HomeMy WebLinkAboutAgenda - 03-06-2008-11bSn~Forma-F-i or, ~~'~m
i!~ THE UNIVERSITY
I1 of NORTH CAROLINA
..,,,, aE CHAPEL HILL
February 19, 2008
ENERGY SERVICES
DEPARTMENT
gzs BRANCH STREET
CAMPUS BOX x855
CHAPEL HILL, NC z7599-x855
RAXMOND E. DUBOSE
Director
P gx9.g66.4xoo .
P 9xg.843.73z8
Ray.DuBose (a~ energy.unc, edu
Ms. Gwendolyn Harvey ,
Assistant County Manager '
Orange County.
Post Office Box 8181
Hillsborough, North Carolina 27278
SUBJECT: The University of North Carolina at Chapel Hill. Memorandum of
Understanding with Orange County RE: Landfill Gas Recovery Feasibility Study
Dear Gwen:
' Transmitted herewith for your use, information and distribution to the Orange County
' ~ Board of Commissioners is a status report for the subject study. Please do not hesitate
to contact me.with any questions. '
Sincerely,
Raymond E. DuBose, P.E.
Director, Energy Services
cc: Carolyn Elfland
Philip Barner
John Masson
~° ~<
~~
~: at ~~
~n~~.
~~ ~.
Landfill Gas Investigation
Monthly Report
February 11, 2008
Produced By:
>wa~ Engineers
1414 Raleigh Road, Suite 305
Chapel Hill, North Carolina
(919)419-9802 (Fax 419-9803)
~t*~'B~ ~ tOOi
i
4
rri< 6aca~;+
Table of Contents
Meeting Notes 1/17/2008 ...........................................................................................................3-4
Meeting Notes 2/4/2008 .............................................................................................................5-6
landfill Gas Sample Plan ..............................:...............................................................................7
Options Site Plan ............:................................:........................................................:...................8
t Affiliated.
Engineers
~-ffiti~d
~~i~e~r~
1414 Raleigh Road, Suite 305
Chapel Hill, North Carolina
(919) 419-9802 (Fax 419-9803)
UNC -Alternative Energy Analysis Landfill Gas Investigation
Project
University of North Carolina- Chapel Hill
Owner
Project Kick-off Meeting ,
Type of Meeling
fVleeting Notes
08029-00
Project No.
01 /17/2008
Meeting Date
Page 1 of 2 jas
Page Typist
Present/Representi ng:
Gwen Harvey
Gayle Wilson
Paul Spire
Michael Meagher
Bob Sallach
John Masson
Ray DuBose
Phil Garner
Matt Lamb
Jerry Schuett
Orange County
Orange County
Orange County
Orange County
Olver, Inc.
UNC-CH Facilities Planning
UNC-CH Energy Services
UNC-CH Energy Services
Richardson Smith Gardner
Affiliated Engineers
gharvey a(~co.orange.nc.us
awilson@co.oranae.nc.us
ospireC7a.co.oranae.nc.us
mmeagher ~co.oranae.nc.us
rsallach .olver.com
JmassonCa~fac. unc.edu
ray.duboseCa~energy.unc.edu
philip.barner .eneray.unc.edu
matt .rsgengineers.com
jschuettCa~aeieng.com
The meeting was held at UNC-CH to discuss the start of the landfill gas analysis effort and review the 90 day
schedule. The following items were discussed:
1. Introductions for all the team members and their roles were discussed. The following .was
established:
a. John Masson will be the primary contact and project manager for UNC.
b. Mike Meagher will be the prime contact for .technical information and site visits required at
the landfill. The team can correspond directly with Mike, but should copy Gayle and Bob
Sallach on all requests for information.
2. The initial feasibility study includes taking samples at the landfill for gas quality and presence of
contaminants. These samples will be taken in the next few weeks and lab analysis will follow.
3. RSG will be using landfill records to develop the gas quantity estimates. Standard EPA modeling
will be used.
a. Olver, Inc. has prepared some very preliminary numbers for estimated gas available. These
preliminary estimates to be sent to RSG for review.
b. Orange County to provide landfill records for RSG use.
4. The leachate is currently pumped and hauled form the site. Orange County is in the process of
installing a system that has a direct connection to OWASA sewer. The equipment will be located
on the south side.
a. It would be desirable to bring all gas to a central location for clean-up.
~-~fi[it+ed
~Et~in
1414 Raleigh Road, Suite 305
Ghapel Hill, North Carolina
(919) 419-9802 (Fax 419-9803)
Meeting (dotes
UNC -Alternative Energy Analysis landfill Gas Investigation
Project
University of North Carolina- Chapel Hill
Owner
Project Kick-off Meeting
Type of Meeting
08029-00
Project No.
01 /17/2008
Meeting Date
Page 2 of 2 ias
Page Typist
b. The new landfll "clean-up" system required for this project should be able to use this same
discharge connection. Based on that, it would make sense to have this equipment on the
south side.
5. Orange County wotald prefer that a shielded, enclosed flare be used and included in the analysis.
Although this is a more expensive option, it provides a shielded flame that is not visible from remote
locations.
6. The three options under consideration were reviewed. The three options are:
a. Power only at Duke Energy Substation site on Homestead
b. CHP (Combined Heat and Power) at Carolina North site
c. Gas use (TBD) at existing Cogen site
7. The pipe routing form the landfill to Carolina North or the Cogen Plant was discussed. AEI noted
that the railroad corridor is the most direct route for any of the options, but dialog with the railroad
needs to take place to confirm the possibility and restrictions. UNC to investigate the potential of
these discussions.
8. Orange County to provide current electrical rates and available capacity for service at the landfill.
Orange County noted they had 3-phase service available at the planned leachate treatment pond.
9. The ownership and operation of the flare system was discussed. Although it is planned that the
flare would only be used in events where all the gas can not be consumed, it seemed to make most
sense for Orange County to have control of flare operation.
10. It was noted that cost for capping/closure of the South landfill would need to be incurred. This
closure is currently planned for 2012.
11. The next meeting is scheduled for February 4th at 1:30 pm.
These minutes represent our best understanding of the discussions held and, decisions reached at the
meeting. Please advise the writer of any errors or omissions of substance.
Affiliated Engineers
Jerry A. Schuett, P.E.
Principal/Project Manger
iti~lte
1414 Raleigh Road, Suite 305
Chapel Hill, North Carolina
(919) 419-9802 (Fax 419-9803)
IVleeting Notes
UNC -Alternative Energy Analysis Landfill Gas Investigation
Project
University of North Carolina- Chapel Hill
Owner
Progress Review Meeting
Type of Meeting
08029-00
Project No.
02/04/2008
Meeting Date
Page 1 of 2 jas
Page Typist
Present/Representing:
Gwen Harvey
Gayle Wilson
Michael Meagher
Bob Sallach
John Masson
Ray DuBose
Phil Barner
Matt Lamb (Partial via phone)
Jerry Schuett
Orange County
Orange County
Orange County
Olver, Inc.
UNC-CH Facilities Planning
UNC-CH Energy Services
UNC-CH Energy Services
Richardson Smith Gardner
Affiliated Engineers
gharvey~co.oranae.nc.us
gwilson(a~co.orange.nc.us
mmeagherCa~co.orange.nc.us
rsallach~olver.com
Jmasson@fac.unc.edu
ray.dubose .energy.unc.edu
philip.barner aC~energy.unc.edu
matt(c~rsgengineers.com
ischuettCa7aeieng.com
The meeting was held at UNC-CH to discuss the progress to date on the landfill gas analysis effort. The
following items were discussed:
1. The progress to date includes:
a. Obtaining and reviewing the landfill records.
b. Obtaining gas samples and sending to lab for testing. Results are expected in about 2
weeks. The initial readings indicated methane quantities ranging from 58% to 62%, which is
good. See attached map for graphics and preliminary sampling data.
c. Gas generation estimates have been started. Using L° = 100 and a collection efficiency of
85% for the North site and 75% for the South site, there is approximately 420 CFM of gas
available at the peak in 2011 to 2012. This quantity will remain above 310 CFM for at least
10 years and should be able to produce between 0.75 and 1.0 Megawatt of power.
d. Preliminary pipe sizing and equipment selection/pricing for Prime Movers has begun.
e. Current electrical and gas demands at Carolina North (existing Facilities Services buildings)
have been quantified and season usage curves have been developed.
2. Based on the preliminary data, it is estimated an 8" to 12" gas main will be required from the landfill
site to the point of use at UNC. Routing paths and costs are being investigated.
3. Based on the preliminary gas estimates and current loads at Carolina North, it appears that a power
generation capacity of 0.75 Megawatts should be considered. There is sufficient load to utilize
approximately 80% of the potential power generation (750 Kw) available in Year 1 (likely 2010), with
this growing to 100% by Year 5 (2015) as new buildings develop at Carolina North.
Atfitied
IEn~inr~
1414 Raleigh Road, Suite 305
Chapel Hill, North Carolina
(919) 419-9802 (Fax 419-9803)
UNC -Alternative Energy Analysis Landfill Gas Investigation
Project
University of North Carolina- Chapel Hill
Owner
Progress Review Meeting
Type of Meeting
Meeting Notes
08029-00
Project No.
02/04/2008
Meeting Date
Page 2 of 2 las
Page Typist
4. UNC will set up a meeting with the Cogen personnel to discuss use of the landfill gas at the Cogen
site. Although this has the longest pipe run, it is a location where the LFG can be fully utilized
immediately to offset coal consumption in the boilers.
5'. RSG will investigate other sources of income for the project. The following were discussed:
a. Grants- REPI program (Renewable Energy production Incentive). This is a federal program
that may possibly offer some grant money for the project.
b. Golden Leaf Foundation -not likely as this is typically tied to job creation.
c. It was decided that a special appropriation from the State Legislature is not likely for this
project, based on UNC's experience with the 01NASA reclaimed water system.
6. The final Agreement was discussed in general. It was decided that the Agreement would need to
define the following items:
a. Ownership and operation of equipment at landfill site (Flare, clean-up equipment,
compressors, etc.)
b. Access and easements at landfill site
c. Who is responsible for purchase and installation of the gas collection and flare system at the
landfill?
d. Permitting responsibilities
e. Timeline for implementation
f. Who retains carbon credits and how are they valued?
7. The next meeting is scheduled for February 21st at 10:30 am.
These minutes represent our best understanding of the discussions held and decisions reached at the
meeting. Please advise the writer of any errors or omissions of substance.
Affiliated Engineers
Jerry A. Schuett, P.E.
Principal/Project Manger
c
'o
o.
a
m
m
.N
a~
a
c~
U
C
O
C
N
O
U
0 x h
~ e ~ n ~ y ^n a o a o a F
O 7 x6 7 x~ v a~ ~~ 7 xC ~_x: x~
O °a b`,a °$ mod v; x,%y~@ s x%. p°t %~ .. ~°o%
N d sr$ggg ~~ fl e~c'~yy~6~gg~ h ?c'gg& g~~~ ~~e$6 ~~ Ez~s Egg ~~ ~?c ~S$~
~ r ~ $~,~E~6~8~~ 4~.. rRstl~~~~ 6~....!3~~~~8$ ti~';.R ~~~ L..iO~m la~ii~~m
to o a ~~~,r:: §~~; r §~a `'-- ~aa'=. ~~~~ ~~~i~,{
LAN®ILL A I