ORANGE COUNTY
BOARD OF COMMISSIONERS
Action Agenda
Item No.v-�
ACTION AGENDA ITEM ABSTRACT
Meeting Date: October 2,1995
SUBJECT: CONTRACT APPROVAL; MECHANICAL ENGINEERING SERVICES
DEPARTMENT: PURCHASING AND CENTRAL SERVICES PUBLIC HEARING:YES: NO:XX
ATTACHMENT(S): INFORMATION CONTACT:
PAM JONES, ext.2650
Proposal
Telephone Number-
Hillsborough 732-8181
Chapel Hill 967-9251
Mebane 227-2031
Durham 688-7331
PURPOSE: To consider authorizing the use of services of Gary Merritt, PE to prepare technical specifications
and drawings with which to bid two projects.
BACKGROUND: The design work to be performed by Gary Merritt will encompass the following scope of work:
• Animal Shelter drain system: The drains in the older portion of the Animal Shelter continue to require
significant maintenance due to frequent stoppage. As the Board may recall,the new section of the
Shelter, constructed in 1988, utilized raised floors of the kennels with a flush drainage system. This
number of service calls for this section of the Shelter is minimal. It is anticipated that the design will
incorporate this concept into the modifications for the older section. Funds are available in the current
Capital Improvements Program (CIP)to support this project(appro)(imately$55,000).
• Replacement water lines at Northern Human Services Building,Cedar Grove: The water supply for
this building has a high metal content,which is believed to be derived from the copper pipes supplying
water to the building. The scope of work for this project includes removing the copper and replacing
all water piping with PVC as well as installing water supply holding tanks in the building. The
installation of the holding tanks will eliminate the need to utilize the existing water tower as a source
for potable water. The water tower, however, will continue to be available for use by the fire
department. Funds are available in the current CIP to support this project(approximately$20,000).
Merritt has proposed a cost of$10,500 to design and prepare drawings and technical specifications for both
projects. This represents approximately 12%of construction costs and is in line with standard engineering fees
for projects of this size.
RECOMMENDATION: The Manager recommends that the Board authorize the use of services of Gary Merritt,
PE for the sum of$10,500;and authorize the Purchasing Director to execute the appropriate paperwork.
l
REQUEST FOR PROPOSAL 2
ENGINEERING WORK TO BE DONE AT ANIMAL SHELTER, CHAPEL HILL
AND
AT THE NORTHERN HUMAN SERVICES CENTER CEDAR GROVE.
Orange County seeks a single proposal for provision of design services for projects at two sites
owned by the County. The design services shall be provided by a professional engineer or
engineering firm with expertise in the field of plumbing and mechanical design and construction.
The two project sites requiring design services are a) the Orange County Animal Shelter which is
located within the Chapel Hill Public Works compound on Airport Road/NC Hwy. 86 in Chapel
Hill; and b) the Orange County Northern Human Services Center which is located on NC Hwy.
86, approximately ten miles north of Hillsborough.
ANIMAL SHELTER
The Animal Shelter is a single story slab on grade concrete block building which has been
expanded in two phases over the years. The facility contains office and meeting space, storage,
rooms with small animal (cat) cages, kennel areas, etc. Most of the floor space area within the
shelter is used for the kennels. This area consists of a number of individual dog pens, each with
an interior and exterior component. The pens are separated on the sides by either a concrete
block wall or chain link fencing. The interior and exterior components of the cages are separated
by a concrete block wall containing an opening which may be covered by a drop sliding metal
panel or door. All pens are fronted by interior aisles. The interior and exterior component of
each pen contains floor drains which discharge through a drain piping network into the sanitary
sewer system. In the older sections of the building, the pen floor drains were designed to collect
and remove floor wash water and storm water. In the newer section of the building, the pen floor
drains are used not only to collect wash and storm water, but as a receptacle for disposal of fecal
material, hair, straw and other solid waste during the cage cleaning process.
The Shelter has two problems, one of which is generating public complaints and the other of
which is causing operating difficulties and hardships on shelter staff. Kennel floor drains in the
older section of shelter require frequent plumbing service as they tend to become clogged with
solid waste. In addition, kennel staff have become accustomed to flushing solid waste directly
into the floor drains during cleaning operations in the newer kennel areas and wish to be able to
clean the older cages in a similar manner. The problem generating public complaints stems from
the washing out of the animal cages in animal control vehicles. Although animal control officers
remove and dispose of most solid prior to the vehicle wash down, some solid material and all
wash water streams down a concrete and asphalt drive, crosses a service road and ponds in the
gravel parking area of the adjacent solid waste convenience center. The ponding of water is
objectionable to convenience center operators and patrons.
The proposed solution to the Animal Shelter problems requires retrofitting the drainage systems.
The solution to the animal control vehicle wash water problem consists of intercepting the water
by means of installing less than thirty feet of cast iron grated precast polymer-concrete trench
drain across the existing asphalt and concrete driveway. Installation of approximately thirty feet
of small diameter drain pipe (and possibly a junction box) will be sufficient to connect the trench
drain to an existing storm sewer.
The solution to the floor drain problem, which is significantly more complex, involves a retrofit
installation of approximately 40 floor drains and associated drain piping. The new floor drains
and drain piping were configured and sized to provide for the removal of wash water, storm water
and solid wastes without stoppages. Installing the new system of floor drains and piping will
require: a) demolishing and replacing sections of the existing concrete floor slab as required to
3
disconnect drain lines form the existing floor drains at the drain header, b) constructing raised
concrete floor slabs in the interior and exterior portion of each pen as necessary to install new
floor drains, traps and piping; c) relocating (raising) masonry openings in concrete block walls
between interior and exterior portion of the pens as to compensate for the raised floor slabs; d)
adjusting chain link portions of cages to accommodate raised floor slabs; e) raising water spigots
in each cage as necessary to accommodate raised floor slabs; and f) identifying and making all
necessary modifications, repairs, etc., required to make the new floor drain system function in a
manner consistent with the kennel cleanup procedures practiced at the shelter.
NORTHERN HUMAN SERVICES BUILDING; CEDAR GROVE.
The County's Northern Human Services Center is a forty-five year old building that was initially
designed and utilized as an elementary school. The building has been converted for use by day
care, senior nutrition, recreational and other miscellaneous human services activities which
generate a total water demand of approximately 3000 gallons per day. The building contains
nine restrooms that have single toilets and sinks, two restrooms which contain multiple sinks and
toilets, several water fountains and a large kitchen facility. Potable water is currently supplied to
and throughout the facility by a system which consists of an on-site well, an elevated storage
tank, a chlorinator and an interior water distribution network consisting of wall-mounted or
otherwise exposed copper piping and tubing. The water system is currently experiencing two
problems: 1) the copper levels in water samples drawn from various points in the plumbing
network are in violation of water quality standards; and 2) the interior of the elevated water tank
is in need of painting.
Orange County proposed to address the water system problems at the Northern facility by
a) replacing all copper piping and tubing with PVC/plastic piping and tubing and b) installing an
interior floor mounted storage tank and compressor system to replace the elevated tank. The
elevated tank is to remain in service, however, as a source of water and water storage for local
volunteer fire departments. It will continue to be filled from the existing well, but will be isolated
from the potable water system by a double check valve assembly or other approved backflow
preventer.
SERVICES REQUESTED
Services upon which your proposal will be based include the following:
1. Analysis of preliminary design proposal, developing and recommending more cost
efficient design alternatives where appropriate.
2. Preparation of plans, specifications and bid documents sufficient for all necessary permit
application submissions, construction and construction bidding.
3. Provision of accurate and detailed construction cost estimates.
4. Contract administration including periodic inspection of work in progress, and review and
approval of shop drawings, materials certification, etc.
Plans and specifications for the work at these two sites should be prepared such that the
projects can be bid as either a single or combined project and so that either portion of the project
can be deleted after the bids are taken.
4
COST OF ENGINEERING SERVICES
Your proposal must indicate a lump sum amount for all work cited above. It is understood that
certain costs will be paid upon a reimbursement basis (eg. copies, postage, etc.). Your proposal
must identify those items which are not within the scope of your lump sum cost. If the cost will be
billed on any basis other than actual cost incurred the basis for billing must be cited as well. It
will expedite the evaluation process greatly if you will use the form of proposal included in this
information packet.
PROJECT TIME TABLE
We anticipate that the Board of Commissioners will award the contract for engineering work on
this project on October 2, with Notice to Proceed issued by October 6. Time is of the essence to
get the project out to bid, particularly the Northern Human Services Building-component. Please
include in your proposal your estimate of when the plans and specs can be ready for
bidding.
RECEIPT OF PROPOSALS/CLARIFICATIONS REQUIRED
Proposals will be received in the office of the Orange County Purchasing Director, 132 East King
Street, Hillsborough, NC until 5:00 p.m. on Wednesday, September 6, 1995. You may also fax
your proposal to (919) 6443001 prior to 5:00 p.m. on September 6, 1995.
Questions relating to the scope of work should be directed to Paul Thames, County Engineer,
extension 2300. Questions regarding other sections of this Request may be directed to Pam
Jones, Director of Purchasing and Central Services.
S
FORM OF PROPOSAL
ENGINEERING SERVICES RE: ORANGE COUNTY NORTHERN HUMAN SERVICES CENTER
AND ORANGE COUNTY ANIMAL SHELTER
DUE BY 5:00 P.M.. SEPTEMBER 6, 1995
DELIVER TO: DfRECTOR OF PURCHASING AND CENTRAL SERVICES
132 LAST K/NG STREET, HILLSSOROUGH, NC; or
Fax to(919) 644-3001
1. Your cast for all work identified in attached request for proposal:
h -
ae#td- _i-1t)•e 14"d'ttg �—`--- -.ooIUo-- dollars)
2. Reimbursables: Please list those items which you will bill on a reibursement basis. Indicate the
rate of reimbursement as well.
LT '8JZ
gIAMAIC, &C
3. Assuming notice to proceed is issued September 21, 1995 what is the earliest date plans and
specs can be available to the County forbidding the project. y/,&41L�e2 8y_ I qqs —