Loading...
HomeMy WebLinkAboutAgenda - 12-04-1995 - IX-B i 1 ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. � ACTION AGENDA ITEM ABSTRACT Meeting Date: December 4,1995 SUBJECT: BID AWARD;OLD COURTHOUSE PAINTING AND MAINTENANCE WORK DEPARTMENT: PURCHASING AND Public Hearing: No CENTRAL SERVICES Budget Amendment Reqd? No ATTACHMENT(S): INFORMATION CONTACT: PAM JONES, ext.2650 Bid tabulation Contract Telephone Number- Hillsborough 732-8181 Chapel Hill 967-9251 Mebane 227-2031 Durham 688-7331 PURPOSE: To consider awarding a bid and approving a contract to Trafalgar House Construction Company for maintenance work to be done at the Old Courthouse. BACKGROUND: Bids were originally solicited for this project in May, 1993,however, bid prices significantly exceeded appropriations for the project,so the project was delayed until additional appropriations could be made. The bid opening on October 31, 1995 yielded no bidders. Bids were solicited once again on November 13 and three contractors responded;the bid tabulation is attached. The scope of work covered in the base bid includes: • painting all exterior trim; • replacing gutters(repairs were made to gutters during the 1986 renovation, but gutters were not replaced);and • replazing windows. Since the cost outlook was unclear at the time specifications were prepared, the specifications included two alternates; one for regiazing the windows,one for repair work to the cupola. Trafalgar House included the reglacing in the base bid,so no additional funds are required for that portion. The bid price for repair and maintenance of the cupola is$72,100. The project budget($119,065) is sufficient enough to allow this work to be done as well,therefore the recommendation includes acceptance of both the base bid and the alternate (total $107,100). RECOMMENDATION: The Manager recommends that the Board award the bid for maintenance work to be done at the Old Courthouse and approve the contract contingent upon Attorney and Staff review, to Trafalgar House Construction Company in the amount of$107,100;and authorize the Manager to execute change orders as may be necessary to the extent of the project budget;and authorize the Chair to sign on behalf of the Board. y 2 � w n Zn 'oo G (D rn n 0 3 O o m e v a . (� cr D rn N ° rnX � rn � z .. $40 N � < t0 W � O Z O Z o0 ` ..'. ° N Z r N O OD W ic z rnri) x D °O W w v 0 O A co O O r3 iii Eft 69 D 0 46 O t i 3 Standard f=orm of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AIA Document A101 -M3w& k Format AGREEMENT made as of the 4th day of Deondmett the year of Nlmeu=Hundred and r BETWEEN the 4wNw. (Nam and addrs:) County Of Orarve 132 East King 9trwt F.O. Bic 8181 aadthe h• N.C. 27278 (Wane and address) ![IN=Howe GBOARR fioo.Inc. F. 0. Roxjh5a R,�st Mdogle Pwk NC 27709 The Project is: (New mid fonnwy RAmvatims & PAPairs Historic Courtbou e Hillsborough, N.C. 27278 The Architect is: (Name and address) awan Kolodi j; A.-I.A. + Atxtdt=t is no la Ver in private suite 601, Sew Hltaq. practice. All referrne, to architect 331 Walt Fain Street should be to owner. Durham, N.C. 2=1 THIS DOCUMENT 1{AS IMPORTANT LZOAL CONSEQUENCas: CONSULTATION WITH AN ATTORNEY 13 ENCOURAGED WITH RESPECT TO M COMPL.IKTION Olt MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AtA DOCUMEW MAY BE MADE SY US=AI/►DOCUb"T D401. The 1987 Edition of ALA Doonwent A201,Claw"CaedRieas ottlte Caab,eet Ae Cemseuctiat<.is&"DW In Wit doeLamt by reference. Ao act use vrith alltar gettesl ervttditiom anMss this doC tit aadised. Tkis doensseat hes been epo vad and sodoexd by The Asso A*W Gawal Cttmresms a(Anwh= Copyright 1913. i9lS.1925, 1937. 1951.19'Sg.1961.1963.1%7, 1974.1977,copyright 1917 by tbo Antennae Uwwute of Architects, 1735 New York AVORW N.W.,Washirtgsse.D.C.20006-5292. Reprodttetioa of the sestaid Martin ar subfssl><W quotation of its provisions wk%m writtw pain asioa of the ALA violues the copyright laws of the United States and will be subject to lead ptositmdon. A[A OOC(WeNT A OL- A�NaNT•rVOL M 6WMW-AtA-0 VIre1GIR IN7.TM ADAM 907M TLO•AWNTICTS,1"s NEW YORIL AvEMtll,N M•.wASN7f10T011.D.C.>Wl.liff.WA 1NIU'10:tirinrM M»>wf+s.idn.t V.R r�,AfM w.ri i..�1i.+t•MM few 7111 "4~ -.r�.._.w...d...d maw*� 0WAr I1040010s a"Ww i j 4 The Owner and Contractor agree as set forth below. ART1Cl.E I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract(General,Supplementary and other Conditions), Deswings, Specifications, addonda issued prior to execution of this Agreement, other doements listed in this Agreement and Modifications issued aftet execution of this Agreement;these forts the Contract, and are as inlay a pact of the Contract as if attached to this Agre sawn or repeated herein. The Contract represents the entire and integrated agimment between the puties hereto and supeaedes prior negotiations, representations or gpemetm, either wtftten or oral. An enumeration of the Contract DocunietM other than Modifications, appears in Ardele 9. AEI THE WORK OF THIS CONTRACT The Contractor shall a mvft the entire Work described in the Contract Doewoents, except to the extent specifically indicated in the Contract tka ments to be the responsibility of otatrs,or as follows: aemeral contract wmic consisting of the foll.oarings nowt deocumta cmalssting of general conditicrts and specifications division It 6, 7, 8, & 9. ARJ!LE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The We of camnmMoemat is tthe dam ftm which the Coutrset Time of paragraph 32 is measured. and shall be the date of this Agreement,ss$rat written Amyl,unless a dim date is hated below or provision is made for the date to be feted is a nodee to proceed issued by the Owner. (Inhere ire dare of emmiene iwm iV ie 4pmfi*m fib dare orAu Apvm rK w, if lR a►aa @tint rue Am vW he And in e"O"Ce to prvpai) Date of Coameaoement_-will be fisted in a Ngdgto proceed issued by the Owner. Unless the daft of is established by a notice to proceed issued by else Owner,the Contrector shill notify the Owner in wtititts not lass than,five days Won oommesuast the Work to permit the timely filing of Martgases,mecb min's Batts sad ottiir security iaferests. 3.2 The Contra w shall achieve Substantial Completion of the entire Work not fatw than (Insert ate vakadw&Isle or mII bw of 4deader$pt q1tr die data t(eawwewenwLt Abe Amwe ow r1pkinows for&wfiw MANt"Hal Cooplatlem eft I pertbw�/Nb 1lorrL tynor ntatsd elanefithnr in,,tAt Contr+etet Doavnntr j Three Hundred caleniar days from the Dee Of Commencam s—L , subject to adjusvmmts of this Coutree Time as provided in tfie Cootraat Documents. (lrrsrrr provtaum. ifdwy.J6r tyaideedtaster reialft to fed-w to demplete as awe.) This contract is to be eoosAlsked aoncurrently with the actwUvxsse/3ai1 additions project wrhich is =260= separate cont:ratct with Trafalgar Souse Construction. A"t)oC1A T w tot-avMlt�70MTVUCTO�AOagftW r-7 MRSTM aDMOW.au-COMUGHT IMP-TM Ah1VWAU 01$?VnM W AILC3WrJX M IM NSW YG%X AvsNbf.NYC.MAIRtt O"K D.C. NtrwN"PYMMMW4 VidG1"wbuMt Iw,,d it WON 1644"/Aomold .TM*=NNWA w . ihr—,maw"Sao mobw 1 1 rt~~ WtwwVWJ0 ft 4�01t,nncElectronicDocttmsntService AIQ1.1987 2 J 5 AR,TICg 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Suva of am Hundred Swim Thousand_ 0M Hundred and OOAOO Dollars {8107,100.00),subject to additions and deductions as provided in the Conbscs Documents. 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and art hereby accepted by the Owner. (Soon,eke members or otArr ldsatpleodan if accapW shernates. If Accufon on athw aahenwst are to be erode by tim ovn"tsr subsquent to the e:eeamw of Nks Avviraeot, anach a scked ds of zwh other elarrnates s6etet W ON amawd jor sack and dw dam oxHif"eh riot saratuw u vetltd) Hale Bid $85.000.00 Alternate 9-1 include in Sase Bid Alternate ernatse 9-2 $22,100.00 4.3 Unit prices,if nay,us as 10ows: Glass Lites deduct (12.00) ARMCaLE I PROGRESS PAYMENTS 5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect.the Owner shall malt progress payments on account of the Contrau Sum to the Connactor as provided below and elsswhere in the Contrsrt Docase nts. 6.2 The period covered by each Application In Payment shall be one calendar month ending on the last day of the month, or as follows: 5.3 Provided an Application for Payment is received by ttee Architect not later dm the lames day of a month,the Owner shall make payment to the Contraictor not later tZsw th».To (10tiy of the aext month. if as Application for Payment is received by the Architect after the application date fixed above, payment shall be mule by the Owner not later than Ten .days after dw Architect receives tbs Application for Paymeai 3.4 Each Application for Payeeema shell be based upon the Schedule of Vahtes submitted by the Contractor in accordance with the Contract Docianis s. The Schedule of Values aball allocate ft entire Contract Sum among the various portion of do Work add be prepared in such form and supported by such data to substantiate its accuracy as the Architect clay require. This schedule. unless objected to by the Architect, shall be used as a basis for reviewing the Cmuntaft Applications for Payttteat. 6.5 Applications far Payment shall inducts the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: G.B.I. Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the Schedule of halos:,less retainage of Ten percent(IQ%).Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as AIA -AM.tA►MOM IN?.Tea AleatVA0=ffrJN OF AxaffrMTS,ins Vtw TQAY AVVXJt.NN,WASODIGTOM.O.C.>seea•.aeL MAAMMM v.ew.ra p.amsoIe"•:•Isar It.f...ydwo,two ad Y @W*N r 4M Mr 1 Tfi.4mson"va. r/r Wwr Was" 1 Maerat ui rr M NMadavA widow.idAHw.sail I N711k Electronic Document Service A101-1967 3 6 provided in Subparagraph 7.3.7 of the General Conditions even though the Contract Suva has not yet been adjusted by Change Order, 6.6.2 Add that portion oft*Cantraat Sum properly allocable to mfftetialr sad equip==delivered and suitably stored at the site for subsequent incorporation in the completad construction(or,if approved Its advance by the Owner,suitably stored off the site at a location agreed upon in writin" Ins rstainsge of Ten percent(IQyG� 6.6.3 Subtract the aggregate of pmt payer tuade by the Owner,turd 6.6.4 Subtract amounts, if any, for wbkb the Architect has withheld or nullified a Certificate for payment as provided in Paragraph 93 of tM General Cooditiotta. 6.7 'face progress payment amount doomnined is accordance with Pwsgmpb 5.6 sliall be further modifled under the following circumstances: 6.7.1 Add, upon Subsumdal Compledoa of the Wodr. a sum sufficient to increase the total payment;to Niucty. pest(22-?6)of the Coasters Sum, lean such amounts as ft Arohitiaet shall detamine for incomplete Work and unsetdad claims;and 6.7.2 Add, if final catapladon of the Work is tbcrpRor maseriany delayed throuo no shalt of the Contractor, any additional amotmts parable in seieotdamce with Subparagraph 9.103 of the Cynaral Conditions. 5.8 Reduction or limbadoo of rwiea6e,if any.shall be as fallowa: (If it At ln►eude{ prier to Sl"tesew comp stow of flu swore Work to red6w or!limit At reeri the pereemases ineerted(w SmbpoopwgiAt$.&I and 112 above, and►A&is suet dw nowtte� mni m, Mfg"krpe provtsto w jor iwh++dowse or Nm�r ) �sLt�litrm is t�4 Cvtraitt Dwecemaprs, A�rtc�1? s FINAL PAYMENT Final payment, conrtltuting the entire unpaid balance of tfte Contrast Stan.shell be made by the Owner to the Contractor when (1) the Coattsot has been !ally performed by the Contractor except for the Contractor's responsibility to carnet nastootnfaming Work as provided In Subparagraph 12.2.2 of the General Conditions and to satisfy other requutemeeb.if airy. which noensarily survive flea!paymwa; and(2)a floe! CmtiBcaw for Payment has been issued by dw Arehidcr such final payment"be zaede by the Owner not mote than 30 days after the issuance of the A kfieds ftai CardBetme for payMAjg,or as fellow;: ESE tk 9e51uit0e0 MAN G29M Deee_rHUM ARTICLE 7 MWELLANEOU3 PROV13IONS 7.1 Where mfereooe is Wade in tlda Agrasmeot to a provision of dw Q#Wnai Coaditio"or another Contract Daeument,the refMace reho to dw provision as ameaded or wpplemeated by wiser provisions of the Contract Docwuents. 7.2 Payments due and unpaid under the Conract shall best Iaterest from the dart payment is due st the rate stated below, or in the absence tbsreof. at the legal rate prevailing troth time to time at the place where the Project is located. (insert rats of inrerrs►AV "pelt fralgr,) Prime Rate as RtMined by WadmMa Bank.Aalei&Naft Qkmilw (Usury laws and revairewtow mmdtr As Federol rr"►h In iAmedlng Act. ttwttlw stair our!letel eouaawer ersdlt lairs awd omer reguiatious at the owmes null Carom r"hiv's prAoeiW places of busirmi" AS taeadow 4(7Ae pr"t end e/stwhtrt way 4Qaet the valldtty of this proruie/w. Leeel adbW shoeld Oo obtained with respect to dt/edear or eradvkAwons. and also rgardlep AM t117t:Ne"7�T Ala-o AGmt/�)rT.'tti1�}TN ietTla"-AIA.CtntYlNWT low.r"a AMINCAel mt>;MM d ASCIa4sCT!ins new Yaept AVWV2.11.W.WAi1011007001.1 L MIN.UM WAND MOc Uniiews d 0 rp VWa"U.S.GesvrIft to"Yei5061Mabad pwwiis.Ilk d..w+rt+.W .It�.iedl,/ffneise"604V l'rr..amw 11"1100114 wi—e.rwilumbst-kbm V1YiM writ t N'1gr. Etcctrooic IJotummt Service A 101-1987 4 i 7 requlrsarofs such as writum&se wwws or mat' rs j 7.3 Other provisions: R CLE $ TRRMINATION OR SUSPENSION 9.1 The Contract My be WMinated by the Owner or the Camnw*os as Provided is Article 14 of the General Conditiow. 8.2 The Work may be saspmded by the Owner ss Provided in Adele 14 of the Gemai Conditions. �R,�tCLE 8 ENUMERATION OF CONTRACT DOCUMENTS 9.1 The Coruna DOMMO 06 MWk to Modiflcatioas issued after eseetuiaa of this ftwmwt,are enumerated as follows: 9.1.1 The Agreement is this umuftd Standard Forst of AgreetnemI Between Owasr and Contractor, ATA Document A 101, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract ibr Coastmolon,A1A Doe meat A201, 1987 PAtion. 9.1.3 The Supplementary and other Conditions of the Connect am thaw mdained in the Project Maouat as follow s Documek Two P"" See shit'C" 9.1.4 The Specificatioas are time eeabined in the Project Manual dated as in Subparagraph 9.1.3.and am as follows: (Da ran dry Sp few hwe ev rwbr m w&%h&w aftw1wd ro&W Asrviiawt) section TMle PaWN Seg.F i�"C" 9.1.5 The Dmwinfs are as ileikvw%sod we daRea¢i M=M.. amass a dilaimt due is shown below: (ElLur tfs1 MW DrWW&W i W or fl or u w sb Nb&&"WIW t m A&AV'UisMML) Number Me Dab See ExwbiL= 9.1.6 The addenda,if any,on as follows: AIA WGVMM41 4101- Aa EBMI&M-TMIi1Tt4 20TTION-AfA-COrY%NW MI-Ti AIKIEAN iNIRTSTIM CIF AAC'NnIK'TR nu W YOAi Avcx;tL Ps.*.wANG"TOK=0906 ML L VARMMM WkWMA p SO +I.r.a u.s,..N.ipa 1.m Mi it W"w lord j w.rw. This 480MM"-a .Ma iwOY p�Ma��-+r Mow..mob* ileumaa ss1 M.U 1�WkhWM �Mw l MWft Elsctrobbuc Doeuttbebte service Ain 1-14x7 5 1 r 8 Portions of addenda relating to biddh*regairtments arc not part of the Contract Docntnents unless the bidding requirements are also enumerated In this Article 9. 9.1.7 Other documents,if any,forming put of the Contract Documents are as follows: (List Aere any addiaeaW decwr ma wkick w o brtaded to jars part 40w CO99rwt Doerwrts The Ganes!CowdUfOw preride that bidding riqutrtmewa swcA w ed+w*4wwm wt or un*Wew Ito bid IxAv c&w w Deddwx.sompk/~and Jw Contractor's bid arc nor port of die Cowsw Degawana wdaw alwt+wv"d m dice dareespA Tbag Awdd M hllatd Aav ewiy(r wtewded to be pan of t"COM POCt Daat MWL) This Agrsemem is entered iotio as of dke day sad year fast whim above and is executed in at least thmo original copies of which one is to be ddiraad to the Coatraetor,ono to the Amhhwt for use in the admittisOndon of the Contract,and the ramainder to the Oww. OWNER CONTRACTOR-Tyr House Comchticbon.Inc. (Printsd nano Ord tide) (Prftkd ws+las and d*) t A 1 OOG DOUT AlaI.OwMiMCQMTtARTOa AdRpMQ�T•Tw><c►Tf eUMM.AA-COPYaiOW IN7.TM AAWLIC M WSTM rlM Or AsC1iMMM 1733 WW YOrt1[wYLM K M.,rr TON.O.0 1Mal.I�q MAt1RA 11d1MrM l Mf�y w1Yr Y!.M11 1rM rt i,MJrI r IyA �TW A�wrr+rr susaM.tWf'l��+!""'�!r•r wwtr I I1fNM7!!�w N A���"�N�wlrlw�I VfIR Electronic Document Service A101-1937 6