HomeMy WebLinkAboutAgenda - 01-04-1994-IX-A t 1 ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No ACTION AGENDA ITEM ABSTRACT Meeting Date: January 4, 1994 SUBJECT: Revision to Capital Improvements Program -------- - - -------- -- - ----------- --------------------------- - - -- DEPARTMENT: County Manager/Budget PUBLIC HEARING YES NO x - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ATTACHMBNT(S) : INFORMATION CONTACT: (1) Revisions to Capital Improvements Plan Manager's Office ext. 2300 (2) Summary of Space Allocations for Budget Office ext 2151 Southern Human Services Center TELEPHONE NUMBER: (3) Proposed Capital Project Ordinances Hillsborough 732-8181 Chapel Hill 968-4501 Mebane 227-2031 Durham 688-7331 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - PURPOSE: To consider revisions to the capital improvements plan to renovate space for the Courts and the Sheriff's Department, and complete the painting project for the Historic Courthouse, and to provide direction to County staff concerning the planning for the Southern Human Services Center (SHSC) . BACKGROUND: Over the past several months, planning for several capital projects has resulted in the need to consider modifications to the capital plan. In the current year, we are requesting that the Board of County Commissioners consider modifications that would allow the completion of a third floor Courtroom in the new Courthouse, renovations to the Sheriff 's Department Building and completion of the exterior paint project for the Historic Courthouse. We are also asking for direction from the Commissioners on the Southern Human Services Center . For this project to be complete on the current time schedule, it is necessary to make a decision about the size of this facility now, rather than wait for the 1994-99 capital improvements planning process. A. Current Year Additional Courtroom in New Courthouse - County staff has worked during the past few months with the Courts to find a solution to immediate Court space needs. The Courts have worked very cooperatively in their scheduling efforts to help ease overcrowding problems, but through discussions, it has become clear that an additional courtroom is r 2 needed. One possibility discussed is an additional courtroom on the third floor of the New Courthouse. This courtroom would be designed to be multi- purpose so that the space would work well for Board of County Commissioners' meetings. The current Capital Improvements Plan(CIP) includes $75,000 for design and preliminary work for this courtroom. The intent has been to add additional funds in the 1994-95 fiscal year as the scope of the project was better defined. Because of the critical needs of the Courts, County staff accelerated the design phase of this project, beginning work this Fall with the architect . The architect has determined the total cost of these renovations to be around $235,000, (see attachment 1) or $160,000 more than the amount currently budgeted. The major single expense in the third floor development is the construction of an emergency exit. The architect suggests that this exit may cost as much as $60,000 . According to Building/Safety Inspectors, the upstairs cannot be used unless an emergency exit is built. This additional courtroom deals only with immediate issues of court overcrowding. The long term challenge is the addition of significant space for the Court functions. The space needs of the Courts are to be studied by the Criminal Justice Facilities Needs Group. Sheriff's Office Renovation - Included in the current Capital Improvements Plan is $80,000 for design and cosmetic work necessary for Sheriff's Department functions in space vacated by the Board of Elections. Hakan/Corley was retained to provide services for this minor renovation project and to give the County information regarding the future needs of the Sheriff 's Department. The result of this action is a plan that significantly improves the downstairs area of the Sheriff 's Department and creates more than 300 square feet of unassigned space on the first floor . In addition, the Sheriff's Department should get some relief for much needed storage space when the addition to the Jail is complete. The architect estimates renovations will total approximately $230,000 (see Attachment 1) which is $150,000 more than the $80,000 currently included in the Capital Improvements Plan for this facility. Because it is necessary to immediately accommodate the Geographic Information System workstation within the Sheriff's Department Building, we are recommending that this renovation project be completed this fiscal year . Historic Courthouse Paint - Currently included in the budget is $44,800 to complete the painting and guttering work on the Historic Courthouse. However, the estimated cost provided by the paint contractor to complete this project is $74,800, or $30,000 more than what is currently included in the budget for this project. The primary reason for this increase over earlier projections is the discovery of lead paint. Because lead paint must be handled as a hazardous substance, 3 the scope and cost of the project have increased. Source of Funding The total combined additional funds necessary to complete these three projects is $340,000 . We propose transferring funds from other capital projects as follows : Government Services Center - This $2 . 8 million dollar project to construct the Governments Services Center and renovate the old Tax and Records building is complete. We are pleased to report an unspent balance of approximately $200,000 in this project. This unspent balance is due primarily to the construction management by the architect and County staff in managing this project. We are proposing that we use $100,000 of this balance as part of the $340,000 needed for the projects described above. Furthermore, we are recommending that the remainder of the funds, approximately $100,000, be used for the Southern Human Services Center Project. County Campus Parkins - Included in the CIP is $35,000 for parking improvements to the Hillsborough campus. These parking improvements were completed as part of the Government Services Center project. Therefore, the $35,000 can be reallocated. Handicapped Accessibility - Currently there is $50,000 in this project to begin reconfiguring existing County buildings to meet the requirements of the Americans with Disabilities Act (ADA) . County staff is currently conducting an inventory of all County facilities to determine the modifications necessary. We propose borrowing $25,000 from this project at this time, and consider additional ADA project funding during the 1994-99 CIP process. Whitted Center - The Whitted Center capital budget includes a $233,000 balance intended to address the overall Orange-Person-Chatham Mental Health space needs and make minor renovations and repairs to this building. We have recently been notified by the N.C. Department of Human Resource that OPC Area Mental Health is one of ten Mental Health programs across the State to receive a $200,000 capital funding award. This grant will provide funds for major interior renovations to the Northside Facility in Chapel Hill, making this facility more functional as a Mental Health Center. Cosmetic improvements such as carpet and paint and upgrading of the wiring are also included. This grant requires $200,000 in matching County funds, of which $75,000 will come from the current County appropriation to OPC Mental Health. The remainder of the required match, $125,000, needed by February 1995, will come from the Whitted Center/OPC Mental Health reserve. Because these funds are not needed until next fiscal year, we propose borrowing part of these reserves set aside for OPC Mental Health in the Whitted Center project. In the upcoming CIP, the repayment of these funds would be included in the overall plan. In addition, other projects in the Whitted Center, including carpet replacement and other cosmetic improvements would be deferred until the Southern Human Services Center is completed. 4 B. Southern Human Services Center The architect has been working with the proposed resident departments of the Southern Human Services Center for several months. It became apparent in these meetings that space requests were likely to exceed the amount that could be built within the existing budget. Although the departmental requests still exceed the original programming estimate of 30, 000 square feet, it appears that program space can be pared to this level without sacrificing essential programs. A summary of the space allocations for this facility are shown at Attachment 2 . The charts below depict the cost break-down and additional funding necessary if the corresponding square footage is built. All of this is based on the educated speculation from the architect that the building can be constructed for $65/square foot, which within the current budget would construct a 23, 100 square foot building. A breakdown of estimates for projected expenses of the project are as follows: Land $ 962,500 Design fees 356,320 Reimbursables associated with design fee 20,000 Site Work (access road, parking lot development, etc.) 400,000 OWASA Impact fees 50,000 Misc. Owner responsibilities Includes survey, geo-technical work, unsuitable soils allowance, etc.) 40,000 Sub Total of expenses without construction of building costs $1,828,820 Amount available for projects $3,382,500 Amount available for construction of building $1,553,680 r , 5 (A) (B) (C) (D) FOR THESE ADDITIONAL ADDITIONAL SQUARE AMOUNT OF S.F.THAT GROSS S.F.WHICH DOLLARS YOU COULD FOOTAGE THAT COULD BE COULD BE BUILT WITH COULD BE BUILT BUILD THE S.F. IN(B) BUILT WITH ADDITIONAL FUNDS CURRENTLY WITH ADDTL FUNDS FROM (A)(Architect AVAILABLE($1.5 MIL) FUNDS FROM (A) estimates$65/s.f.const.cost) (Reference:GSC=26,500 s.f.) $448,500 6,900 23,100 30,000 $350,000 5,384 23,100 28,484 $250,000 3,846 23,100 26,946 $200,000 3,077 23,100 26,177 $100,000 1,538 23,100 24,638 The need to address the funding issue outside the regular CIP process is prompted by the need to submit documents for the Chapel Hill Special Use Permit (SUP) process in time to receive approval by June 30, 1994 . The Town Council conducts no business during July and August, so we are trying to obtain approval by June 30, to maintain the momentum of the project during the vacation months. The SUP documents must be submitted by February 1 to maintain this time table. As indicated above, the Government Services Center Project has a balance of approximately $200,000, of which $100,000 is recommended to partially fund the anticipated additional funding needed for this project. If the Board endorses the addition of funds to the project beyond the $100,000 it would be funded through the CIP for the years 1995-96 and 1996-97 . A possible source of partial funding is the funds available from growth in the sales tax revenue, as the sales tax revenue estimates are revised. Conclusion The attached proposed capital project ordinances make these proposed changes to the impacted projects and establishes a separate capital project for the New Courthouse Renovations and consolidates all the on- going work on this facility into this project ordinance. If the Board endorses this plan, revisions to the capital improvements plan for the Southern Human Services Center will be incorporated into the 1994-99 capital plan scheduled to be presented to the Board at the second meeting in February. While we usually propose significant changes to the CIP during the annual update process, we believe that timing and progress on the projects mentioned warrant the Board's consideration of the proposed amendments at this time. i 6 RS ION The Manager recommends that the Board of County Commissioners: (1) Amend the current capital program by adopting the attached capital project ordinances; (2) Determine the gross square footage of the New Southern Human Services Center, and, (3) Direct Staff to prepare recommended project funding for the Southern Human Services Center in the 1994- 99 CIP that reflects the square footage approved by the Board. ATTACHMENT 1. 7 Revisions to Capital Improvements Plan Current Needed Difference Historic Courthouse Paint and Gutters $44,800 $74,800 ($30,000) New Courthouse Renovations 75,000 235,000 (160,000) Sheriff Office Renovation 80,000 230,000 (150,000) Total $340 000 Proposed Funding: Current Proposed Balance Transfer Government Services Center 200,000 $100,000 County Campus Parking 35,000 35,000 Handicapped Accessibility 48,360 25,000 Whiffed Center Total 1 232,8361 180,000 Total Amount to Transfer $340,000 8 Attachment 2 - Summary of Space Allocations for the Southern Human Services Center Department: Estimated Square Footage Social Services 5,480 Health Dept. Personal Health 3,700 Dental Clinic 1,070 Dept on Aging 3,570 Child Support Enforcement (1) 200 Cooperative Extension (2) 620 County Commissioners (1) 200 Housing and Community Development 600 Comm. for Women/ Human Relations 100 Sheriff Department 280 JOCCA 900 Shared Meeting Space: Main Meeting Room (150 Persons Capacity) 2,000 Meeting Space; shared 280 Meeting Space; shared 385 Meeting Space; shared 500 Shared Waiting and Reception Waiting Space for 100 persons 1,000 Reception space for 3-4 Receptionists 360 Shared Office Space: 2 Offices at 80 S.F. each 160 2 Offices at 150 S .F. each 300 1 office at 200 S.F. 200 Sub Total Program Space 20, 785 Shared Support Space Breakroom for 50 persons 750 Kitchen 600 Staff Restrooms 500 Public Restrooms 1,200 Miscellaneous Storage 750 Subtotal Shared Support Space 3,800 Circulation and Mechanical 5,200 Total Estimated Square Footage 29,785 (Gross Square Footage) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (1) These user groups will used shared offices included in the program total. (2) Cooperative Extension not included in total since they will be housed in the renovated dwelling on site. Note: The area designated as "Main Meeting Room" will also be used by JOCCA for their congregate meals program. It should be noted that the departmental listings are estimates only, actual may vary as design proceeds. 9 Sheriff Office Renovation Project Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina,the following capital project is hereby adopted. Section 1. The project authorized will provide funds for design/architectural services and renovations to the existing Sheriff's Office to make the facility functional as a law enforcement office. This project will be financed with proceeds from the County's portion of the one half cent sales taxes. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Transfer from County Capital Reserve Fund $75,000 Transfer from General Fund 5,000 Transfer from Whitted Human Services Center Project 150,000 Total Revenue 30 000 Section 4. The following amount is appropriated for this project: Sheriff Office Renovation Project $230,000 Section 5. This ordinance supersedes all previous Sheriff Office Renovation Captial Project Ordinances. Section 6. This ordinance,originally adopted June 29,1992 and subsequently amended,shall be in effect until June 30,1994. Adopted this 4th day of January,1994. M-MU DGE'I�ORDSICOUCAPSHERTF 10 FacilitieslmprovementsProject Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina,the following capital project is hereby adopted. Section 1. The project authorized will provide for an updated assessment of Orange County facilities and set aside funds for needed improvements to these buildings. This project will be financed with proceeds from the one—half cent sales taxes. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Transfer from County Capital Reserve Fund $199,800 Transfer from General Fund 55,000 Transfer from Court Facilities Project 30,000 Transfer from Whitted Human Services Center Project 30,000 Total Revenues $314,800 Section 4. The following amount is appropriated for this project: Facilities Improvements Project $314,800 Section 5. A portion of the available funds for this project have been transferred to the New Courthouse Renovation Capital Project. Section 6. The following amendment is anticipated to complete this transfer: Transfer to New Courthouse Renovation Project $140,000 Facilities Improvements Project ($140,000) Section 7. This ordinance supersedes all previous Facilities Improvements Reserve Capital Project Ordinances. Section 8. This ordinance,originally adopted June 25,1991 and subsequently amended,shall be in effect until June 30,1994. Adopted this 4th day of January,1994. MABUDGETNORDSCCOUCAPfACIMPS ' 11 New CourthouseRenovationsProject Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina,the following capital project is hereby adopted. Section 1. The project authorized is for the renovation of the New Courthouse located in Hillsborough including roof replacement,exterior painting, ceiling tile replacement in the Superior Courtroom and renovations to the third floor. The project will be financed with proceeds from the County's portion of the one—half cent sales tans. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Transfer from Facilities Improvements Capital Project $140,000 Transfer from Roof Replacement Project 50,000 Transfer from County Campus Parking Project 35,000 Transfer from Government Services Center Project 100,000 Transfer from Handicapped Accessibility Project 25,000 Total Revenues $350,000 Section 4. The following amount is appropriated for this project: New Courthouse Renovations Capital Project $350,000 Section 5. This ordinance,originally adopted January 4,1994,shall be in effect until June 30,1994. Adopted this 4th day of January,1994. M:W DGEZ0RDSICOUCAP\NEWCRTHS 12 Government Services Center Project Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina,the following capital project is hereby adopted. Section 1. The project authorized is for the construction of the Government Services Center and renovation of the Government Services Annex in Hillsborough. The project will be financed by 1988 bond referendum funds and proceeds from the County's portion of the one half cent sales taxes. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: 1988 Bond Funds $2,320,000 Transfer from County Capital Reserve Fund 515.000 Total Revenues $2,835,000 Section 4. The following amount is appropriated for this project: Government Services Center $2,835,000 p•y-ws-ys�-�e Section S. A portion of the available funds for this project have been transferred to the New Courthouse Renovation Capital Project. Section 6. The following amendment is anticipated to complete this transfer: Transfer to New Courthouse Renovation Project $100,000 Government Services Center ($100,000) Section 7. This ordinance supersedes all previous Government Services Center Capital Project Ordinances. Section 8. This ordinance,originally adopted June 15,1989 and subsequently amended,shall be in effect until June 30,1994. Adopted this 4th day of January,1994. MABUDGEINORMCOUCAMSC 13 County Campus Parking Project Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina,the following capital project is hereby adopted. Section 1. The project authorized will provide for parking lot improvements/construction for the County Campus located in Hillsborough. This project will be financed with proceeds from the County's portion of the one—half cent sales taxes. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Transfer from County Capital Reserve Fund 35,000 Section 4. The following amount is appropriated for this project: County Campus Parking Project $35,000 Section 5. The project authorized has been consolidated into the New Courthouse Renovation Capital Project Section 6. The following amendment is anticipated to complete this transfer: Transfer to New Courthouse Renovations Project $35,000 County Campus Parking Project ($35,000) Section 7. This ordinance supersedes all previous County Campus Parking Capital Project Ordinances. Section 8. This ordinance,originally adopted June 25,1991 and subsequently amended,shall be in effect until June 30,1994. Section 9. The officers of the County are hereby authorized to close this project at the expiration date contained in Section 8. Adopted this 4th day of January,1994. MABUDGEnORDS\COUCAMPARKING 14 Richard E. Whitted Human Services Center Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina,the following capital project is hereby adopted. Section 1. The project authorized is for refurbishments,modifications and parking improvements at the Richard E.Whiffed Human Services Center. The project will be financed with proceeds from the County's portion of the one half cent sales taxes and a Department of Social Services State grant. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Transfer from County Capital Rcscrvc Fund $308,500 Intergovernmental 16,500 Total Revenue $325,000 Section 4. The following amount is appropriated for this project: Whiffed Human Services Center Project $325,000 Section 5. A portion of the available funds for this project have been transferred to the Sheriff Office Renovation Capital Project and to the Facilities Improvements Capital Project Section 6. The following amendment is anticipated to complete this transfer: Transfer to Sheriff Office Renovation Project S150,000 Transfer to Facilities Improvements Project $30,000 Whiffed Human Services Center Project ($180,000) Section 7. This ordinance supersedes all previous Richard E.Whitted Human Services Center Capital Project Ordinances. Section 8. This ordinance,originally adopted June 28,1989 and subsequently amended,shall be in effect until June 30, 1994. Adopted this 4th day of January,1994. MN3UDGET\0RDS\C0UCAP\WHSC 15 Roof Replacement Project Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina,the following capital project is hereby adopted. Section 1. The project authorized will provide funds for roof replacement at the New Courthouse. The project will be financed with proceeds from the County's portion of the one—half cent sales taxes. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Transfer from General Fund $50,000 Section 4. The following amount was originally appropriated for this project: Roof Replacement Project $50,000 Section 5. The available funds for this project have been transferred to the New Courthouse Renovation Capital Project. Section 6. The following amendment is anticipated to complete this transfer: Transfer to New Courthouse Renovation Project $50,000 Roof Replacement Project ($50,000) Section 7. This ordinance supersedes all previous Roof Replacement Capital Project Ordinances. Section 8. This ordinance shall be in effect until June 30, 1994. Section 9. The officers of the County are hereby authorized to close this project at the expiration date contained in Section 8. Adopted this 4th day of January,1994. MABUDGEMRD%9293\C0UCAP,R00FS 16 Handicapped AccessibilityProject Capital Project Ordinance Be it ordained by the Orange County Board of County Commissioners that pusuant to Section 13.2 of Chapter 159 of the General Statutes of North Carolina,the following capital project is hereby adopted. Section 1. The project authorized will provide funds to make all County facilities handicapped accessible in order to comply with the American Disabilities Act(ADA). This project will be financed with proceeds from the County's portion of the one—half cent sales taxes. Section 2. The officers of the County are hereby directed to proceed with the project within the budget contained herein. Section 3. The following revenue is anticipated to complete this project: Transfer from County Capital Reserve Fund $50,000 Section 4. The following amount is appropriated for this project: Handicapped Accessibility Project $50,000 Section 5. A portion of the available funds for this project have been transferred to the New Courthouse Renovation Capital Project. Section 6. The following amendment is anticipated to complete the transfer: Transfer to New Courthouse Renovation Project $25,000 Handicapped Accessibility Project ($25,000) Section 7. This ordinance supersedes all previous Handicappped Accessibility Project Ordinances. Section 8. This ordinance,originally adopted June 29,1992 and subsequently amended,shall be in effect until June 30,1994. Adopted this 4th day of January,1994. MABU DGE'INORDS COUCAPIHANDACC