HomeMy WebLinkAboutAgenda - 08-22-1995 - X-C 1
1
ORANGE COUNTY
BOARD OF COMMISSIONERS
Action Agenda
Item No X-C,
ACTION AGENDA ITEM ABSTRACT
Meeting Date: August 22, 1995
SUBJECT: Data Processing Report
-----------------------------------------------------------------------
DEPARTMENT Data Processing PUBLIC HEARING YES NO X
-------------------------------- -------------------------------
ATTACHMENT(S) INFORMATION CONTACT
Report Keith Brooks, ext 2276
TELEPHONE NUMBER
Hillsborough 732-8181
Chapel Hill 968-4501
Mebane 227-2031
Durham 688-7331
-----------------------------------------------------------------------
PURPOSE: To receive a follow-up report on progress in use of
automation by Orange County departments and options/plans for further
computer enhancements.
BACKGROUND: At the June 5, 1995 meeting, the Board of Commissioners
received a report on the County' s automation plans. At that meeting,
and during budget work sessions later in June, the Board asked staff to
consult with an outside, third party to provide a review of the
County' s plans. Staff and Commissioner Willhoit met in late June with
staff from the UNC Data Processing Department. The attached report
summarizes the outcomes of that discussion and lays out the staff' s
plans in the next few months to proceed with various steps of the
automation plan.
RECOMMENDATION: The Manager recommends that the Board receive the
report as information and provide any additional comments about the
County' s direction in automation improvements.
L
2
M E M O R A N D U M
To Orange County Board of Commissioners
John Link, County Manager
From: Keith Brooks, Data Processing Director
Re Updated Status of Data Processing
Date: August 3, 1995
1. Meeting with UNC staff
In late June, County staff and Commissioner Willhoit met with
staff from UNC's Administrative Data Processing. Attending from
the County in addition to Don Willhoit was Keith Brooks, DP
Manager; Jane Sparks, Systems Analyst; Don Webster, Microcomputer
Specialist; and Rod Visser, Assistant County Manager. Present
from UNC was David Jenkins, Director of Administrative Data
Processing; Joel Dunn, Manager Communications; and David
Laudicina, Systems and Programming Manager. The County provided
the UNC group a copy of the May "Status of Data Processing" report
prior to the meeting.
The UNC group were very knowledgeable of the equipment we are
currently using in the County with the exception of the old
McDonnell Douglas system, and even there, they were familiar with
the "PICK" operating system which it supports. UNC is currently
using IBM RS60001s very similar with the one we are currently
using. They are also supporting a large number of IBM compatible
PCs and their software standard is the MicroSoft Office Suite of
software. UNC also supports several PC LANs running Novell
Netware and connected to the RS60001s.
The UNC group were very supportive of the upgrade path proposed in
the May status report. They consider the RS6000 series a very
reliable, powerful, and flexible system to use as the base for the
County's move into the Client-Server environment. Client-Server
is an environment where the clients (county staff) are using LAN
based PCs connected to a Host server (RS6000) to perform their
daily functions. This configuration provides the desktop
automation tools, such as word processing and spreadsheet, and
access to the County legacy systems, such as General Ledger and
Tax Collections, from the one device located on the workers desk.
3
2. Timeline for RS6000 upgrade
As proposed in the May report and strongly supported by the UNC
group, funding for upgrading the current RS6000 to allow the
migration of all existing mainframe applications to a Client-
Server environment is available in the current 1995-96 DP budget.
This will move the County to a new UNIX based Client-Server
environment which will greatly enhance our connectivity to the PC
LANs, the GIS system, the E911 system and outside agencies.
The final payment to IBM for the current lease/purchase will be
August 1995. IBM has priced two upgrades for the existing 530H as
outlined below:
1. Upgrade Model 530H to a Model 580H
Double memory size to 64 Meg.
Add second 2GB disk
Cost for this upgrade $30,836
This doubles the internal speed of the processor, doubles
the memory size and doubles the disk size.
2 . Upgrade Model 530H to a Model 590H
Quadruple memory size to 128 Meg
Add second 2GB disk
Cost for this upgrade $45,876
This quadruples the internal speed of the processor and the
memory size and doubles the disk size.
The bid process should reduce this cost and if we look at used
equipment we may be looking at a fifty percent discount.
Either option above is possible within the existing DP budget,
possibly as a direct purchase or as a multiyear lease/purchase.
If we release the bid specifications for the RS6000 upgrade by
September 1st we should be able to have the new upgraded RS6000
installed by November 1995. We estimate approximately three
months for the conversion from the McDonnell Douglas to the new
system. We should be up and running totally on the RS6000 by
March 1996.
4
3. Timeline for- PC and network upgrades
We currently have seven PC LANs: MCI (Whitted) , Child Support
(ACTS) , EDC/Elections, Public Works, Budget/Personnel, Register of
Deeds Optical, and E-Mail.
Funded in the 1995-96 budget is a network for the Carr building
which includes Planning, Environmental Health, Animal Control,
Soil Conservation and Cooperative Extension and a network for EMS.
We are also planning to move the original County equipment used by
the Child Support network, and replaced by ACTS, to Northside for
use by DSS and JOCCA. The Aging Department is expecting funding
from the Friends to allow the installation of a network at the
Chapel Hill Senior Center. The Sheriff's system is being moved to
the new PC LAN based VISIONS software as funded in the current
budget. This will give us a total of twelve networks by June
1996.
We also have funding of sixty thousand dollars ($60, 000) for PC
hardware and software replacements in the 1995-96 budget. This
will allow a partial movement to the new County software standards
(Windows and Microsoft Office) . The additional required funds to
complete the move to the new software and hardware standards are
in the 1996-2000 CIP.
4. Staff training
PC software training funds of twenty thousand dollars ($20,000)
are included in the Employee Development account in Personnel 's
1995-96 budget. We also have five thousand dollars ($5, 000) in
the current year CIP for DP staff training for PC type software.
This formal training will greatly enhance the DP staff's ability
to provide quality support to our growing base of PC users and
networks. This will also allow for training in developing PC
applications by existing DP staff.
Based on a department by department needs assessment study, just
completed, additional funds will be required for training. A
majority of County employees consider themselves to be new PC
users, or have limited experience with PC's, and even those users
who have extensive experience with computers have had no
experience with Windows. These additional training needs will be
addressed in the next CIP and/or through creative amendments to
the current budget.
To address immediate computer training needs, Personnel has
contracted with New Horizons Computer Learning Center to provide
Microsoft windows-based training for 96 users (one application per
user) in September. New Horizons provided a similar training
package to County employees in April, 1995, and it was well
received by all who attended. Personnel, Data Processing and
Human Service Department representatives are currently developing
a training plan (based on the needs assessment) which would
s
provide all PC users with necessary training on the County's
standard software applications including network training. Under
this plan, Personnel will schedule and coordinate training using
both DP staff and outside vendors such as New Horizons to conduct
the training. Personnel plans to bring to the Board (at one of
the September meetings) a contract for computer training services
which will be necessary to begin carrying through with this plan.
As mentioned above, funds have been set aside in the 1995-96
budget for this computer training.