Loading...
HomeMy WebLinkAboutAgenda - 08-03-1995 - VIII-I e f 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: August 3, 1995 Action Agenda Item SUBJECT: Meadow Ridge - Preliminary Plan ACTION BY: September 17, 1995 DEPARTMENT: Planning PUBLIC HEARING Yes 8 No ATTACHMENT(S) : INFORMATION CONTACT: Eddie Kirk Extension 2582 Resolution of Approval Application Vicinity Map TELEPHONE NUMBERS: Cluster Narrative Hillsborough - 732-8181 Fiscal Impact Analysis Durham - 688-7331 Preliminary Plan Mebane - 227-2031 7/17/95 Draft Planning Board Minutes Chapel Hill - 967-9251 PURPOSE: To consider the Preliminary Plan for Meadow Ridge. BACKGROUND: The property is located on the south side of New Hope Church Road (SR 1723) west of Interstate 40 in Chapel Hill Township. It is zoned Rural Buffer and designated Rural Buffer in the Land Use Element of the Comprehensive Plan for Orange County. The property is wooded with large acreage lots to the south and residential development to the west and east. The tract is 26.02 acres in size with thirteen (13) new residential lots proposed. Individual wells and septic tanks are proposed to serve the new lots: Access to the lots will be provided by Woodlot Ridge and Spring House Lane which are proposed public roads. Spring House Lane will extend south off New Hope Church Road (SR 1723) and Woodlot Ridge will extend off Spring House Lane. Lots range in size from 1.00 acre to 1. 67 acres with two areas of open space proposed. One area of open space is 6.51 acres and the other area is 3.30 acres. A drainage area with an intermittent stream runs through the common area. 2 The Planning Board approved the Concept Plan for Meadowridge Park on March 20, 1995. The applicant changed the name of the subdivision from Meadowridge Park to Meadow Ridge. On July 17, 1995, the Planning Board unanimously approved the Preliminary Plan for Meadow Ridge per the attached Resolution of Approval. RECOMMENDATION: The Administration recommends approval of the Preliminary Plan for Meadow Ridge per the attached Resolution of Approval. 3 RESOLUTION OF THE ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS Date August 3. 1995 Name of Subdivision Meadow Ridge Owner/Applicant Mark Hance The Board of County Commissioners hereby approves Meadow Ridge Subdivision Preliminary Plat, dated May 30, 1995 and containing 13 lots in Orange County, subject to the fulfillment of requirements specified herein. Woodlot Ridge and Spring House Lane shall be irrevocably dedicated to the general public and be constructed to standards of the North Carolina Department of Transportation. The approval of this resolution authorizes and directs the Orange County Manager to accept for Orange County and on behalf of the public generally, the offer of dedication of Woodlot Ridge and Spring House Lane. This acceptance by Orange County of the dedication to the general public of Woodlot Ridge and Spring House Lane shall be without maintenance responsibility. These roads shall be maintained by the owner/applicants until such time as they are accepted for maintenance by the North Carolina Department of Transportation or some other governmental body. Before the Final Plat of Meadow Ridge can be recorded: A. Sewage Disposal 1. Each residential lot shall contain an adequate area for septic disposal, and repair area, approved by the Orange County Division of Environmental Health. 2. The septic system location may restrict the size and location of improvements. This disclosure shall be included in a document describing development restrictions to be recorded concurrently with the Final Plat. The document shall also disclose that information regarding the tentative location of septic systems is available from the Orange County Health Department, Division of Environmental Health. B. Roads and Access 1. Woodlot Ridge and Spring House Lane shall be constructed to standards of the North Carolina Department of Transportation, within a 50-foot right-of-way, and the construction shall be inspected and approved by NCDOT. OR 4 A letter of credit, escrow agreement, or bond shall be submitted to secure construction of Woodlot Ridge and Spring House Lane to the standards of the North Carolina Department of Transportation. An estimate of the construction cost must be prepared by a certified/licensed engineer or grading contractor and submitted to the Planning and Inspections Department. The financial guarantee must reflect 110% of that estimate and be issued by an accredited financial institution licensed to do business in North Carolina. The document describing development restrictions to be recorded with the Final Plat shall state that the financial guarantee will not be released until the road construction has been inspected and approved by NCDOT. 2. Submit an erosion control plan for construction of the road. 3. A sight triangle to NCDOT standards shall be shown at the intersection of New Hope Church Road and Woodlot Ridge, and Spring House Lane and Woodlot Ridge. 4. An approved street name sign shall be erected at the intersection of streets as required in Section IV-B-3-c-12 of the Orange County Subdivision Regulations. Evidence shall be submitted by the applicant that signs are in place or a copy of the receipt for purchase of the signs shall be submitted to the Planning Department. 5. All lots shall receive access from Woodlot Ridge or Spring House Lane. C. Land Use Buffers and Landscaping 1. Landscaping shall be installed or preserved as indicated on the approved landscape plan, and must be inspected and approved by the Planning and Inspections Department. OR Guaranteed financially through a letter of credit, escrow agreement, or bond submitted to secure required landscape installation and preservation. An estimate of the cost for required preservation, plantings and their installation must be provided. The financial guarantee shall reflect 110 percent of the estimate and be issued by an accredited financial institution licensed to do business in North Carolina. 2. Provisions for protection of existing trees as shown on the approved landscape plan shall be included in a document describing development restrictions and requirements to be prepared by Planning Staff and recorded concurrently with the Final Plat. 5 D. Drainage 1. A 30 foot drainage easement shall be provided through parcels A, B and lot 11 as required by the Orange County Erosion Control Officer. E. Parkland 1. Cash in the amount of$1,961.00 [($5,279/acre x 13/35 acre)] shall be paid to Orange County as payment in lieu of parkland dedication. 2. The entirety of the open space shown as lots A and B shall be shown on the Final Plat(s) and shall be irrevocably dedicated to the homeowners association for recreation/open space use by residents of the subdivision. F. Miscellaneous 1. The Final Plat shall contain a title block and vicinity map in accordance with Section V-D-2 and V-D-3 of the Orange County Subdivision Regulations. G. Certifications 1. A Certificate of Survey and Accuracy signed by a registered Land Surveyor shall be notarized on the face of the Final Plat. 2. A Certificate of Declaration and Maintenance in the form provided in Section V-D-6-b of the Orange County Subdivision Regulations signed by the landowner and developer shall be on the face of the plat and included in a document describing development restrictions to be recorded concurrently with the Final Plat. 3. The Department of Environmental Health shall certify that all lot residential lots contain sufficient area for septic tank disposal and repair. 4. The North Carolina Department of Transportation shall certify that Woodlot Ridge and Spring House Lane has been constructed to State standards or that construction plans have been approved. 5. A Certificate of Approval signed by the Orange County Planning and Inspections Department. Signature of Applicant Clerk to the Board I, , accept the above listed conditions of subdivision approval, and acknowledge that each must be met prior to recordation of the final plat. 6 Signature of Applicant , I, , accept the above listed conditions of subdivision approval, and acknowledge that each must be met prior to recordation of the final plat. Clerk to the Board tlrt'L/l.H t IUi11 f Vr1 t;t>rLlly111�Ht1 I t'L�-�►l� r+rrnv v r-�� I MAJOR SUBDIVISION 8/93 ORANGE COUNTY 7 ' DATE: 30 PLEASE TYPE OR POINT (INK ONLYI SUI3DIVISION NAME: fs06, y-4 RND(t - LOCATION: N r-, -)N CJ1t�¢c I�r (20AD OWNER/DEVELOPER: _1AAA9-C- 1,.a AxG1t- ADDRESS: DZ CSM`-c O-LLA MX> TELEPHONE NO.: 383-(o1T(p c,1-i/JPLL- AGENT/CONTACT: ET1T Lp,i Scx`•g5. Imo_ TELEPHONE NO.: 7'��(o1(oL A. SUMMARY INFORMATION: Orange County Tax Map L3 Block "' Lot(s) (-P F Township Zoning District(s): Q Total'Number of Acres: Z 3 Phases: I Total Number of Lots: 1_Average Lot Size: 2 •00A.— Minimum Lot Size: 1.00 ize, NumberlType of Structures: (existing) (proposed) Lineal Feat in Streste: 2-00o-1/- Acres in Open Space. Q•81 A,<-- Water Supply, Public (specify) Community Individual Wastewater Disposal: Public (Specify) Community Individual School District: Fire District: . General Land Uses in Area: e e,s QtT-T\,p(, Critical Areas: stream/drainagaways flood prone areas watershed (apseil`Y) historic sites other (explain) Is the property to be subdivided currently under 'form use value taxation'? Yes No.. If "yes", please contact the Orange County Tax Office. Subdivision of the property may,require payment of deferred taxes under "farm use value taxation". S. All plats must be submitted on sheet no smaller than one inch equals two-hundred foot (1" 200') and no larger than one inch equals twenty feet (1'=20') and must contain the followina'information: 4" subdivision name zoning of vast and adjacent. name & address of owners) ' G properties 22.5% name &address of subdivider building setback lines by notation (if other than owner) / or typical lot layout :? name of surveyor, engineer, ✓ location and width of existing and C -� landscape architect or architect, proposed easements (drainage, address. registration 0 and seat utilities, roads, eto.) y ✓ ' (title) Preliminary Plan 2!=, existing, proposed and adjoining �Y..•,•: . scale, north arrow rights-of-way including dimensions ✓ date (including revision does) and street names and stole road 6 w ✓ township.tax map-block-lot numbers. Lineal feat of road 0 w references centerlines and approximate "4 O :t•.,:. ' ;< Parent Parcel Identification >M acreage of new street rights-of- -0 7 L`".•�$ deed book and page *of property , way +� 4+ to be subdivided a=1-`A existing and proposed utilities, E 4 boundary described yvhh bearings including type, sisas. hydrants, and distances valves, menholas total acreage of the tract and existing and proposed curbs, acreage of lots, including and gutters and culverts, including excluding area within tights-of- 1 sizes and grades r way v location and width of alloys. v N ✓ control corner sidewalks, bike Ienss, transit systems, and bus stop* (please complete reverse side) propoevc 'cc i1nef wftm dimensions V lot & block numoorit intersection details inciudino phasing lines design and width of Iravolway and >, topography at Ion foot (10) shoulders intervals horizontal alignment and general 0 ✓ wsl*F bodies, streams, floodway curve data {public roads) 0 and floodplains centerfine radius on all proposed Z AH stream buffers streets location and size of parcels permanent features such as do, ited for public use, buildings, cemeteries, historic roe ions[ use or reserved in landmarks cc-, :n, with purpose noted adjoining lot layout names of lrripo;-.,ious surface data (if located adjoining property owners. If in water supply watershed) subdivided, subdivision olat name, Q vicinity map showing general plat book & page number, and M location of subdivision with street* perimeter lot numbers. and roads identified by State road location and size of lots of number and name reitricied development potential W -14 cu landscaping and buffer and notation on plot regarding requirements same township, corporate and extra- stormwater detention and/or territorial planning jurisdiction lines retention aites and undisturbed which cross the property areas for infiltration purposes (if located in water supply watershed) C. OTHER SUBMITTAL REQUIREMENTS 1 Twenty-five (25) copi"of the preliminary plat. 2. One full Size copy of an Orange County Tax map (with tax parcels involved clearly marked in pencil). 3. More municipal or OWASA sewer is not available, a copy of the Preliminary Plot indicating Health Department soils analysis approval/denial for each lot shown thereon. 4. Where a private road is proposed a written statement by the applicant or his/her authorized representative which sets forth the justification for a privets road (see, Section IV•8-3-d-I of the Orange County Subdivision Regulations), 5. Auxiliary documerlia, in draft form, prepared in accordance with Section• 1,of,this Ordinance which "Ourit completion and/or maintenance of improvements required by this Ordinance. Such documents may include, but not be limited to, a private road maintenance itt.-fa-_rnent, and articles of incorporation and restrictive covenants pertaining to a homeowner's "acciation. These documents may be required as necessary as evidence that the ordinance requirements are being met. 0. Fes - $350.00 Plus 45.00 per lot (1 fee for preliminary and final plat). 7. If the subdivision contains 10 lots or more the following informartion shell be submitted with the application: • a. Number of Viters to buildout. b. Number of houses to be built during each year to buildout. C. Aversas price of houses including iota for each year to buildout. 1, the oopheqnt, hereby certify that the foregoing application in complolts and accurate. APPU 'S SIGNATURE OWNER'S SIGNATURE DA I)t ' DATt FEES: Amount- Date Paid Receipt 0 A - - - - -- - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - J Meadow Ridge Applicant: Mark Hance 9 Zone: Rural Buffer ° LUP: Rural Buffer N ti C _ W �WI 6A 2030 /� ----- ' 3B I 1 3.22 A , 6 i 6E 663 .44 - A ' � 30" ASE WENT / % 11 3469 61. 3 9 A C 0. ; �. I 1.67AC, �1`L' 3as P 240 A p 8200 L s 3 1 I .18� I1 7162 s 20.-p,. /6 ,J AC. 4A i k 10.01 AC. 40 ti 525 raj /,3�e I F c $ 6.77AC z : 6C 68 68 4 > 1782 N 7788 \ IJ 0 1 .4687 N a 0 4.68 AC. 0642 2qO / 10- 01 AC. 8 3.02 AC. 3 z' A 135.78 IL. %43.24 a 1 2B • 1223 ss9. 75 AC. 66ti• 28 �. K �_ 5053 �✓ FREE ? 4. 89AC. J 27 l D2C ,4547 \oJ 25-27 m .12 AC 448 8.74AC t 5.15 AC. )0 I `5,e� 0 // 8188 8 ,,2A � �_ 22.19AC. 2 78 8 10 FINDINGS OF THE ORANGE COUNTY PLANNING AND INSPECTIONS DEPARTMENT PERTAINING TO MEADOW RIDGE SUBDIVISION CRrrERIA FIND IV-B-10-b Application Criteria a) The tract is a minimum of 400,000 a) The property is 28.37 acres or square feet for the AR and RB districts. 1,235,797 square feet in size, 835,797 200,000 square feet for the R-1 district square feet larger than the minimum and 80,000 square feet for all other required. districts. b) Approved water supply and wastewater b) As approved by the Orange County treatment systems are available and Division of Environmental Health, each each lot is served by separate water lot will have an individual well and supply and sewerage connections. septic system. c) The total number of lots proposed for c) 28.37 acres gross land area the tract, excluding parcels of reserved -2.32 acres in right-of-way recreation/open space, is not greater ----- than the number determined by dividing 26.05 acres net land area the gross land area, excluding public road rights-of-way, by the minimum lot 26.05 size requirements for the zoning district 2 acres = 13 lots maximum established in the Orange County Zoning Ordinance. 13 lots proposed d) The recreation/open space reserved d) See comments that follow. within the tract conforms with the recreation and open space standards established in Section IV-B-7-b. IV-B-7-b 2. Dimensional Requirements If the application of the provisions The acreage provided for of Article 5.1.1 (Required recreation/open space is 9.81 acres, Minimum Recreation Space Ratio) which exceeds the amount required by and Article 6.12 (Land Use the Zoning Ordinance (.79 acre) and by Intensity System) of the Orange the Subdivision Regulations (0.3 acre). County Zoning Ordinance results in a greater amount of land, then the difference between the application of the standards above and those of Article 5.1.1 and Article 6.12 shall be established as private recreation for the use of the residents of the development. 11 I Site Suitability Land provided or dedicated for passive recreation and open space purposes shall be of a character, slope and location suitable for use for walking, jogging, reading and similar quiet activities, and the preservation of natural features and cultural resources such as steep slopes, rock outcrops, native plant life and wildlife cover, mature woodlands and water resources. Criteria for evaluating the suitability of proposed recreation areas shall include but not be limited to the following: a. Location. Land dedicated for a. The open space as shown preserves a recreation purposes shall be natural wooded area and intermittent located so as to serve the needs stream through lot B. Lot A has an of the residents of the open area where land is more suited for subdivision and the residents of recreational purposes due to level the immediate neighborhood slopes and dry soil conditions. Both within which the subdivision is recreation areas have over 200 feet of located. Recreation areas shall frontage on Spring House Lane. be located so as to provide insofar as possible, reasonable accessibility to all residents of the subdivision and residents living in the immediate neighborhood. Recreation areas shall be located where land more suited for recreational purposes due to shape, level slopes and/or dry soil conditions is present. Where proposed park sites are shown on the adopted Land Use Plan, and a subdivision contains a portion of the park site, then the recreation area may be located at the edge of the subdivision so that additional land may be added as adjacent land is subdivided. 12 b. JLai y. Land dedicated for b. The acreage designated for recreation purposes shall be a recreation/open space is divided by the single parcel except where it is proposed road; however, both parts determined that two (2) or more will be owned by the Homeowners parcels are suited to the needs Association. of a particular subdivision. The Planning Board may recommend, and the Board of Commissioners may require, the dedication of a connecting path in addition to the land required in Section IV-B-7-b-2 of this ordinance. Where a connecting path is necessary, a path of up to fifty (50) feet in width may be required, but in no case shall the path be less than thirty (30) feet in width. c. Accessibility. Land dedicated c. The recreation/open space has frontage for recreational purposes shall on Spring House Lane. have at least fifty (50) feet of frontage on at least one (1) street within the subdivision. 4. Site Improvements Private recreation facilities, either The recreation/open space is suitable for required or provided at the option passive recreation (walking, nature study of the applicant, shall meet the photography, campfires, etc.) It also standards for improvements: serves as a buffer for the intermittent stream through lot B. Park bench, picnic tables, grills and trash receptacles. In addition, the applicant is required to make a payment of$1,961.00 in lieu of One (1) picnic table per 50 public dedication of recreation/open space residents, 50 sq. ft. of land per which will be used to purchase and/or table. develop parkland for use by the subdivision and neighborhood residents. In addition to land provided or dedicated for active recreation purposes, sufficient area shall be provided to make available a minimum of five (5) off-street parking spaces for the first two (2) acres of each recreation site and one (1) space for each additional acre thereafter. 5. Method of Provision or Dedication 13 A greenway dedication is not required at Land dedicated for public this location. The payment in lieu of land recreation area as required by this dedication will be used to purchase and/or Ordinance shall be designated on develop parkland for use by the both the preliminary and final subdivision and neighborhood residents. plat(s) of the subdivision and must be dedicated to an appropriate unit of local government. e. The minimum amount of land reserved Lot sizes have been reduced a total of 9.8 as recreation/open space shall be the acres. 9.81 acres of recreation/open space sum of all reductions in minimum lot are proposed. area as a result of the cluster form of development and/or the minimum recreation/open space required in Section IV-B-7-b, whichever is greater. IV-B-10-c Reductions in Lot and Setback Requirements For lots created as part of a cluster development minimum lot area, lot width and setback requirements specified in Section 4.1.2 may be reduced as follows: a. Minimum lot area requirements may be a. The minimum residential lot size reduced by fifty percent (50%) but shall proposed is 1.00 acre, a 50% reduction be no smaller than 5000 square feet. of the 2-acre lot size required in the Rural Buffer zoning district. b. Minimum lot width requirements may b. The minimum lot width required is 130 be reduced by twenty percent (20%), feet. Lot widths may be reduced to but shall be no less than fifty (50) feet. 104 feet. Lot width is not applicable on the turning circle of the cul-de-sac. c. Minimum front setback requirements c. Front setbacks may be reduced to 30 may be reduced by twenty-five percent feet. (25%) except where the front lot line forms an exterior boundary of the cluster development. d. Minimum rear and side setback d. With the exception of exterior requirements may be reduced to ten subdivision boundaries, side and rear (10) feet except where the rear or side setbacks may be reduced to 10 feet. lot line forms an exterior boundary of the cluster development. IV-B-10-e Approval of Preliminary 14 Plan a. Individual lots, buildings and streets a. The proposed road will cross the shall be designed and situated to stream at a 90 degree angle. Houses minimize alteration of the natural site will be located away from the stream features to be preserved. and most of the open field. b. The usability of cluster open/recreation b. The open space is suitable for passive space shall be determined by the size, recreation. shape, topographic and location ` requirements specified in Section IV-B- 7-b. c. Cluster open space shall include c. It includes an open field and stream irreplaceable natural features such as, surrounded by a significant stand of but not limited to, streams, significant trees. stands of trees, individual trees of significant size and/or species, uncommon plant communities, wildlife habitats and rock outcroppings. d. Cluster recreation space shall be easily d. The open space is located on each side accessible to pedestrians, including the of the subdivision road where slope handicapped. gradients are accessible for pedestrians. e. The suitability of cluster open space e. The open space preserved is located intended for scenic value shall be specifically to protect the stream and determined by its visibility from provide a buffer. adjoining properties and streets and shall seek to lessen the area devoted to motor vehicle access. L Diversity and originality in lot layout f. The road and lots are located to shall be encouraged to achieve the best minimize disturbance and make the best possible relationship between the land use of soils for sewage disposal. The and the development. open space area on each side of the road provides additional protection the intermittent stream. g. Up to one-fourth of the land with g. There are no slopes greater than 15% slopes greater than fifteen percent on the property. (15%) may be removed or altered only when such slopes are small and isolated and do not otherwise adversely affect the design of the development. 15 h. At least twenty percent of the gross h. 9.81 acres (34%) is designated as land area is designated as common common open space. There are no open space. No more than fifty percent sewage treatment systems, utilities, or (50%) of the required common open other uses which prohibit access by the space shall be used exclusively for residents of the cluster subdivision. sewage treatment systems, utilities, or other uses which prohibit access by the residents of the cluster subdivision. This restriction does not apply to areas of historic or natural significance which may be protected by access restrictions. 15a FISCAL IMPACT ANALYSIS FOR MEADOW RIDGE SUBDIVISION RESIDENTIAL SERVICE STANDARD APPROACH Prepared by The Orange County Planning Department June, 1995 PROJECT DESCRIPTION Meadow Ridge Subdivision is a proposed 13-lot cluster subdivision located in Chapel Hill Township on the south side of New Hope Church Road.The total area of the subdivision is approximately 26 acres, and the current zoning is RB - Rural Buffer. Excluding 9.81 acres of open space to be owned and maintained by a homeowners association, the average lot size is approximately 1.25 acres. All lots will be served by individual wells and septic tanks, and public roads. For Meadow Ridge,project build-out is estimated at three years.Housing units will be constructed, beginning in 1996, with completion of the project scheduled for 1998. Units will consist of detached single-family homes, and the applicant estimates the average sales price to be $350,000 in the first year, including the lot, with an annual increase in price of$30,000 to $35,000. METHODOLOGY Fiscal impact analysis is a projection of the direct, current, public costs and revenues associated with residential and non residential growth in the jurisdiction in which the growth is taking place. Fiscal impact analysis considers only direct impact in that it projects only the primary costs that will be incurred and the immediate revenues that will be generated. It calculates the financial effect of a planned development or new subdivision by considering the current costs and revenues such a development would generate if it were completed and occupied today.Fiscal impact analysis does not consider the private costs of public action. It is concerned only with public (governmental) costs and revenues. The method used in preparing the fiscal impact analysis is the Service Standard Approach. While only gross expenditures by service category are derived from the Per Capita Method,the Service Standard method determines the total number of additional employees by service function that will be required as a result of growth. This method employs average county government costs per person, average school costs per pupil, an employee to population ratio, and average operating expenses per employee for each service category and school district. The number of new employees are projected and multiplied times the average operating expenses(includes personnel,operating and capital costs)per employee. These average costs are then weighed against per capita and per pupil revenues to project the total net fiscal impact of the development. SECTION 6 — SUMMARY OF PROJECTED DEMOGRAPHIC/FISCALIMPACTS 16 YEAR 1996 1997 1998. 1999 2000 HOUSING UNITS 8 13' 13 13 POPULATION 4 18 29.. 29 ::29 SCHOOL CHULDREN Elementary 1. 1 :. . 2'' 2 2 Middle High School 2 '0 TOTAL 1 2 4: 4 4 COUNTY EMPLOYEES 0.0_. 0.1 Q:2.,: 0.2 0.2 SCHOOL EMPLOYEES 0.1"` 0.2 :..:: 0..:3: 0.3 Tax BASE($1000) >< ; 140(I` 2981 5142:: 5291 5445 COUNTY BUDGET(S) Revenues 11938;: 25309 ° :.43499; 44761 46059 Expenditures 4771 9819 16418. :17384. BALANCE ' 67 ? . 15490 27081 27867 28675 SCHOOL DISTRICT BUDGET S Revenues «:. .7407:: 15398 25991::i 26745 ::?`: Expenditures Exp 12261 2Q503: 21097 :::::. ": 21709 BALANCE 1449 3136 %:;:`:5488 5648 :: `- >::::`::>;'. .>5811 COMBINED BUDGETS(S) Revenues 19345:: 40707 :::;69490` 71506 Z35 ...;..:... ;: Expenditures Exp 1Q7 :' 22080 36 .I.': 37991 BALANCE 18627 32570<; 33514 .34486 YEAR - :<>>'<, ;;'`: 2001 2002 ZEI03 2004 2005. HOUSING UNITS ........... POPULATION 29`_ 29 :.: ::: ».;: 29 ::>i:rr;:::::: ::;c:::;:.;::. 29_ SCHOOL CH II.D REN Elementary tart <.>:>:::.::><.>:;;:,..;. 2 2 2 Middle High School T OTAL �:. 4:< COUNTY EMPLOYEES PEES '>>:>42:`: 0.2 .:': ': : ;` `:�: `' SCHOOL EMPLOYEES YEES ................ 0 .3: TAX BAS E 00 0 S 1 ( 57 5932 6104 COUNTY uNTY B uD GET s O v Re e u n es 3 48769 ;.:—.**.-*.­ '` `_'�>> 5183;;; 51639 <<: <;;:;:;;:':.:;` 53136 Expenditures 18407 .:: ....................... 19490,:'`:..:::' ''»`;;>;'20055;. BALANCE 506> 32149 SCHOOL 00 L DI3 TRI CT BUDGET T Revenues g: 29 .:..:.......:. ::::;:;`':2831 ;. 140 `:':::':::::::;::;::'::29985>' 30854 :`: :':<:;:3.:749 Expenditures 22339:; 229 ; 2365 ;; 24339 ; ;:<> ;; < ._;;;25045 BALANCE 6153 :::>::;::;::;;<.:: 6515 ;:;...::... .......6704:' COMBINED INED B UD GET S S Revenues 73. S �..:. 909 :::: >> ? ;: '.$0168: 82493 77 89885: enditures 40227'; 41393 42594: 43829 . 45100: BALANCE 35486: 36515 < >>.;' : '.:37574::: 38664 16a SECTION 7 — SUMMARY OF PROJECTED PUBLIC SCHOOL CAPACITY IMPA(:rS SCHOOL DISTRICT DATA: ENTER 111"IN( ) BESIDE SCHOOL DISTRICT IN WHICH PROJECT IS TO BE LOCATED TO GENERATE STUDENT DISTRIBUTION BY SCHOOL TYPE. School District: School Attendance: Orange.County... Elementary School 50% Middle School 23% Chapel Hill-Carrborn 0 Hi School 27% YEAR 1996 1997 1998 1999 2000 SCHOOL CHILDREN Elementary r;: 1 1 .. 2.: 2 2 Middle 0'; 1 1 _ 1: High School Q 1 1 1 1 TOTAL ...... .. : :.. 1. 2 : 4 4 4 YEAR 2001 2002 2003 2004 2005 SCHOOL CHILDREN Elementary 2.: 2 —::2 2 2 Middle High School .. . ::..:... TOTAL 4 ''4 4 :.: 4.. 4 `: . ..q SCHOOL CAPACITIES-ALL SCHOOLS CURRENT ENROLLMENT -ALL SCHOOLS 2838 Elementary. 2767: Middle 1232 Middle 1290 Hz°h School I518 Hi School 1505 TOTAL 5588 ITOTAL 5562 YEAR 1996 1997 1998 1999 2000 PROJECTED ENROLLMENT *: Elementary 2768.:. 2768 2769 2769 2769 Middle 1290 1291 1291. 1291 :. :: :1291: High School ? :: .1505.. 1506 1506': 1506 ;.. `;:::.' 1506 TOTAL 5564 :::5566. 5566 :::: ': 5566 YEAR 2001 2002 2003 2004 2005 PROJECTED ENROLLMENT Elementary 7 9 ary 2 69 2769:. 276 2769: Middle >:..... :<;:.,:`: 2 ': 1291 1291:: 1291 ::.:: ::::' ::.'::?::::: ,1291 High School .......,:::_ISQ6.: 1506 ;:.`::1506: 1506 °150b. TOTAL ;:::5566:. 5566 SSb6: 5566 ;:`:. >:::..:. . 5566 .� On July 14, 1994, a minor subdivision creating 17 five lots for Habitat for Humanity was approved on a portion of the original lot owned by the applicant. One of the conditions of approval of the Habitat subdivision was that Alpha Drive be improved to NCDOT unpaved public road standards. All of the conditions of approval will be met after final approval of the security agreement for the future construction of Alpha Drive. Unless Alpha Drive has been secured or constructed prior to Preliminary Plan approval for Scarlett Woods Phase 2, the same requirement for approval of Alpha Drive to NCDOT unpaved public road standards would apply. The Planning Staff recommends approval of the Concept Plan for Scarlett Woods Phase 2. b. Preliminary Plans (1) Meadow Ridge ( 13 Lots - Chapel Hill Township) Presentation by Eddie Kirk. The property is located on the south side of New Hope Church Road (SR 1723) west of Interstate 40 in Chapel Hill Township. It is zoned Rural Buffer and designated Rural Buffer in the Land Use Element of the Comprehensive Plan for Orange County. The property is wooded with large acreage lots to the south and residential development to the west and east. The tract is 26.02 acres in size with thirteen ( 13) new residential lots proposed. Individual wells and septic tanks are proposed to serve the new lots. Access to the lots will be provided by Woodlot Ridge and Spring House Lane which are proposed public roads. Woodlot Ridge will extend south off New Hope Church Road (SR 1723) and connect to Spring House Lane. Lots range in size form 1.00 acre to 1.65 acres with two areas of open space proposed. One area of open space is 6.51 acres and the other area is 3.30 acres. A drainage area with an intermittent stream runs through the common area. The Planning Board approved the Concept Plan for Meadowridge Park on March 20, 1995. The applicant changed the name of the subdivision from 0 RN 18 Meadowridge Park to Meadow Ridge. Kirk stated that the surveyor submitted a new plan today which changes the road alignment. This change was due to topo problems. Kirk continued that this change will affect lot size of Lots 3, 8, 10 and 11. Lots 3 and 8 increased slightly in size and Lots 10 and 11 had a slight decrease. Kirk indicated that the Planning Staff is supportive of the change in road alignment. The Planning Staff recommends approval of the Preliminary Plan for Meadow Ridge per the Resolution of Approval (an attachment to these minutes on pages ) . Price noted the odd shape of lot #10 and asked about buildable area. Surveyor, Steve Yuhasz, responded that the house would need to be built reasonably close to the road, but there is sufficient buildable area. Kirk noted that Environmental Health Department has approved each lot for a septic system. Brown asked how the open space is to be dedicated. Kirk responded that the open space will be dedicated to and maintained by the homeowners, association. Brown continued, asking if this type of open space would be considered Type A in the Flexible Development Proposal. Yuhasz responded that the majority of Lot A is an open field and will have use for playground and ball fields. Lot B is wooded and has a drainage through it so it would be more secondary with uses such as nature walks. Brown asked if there were septic easements in the subdivision. The response was no, they are all on-lot. Howie complimented the owner and developer of Meadow Ridge for the amount of open space set aside. MOTION: Katz moved approval as recommended by the Planning Staff. Seconded by Rosemond. VOTE: Unanimous.