HomeMy WebLinkAboutAgenda - 02-28-1994 - C.1.a O R A N G E C 0 U N T Y
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: February 28, 1994
Action Agenda
Item # C• -cx
SUBJECT: PROPOSED ZONING ORDINANCE TEXT AMENDMENT
ARTICLE 6.23.7 - Watershed Protection Overlay Districts
(Stream Buffers)
ARTICLE 6.23.8 - Watershed Protection Overlay Districts
(Sewage Disposal and Watersupply)
DEPARTMENT: PLANNING PUBLIC HEARING —X—Yes No
ATTACHMENT(S) : INFORMATION CONTACT: Mary Willis
Extension 2583
Proposed Amendment
OWASA Memorandum TELEPHONE NUMBERS:
OWASA Resolution Hillsborough - 732-8181
Durham - 688-7331
Mebane - 227-2031
Chapel Hill - 967-9251
PURPOSE: To receive citizen comment on a proposed amendment to the
Zoning Ordinance to allow for a reduction in the 150 '
building setback and 300' septic system setback adjacent
to reservoirs and/or streams for lots created prior to
January 1, 1994.
BACKGROUND: Article 6.23.7 requires that new structures be located at
least 150' from a reservoir, or outside of the stream
buffer, whichever is greater. Article 6.23.8 requires
that septic systems be located at least 300 ' from a
reservoir or outside of the stream buffer, whichever is
greater.
Application of these setbacks may render some existing
lots unbuildable. The remedy available at this time is
for the property owner to seek a variance of the setback
requirements to the extent necessary to develop the
property in a reasonable manner.
The proposed amendment would allow a reduction in the
septic and building setbacks on lots which were created
prior to January 1, 1994 to the extent necessary to build
on the property, provided that septic system and
structures remain outside of stream buffers, and the
septic system remains at least 100' from the reservoir (as
required by the State mandate) .
The Orange Water and Sewer Authority is opposed to the
proposed amendment, as indicated in the attached
4
memorandum and Resolution.
R£COMMMATION: Article 20.3 of the Zoning Ordinance requires that the
Zoning Officer' s recommendation be presented to the
Planning Board within 30 days of receipt of an
application. However, Article 20.4 exempts any
application for amendments to the Zoning Ordinance by
either the public or the County from the provisions of
Article 20.3. In either case, though, the public hearing
is the time scheduled for presentation of the Zoning
Officer' s recommendation.
Zoning Officer Recommendation
Provided that the Planning Board and Board of
Commissioners find in the affirmative, the Zoning Officer
recommends approval of the proposed text amendment.
Administration Recommendation
The Administration recommends that the proposed amendments
be referred to the Planning Board for a recommendation to
be returned to the Board of Commissioners no sooner than
April 4, 1994.
PROPOSED ORDINANCE AMENDMENT
ORDINANCE: ZONING ORDINANCE
REFERENCE: ARTICLE 6.23.7 - Watershed Protection Overlay
Districts (Stream Buffers)
ARTICLE 6.23.8 - Watershed Protection Overlay
Districts (Sewage Disposal and
Watersupply)
ORIGIN OF AMENDMENT: _x_ Staff Planning Board
BOCC Public
Other:
STAFF PRIORITY RECOMMENDATION: High Middle _x_ Low
Comment:
PUBLIC HEARING DATE: February 28, 1994
PURPOSE OF AMENDMENT: To allow for a reduction in the
150' building setback and 300'
septic system setback adjacent to
reservoirs and/or streams for lots
created prior to January 1, 1994.
IMPACTS/ISSUES: Article 6.23.7 requires that new structures
be located at least 150' from a reservoir, or
outside of the stream buffer, whichever is
greater. Article 6.23.8 -requires that septic
systems be located at least 300' from a
reservoir or outside of the stream buffer,
whichever is greater.
Application of these setbacks may render some
existing lots unbuildable, particularly those
which were not subject to any watershed
protection standards at the time of their
creation. For example, the Bellechene East
Subdivision, located adjacent to Lake Orange,
was approved prior to the zoning of Cedar
Grove Township and the application of
watershed protection standards. Eighteen of
the 30 lots are located entirely or almost
entirely within 300 feet of Lake Orange, and
would be unbuildable if the 300' septic
system setback were applied.
There are a number of other existing
subdivision lots surrounding Lake Orange
which may be unbuildable if the 300' septic
setback and 150' building setback are
6
applied. There may also be lots adjacent to
University Lake or Cane Creek which existed
prior to the adoption of watershed standards
that have not yet been built on. The remedy
available at this time is for the property
owner to seek a variance of the setback
requirements to the extent necessary to
develop the property in a reasonable manner.
The proposed amendment would allow a
reduction in the septic and building setbacks
on lots which were created prior to January
1, 1994 to the extent necessary to build on
the property, provided that septic system and
structures remain outside of stream buffers,
and the septic system remains at least 100 '
from the reservoir (as required by the State
mandate) .
EXISTING ORDINANCE PROVISIONS AND PROPOSED AMENDMENT:
6.23.7 STREAM BUFFERS
e) Minimum Buffer Width Required
DISTRICT MINIMUM STREAM BUFFER WIDTH
UNIV-CA The buffer width adjacent to streams shall be
calculated for both Method A and Method B, and at
any given point along the stream, the width of
the buffer shall be the larger of the two.
The same method shall be used to calculate the
buffer around the reservoir itself. New
structures shall be located at least 150' from
the reservoir or outside of the stream buffer,
whichever is greater; EXCEPT when the lot was
created prior to 1/1/94 and it is shown that
acolication of the 150' setback would render the
lot unbuildable. In that case, the 150' setback
may be reduced to the extent necessary to
develop the lot in a reasonable manner, provided
that the reduced buffer width remains at least as
wide as the stream buffer.
UNIV-PW The buffer width shall be calculated for both
Method A and Method B, and at any given point
along the stream, the width of the buffer shall
be the larger of the two.
DISTRICT MINIMUM STREAM BUFFER WIDTH
CANE-CA The buffer width adjacent to streams shall be the
U-ENO-CA width calculated using Method A.
The same method shall be used to calculate the
buffer around the reservoir itself. New
structures shall be located at least 150 ' from
the reservoir or outside of the stream buffer,
whichever is greater; EXCEPT when the lot was
created prior to 1/1/94 and it is shown that
application of the 150' setback would render the
lot unbuildable. In that case, the 150 ' setback
may be reduced to the extent necessary to
develop the lot in a reasonable manner, provided
that the reduced buffer width remains at least as
wide as the stream buffer.
U-ENO-PW The buffer width shall be as calculated using
L-ENO-PW Method A, or 1501 , whichever is less, except
HACK-PW where density exceeds 1 du/ac and impervious
surface exceeds 12%.
Where density exceeds 1 du/ac and impervious
surface exceeds 12%, the buffer width shall be
calculated as above, but shall not be less than
100' .
CANE-PW
LITTLE-PW
HYCO-PW The buffer width shall be the width calculated
FLAT-PW using Method A, or 1501 , whichever is less.
HAW-PW
JORDAN-PW
6.23.11 WATER SUPPLY/SEWAGE DISPOSAL FACILITIES
DISTRICT WATER SUPPLY/SEWAGE DISPOSAL
UNIV-CA Water supply and sewage treatment systems
UNIV-PW shall be limited to individual wells and
CANE-PW on-site septic tanks systems or individual
CANE-CA on-site alternative disposal systems.
U-ENO-CA
DISTRICT WATER SUPPLY/SEWAGE DISPOSAL
All Watershed No new treatment system will be permitted
Overlay Districts where effluent disposal occurs on a
separate lot from the source of wastewater
generation.
Repair systems are permitted on a lot other
than the lot which is the source of
wastewater generation provided that the
Orange County Health Department certifies
that:
1. The residence or use has a failing
system, AND
there is not a suitable location for a
repair system on the same lot as the
residence or use, or
2. In the case of an unimproved lot
created by recorded deed, valid
probated will or recorded plat prior
to 6/15/91 for UNIV-CA and UNIV-PW,
and 1/1/94 for all other watershed
overlay districts, there is not a
suitable location for a repair system
on the same lot as the residence or
use.
UNIV-CA New septic tanks and their nitrification
fields shall be located outside of any
stream buffers, or 300 feet from a
reservoir or perennial or intermittent
stream as shown on the USGS Quadrangle
maps, whichever is further/
EXCEPT when the lot was created prior to
1/1194 and it is shown that application of
the 300, setback would render the lot
unbuildable. In that case, the septic
system setback may be reduced to the
extent necessary to develop the lot in a
reasonable manner, provided that the
reduced buffer width remains at least 100
feet.
DISTRICT WATER SUPPLY/SEWAGE DISPOSAL
CANE-CA New septic tanks and their nitrification
U-ENO-CA fields shall be located outside of any
stream buffers and at least 100 feet from a
perennial or intermittent stream as shown
on the USGS Quadrangle maps, and at least
300 feet from a reservoirl_
EXCEPT when the lot was created prior to
1/1/94 and it is shown that application of
the 300' setback would render the lot
unbuildable. In that case, the septic
system setback may be reduced to the
extent necessary to develop the lot in a
reasonable manner, provided that the
reduced buffer width remains at least 100
feet.
UNIV-PW Septic tanks and their nitrification fields
CANE-PW shall be located outside of any stream
U-ENO-PW buffers and at least 100 feet from a
HYCO-PW perennial or intermittent stream as shown
LITTLE-PW on the USGS Quadrangle maps.
BACK-PW
HAW-PW
JORDAN-PW
L-ENO-PW
**********************************
ORDINANCE REVIEW SUBCOMMITTEE: January 19, 1994
PLANNING BOARD REVIEW:
BOCC REVIEW:
1��
� tt
Orange Water and Sewer Authority
400 Jones Ferry Road
QWAS P.O. Box 366
Carrboro, NC 27510
(919) 968-4421
MEMORAT'DUM
i
TO:
Everett Billingsley
FROM: Ed Holland
DATE: February 17, 1994
SUBJECT: Public Hearing on Proposed Changes to Orange County Watershed Regulations
i The Orange County Board of Commissioners will hold-a public hearing on Monday, February 28,
1994 at 7:30 p.m. in the Superior Courtroom of the Orange County Courthouse (New) in
Hillsborough to receive comments on proposed changes to portions of the Orange County Zoning
Ordinance pertaining to water supply watersheds. A copy of the Public Notice and description of
the proposed action are attached.
SETBACKS FOR NEW STRUCTURES AND SEPTIC SYSTEMS
Existing: The Zoning Ordinance now requires that new structures be located at least 150 feet
from a reservoir, or outside of a designated stream buffer, whichever distance is greater. Septic
systems must be located at least 300 feet from a reservoir, or outside of a designated stream
buffer, whichever distance is greater.
Proposed: Because these requirements may render a number of existing lots unbuildable,
especially around Lake Orange, the County proposes reducing the setbacks to the extent necessary
to build on the property for all lots created before January 1, 1994, provided that new buildings
remain outside of stream buffers and septic systems remain at least 100 feet from a reservoir or
stream. The more stringent current requirements would remain in effect for all lots created after
January 1, 1994.
OWASA Sw f Comment: As stated in the Resolution adopted by the Board of Directors on
November 11, 1993 and specified in a November S, 1993 staff memorandum referenced by the
Resolution (copies attached), the Authority's most recent position is as follows:
'Existing setback requirements of 300 feet for septic systems and 150 feet for structures should
remain in place along the shorelines of University Lake and the Cane Creek Reservoir and along
the perennial streams discharging to these impoundments.
This is somewhat less restrictive than the current regulations, which apply to all streams. (The
OWASA recommendation would only apply to perennial streams.) It is my opinion that the
i
An Equal Opportunity Employer
Orange County Watershed Protection.
February 17, 1994
Page 2
Board's position represents a reasonable balance between the stringent regulations currently in
place and the more permissive rollback proposed by the County. I recommend that the
Authority's November 1993 position be reaffirmed for the University Lake and Cane Creek
watersheds.
OF_F M EASEMENTS FOR SEPTIC SYSTEMS
Existing: Except to correct a failing system, current County regulations prohibit the use of offsite
septic system easements in all Orange County water supply watersheds. That is, no portion of an
individual septic system may be located on a separate piece of property. This restriction has been
in effect in the University Lake watershed for several years, but was not applied to the County's
other water supply watersheds until recent changes were.adopted in December 1993. Although no
comments were addressed to this issue during last year's public hearings, the County received two
letters of opposition after the hearing record was closed.
Proposed: The proposed amendment would allow the use of offsite septic system easements in all
areas except the University Lake watershed; i.e., this issue would return to its pre-December
1993 status.
Rationale for the Proposal• Given the lack of specific attention given to this issue either by the
public or the County Commissioners during lengthy deliberations over the complex and
comprehensive watershed protection matters, the County desires to revisit the issue and clarify its
intent.
Orange County Health Department staff have indicated that the prohibition of individual off-site
easements would not enhance water quality, but that allowing such easements could be beneficial
in some cases due to greater discretion in locating and designing septic systeins. Health
Department staff suggested that maintenance problems would more likely be reported for
drainfields looted on offsite easements than on a resident's own property. County staff also state
that the current prohibition of offsite easements tends to foster the creation of lots with very
irregular shapes and to inhibit more creative subdivision design, such as cluster developments.
OWASA Staff Comments: This issue has not been the focus of previous comments by the
Authority. In 1989 OWASA did oppose a subdivision proposed for the University Lake
watershed that would have relied extensively on offsite septic system easements, but this was only
one of several points of the Authority's opposition. OWASA's 1993 statements to the County "
Commissioners recommended that the overall level of watershed protection for Cane Creek should
be equivalent to what was already in place for University Lake, but the specific item of offsite
septic easements was not addressed.
I believe that there is merit to County staff suggestions that offsite easements may offer more
flexibility in optimizing septic systern design and subdivision configuration. I disagree, however,
with the suggestion that failing systems are more likely to be corrected when those systems are
Orange County Watershed Protection
February 17, 1994
Page 3
not located on the resident's own property, especially if the easement exists on an undeveloped
parcel or on a remote portion of a developed lot not normally seen or encountered during day to
day homeowner activities. It has certainly been OWASA's experience that some of the most
intractable utility problems are ones in which private sewer lines are located on someone else's
property.
To the extent that offsite easements result in increased numbers of unresolved septic system
problems, I believe that the potential water quality risks represented by the County's proposal
outweigh the potential benefits of design flexibility. Accordingly, it is my opinion that the current
prohibition for offshe septic easements should be left in place for the Cane Creek and University
Lake watersheds.
Edward A. Holland, AICP
Director of Planning and Development
VIDE TO BOARD OF DIRECTORS
APP]
14 ^1
RESOLUTION AUTHORSZV G CO?►5fENZ'S TO THE ORANGE COUNTY BOAW/OF
COMhIISSIOINERS REGARDING WATERSHED PROTECTION REQLURENMNTS,,,MR,
IJtiTV'ERSITY 1.AKE AND CANE CREEK RESERVOIR l%
WHEREAS, the Orange County Board of Commissioners will hold a public hearing on February
28, 1994 for the purpose of receiving comments on proposed amendments to the Orange County Zoning
Ordinance; and
MiEREAS, several of the proposed changes pertain to watershed protection requirements for
University Lake and Cane Creek Reservoir.
NOW, THEREFORE, BE ff RESOLVED:
..f
1. That the Board of Directors of Orange Water and Sewer Authority opposes changes to the
Orange County Zoning Ordinance that would reduce setback requirements for new structures and septic
systems to the extent proposed by the subject amendments, and reaffirms its position of November 11,
1993 on this issue:
"Existing setback requirements of 300 feet for septic systems and 150 feet for structures
should remain in place along the shorelines of University Lake and the Cane Creek
Reservoir and along the perennial streams discharging to these impoundments.
2. That the Board supports the continued prohibition of individual offshe septic system easements
in the University Lake and Cane Creek Reservoir watersheds and opposes amendments that would allow
such easements in either watershed.
3. That the Board hereby authorizes and directs its Chairman and staff to pursue these
recommendations, as further justified in the OWASA staff memorandum dated February 17, 1994 and
attached hereto, through appropriate contact with County officials.
4. That copies of this Resolution and attachment be transmitted to the Orange County Board of
Commissioners, Carrboro Board of Aldermen, and Chapel Hill Town Council.
Adopted the 24th day of February 24, 1994.
Julianne M. Andresen, Chairman
ATTEST:
Riley Wilson
Secretary-Treasures
REGEIUED FROM 9199604421 P. 3