking at what the distribution might be in terms of the different uses. They reviewed several plans of how they might be located within each node. There was some discussion of doing some grouping as suggested by Burklin. The decision was made by the Work Group that it should be more flexible. It felt that those kinds of arrangements would be determined by the market place. EDC is already involved in such discussions. Burklin noted that he felt if a vision and a commitment to a vision is developed and gets publicized, some of the remaining concerns might be 56 mitigated. With all the different uses, a vision doesn't look apparent, but, it is understandable that the flexibility is needed to move with and access the market. He indicated he felt the Planning Board could not access the market that EDC can. He reiterated his suggestion to follow through on a vision and an active process with the landowners. Jobsis responded that she felt EDC is already working on this. Burklin noted that he felt this is not stated. Waddell asked that comments be addressed to the questions/considerations of Commissioner Willhoit as listed. He asked what was the general sense of the Board regarding the staff comment to the first consideration of removing permitted manufacturing uses. Jobsis stated that her feeling was the statements and comments indicated the Board agreed with the staff comment with the addition that EDC work toward some sense of design within the districts. Waddell responded that, if anything, the Planning Board might want to augment staff comment and recognize that the EDC is working towards developing a common focus for each of the areas. Jobsis noted that she had not heard comments that were against the staff position. With no opposition indicated, Waddell stated that the Planning Board supported the staff position. Waddell continued with the second consideration which was to consider adequacy of proposed ordinance modifications in addressing access/driveway cuts onto Old NC 86; i.e. , property fronting on Old NC 86. He stated that the language of unless justified and wherever possible speaks to the concern. Barrows noted that Dolly Hunter, at the Commissioners, meeting in Efland had suggested the idea of a parallel access road. She indicated she felt that idea may have some merit. Waddell responded that not knowing how the land was going to develop, it becomes problematic to know that there is to be an access road. Collins commented that language could be included which encouraged developers to install marginal access roads, particularly on a larger tract. With no opposition indicated, Waddell stated that the Planning Board supported the staff position. 57 Consideration #3 : Consider phasing of implementation of prezoned areas to coincide with the extension of sewer service. The character of development without sewer may preempt the type of development that we desire. Collins used a colored map to indicate the location of sewer lines as described in the staff comment (copy an attachment to these minutes on page ) . He also reviewed the options as indicated in the staff comment. Collins continued that there is a practice that some jurisdictions use called "installation of dry sewers" . These would not be used until major sewer lines were extended and connection could be made. Jobsis asked if there would be problems installing sewer lines under I-40. Ted Abernathy, EDC director, stated that the problem would be the cost. It can be done, but is very costly. Jobsis continued that was the reason the Work Group did not select a section south of I-85 to Buckhorn. Collins continued with the point made by Commissioner that Willhoit that development that relies on septic tanks may preempt the type of development character that is desired. The response to that consideration is that there is one design manual with standards that apply to all development, whether served by public sewer or septic. One result could be that there would be more open space with septic tanks since more lot area is required for septic fields. Waddell noted that economic impact is such that we could not expect the southernmost areas to install septic lines under the interstate until the time the nitrification fields cost more than public sewer lines. Abernathy agreed. Jobsis commented that it seemed if that area was to develop at all, it would have to be allowed to develop with something other than public sewer lines. That would likely be the situation for at least the next twenty years. Waddell continued noting that there would be no reason that a business going in with a nitrification field, switching to public sewer when it becomes available. The nitrification fields could be replaced with another building as long as all the conditions were met. Collins agreed. 58 Cantrell noted support for the installation of dry sewer system. She felt it could be done in the initial stages at a fairly moderate cost and would not implicate the County or the present or future landowner to tear up something already there to install lines. Waddell stated that he felt the language should be such to encourage, as opposed to a requirement, because it will be an economic decision. Cantrell responded that she would be more on the side of requiring because it is going to be extra expense. It's a forward motion. Jobsis stated that subcommittees had discussed the issue of dry lines. The group had concerns that the original owner may not be the owner twenty years into the future and uses could change. There are a lot of things that cannot be totally controlled. She did not feel that the added expense of installing dry sewer lines could be required, but, rather agreed with the term encourage. Cantrell stated agreement in the same manner in which road standards have been done with "an eye with what is coming down the road next" ; not trying to necessarily maintain a viable general outlook. She felt if it was not required, no one would do it. Waddell noted that if zoning was not implemented until sewer lines were in place, and that might not occur for some time, then zoning would be delayed. He felt that was not in line with the sense of the Board. He felt the Board was in agreement with the staff comments and the alternative of dry sewers. He felt the Board would like to allow for development in all the areas and not pre-zone piecemeal. Cantrell suggested a show of hands to determine whether the term encourage or require should be used in terms of dry sewer systems. Waddell agreed. Hoecke stated that he felt that the intent was to prezone all of the areas at the same time. It was the consensus of the Board to encourage rather than require the installation of dry sewer lines. Consideration #4: Consider making residential uses special uses. 59 Consider reducing permitted residential density such that it is not more attractive (profitable) than business development. Consider not zoning residential areas until a specified amount of the Primary Area has been developed. It was noted that staff comment should read: Residential densities are limited to no more than four (4 ) dwelling units per acre . . . (A copy of the Staff comment is an attachment on page ) . Collins that he felt one of Commissioner Willhoit's concerns was that he would prefer offices in the area (indicated on map) and concerned with apartments being built so near the proposed development area. One means of addressing that could be reducing the residential densities in the Design Manual. Leaving proposed areas in an R-1 zoning category until a specified amount of the Primary Area has been developed may result low- density development at the fringes of the district instead of a "step-down" from more intensive to existing residential development. In addition, leaving the residential option in the Secondary Development Areas open provides more opportunity for properly planned development where non-residential and residential uses are considered as part of a single project. Burklin asked why have residential at all? He felt R-2 was not any better. Abernathy stated that he did not favor any residential in the Secondary Development Area. Cantrell noted that without public sewer there could not be dense residential. Collins agreed. Waddell asked if the Board agreed with staff comments. Jobsis stated that logically, if it is to be an economic development area, there should not be residential development. Collins indicated on the map, that most of the areas adjacent to the Secondary Development Area are parts of very large lots. Eidenier commented that two or three years ago it was discussed to have residential development next to commercial/industrial so that people could walk to work. Waddell noted that had not been mentioned. 60 Reid stated that with all the previous discussion about buffering commercial/industrial from residential areas, he felt residential development should not be allowed in the Secondary Development Area. He also felt the required buffers would be enough for developers to deal with and there would be a different type of traffic that a residential area would not like or need to deal with. It was the consensus of the Board that residential development not be allowed in the Secondary Development Area. Burklin stated that he did not see this node as different from the other two. In fact, the other two have some reasonable high density neighborhoods next to them already. Reid agreed. Collins asked for clarification regarding permitted uses in the Secondary Development Area. The response was all permitted uses with the exception of residential. Collins noted that I-85/US 70 was the only other area that had a Secondary Development Area. It was designed specifically to account for the mobile home parks already in existence and the desire not to create non-conforming uses. The following Planning Board comments were presented by Cantrell and voted on individually to match with the questions/considerations of Commissioner Willhoit. 1. We concur with staff comments. The intent of the process has been to create viable Economic Development Districts. We believe the permitted uses are now severely restrictive and would not support restricting them further. We would encourage Economic Development Commission to continue its efforts and involve/communicate with all landowners in the districts to work with market forces to produce/coordinate "theme" or compatible uses. VOTE: Unanimous. 2. We join/support staff comment. VOTE: Unanimous. 3. We support prezoning to allow development in all areas regardless of sewer extension, and encourage the laying of dry sewer lines for 61 future tap-ons where septic systems are used. VOTE: Unanimous. 4 . We believe any residential development within the Economic Development Districts will further constrict and complicate the planning of Economic Development. We oppose any residential development within the Economic Development Districts. Needed residential development can occur outside but contiguous to the Economic Development District if the market supports it. There is land available. VOTE: 10 in favor. 1 opposed (Waddell - felt it should be allowed, although it probably would not be used often) . Collins began review of questions/concerns of Commissioner Gordon (copy of these concerns is an attachment to these minutes on pages ) . The first group of concerns relate to the Land Use Plan. Collins noted that Commissioner Gordon raised the issue as to whether or not the I-40/01d 86 node is consistent with the Land Use Plan. The basic answer is no, it is not. That is the reason for the proposed amendment to the Land Use Plan to create the District category and to denote this on the Land Use Plan as one of the three districts. Another question was about the locational criteria for commercial/industrial nodes and commercial activity nodes and the fact that they differ from those proposed for economic development activity nodes. Collins noted that one point he had made at the Board of Commissioners, meeting was that one reason for changing these locational criteria was to provide a linkage between the Design Manual, Zoning - Ordinance and Land Use Plan. The items underlined by Commissioner Gordon are addressed in the Design Manual. The basic response was the standards for economic development districts are better than the ones for the commercial activity nodes. The second group of concerns involve the Design Manual and, specifically, the mixing of fuzzy standards and objective standards. Collins noted that the developer must do his/her homework if plans are to be accepted for review. Furthermore, pre- submission meetings are to be held with the developer and the Planning and EDC staffs. The intent of such meetings is to insure that the 62 developer understands the intent of the Design Manual and prepares plans which adhere to all standards. Collins explained that a plan, once accepted, was then sent out for agency review and comment. He said that the approval process was not easy, was not intended to be, and once responses were received, staff would be insuring that agency comments were addressed. Collins then responded to specific questions of Commissioner Gordon. In response to the question, would additional staff be required, the answer was no. In response to the question, would the staff need to be trained as architects, the answer was no. The standards are basic design criteria that planners deal with on a daily basis. The staff feels very comfortable in being able to make the judgments necessary to determine compliance. The next series of questions concerned amendments to the Design Manual and its relationship to other plans and ordinances. Collins indicated that the Design Manual is a part of the Zoning Ordinance and would be changed or amended through the same public hearing process that Zoning Ordinance amendments are made. In terms of the Manual being made more concise and objective, Collins indicated that there was no way to draft design standards which covered every conceivable situation. The use of terms such as "where practical" and "wherever possible" were deliberate. He cited an example of a site where no scenic views existed. He noted that there was no need to require that "access to views be preserved" when none existed. He explained that the reason for the site analysis was to determine what features existed and needed to be addressed. That analysis provided the developer as well as the staff guidance in terms of which standards applied and where. The next series of questions pertained to "costs. " Collins noted that in terms of water and sewer service cost, the developer pays for the cost of installation in accordance with the policies of the utility provider. The only exception might be where the developer applies to the County under the terms of the Water & Sewer Policy for financial assistance in installation cost. In such situations, the decision to participate in funding would be that of the Board of Commissioners. In terms of who would serve the Buckhorn node, the Commissioners made it 63 clear that development would be connected to the Efland sewer system. Insofar as transportation is concerned, Collins said that standards had been provided which required sites to be transit compatible. The developer pays for such site improvements, but the public pays for the transit system. Individual businesses that are large enough could provide van pools to park-and- ride lots or between the node and municipalities. The difficulty for the Triangle Transit Authority in terms of planning for and providing transit service to the nodes is that there is "nothing on the ground" in terms of actual development or zoning categories. Such service may ultimately be provided through rail and/or bus service, but the long term cost may well be by the public initially with capital and operating costs recouped through rider fares. Collins handed out a one-page summary which provided basic information about cost-benefit analysis. (A copy of the handout is included as an attachment to these minutes on pages -_. ) Collins noted impacts that the Commissioners had identified and stated that either through Planning or EDC data, it would be possible to provide most, if not all, of the desired information. The only exception would be where confidentiality or legal constraints existed. Ted Abernathy indicated that he felt that the districts would have no impact on residential growth. Abernathy noted situations that might occur where a building is constructed but no tenants have been located in the facility. While tax revenues would be received, until the space is actually occupied, there would be no employment data to collect. The other situation noted by Abernathy was that employees come and go. Capturing the information may be no problem, but six months from . the date of the survey, the responses may have changed completely. Abernathy concluded by saying that clarification is needed on some terms, such as "new" residents, but that could be worked out before data collection begins. He indicated that two years from now, there would probably be no development in either of the districts, so the time frame of 2-3 years would probably need to be expanded. Collins indicated that the last set of comments concerned criteria for development such as low water usage, little or no production of hazardous waste, and little or no truck traffic and low noise levels. Collins stated that hazardous waste was controlled 64 through the State Building Code; i.e. ; the Fire Prevention Code, and changes from the Code requirements would have to be approved by the Building Code Council. In terms of low truck traffic, standards could be set, but they would vary from person to person. The standards in the Manual address related issues such as location of loading docks, buffer requirements, and noise thresholds. Burklin asked if information was required concerning trip generation and improvements to thoroughfares. Collins noted that as long as the capacity of a road is not exceeded, as determined by an impact analysis, dedication of additional right-of-way would be required but not improvements. When the capacity of the road to carry the traffic was exceeded, improvements would be required of the developer. Collins then turned to the final set of questions, with the general concern being whether some kind of pilot project should be utilized. He indicated that further differentiation of uses in districts would only make the districts more restrictive and less likely to be implemented. With the involvement of the Commissioners in the approval of major development projects, the intent of districts would not be carried out; i.e. , staff approval based on design and performance standards, with Commissioner approval where projects failed to meet criteria. Before proceeding further, Waddell asked if the Planning Board members agreed with Collins' responses to Commissioner Gordon's questions. Waddell noted that, in looking around the table, there was unanimous consent with Collins' comments and asked Collins to continue. Collins noted that he wanted to highlight some changes appearing on pages 29-30 that staff was recommending. First, the Site Volume Ratios for office and retail uses in the I-40/Old NC 86 district are recommended for change as follows: Use Current SVR Revised SVR Retail 1.000 1.500 Office 2.000 2.500 Collins then noted that the number of trees per acre of unobstructed open space for industrial uses (in all districts) needed to be changed from 6 to 20 large trees and from 11 to 10 small trees to correct a distortion in the original analysis. 65 Waddell asked about an apparent discrepancy appearing on page 61 of the agenda (permitted use table) . He asked why nightclubs, bars, and pubs, accessory to hotels and motels, are shown as being permitted by right when hotels and motels require a special use permit. Collins indicated that for a nightclub, bar or pub to be allowed, it would have to be located in a hotel or motel, and the hotel or motel must first be approved as a special use. Otherwise, no nightclub, bar or pub would be permitted. Waddell then noted that on page 37, fourth line from the bottom, the last "as" in "as far south as" should be crossed out. On the last line, the sentence should read, "in the northwest corner of the Chapel Hill Township" , with "Chapel Hill" being added. On page 41, under 1.d. 1, after the wording "major arterial road" , there should be a period to end the sentence. Waddell asked if there were any other comments by any of the other members. There being none, Waddell indicated that he would like to get a motion concerning the proposal, as revised, including the Zoning and Land Use Plan amendments (maps and text) . XOTIOM: Jobsis moved approval of the amendments to the Land Use Element and Zoning Ordinance, as revised, including the Design Manual, and including the current amendments that were proposed in the document. Seconded by Cantrell. VOTE: Unanimous. Burklin indicated that while he approved of the Plans and Manual, he wanted to share his concern with the Commissioners that there should be compatible uses, but feels that should be done within the goals, visions, and plans of the EDC instead of through the process of restricting the permitted use table because that takes too much flexibility out of the plans. Waddell indicated his agreement with Burklin's statement being reflected in the minutes. 66 CONSIDERATIONS REFERRED TO THE PLANNING BOARD BY COMMISSIONER DON WILLHOIT AT THE BOARD OF COMMISSIONERS FEBRUARY 15, 1994 MEETING NOTK-All questions or considerations pertain to the I-40 101d N.C.86 Economic Development District. I. Consider removing permitted manufacturing uses from the I-40/Old 86 node, or at least making them special uses. Staff Comment: Proposed permitted manufacturing uses in the "Primary Development Area" include those listed on the following page. Also provided is a comparison of the list of permitted manufacturing uses in comparable Durham zoning districts; i.e., BP - Business Park and RA- Research Applications. Staff has revised the "manufacturing and processing operations' designation in the current Zoning Ordinance to be more specific;i.e.,designation by Standard Industrial Classification(SIC)code.This breakdown is consistent with that used by both Durham City/County and Wake County in incorporating Research Triangle Park standards/uses into their zoning ordinances. If the desire is to limit the I-40/Old N.C. 86 district to an office/distribution center with limited retail,either eliminating manufacturing uses or requiring them to obtain a special use permit through the"planned development"process is an option. If there is a concern that the range of possible uses is still to open and requires each use requires closer scrutiny, approval through the "planned development" process is an option.However,staff feels that the performance standards and design criteria in the Design Manual will adequately address concerns about specific uses.The"monitoring, process recommended by Commissioner Gordon will also provide information as to whether more control is required. Planning Board We concur with the staff comment inasmuch as the intent of the process has Comment: been to create viable Economic Development Districts. In addition, we believe the permitted uses are now severely restrictve and would not support restricting them further. Finally, we would encourage the Economic Development Commission to continue its efforts and involve/communicate with all landowners in the district to work with market forces to produce a coordinated"theme" of compatible uses. (VOTE: Unanimous, 11-0.) 2. Consider adequacy of proposed ordinance modifications in addressing access/driveway cuts onto Old N.C.ft i.e.,property fronting on Old N.C.86. Staff Comment: On Page 3.3.10 of the Design Manual, the proposed cross-section for Old N.C. 86 is shown.The four-lane road will eliminate turning movements by providing a landscape median instead of a center turn lane.Turn lanes would be available only at designated mane points as shown on the schematic plan for the district on page 2.1.8 of the manual On page 3.3.3,entrances and erits are limited to no more than one per street frontage unless iustified by site configuration, trip generation, and traffic conditions. In addition, entrances and erits must be restricted to side streets wherever possible rather than providing direct access to arterial and collector streets. Finally, common driveways are identified and encouraged as a means of reducing the number of access Points- 67 PERMITTED IN COMPARABLE DURHAM ZONING DISTRICTS MANUFACTURING USES PERMITTED IN I-40/OLD N.C. 86 ECONOWC DEVELOPMENT DISTRICT Business Research Park Application Dairy NO NO Bakery NO NO Food Bottling plant NO NO Products Miscellaneous NO NO Converted paper & paperboard NO NO Paper products Products Paperboard containers boxes NO NO Printing& publishing establishments NO NO Pharmaceutical products YES YES Industrial Office & computing equipment machinery YES YES Electric transmission& distribution YES YES Electrical industrial apparatus YES YES Household appliances YES YES Electric lighting& wiring equipment YES YES Electronic Equipment Radio & TV receiving equipment YES YES Communisations equipment YES YES Electronic components &accessories YES YES Motorcycles, bicycles & parts NO NO Transportation Equipment Miscellaneous NO NO Measuring& analyzing instruments YES YES Instruments Paphic, medical& opt goods YES YES Watches& clocks YES YES Jewelry& silverware NO NO Musical instruments NO NO Miscellaneous Toys+ sporting& athletic goods NO NO Pena, pencils, office& artist supplies NO NO Miscellaneous NO NO 68 The above standards were deliberately worded to be flexible to protect the carrying capacity of the street and limit the number of access points from each lot. This flexibility is needed because of existing lots which currently front on Old N.C. 86, some which have no other means of access because of floodplains and other environmental constraints; i.e., steep slopes adjacent to the street right-of-way. Planning Board We join/support the staff'comment. Comment: (VOTE: Unanimous, 11-0.) 3. Consider phasing of implementation of prezoned areas to coincide with the extension of sewer service.The character of development without sewer may preempt the type of development that we desire. Staff Comment: On pages 2.4.22, 2.4.23, and 2.4.25, a map and teat describe the availability of sewer to the I.40/Old N.C.86 district. A proposed 12-inch sewer line is to be completed by the end of 1994 which would terminate (via a stub-out) where Cates Creek crosses I- 85. Service to the I-40/Old N.C. 86 district can be provided by extension of this line. Phasing of the development of the district to coincide with the availability of this sewer line would mean that the northeast quadrant of the interchange would occur first,followed(in order) by the northwest quadrant,the southwest quadrant, and the southeast quadrant.If property owners have no other means of developing their land until sewer service is available, this would mean that some areas would not be developed for 20-30 years. One alternative is to use pump stations and force mains as an interim solution until the major gravity line along Cates Creek is extended. In lieu of this approach, property owners could be allowed to develop with septic tanks. In terms of such development pre-empting the types of development desired,,the criteria in the Design Manual insure that all development, whether served by septic tanks or public sewer, are subject to the same standards. One result,however, will be that businesses using septic tanks will be required to provide greater land area for nitrification fields. One consideration might be to require that property owners design septic systems so that connection to public sewer would be possible once extended. In the case of large lots to be subdivided,it could mean installing"dry sewer"or sewer lines in the streets or easements which would not be used until major sewer lines were extended and connection could be made.For alternative systems,they could either be prohibited or approved only under the"planned development"process. Planning Hoard We support prezoning to allow development in all areas regardless of sewer Comment extension and encourage the laying of"dry"sewer lines for future connection to major trunk lines,at the time of site development,where septic systems are used.Incentives from utility providers, such as the waiver of tap-on fees or assessments, should be used to promote the installation of dry sewer lines. (VOTE: Unanimous, 11-0.) 4. Residential uses in Secondary Area of I-40 10ld N.C.86. a. Consider malting residential uses special uses. Staff Comment See "b" below. s 69 b. Consider reducing permitted residential density such that it is not more attractive (profitable) than business development. Staff Comment: Residential densities are limited to more than four (4) dwelling units per acre by the Design Manual (page 2.1.2). If density is a concern, the range of densities could be reduced similar to the approach taken with respect to land adjoining Stagecoach Run Subdivision. In that location, residential densities cannot exceed two (2) units per acre (page 2.1.6). If the type of residential unit permitted is a concern; i.e., single-family, condominium, apartment or mobile home, specific types of residential units could be allowed. For example, single-family attached and detached units at densities of not more than two units per acre might be allowed. If higher densities (not to exceed four units per acre) were desired, the developer would have to secure approval through the "planned development" process. C. Consider not zoning residential areas until a specified amount of the Primary Area has been developed. Staff Comment: heaving proposed areas in an R-1 zoning category until a specified amount of the Primary Area has been developed may result in low-density development at the fringes of the district instead of a"step-down" from more intensive to existing residential development.In addition,leaving the residential option in the Secondary Development Areas open provides more opportunity for properly planned development where non-residential and residential uses are considered as part of a single project. Planning Board We believe any residential development within the I-40/O1d N.C.86 Economic Comment: Development District will further constrict and complicate the planning of the district. Thus, we oppose any residential development within the district. Needed residential development can occur outside but contiguous to the district if the market supports it. There is land available. NOTE: 10-1, with Waddell dissenting because he felt that residential development should be left in as an option even though it may not be used fiw1ientlyj a 70 CONSIDERATIONS CONCERNING COST-BENEFIT ANALYSIS The following comments are taken from A Primer for Policy Analysis, by Edith Stokey and Richard Zeckhauser,and are intended to provide a basic understanding of what cost-benefit analysis encompasses. "Benefit-cost analysis is the principle analytical framework used to evaluate public expenditure decisions. This approach requires systematic enumeration of all benefits and all costs, tangible and intangible, whether readily quantifiable or difficult to measure, that will accrue to all members of society if a particular project is adopted." "Benefit-cost analysis is ex an it attempts to evaluate a project before it is undertaken to decide in what form and at what scale it should be undertaken, and indeed whether it should be undertaken at all." "The rationale for benefit-cost analysis is economic efficiency; it aims to ensure that resources are put to their most valuable use, including the significant possibility of leaving them in private hands. As a practical matter, benefit-cost analysis is most helpful in assessing well-defined projects. It would be of great assistance in choosing among alternative pollution-control systems for a particular river system, or in deciding whether mad repairs in a community should be made with a new, more weather-resistant asphalt. For wide-ranging programs, such as the War on Poverty of the 1960s, benefit-cost analysis is most useful as a paradigm." "But it would be unfair to praise the merits of preject evaluation techniques without identifying their liabilities as well...The techniques are potentially dangerous to the extent that they convey an aura of precision and objectivity.Logically they can be no more precise than the assumptions and valuations that they employ...." "In principle, the procedure followed in a benefit-cost analysis consists of five steps. 1. The project or prgfeets to be analyzed are identifiable. 2. All the impacts, both favorable and unfavorable, present and future, on all society are determined 3. Values, usually in dollars, are assigned to these impacts. Favorable impacts will be registered as benefits, unfavorable ones as costs. 4. The net benefit(total benefit minus total cost)is calculated. 5. The choice is made." "All benefit-cost analyses hinge on the Fundamental Rul :In any choice situation, select the alternative that produces the greatest net benefit." At the CommiedoneW February 1, 1994 meeting, the following items were suggested for Inclusion in a cost-benefit analysis: 1. What will be the fiscal impact;i.e.,impact on the County's operating budget and tax base, of non- residential development in the Economic Development Districts? 2. What additional residential growth will be generated as a result of the Economic Development Districts? a. How many of the employees working at businesses in the Economic Development Districts live in Orange County? t • a 71 b. How many of the jobs will be filled by new us. existing residents? C. What will be the fiscal impact of new residential growth attributable to the Economic Development Districts? 3. What wages will be paid lane being paid by businesses which locate in the Economic Development Districts? Discussions with the Economic Development Director have indicated that most, if not all, of the above mentioned information could be collected,either by the Planning Department through its building permit process or by the Economic Development Commission stag'as part of its activities. The only limitation is determining those situations where,because of confidentially or legal reasons, such information cannot be obtained. Examples are such situations include the place of residence of employees and their wages. r , Znapel h : _ _ , NZ 6 ( 919 ; 942-7906 February 2.1 , 1994 :o : =he Orange County Board of Commissioners Re : :-40/01d 86 Economic Development District Lacies and Gentlemen of the Board : For the past three years we have waited patiently through the long process of meetings and public hea_ings for the Economic Development Di-st�-i-ct -tt tnt­:-40/.0ld- 86 area, hoping.- to s.ee o-ur property become an asset to the County - and our families . Throughout the past year , we have had our hopes raised, along with other land owners in the area, that our currently un-marketable lands would _finally be approved by the Board and that our tax burden of the past few years would be lifted by the ability to market the property to interested investors , or through development .of. our own . We support the- County ' s desire to see this area properly developed : We support a list of permitted uses that would prevent un-sightly cr environmentally damsging use of the area. We cannot , however, take the risk of .another extended period of months- or years while the Board "fine tunes" this list of uses . in recent . conv.ersations with the neighboring land owners , we have been advised, that many of- those owners now believe that the County Will continue to stall• on the E.D.D. for 1-40,/Old 86 , and that the list of uses will become so restrictive that -no lending agency will =und development within the district . These owners are preparing to apply to the Town of Hillsboroagh -for annexation of their lands, if the Board of County Commissioners does- not pass the E .D .D. in Karch. .Although w.e .are under considerable financial pressure , due to our tax burden , to join this growing movement towards annexation, we still believe that the area would be best served by being under th-e County ' s jurisdictica . We urge t-he Board to pass the I-40/01d 86 E .D.D. when they meet in March . ire bel,iev.e that.. a failure to do so will be detrimental to the best interests. of the citizens of Orange County, and will certainly lead to yet another annexation request to Hillsborough . Thank y u. � . Robert J. Ayers :Harold M. Harris