HomeMy WebLinkAboutAgenda - 02-15-1994-X-A � 1
O R A N G E C O U N T Y
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: February 15, 1994
Action Agenda
Item # ?(_A
SUBJECT: Saddle Club Road
Solid Waste Site Development
DEPARTMENT: Public Works PUBLIC HEARING: Yes _X—No
ATTACHMENT(S) : INFORMATION CONTACT: Wilbert McAdoo
Area Map Ext. : 2627
Site Survey
11/16/93 Agenda Abstract TELEPHONE NUMBERS:
Hillsborough - 732-8181
Durham - 688-7331
Mebane - 227-2031
Chapel Hill - 967-9251/968-4501
PURPOSE: To update Board of County Commissioners on plans for
development of a Solid Waste Convenience Center Site on Saddle Club
Road in Cheeks Township.
BACKGROUND: The Orange County Staff presented a proposal to the
Orange County Solid Waste Committee at their meeting in October 1993
for development of a Solid Waste Convenience Center on Saddle Club
Road in Cheeks Township. The proposal called for relocating the
existing site on High Rock Road to Saddle Club Road within one mile of
the existing site. Investigation into conversion of the High Rock Road
greenbox site to a Solid Waste Convenience Center revealed that the
existing site was surrounded by homes, would require that all buffers
be removed, would not allow for future growth and would require that
the existing site be closed for an extended period to allow for
construction. In discussions the property owner indicated that he
had property on Saddle Club Road that he felt would be suitable
for a Solid Waste Convenience Center and have less impact on the
neighbors. The property owner has agreed to lease eight (8) acres for
a period of 25 years for $200.00 per month, with an escalation clause
related to the consumer price index) built in. The OCSWC endorsed the
proposal and Staff proceeded by presenting it to the Board of County
Commissioners. The County Staff presented and received approval on
November 16, 1993 for a conceptual plan to enter into a long-term lease
with the property owner for development of a Solid Waste Convenience
Center on the property located on Saddle Club Road.
2
Since receiving approval from the Board of County Commissioners, the
Staff has performed the following:
- Performed site suitability analysis - Orange County Engineer, Orange
County Planner, Orange County Soil Scientist and Orange County
Public Works Director visited site and determined that site is
suitable for a Solid Waste Convenience Center.
- Land Surveyor conducted survey including topographic elevation.
- County Engineer began development of a conceptual site plan.
- Purchasing Agent began developing proposed lease.
The next step in the process which will require expenditure of funds
will include:
- Development approval and execution of an acceptable lease agreement.
- Development of site plan.
- Seek approval of the subdivision through the Orange County Planning
Department process.
- Develop and seek approval for an erosion control plan for
development of the site through the State.
- Development of construction documents.
- Follow purchasing procedure for securing necessary bid proposals
and contracts for construction of the Solid Waste Convenience
Centers.
- Construction of the site and placement of equipment.
RECOMMENDATION: The Manager recommends that the Board provide
direction to the Staff on development of the proposed Saddle Club
Road Solid Waste Convenience Center.
R
3
ORANGE COUNTY
BOARD OF COMMISSIONERS
Action Agenda
Item No V=_E
ACTION AGENDA ITEM ABSTRACT
Meeting Date: November 16, 1993
SUBJECT: Saddle Club Road Solid Waste Site Lease
-----------------------------------------------------------------------
DEPARTMENT Public Works/Purchasing PUBLIC HEARING YES NO X
------------------------------------mm_------------------------------
ATTACHMENT(S) INFORMATION CONTACT
Area Map Wilbert McAdoo, ext 2625
Site Survey Pam Jones, ext 2650
TELEPHONE NUMBER
Hillsborough 732-8181
Chapel Hill 968-4501
Mebane 227-2031
Durham 688-7331
-----------------------------------------------------------------------
PURPOSE: To authorize a long-term lease for a solid waste convenience
center site on Saddle Club Road in Cheeks Township.
BACKGROUND: On October 1, 1993, the County undertook a transition
between the old system of unattended greenbox sites and a new system of
staffed, consolidated solid waste convenience centers. Six of the
previous nineteen greenbox sites were retained as interim staffed
sites, which do not provide all the services that will be provided at
the solid waste convenience centers, once they are established. One of
the six sites is located on High Rock Road, just south of the Cheeks-
Cedar Grove Township line. The County leases this site of just under 2
acres from Mr. Carl Walters for $100 per month.
For several months, the County staff has been exploring the possibility
of entering into a long-term lease for the High Rock Road site under
which the County would develop it as the first complete solid waste
convenience center. During discussions with Mr. Walters, he indicated
that he would also be willing to lease another site on Saddle Club Road
to the County for this purpose. This would be an 8 acre site, within
one mile of the existing High Rock Road site, also just south of the
Cheeks-Cedar Grove line. The site would be larger than the standard
planning figure of 2 acres in order to comply with watershed
restrictions on impervious surface, assuming that the high density
option for the Back Creek Watershed is approved as recommended.
Mr. Walters has indicated his willingness to lease the site for a
period of 25 years, for $200 per month, with an escalation clause
(related in some way to the consumer price index) built in. The County
would be responsible for all costs of developing and operating the
site. Advantages to this site include that there are no residents in
the immediate vicinity who might be disturbed by activity at the site;
the land is flat and treeless, and comparatively easy to develop; and
the County could keep the interim High Rock Road site open while it
constructs a permanent site on Saddle Club Road.
f
4
The biggest disadvantage to this site is that it is not in an ideal
geographic location, as it is within one mile of the Alamance County
line. However, given the extreme difficulty experienced by the County
in trying to establish the first solid waste convenience center during
the last three years, the County staff recommend that the Saddle Club
Road site be pursued.
If the Board gives its conceptual approval to this plan, staff would
continue the. development process of the Saddle Club Road site.
Assuming that plans would be approved through the County' s subdivision
process and the State' s erosion control process, the Purchasing and
Central Services Director would prepare a lease with Mr. Walters under
the terms outlined above, subject to final review by the County
Attorney and the Chair' s signature.
RECOPMNDATION: The Manager recommends that the Board approve the
Saddle Club Road lease concept, authorize staff and the County Attorney
to prepare the lease document, and authorize the Chair to sign it.
1
_ r,._,. ; �-_•mot-�. •---._._. __ ._.T_._. ._
2 r, RIVE �.
i.b �� '• �- >,1� DAFT. T1N
LSB
"�•�� �H -� ` -'ENO TWP.-
'HILLSBOROUGH
j 1
- AP H
CHAPEL HILL � 1
�� ; ~ • - is �� / 'a' Sud'ec+ Qrope-
C CARRBORO
INDEX MAP OIF
ORANGE COUNTY -
M11 NORTH CAROI INe - •.. - ._- - �� - _.�
I 6 '
i
W �
r OW
�O
ti
SOO'47',g'W
N
320.00'
a�
h
ire
1
\V�
h
iy�ONO
w 3
ih N
ryN
r ` raj N
r v
V � q
O
or
yin a
m
h S02'06'30"E
L" K 202.89'
�Ia h NCO
U N
m 19�,
W N ll
�o V
co
P8 38/93P/7�_ `'�4
�U